CN206539011U - Hang the solid split heads device of template in a kind of new Jiang Ban areas - Google Patents

Hang the solid split heads device of template in a kind of new Jiang Ban areas Download PDF

Info

Publication number
CN206539011U
CN206539011U CN201720090010.8U CN201720090010U CN206539011U CN 206539011 U CN206539011 U CN 206539011U CN 201720090010 U CN201720090010 U CN 201720090010U CN 206539011 U CN206539011 U CN 206539011U
Authority
CN
China
Prior art keywords
template
split heads
bearing rod
hanging
rectangular plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720090010.8U
Other languages
Chinese (zh)
Inventor
张永良
牛化宪
陈前钟
赵海峰
乔元亮
王德才
赵忠杨
董森
邓秀丽
明宪永
张亮
张凤兰
陈宝磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201720090010.8U priority Critical patent/CN206539011U/en
Application granted granted Critical
Publication of CN206539011U publication Critical patent/CN206539011U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

Hang the solid split heads device of template in a kind of new Jiang Ban areas, template is hung including one, the template of hanging is formed by connecting from beginning to end successively by some rectangular plates, some split heads are provided with below template hanging, the split heads includes the supporting part with hanging template clamp, supporting part is connected with a horizontally disposed bearing rod, and in one end of bearing rod provided with one and the vertically disposed vertical bar of bearing rod, one and the vertically arranged horizon bar of bearing rod are provided with the other end of bearing rod.The utility model is simple in construction, reasonable in design, and supporting part is connected using three bar compositions, realization with the clamping of rectangular plate;Split heads and hanging need not be welded between template, need not be welded between rectangular plate, convenient disassembly;Split heads can be processed using the leftover bits and pieces such as reinforcing bar and be formed, low cost but stabilized structure.

