CN206531239U - Multi-gang air-conditioner control system - Google Patents

Multi-gang air-conditioner control system Download PDF

Info

Publication number
CN206531239U
CN206531239U CN201720211964.XU CN201720211964U CN206531239U CN 206531239 U CN206531239 U CN 206531239U CN 201720211964 U CN201720211964 U CN 201720211964U CN 206531239 U CN206531239 U CN 206531239U
Authority
CN
China
Prior art keywords
server
control
control terminal
control system
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720211964.XU
Other languages
Chinese (zh)
Inventor
刁作清
牟桂贤
蔡伟星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201720211964.XU priority Critical patent/CN206531239U/en
Application granted granted Critical
Publication of CN206531239U publication Critical patent/CN206531239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The utility model discloses a kind of multi-gang air-conditioner control system.The system includes:Some monitoring devices;The monitoring device is connected with air-conditioner set bus, belongs to several different unit regions;Area router, the area router has unique corresponding unit region;The area router is communicated to connect with the monitoring device in corresponding unit region;Server group, the area router is communicated to connect with the server group, and the server group has some data access ports;Control terminal, the control terminal gathers user instruction, is communicated to connect by the data access port and the server group.

Description

Multi-gang air-conditioner control system
Technical field
The utility model is related to air conditioner controlling technology field, more particularly to a kind of multi-gang air-conditioner control system.
Background technology
Existing multi-gang air-conditioner unit centralized Control is typically what is realized in the range of single project installation, substantially only It is limited to many in the single-point control of the air-conditioner set in a small area, such as a certain building or some industrial park The centralized Control of gang air-conditioner unit.
There are many different types of technical schemes to be used to realize the multi-link sky in above-mentioned small area in the prior art Centralized Control is adjusted, such as Patent No. CN201310292495.5 Chinese patent discloses a kind of control of multiple central air conditioner System and control method processed.The control system belongs to the control system for being limited to single regional air conditioner equipment control, mobile terminal (control Terminal) control unit mode be use point-to-point form.
But with the continuous propulsion of the process of integration, start to occur many group customer and use multi-gang air-conditioner unit.This A little set clients would generally set the air-conditioner set of enormous amount, such as point public affairs in various regions in the whole world or domestic regional Department or factory building set air-conditioner set.These air-conditioner sets are required for being managed or controlled.
During the utility model is realized, it is found by the applicant that the problem of existing following in the prior art:Existing Air-conditioning centralized management system in, between regional the need for independent control respectively, it is impossible to realize the multi-connected machine of different geographical The unified management of equipment.Further, since the limitation of communication bus, it is impossible to meet the demand of quick control response.Therefore, it is impossible to real The unified monitoring between multi-gang air-conditioner equipment network between existing different zones can not also be realized.
Utility model content
The utility model embodiment is realized pair mainly solving the technical problems that provide a kind of multi-gang air-conditioner control system In the centralized management of trans-regional multi-gang air-conditioner unit.
In order to solve the above technical problems, the technical scheme that the utility model embodiment is used is:There is provided a kind of many Gang air-conditioner control system.The control system includes:
Some monitoring devices;The monitoring device is connected with air-conditioner set bus, belongs to several different unit areas Domain;
Area router, the area router has unique corresponding unit region;The area router with it is corresponding Monitoring device communication connection in unit region;
Server group, the area router is communicated to connect with the server group, and the server group has some numbers According to access interface;
Control terminal, the control terminal gathers user instruction, passes through the data access port and the server group Communication connection.
Alternatively, the monitoring device includes:At least one be used for gather the monitoring device of air-conditioner set operational factor with And at least one control device for controlling air-conditioner set.
Alternatively, the server group includes:Server and Web Administer Server;
The server is communicated to connect with the Web Administer Server, and the web server is provided based on web modes Log in platform and be used as the data access port.
Alternatively, the system also includes:Local control terminal;The local control terminal and the area router pair It should set, the local control terminal is communicated to connect with corresponding area router.
Alternatively, the control terminal includes:Keeper's control terminal and user control terminal;
The user control terminal has corresponding user right;Keeper's control terminal is used to configure the user The user right of control terminal.
Alternatively, the server group includes:The device map unit set by keeper's control terminal;The clothes Device group of being engaged in is by the device map unit, the communication set up between the user control terminal and corresponding target monitoring equipment Connection.
Alternatively, the unit region is the presumptive area positioned at areal.
Alternatively, in addition to:Certificate server;The certificate server is separately positioned on the area router and service In device group, in the communication connection that the area router and server group are set up, transmission of authentication information.
Alternatively, the monitoring device includes:Data access port, data-out port, buffer storage and parsing dress Put;The data access port is communicated to connect with buffer storage, and the buffer storage is used to store the data access port Obtain information;
The resolver is connected with the buffer storage bus, and the resolver parsing acquisition information simultaneously passes through Data-out port is exported.
Alternatively, the communication connection includes:Internet connection, client cables connection and broadband connection.
A kind of multi-gang air-conditioner control system that the utility model embodiment is provided, by building and traditional centralized Control system The system topology for the distributed AC servo system that system is differed, can both complete the air-conditioner set monitoring of tools in single region, realize The centralized Control of the air-conditioner set of multiple different zones and monitoring, meet the use needs of group customer.The air-conditioner control system System topology can realize differentiation monitoring and the control strategy of air-conditioner set between different zones.
Brief description of the drawings
Fig. 1 is the system construction drawing for the multi-gang air-conditioner control system that the utility model embodiment is provided;
Fig. 2 is the structural representation of the subsystem for the multi-gang air-conditioner control system that another embodiment of the utility model is provided Figure;
Fig. 3 is the functional block diagram for the monitoring device that the utility model embodiment is provided;
Fig. 4 is the method flow diagram of the framework method for the multi-gang air-conditioner control system that the utility model embodiment is provided.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only to explain this Utility model, is not used to limit the utility model.
Centralized control system refers to one-of-a-kind system, and its system topological latticed form is that single control unit (such as computer) is right Multiple objects or equipment are managed concentratedly and controlled.Relative, dcs is a kind of multi-computer system, it is multiple not Same control unit is controlled to different object or equipment respectively, each constitutes multiple subsystems.Have between subsystem There are the contact between multiple different connecting channels, done subsystem and information to exchange.
The topological network result schematic diagram for the multi-gang air-conditioner control system that Fig. 1 provides for the utility model embodiment.Institute The form that multi-gang air-conditioner control system uses dcs is stated, to realize (trans-regional) control in strange land.
As shown in figure 1, the multi-connected unit control system includes:Belong to multiple different unit regions air-conditioner set 10, Monitoring device 20, area router 30, server group 40 and control terminal 50.
The air-conditioner set 10 can be that any kind of there is provided the regulation of environment temperature, humidity or other air parameters Or the equipment or unit of control function.The monitoring device 20 can pass through bus with one or more air-conditioner set 20 Or the connection of other connected modes, the operation of air-conditioner set 10 is controlled, for example, controls the power of air-conditioner set, end equipment to send Wind state, cold and hot source device is turned on or off.
The monitoring device 20 can also gather the service data of air-conditioner set or different by one or more Sensor gathered data.The monitoring device 20 specifically can be according to actual conditions, using existing any suitable, for gathering With the monitoring device or system for uploading data.
As shown in figure 1, the unit region is the regional extent in a geographic concepts, can with administrative region planning or The greater or lesser level of person is divided, and some is located at areal, the region with particular range size.For example, machine Group region A can be Guangzhou, and unit region B is Beijing.Either unit region A can be China, and unit region B is Russia Deng.Such unit region climatically has larger difference due to geographic difference.Therefore, different units are deployed in The air-conditioner set in region needs to use different control strategy or method to realize the efficient utilization of resource.
The area router 30 can be any suitable router or network hardware equipment in the prior art, can Meet Shi Jishiyong demand.Area router 30 is correspondingly arranged with unit region.That is, in the distribution control of the present embodiment In system processed, each area router is as one of control unit in dcs, in a unit region One subsystem of middle formation.
The area router 30 can be communicated to connect as the monitoring device 20 in junction nodes, with unit region, example Such as, monitoring device 20 can add the network of the foundation of area router 30 after the programs such as checking.The monitoring device 20 can To upload data to area router 30, control instruction (such as specific airconditioning control can also be received by area router 30 Strategy), control or the operation of adjustment air-conditioner set.
Server group 40 can specifically be realized using any suitable electronics calculating platform.In certain embodiments, it can Be the hardware devices such as cluster server or high-performance server realize.In further embodiments, it can also pass through void The software mode conformity calculation resource such as plan machine is completed.
The server 40 is used for the contact set up between area router 30.Area router 30 can be according to actual feelings The need for condition, communication connection is set up there is provided communication channel to realize that data are passed by any suitable wire/wireless connected mode It is defeated., can be with when data transfers are larger, between area router 30 and server 40 for example, higher in business need Connected by client cables (special line).In further embodiments, it can also be used between area router 30 and server 40 Internet is connected or broadband connection.
The server group 40 can also provide multiple data access ports as a data center.Control terminal 50 By the data access port, it is linked into control system, by server group 40, reads the running situation of specific air-conditioner set And issue specific air conditioner control strategy.
The control terminal 50 can be specifically any kind of, the intelligent or non intelligent electricity with user mutual ability Sub- equipment, such as smart mobile phone, PC, tablet personal computer, electronic reader.
In certain embodiments, the mode of Web page can be used to realize between control terminal 50 and server group 40 Communication connection.That is, at least one Web server can be included in the server group, Web server can provide a phase The webpage of pass is used as login platform.User logs in the network address using control terminal 50, by (such as inputting correspondence after authentication Account number cipher) can be linked into server group 40, read or issue data.
Different terminals (computer, mobile phone, flat board) logins can be met in internet using above-mentioned Web modes needs Ask, while can be used in different platforms (windows, ios, android etc.), with good compatibility.In other realities Apply in example, it would however also be possible to employ CS frameworks, respectively different system platforms develops corresponding client and is used as data access port.