Description

Hang the solid split heads device of template in a kind of new Jiang Ban areas
Technical field:
The utility model is related to a kind of new Jiang Ban areas and hangs the solid split heads device of template.
Background technology:
Kitchen and toilet drop plate is widespread practice in residential project, but because plate face rebar ratio is low in work progress, Steel area size is small, and how to ensure the installation quality for hanging template is the key that sheet metal forming quality drops in concrete.In work progress In often borrow and the installation for hang template is welded and fixed or be supported using concrete pad on plate face or beam steel add Gu.This traditional reinforcement means stability is poor, easily rocks, tramples in concreting process, hangs mould displacement and hangs at mould The quality problems such as be uneven.The installation quality for hanging mould how is improved, is to improve concrete formation quality at drop plate, accelerate construction Progress ensures the important means of engineering quality.The plan of solution is had no to this in the prior art.
Utility model content:
The utility model hangs the solid split heads dress of template to make up the deficiencies in the prior art there is provided a kind of new Jiang Ban areas Put, it is simple in construction, reasonable in design, it is not necessary to welded, low cost solves problems of the prior art.
The utility model is to solve the technical scheme that is used of above-mentioned technical problem:
The solid split heads device of template is hung in a kind of new Jiang Ban areas, including one hangs template, and the template of hanging is by some rectangular plates It is formed by connecting from beginning to end successively, some split heads is provided with below template hanging, the split heads includes the supporting part with hanging template clamp, props up Support part is connected with a horizontally disposed bearing rod, and one and the vertically disposed vertical bar of bearing rod are provided with one end of bearing rod, The other end of bearing rod is provided with one and the vertically arranged horizon bar of bearing rod.
It is preferred that, the supporting part includes two and the vertically opposite spaced apart vertical support bar of bearing rod, at two A horizontal support bar is provided between vertical support bar, the rectangular plate is installed between two vertical support bars and and horizontal support Bar, which is abutted, to be set.
It is preferred that, the first bolt hole is respectively equipped with rectangular plate two ends, the both sides up and down in two rectangular plate intersections Fixed plate is respectively equipped with, second be equipped with fixed plate provided with the first bolt hole intersected respectively with two on rectangular plate Bolt hole, is provided with the bolt and nut component of fastening in corresponding the first bolt hole and the second bolt hole.
The utility model uses such scheme, simple in construction, reasonable in design, supporting part using three bars composition, realize with The clamping connection of rectangular plate;Split heads and hanging need not be welded between template, need not be welded, dismantled between rectangular plate It is convenient;Split heads can be processed using the leftover bits and pieces such as reinforcing bar and be formed, low cost but stabilized structure.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of split heads.
In figure, 1, hang template, 2, split heads, 3, bearing rod, 4, vertical bar, 5, horizon bar, 6, vertical support bar, 7, level branch Strut.
Embodiment:
For the technical characterstic for illustrating this programme can be understood, below by embodiment, and its accompanying drawing is combined, to this reality It is described in detail with new.
As shown in Figure 1-2, the solid split heads device of template is hung in a kind of new Jiang Ban areas, including one hangs template 1, described to hang template 1 It is formed by connecting from beginning to end successively by some rectangular plates, some split heads 2 is provided with below template 1 hanging, the split heads 2 is included with hanging mould The supporting part of the clamp of plate 1, supporting part is connected with a horizontally disposed bearing rod 3, and one and bearing rod are provided with one end of bearing rod 3 3 vertically disposed vertical bars 4, one and the vertically arranged horizon bar 5 of bearing rod 3 are provided with the other end of bearing rod 3.Horizon bar 5 For level to positioning, vertical bar 4 is used for the positioning of vertical direction.
The supporting part includes two and the vertically opposite spaced apart vertical support bar 6 of bearing rod 3, in two vertical branch Between strut 6 be provided with a horizontal support bar 7, the rectangular plate be installed between two vertical support bars 6 and with horizontal support bar 7 Abut and set.Supporting part is constituted using three bars, it is simple and reasonable and cheap.
The first bolt hole is respectively equipped with rectangular plate two ends, is respectively equipped with the both sides up and down of two rectangular plate intersections Fixed plate, is provided with fixed plate and intersects the second bolt hole that the first bolt hole on rectangular plate is equipped with two respectively, The bolt and nut component of fastening is provided with corresponding the first bolt hole and the second bolt hole.Make the company between rectangular plate Connect conveniently, and it is easy to disassemble.
Split heads 2 carries out that by the way of welded and installed batch making can be carried out using reinforcing bar leftover bits and pieces, comprises the following steps that:1) Setting-out:Drawing size is checked, with 1:1 ratio full-page proof releases node, checks the size of each several part;2) number material:Check verification material Material, cutting position is drawn on material, dash number is marked;3) cutting stock:Using bar cropper by drawing on material Position carries out bar material processing;4) weld:Material is subjected to assembling full weld;5) mopping:Mopping at soldering opening.
During onsite application, it is divided into following steps:1) arrange:By single split heads alone 2 is according to the strong point of checking computations and sets Meter spacing is fixed;2) reinforcing bar colligation:Scene completes the colligation of beam slab arrangement of reinforcement;3) place and hang template 1:Template 1 will be hung to place In carrying out installation fixation on split heads 2, first rectangular plate can be also fixed on split heads 2 and carry out Assembling.
Above-mentioned embodiment cannot function as the limitation to the utility model protection domain, for the skill of the art For art personnel, any alternate modification or conversion made to the utility model embodiment all fall within guarantor of the present utility model In the range of shield.
Part is not described in detail for the utility model, is the known technology of those skilled in the art of the present technique.