The multi-gang air-conditioner control system provided in the present embodiment, it uses the thought of distributed AC servo system, passes through spy Fixed grid topological form, the remote centralized for realizing multiple unit regions is monitored and controlled, and can be according to unit Regional characteristics, realizes that the centralized Control of differentiation (such as in a control terminal, is taken unit region A and unit region B respectively Different air conditioner control strategies), the use demand of some group users is met well.
The structured flowchart of the subsystem for the control system that Fig. 2 provides for the utility model embodiment.As shown in Fig. 2 one In individual subsystem, in addition to the air-conditioner set 10 shown in Fig. 1, monitoring device 20, area router 30, one can also be included locally Control terminal 70.
The local control terminal 70 is communicated to connect with the area router 30, is laid in correspondence unit region.It is logical Cross and set local control terminal 70 to realize the local monitor for different unit regions, as subsystem autonomous detection or Person's control system.For example, the Guangzhou Branch in group customer can also be by local control terminal 70 to the air conditioner of oneself Group is controlled without the server by general headquarters.
The local control terminal 70 can be specifically any kind of electronic computing device, such as computer, server Or other calculating platforms, it can have user mutual ability, and running status or the reception of air-conditioner set are shown to user Adjust instruction etc..
Alternatively, as described above, the monitoring device is adopted as the data output end of control system, it is necessary to perform data Collection and control function.The monitoring device can include:At least one is used for the monitoring dress for gathering air-conditioner set operational factor Put and at least one be used to control the control device of air-conditioner set, be respectively used to collection operational factor shown to user and according to User instruction controls air-conditioner set.
The functional block diagram of the data processing for the monitoring device that Fig. 3 provides for the utility model embodiment.In the present embodiment, The monitoring device 20 includes:Data access port 21, data-out port 22, buffer storage 23 and resolver 24.
The data access port 21 and data-out port 22 are respectively the input and output end of monitoring device.Caching Device 23 can cache the acquisition information (air conditioner control strategy that such as control terminal is sent) of the data access port.The solution Analysis apparatus is connected with the buffer storage bus, as data processing function unit (such as CPU), parses the acquisition information simultaneously Exported by data-out port into air-conditioner set, complete the control to air-conditioner set.
In certain embodiments, to ensure the security transmitted on the internet of data, it is to avoid hacker etc. to the control The malicious attack of system processed, the system can also include:Certificate server.
The certificate server is separately positioned in the area router and server group, in the Partial route In the communication connection that device is set up with server group, transmission of authentication information.
During distributed system is built, the service of similar fire wall is provided by the certificate server additionally set, Avoid malicious attack from pretending to be the node of area router, be added in the control system and steal data or attack server.
Below in conjunction with instantiation, the framework process of the multi-gang air-conditioner control system is described in detail:
Assuming that the general headquarters of first group of general headquarters of certain group customer are located at Beijing, 2 subordinate branch company A and B, company A are had Positioned at Shanghai City, B companies are located at Guangzhou.Unified installation multi-gang air-conditioner equipment is now needed, and carries out general headquarters' unified monitoring.Its In, multi-gang air-conditioner totally 1024 is installed by general headquarters, is equipped with 4 monitoring devices;Company A installs 500 multi-gang air-conditioners, is equipped with 2 Individual monitoring device;B companies are mounted with 128 multi-gang air-conditioners, are equipped with a monitoring device.
As shown in figure 4, control system distribution method includes:
In general headquarters side, monitoring device access server and WEB management servers (step 100) are laid, and by general headquarters Monitoring device is connected to access server (step 200) by LAN.
In branch company side, company A and B companies are laid in the server (step 300) of general headquarters by being accessed on internet, together When can realize local monitor (step 400) in locally-installed local control terminal terminal.
In control end:If control terminal is keeper's identity, by logging in Web server allocation project information, user Authority and device map relation (mapping relations between such as multi-gang air-conditioner and unit region) configuration information (step 500). If control terminal is user terminal, it can be realized to air-conditioning equipment status inquiry, control, set by logging in Web server Tactful (step 600).
In air-conditioner set side:Monitoring device receives what user terminal was collected, can be automatic after the policy information of user's input Task queue (being such as buffered in buffer storage) is converted into, execution (step 700) to be matched is waited.Finally, after by parsing, control Air-conditioner set is performed corresponding tactful (step 800).
In the multi-gang air-conditioner control system that the utility model is provided, using distributed centralized control system of knowing clearly, Both the monitoring of tools in single unit region can have been realized, group customer can also be met to multiple different unit regions (strange land) Networking unified monitoring and between different unit regions differentiation control or monitoring strategies, meet well using need Ask.And Web modes are used as data access port, and as user login management platform, control terminal only needs to login pair The domain names answered, can meet the cross-platform monitoring demand in multiple terminals.
Embodiment of the present utility model is the foregoing is only, the scope of the claims of the present utility model is not thereby limited, it is all It is the equivalent structure or equivalent flow conversion made using the utility model specification and accompanying drawing content, or directly or indirectly uses In other related technical fields, similarly it is included in scope of patent protection of the present utility model.

Claims (10)

1. a kind of multi-gang air-conditioner control system, it is characterised in that including:
Some monitoring devices;The monitoring device is connected with air-conditioner set bus, belongs to several different unit regions;
Area router, the area router has unique corresponding unit region;The area router and corresponding unit Monitoring device communication connection in region;
Server group, the area router is communicated to connect with the server group, and there are the server group some data to connect Inbound port;
Control terminal, the control terminal gathers user instruction, is communicated by the data access port with the server group Connection.
2. control system according to claim 1, it is characterised in that the monitoring device includes:At least one is used to adopt Collect the monitoring device and at least one control device for being used to control air-conditioner set of air-conditioner set operational factor.
3. control system according to claim 1, it is characterised in that the server group includes:Server and web pipes Manage server;
The server is communicated to connect with the Web Administer Server, and the web server provides the login based on web modes Platform is used as the data access port.
4. control system according to claim 1, it is characterised in that also include:Local control terminal;
The local control terminal is correspondingly arranged with the area router, the local control terminal and corresponding Partial route Device is communicated to connect.
5. control system according to claim 1, it is characterised in that the control terminal includes:Keeper's control terminal And user control terminal;
The user control terminal has corresponding user right;Keeper's control terminal is used to configure the user's control The user right of terminal.
6. control system according to claim 5, it is characterised in that the server group includes:Controlled by the keeper The device map unit that terminal processed is set;
The server group is set up between the user control terminal and corresponding monitoring device by the device map unit Communication connection.
7. control system according to claim 1, it is characterised in that the unit region is positioned at the predetermined of areal Region.
8. control system according to claim 1, it is characterised in that also include:Certificate server;
The certificate server is separately positioned in the area router and server group, for the area router with In the communication connection that server group is set up, transmission of authentication information.
9. control system according to claim 1, it is characterised in that the monitoring device includes:Data access port, number According to output port, buffer storage and resolver;
The data access port is communicated to connect with buffer storage, and the buffer storage is used to store the data access port Obtain information;
The resolver is connected with the buffer storage bus, and the resolver parsing acquisition information simultaneously passes through data Output port is exported.
10. according to any described control systems of claim 1-9, it is characterised in that the communication connection includes:Internet connects Connect, client cables are connected and broadband connection.
CN201720211964.XU 2017-03-06 2017-03-06 Multi-gang air-conditioner control system Active CN206531239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720211964.XU CN206531239U (en) 2017-03-06 2017-03-06 Multi-gang air-conditioner control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720211964.XU CN206531239U (en) 2017-03-06 2017-03-06 Multi-gang air-conditioner control system