Claims (3)

1. the solid split heads device of template is hung in a kind of new Jiang Ban areas, it is characterised in that:Template is hung including one, the template of hanging is by some Rectangular plate is formed by connecting from beginning to end successively, and some split heads are provided with below template hanging, and the split heads is included with hanging template clamp Supporting part, supporting part is connected with a horizontally disposed bearing rod, vertically disposed with bearing rod provided with one in one end of bearing rod Vertical bar, one and the vertically arranged horizon bar of bearing rod are provided with the other end of bearing rod.
2. the solid split heads device of template is hung in a kind of new Jiang Ban areas according to claim 1, it is characterised in that:The supporting part Including two and the vertically opposite spaced apart vertical support bar of bearing rod, a level branch is provided between two vertical support bars Strut, the rectangular plate is installed between two vertical support bars and setting is abutted with horizontal support bar.
3. the solid split heads device of template is hung in a kind of new Jiang Ban areas according to claim 1, it is characterised in that:In rectangular plate Two ends are respectively equipped with the first bolt hole, fixed plate are respectively equipped with the both sides up and down of two rectangular plate intersections, in fixed plate Provided with the second bolt hole that the first bolt hole on rectangular plate is equipped with is intersected with two respectively, in the first corresponding bolt The bolt and nut component of fastening is provided with hole and the second bolt hole.
CN201720090010.8U 2017-01-23 2017-01-23 Hang the solid split heads device of template in a kind of new Jiang Ban areas Expired - Fee Related CN206539011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720090010.8U CN206539011U (en) 2017-01-23 2017-01-23 Hang the solid split heads device of template in a kind of new Jiang Ban areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720090010.8U CN206539011U (en) 2017-01-23 2017-01-23 Hang the solid split heads device of template in a kind of new Jiang Ban areas

Publications (1)

Publication Number Publication Date
CN206539011U true CN206539011U (en) 2017-10-03

Family

ID=59939377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720090010.8U Expired - Fee Related CN206539011U (en) 2017-01-23 2017-01-23 Hang the solid split heads device of template in a kind of new Jiang Ban areas

Country Status (1)

Country Link
CN (1) CN206539011U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900850A (en) * 2021-03-03 2021-06-04 中建八局轨道交通建设有限公司 Structure and method for constructing descending plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900850A (en) * 2021-03-03 2021-06-04 中建八局轨道交通建设有限公司 Structure and method for constructing descending plate

Similar Documents

Publication Publication Date Title
CN201474292U (en) Midsize template assembled large template
CN205875473U (en) Built -in location prefab reinforced concrete shear wall
CN106193589B (en) Concrete superelevation heavy type beam and overlapping board combining structure method for supporting
CN206786135U (en) A kind of pipeline waterborne and π type compensator hoisting bracket
CN110409813B (en) Non-dismantling forming beam template containing reinforcement cage, template structure and building process
CN106592775A (en) High-precision embedded part reinforcing and mounting device and method and purpose
CN204703500U (en) Assembled architecture construction novel support system
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN206539011U (en) Hang the solid split heads device of template in a kind of new Jiang Ban areas
CN211006346U (en) Cast-in-place support of side span of dismouting of being convenient for suitable for bridge
CN102926554A (en) Steel hanging seat formwork support and construction method thereof
CN211498507U (en) Whole reassembling type protection rack
CN109518950B (en) Support-free tool-based template system applied to assembled cast-in-place section and use method thereof
CN203296310U (en) Curtain wall pendant capable of being adjusted in three-dimensional mode
CN215671116U (en) Supporting structure for granary concrete gutter formwork
CN206591684U (en) The connecting node of round steel tubing string and concrete shear force wall
CN204960324U (en) Suspension type floor formwork support device
CN209670061U (en) A kind of construction assembly with connection structure
CN110258770B (en) Full-assembly house structure system
CN211114806U (en) Reverse ridge formwork reinforcing steel bar fixture
CN210918312U (en) Detachable design protection operation canopy of construction is built in room
CN103938877B (en) The installation method of crab-bolt stock
CN203834756U (en) Keel support system unit used for stone curtain wall
CN206233578U (en) Inner corner trim reinforcing template and its formwork system
CN207862787U (en) A kind of pin-connected panel slideway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003