Publications (1)

Publication Number Publication Date
CN206531239U true CN206531239U (en) 2017-09-29

Family

ID=59915256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720211964.XU Active CN206531239U (en) 2017-03-06 2017-03-06 Multi-gang air-conditioner control system

Country Status (1)

Country Link
CN (1) CN206531239U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112303832A (en) * 2019-08-01 2021-02-02 青岛海尔空调电子有限公司 Equipment information configuration method of multi-split air conditioner centralized control system
CN112378034A (en) * 2020-10-29 2021-02-19 四川虹美智能科技有限公司 Central air-conditioning control system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112303832A (en) * 2019-08-01 2021-02-02 青岛海尔空调电子有限公司 Equipment information configuration method of multi-split air conditioner centralized control system
WO2021017767A1 (en) * 2019-08-01 2021-02-04 青岛海尔空调电子有限公司 Device information configuration method for centralized control system of multi-split air conditioner
CN112378034A (en) * 2020-10-29 2021-02-19 四川虹美智能科技有限公司 Central air-conditioning control system and method

Similar Documents

Publication Publication Date Title
Rath Resource provision and QoS support with added security for client side applications in cloud computing
CN100524125C (en) Solution method for remote monitoring and maintenance of automatization system
CN203086496U (en) Intelligent household system
Qian et al. An edge-computing paradigm for internet of things over power line communication networks
CN107566528A (en) Sewage treatment plant's monitoring system based on high in the clouds data sharing
CN109462652A (en) Terminating gateway load allocation method in smart home system based on hash algorithm
CN105306557A (en) Bridge health monitoring system based on cloud platform
CN105119787B (en) A kind of public internet access system and method based on software definition
CN105401771A (en) Stereo garage integrated management system
CN206531239U (en) Multi-gang air-conditioner control system
CN204808029U (en) Intelligence house remote control system based on AC and VPN technique
CN104967656A (en) Wireless ZigBee data acquisition and real-time house deformation monitoring remote transmission system
CN202561960U (en) Central air conditioning remote monitoring device
Zhou et al. The 5G communication technology-oriented intelligent building system planning and design
CN112098718A (en) Power management system based on Internet of things and block chain
CN108833218B (en) Network system of multi-connected air conditioning unit and establishing method thereof
CN107426268A (en) A kind of solar energy intelligent control method and system based on cloud computing
CN109547553A (en) Region transformer station management system and management method based on private clound
CN102131072A (en) System and method for realizing network video monitoring under internet platform
CN106992885A (en) The method and server system of identification equipment in a kind of server system
CN111953771A (en) Power distribution Internet of things management system
CN114745616B (en) Underground heat information remote monitoring and early warning system and method
CN106656779B (en) A kind of aggregation gateway and its cut-in method
CN206712842U (en) Data transfer netting communication system
CN106850806B (en) Data exchange method and device of intelligent building and energy efficiency monitoring system based on Internet of things

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant