CN206530053U - A kind of formwork support structure of hole to be provided top cover construction - Google Patents

A kind of formwork support structure of hole to be provided top cover construction Download PDF

Info

Publication number
CN206530053U
CN206530053U CN201720217442.0U CN201720217442U CN206530053U CN 206530053 U CN206530053 U CN 206530053U CN 201720217442 U CN201720217442 U CN 201720217442U CN 206530053 U CN206530053 U CN 206530053U
Authority
CN
China
Prior art keywords
hole
support
section steel
top cover
under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720217442.0U
Other languages
Chinese (zh)
Inventor
叶小斌
杨涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201720217442.0U priority Critical patent/CN206530053U/en
Application granted granted Critical
Publication of CN206530053U publication Critical patent/CN206530053U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of formwork support structure of hole to be provided top cover construction, if the hole to be provided including dried layer, section steel beam is fixed at the opposite sides side of top hole to be provided hole, some equally distributed secondary beams are fixed between the section steel beam of both sides, secondary beam two ends are separately fixed on the section steel beam of both sides, support scaffolding is set up on the section steel beam of both sides, the base of the support scaffolding is respectively arranged on the section steel beam of both sides;Support beam is just to fixing some equally distributed plate lower secondary beams under support beam, two plates between support beam under two section steel beams, and two plates under two plates of setting at the top of support scaffolding, and the two ends of plate lower secondary beam are respectively arranged under two plates in support beam;Support beam under the plate, on plate lower secondary beam template is set.The utility model sets the problem of console mode support for shuttering has larger potential safety hazard to solve during hole to be provided top cover cast-in-place construction in the prior art, be embodied as cast-in-place provide of hole to be provided top cover and support while reducing the purpose of potential safety hazard.

Description

A kind of formwork support structure of hole to be provided top cover construction
Technical field
The utility model is related to civil engineering field, and in particular to a kind of formwork support structure of hole to be provided top cover construction.
Background technology
In the civil engineering of large-scale synthesis body project, there is continuous dried layer to be big face if the intermediate layer of agent structure occurs The situation of product hole to be provided, such as hole to be provided, the Zhongting hollow out hole to be provided of escalator etc., this usual area of part hole to be provided compared with Greatly.In the prior art, the concrete top cover at the top of hole to be provided is when carrying out cast-in-place construction, and bottom formwork-support is only capable of according to normal Rule mode, takes console mode support for shuttering, it will usually be height very high superelevation support body, sets up complicated, time-consuming, while by It is too high in height, also there is larger potential safety hazard.
Utility model content
The purpose of this utility model is to provide a kind of formwork support structure of hole to be provided top cover construction, to solve existing skill The problem of console mode support for shuttering has larger potential safety hazard is set in art during hole to be provided top cover cast-in-place construction, hole to be provided top is embodied as Lid is cast-in-place to provide support while reducing the purpose of potential safety hazard.
The utility model is achieved through the following technical solutions:
A kind of formwork support structure of hole to be provided top cover construction, if including the hole to be provided of dried layer, in top hole to be provided hole Set at mouth opposite sides side between fixed section steel beam, the section steel beam of both sides and fix some equally distributed secondary beams, secondary beam two End is separately fixed on the section steel beam of both sides, and support scaffolding, the bottom of the support scaffolding are set up on the section steel beam of both sides Seat is respectively arranged on the section steel beam of both sides;Support beam is set at the top of support scaffolding under support beam under two plates, two plates just To fixing some equally distributed plate lower secondary beams, the two ends point of plate lower secondary beam between support beam under two section steel beams, and two plates It is not arranged under two plates in support beam;Support beam under the plate, on plate lower secondary beam template is set.
When console mode support for shuttering is set during for hole to be provided top cover cast-in-place construction in the prior art, complicated, expense of taking a lot of work is set up When, while the problem of also there is larger potential safety hazard, the utility model proposes a kind of shuttering supporting knot of hole to be provided top cover construction Structure, if being set on the hole to be provided of top among the dried layer large area hole to be provided, is included in top hole to be provided hole relative Two inner side edges fix section steel beam as the main beam structure of support, and section steel beam is fixed on the wall of hole to be provided side, that is, is able to ensure that shaped steel Beam it is solid and reliable.Some secondary beams are connected between two section steel beams, secondary beam two ends are separately fixed on the section steel beam of both sides and some Secondary beam is uniformly distributed.The hole to be provided hole of top is insulated by secondary beam so that the hole forms striated support knot Structure, links together both sides section steel beam because secondary beam is fixedly connected with section steel beam, therefore by some secondary beams so that secondary Beam, section steel beam turn into firm overall structure, improve the enabling capabilities of scaffold bottom.Support feet is set up on the section steel beam of both sides Hand cradle, two wing bases of support scaffolding are respectively arranged on the section steel beam of both sides, in addition, other bottom terminations of support scaffolding It can also be fixed on as needed on secondary beam so that connection is more firm.Support beam under two plates is set at the top of support scaffolding, For supporting under cast-in-situ template, two plates, support beam is just to two section steel beams, to ensure that main load is located at identical vertical plane up and down On, support beam carries out main support with section steel beam under plate.Some equally distributed plates are fixed under two plates between support beam Lower secondary beam, the two ends of plate lower secondary beam are respectively arranged under two plates in support beam, are by two by some plate lower secondary beams Support beam links into an integrated entity under plate, while the position for laying support is provided by plate lower secondary beam for the template on top, so that Weight when template and its top joints cement is transferred to support beam under plate by plate lower secondary beam, then is transferred to type by scaffold In girder steel, the concrete structure being passed to by section steel beam around hole to be provided, so that by mixed around top hole to be provided Solidifying soil main body is supported to template, is supported without taking traditional approach to set up console mode support for shuttering from ground floor again, The complexity and difficulties for setting up support frame are reduced, material usage is largely reduced with setting up duration, solves and set up The problem of potential safety hazard caused by superelevation support frame, realize that to be that hole to be provided top cover is cast-in-place provide support while to reduce safety hidden The purpose of trouble.
It is preferred that, the section steel beam is connected with hole to be provided side wall by Bar Anchorage.To ensure the shaped steel as main carrying Secure and reliable connection between the concrete of beam and hole to be provided side wall.Reinforcing bar for anchoring is preset in concrete or by rearmounted Mode is implanted into.
Further, some the first floor stringers parallel to section steel beam, described are additionally provided between the section steel beam of both sides The two ends of one floor stringer are by Bar Anchorage in hole to be provided side wall.It is to help section steel beam to share load by the first floor stringer Lotus so that whole load is evenly distributed, and section steel beam collectively forms parallel list structure with the first floor stringer, and secondary beam is matched somebody with somebody therewith again The network structure for being formed and being intersected is closed, so that the supporting construction below scaffold has the characteristics of load is evenly distributed, it is to avoid The situation of local pressure occurs.
Further, some the second floor stringers parallel to support beam under plate are additionally provided with two plates between support beam, Second floor stringer is welded in plate lower secondary beam.It is to help support beam under plate to share load, the second auxiliary by the second floor stringer Beam is welded in plate lower secondary beam, while support beam, plate lower secondary beam are collectively forming the network structure of intersection under the second floor stringer, plate, So that the weight dispersed distribution that top template is applied, it is to avoid the excessive situation for causing quickly to be damaged of support beam local pressure under plate Occur.
It is preferred that, the spacing between adjacent two secondary beams, adjacent two plate lower secondary beams, which is respectively less than, is equal to 2m.To increase support The resistance to overturning of structure, prevents secondary beam, plate lower secondary beam are excessively sparse from causing the problem of stability deficiency influences security performance.
Further, section steel beam upper surface welded reinforcement head, the base of support scaffolding is set and the steel bar end phase The jack matched somebody with somebody, support scaffolding is inserted in steel bar end.It is the reinforcing bar being inserted in the base of support scaffolding on section steel beam It is that can just insert steel bar end because jack matches with steel bar end on head, can be obtained in horizontal direction after insertion steel bar end With firm, support scaffolding rocking in the horizontal direction is prevented, it is ensured that have reliable positioning to connect between scaffold and section steel beam Connect, it is to avoid slide displacement occurs when scaffold is shaken.
It is preferred that, the secondary beam is set two layers, is respectively welded at the upper and lower surface of section steel beam.Pass through double-deck secondary girder construction Structural stability is improved, while so that section steel beam is protected between two layers of secondary beam by secondary beam to section steel beam, it is to avoid make Directly collided with by external force damage etc. for the section steel beam of main load bearing component, so as to improve the bulk strength of this structure, stably With service life.
It is preferred that, the section steel beam uses support beam under 25#b I-steel, plate to use 25#a I-steel.Section steel beam uses strong The bigger 25#b I-steel of degree, it is ensured that there is intensity maximum in this structure as the section steel beam of main carrying.As directly supporting Support beam under the plate of template load, its bearing requirements with not as section steel beam it is so high, but be also required to enough intensity, because This selects 25#a I-steel, and the only load-carrying properties than section steel beam are slightly weak, so that it is guaranteed that stabilization and the carrying of total.
It is preferred that, the secondary beam, plate lower secondary beam are steel pipe.Secondary beam, plate lower secondary beam are auxiliary support member, after being mainly used in Continuous piecemeal sets template to be provided when being poured and set for this platform.Therefore its intensity requirement is far below section steel beam and support beam under plate Intensity requirement, it is therefore preferable that using steel pipe, can either be easy to be welded to connect the platform that template is built is provided, but light weight and drop Low deadweight.
It is preferred that, uniform laying batten plate between any two adjacent first floor stringers.Operator station is easy to by batten plate Stand on hole to be provided and constructed, while can also improve the globality between two adjacent first floor stringers.
The utility model compared with prior art, has the following advantages and advantages:
1st, a kind of formwork support structure of hole to be provided top cover construction, at top hole to be provided hole, two relative inner side edges are consolidated Shape main beam structure of the girder steel as support, connect some secondary beams between two section steel beams, secondary beam two ends are separately fixed at both sides On section steel beam and some secondary beams are uniformly distributed, the hole to be provided hole of top is insulated by secondary beam so that the hole shape Both sides section steel beam, is connected to by supporting construction because secondary beam is fixedly connected with section steel beam, therefore by some secondary beams into strips Together so that secondary beam, section steel beam turn into firm overall structure, the enabling capabilities of scaffold bottom are improved.
2nd, support scaffolding is set up on a kind of formwork support structure of hole to be provided top cover construction, both sides section steel beam, is supported Two wing bases of scaffold are respectively arranged on the section steel beam of both sides, and support beam under two plates is set at the top of support scaffolding, is used for Support beam under cast-in-situ template, two plates is supported just to two section steel beams, to be located at main load above and below ensuring on identical vertical plane, by Support beam carries out main support with section steel beam under plate.Weight when obtaining template and its top joints cement is passed by plate lower secondary beam Support beam under plate is handed to, then section steel beam is transferred to by scaffold, the concrete around hole to be provided is passed to by section steel beam In structure, so as to be supported by the concrete main body around top hole to be provided to template, without taking traditional approach again Console mode support for shuttering is set up from ground floor to be supported, and reduces the complexity and difficulties for setting up support frame, largely Reduce material usage with set up duration, solve the problem of setting up the potential safety hazard caused by superelevation support frame, realize for Hole to be provided top cover is cast-in-place to provide support while reducing the purpose of potential safety hazard.
3rd, a kind of formwork support structure of hole to be provided top cover construction, the base of support scaffolding is inserted on section steel beam It is that can just insert steel bar end because jack matches with steel bar end on steel bar end, energy in horizontal direction after insertion steel bar end Enough consolidated, prevent support scaffolding rocking in the horizontal direction, it is ensured that have reliable fixed between scaffold and section steel beam Position connection, it is to avoid slide displacement occurs when scaffold is shaken.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the utility model embodiment, constitutes the one of the application Part, does not constitute the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is the front view in the utility model specific embodiment;
Fig. 2 is the upward view in the utility model specific embodiment;
Fig. 3 is the top view in the utility model specific embodiment.
Mark and corresponding parts title in accompanying drawing:
1- section steel beams, 2- secondary beams, 3- support scaffoldings, 4- support beams, 5- plate lower secondary beams, 6- templates, the floor stringers of 7- first, The floor stringers of 8- second, 9- steel bar ends, 10- batten plates.
Embodiment
For the purpose of this utility model, technical scheme and advantage is more clearly understood, with reference to embodiment and accompanying drawing, The utility model is described in further detail, and exemplary embodiment of the present utility model and its explanation are only used for explaining this Utility model, is not intended as limiting of the present utility model.
Embodiment 1:
A kind of formwork support structure of hole to be provided top cover construction as shown in Figure 1 to Figure 3, if including the hole to be provided of dried layer, Characterized in that, being set at the opposite sides side of top hole to be provided hole between fixed section steel beam 1, the section steel beam 1 of both sides Fixed some equally distributed secondary beams 2, the two ends of secondary beam 2 are separately fixed on the section steel beam 1 of both sides, on the section steel beam 1 of both sides Support scaffolding 3 is set up, the base of the support scaffolding 3 is respectively arranged on the section steel beam 1 of both sides;Support scaffolding 3 is pushed up Support beam 4 is just to solid between support beam 4 under two section steel beams 1, and two plates under support beam 4 under two plates of portion's setting, two plates Fixed some equally distributed plate lower secondary beams 5, the two ends of plate lower secondary beam 5 are respectively arranged under two plates in support beam 4;Under the plate Template 6 is set on support beam 4, plate lower secondary beam 5.The section steel beam 1 is connected with hole to be provided side wall by Bar Anchorage.Both sides Some the first floor stringers 7 parallel to section steel beam 1 are additionally provided between section steel beam 1, the two ends of first floor stringer 7 pass through Bar Anchorage is in hole to be provided side wall.It is additionally provided with two plates between support beam 4 some parallel to the second auxiliary of support beam under plate 4 Beam 8 is helped, the second floor stringer 8 is welded in plate lower secondary beam 5.Spacing between adjacent two secondary beams 2, adjacent two plate lower secondary beams 5 Respectively less than it is equal to 2m.The upper surface welded reinforcement first 9 of section steel beam 1, the base of support scaffolding 3 is set and the phase of steel bar end 9 The jack matched somebody with somebody, support scaffolding 3 is inserted in steel bar end 9.The secondary beam 2 is set two layers, is respectively welded at section steel beam about 1 Surface.The section steel beam 1 uses support beam 4 under 25#b I-steel, plate to use 25#a I-steel.The secondary beam 2, plate lower secondary beam 5 For steel pipe.Uniform laying batten plate 10 between any two adjacent first floor stringers 7.This structure is relative at top hole to be provided hole Two inner side edges fix section steel beam 1 and connect some secondary beams 2,2 liang of secondary beam as the main beam structure supported, between two section steel beams 1 End is separately fixed on both sides section steel beam 1 and some secondary beams are uniformly distributed, and is carried out the hole to be provided hole of top by secondary beam 2 Packing so that the hole forms strip supporting construction, because secondary beam 2 is fixedly connected with section steel beam 1, therefore passes through some secondary beams Both sides section steel beam 1 is linked together so that secondary beam, section steel beam 1 turn into firm overall structure, improve the branch of scaffold bottom Support ability.Support scaffolding 3 is set up on both sides section steel beam 1, two wing bases of support scaffolding 3 are respectively arranged at both sides shaped steel On beam 1, the top of support scaffolding 3 sets support beam 4 under two plates, for supporting under cast-in-situ template 6, two plates support beam 4 just To two section steel beams 1, to ensure that main load is located on identical vertical plane up and down, support beam 4 is carried out mainly with section steel beam 1 under plate Support.Weight when obtaining template 6 and its top joints cement is transferred to support beam 4 under plate by plate lower secondary beam 5, then passes through pin Hand cradle is transferred to section steel beam 1, in the concrete structure being passed to by section steel beam 1 around hole to be provided, so as to pass through top Concrete main body around hole to be provided is supported to template 6, and console mode is set up without taking traditional approach again from ground floor Support for shuttering is supported, and reduces the complexity and difficulties for setting up support frame, largely reduces material usage and erection Duration, solves the problem of setting up the potential safety hazard caused by superelevation support frame, realizes and provides branch for hole to be provided top cover is cast-in-place Support reduces the purpose of potential safety hazard simultaneously.The base of support scaffolding 3 is inserted on the steel bar end 9 on section steel beam 1, due to inserting Hole matches with steel bar end 9, is that can just insert steel bar end 9, can be consolidated in horizontal direction after insertion steel bar end 9, Prevent the rocking in the horizontal direction of support scaffolding 3, it is ensured that have between scaffold and section steel beam 1 and be reliably located by connecting, keep away Exempt from occur slide displacement when scaffold is shaken.In addition, being additionally provided between both sides section steel beam 1 some parallel to section steel beam 1 First floor stringer 7, the two ends of first floor stringer 7 are by Bar Anchorage in hole to be provided side wall.Under two plates support beam 4 it Between be additionally provided with some the second floor stringers 8 parallel to support beam under plate 4, the second floor stringer 8 is welded in plate lower secondary beam 5.I.e. It is to help section steel beam 1 to share load by the first floor stringer 7 so that whole load is evenly distributed, the floor stringer of section steel beam 1 and first 7 collectively form parallel list structure, and secondary beam is matched again to form the network structure intersected, so that below scaffold Supporting construction has the characteristics of load is evenly distributed, it is to avoid the situation of local pressure occurs.It is next that second floor stringer 8 is welded on plate On beam 5, while support beam 4, plate lower secondary beam 5 are collectively forming the network structure of intersection under the second floor stringer 8, plate so that top mould The weight dispersed distribution that plate 6 is applied, it is to avoid the local pressure of support beam 4 is excessive under plate causes situation about being quickly damaged to occur.
Above-described embodiment, is entered to the purpose of this utility model, technical scheme and beneficial effect One step is described in detail, be should be understood that and be the foregoing is only embodiment of the present utility model, is not used to limit Fixed protection domain of the present utility model, all any modifications within spirit of the present utility model and principle, made, is equally replaced Change, improve, should be included within protection domain of the present utility model.

Claims (10)

1. a kind of formwork support structure of hole to be provided top cover construction, if including the hole to be provided of dried layer, it is characterised in that in top Set at the opposite sides side of hole to be provided hole between fixed section steel beam (1), the section steel beam (1) of both sides and fix some be uniformly distributed Secondary beam (2), secondary beam (2) two ends are separately fixed on the section steel beam of both sides (1), and support is set up on the section steel beam (1) of both sides Scaffold (3), the base of the support scaffolding (3) is respectively arranged on the section steel beam of both sides (1);Support scaffolding (3) is pushed up Portion sets support beam (4) under two plates, and support beam (4) is just to two section steel beams (1) under two plates, and support beam under two plates (4) some equally distributed plate lower secondary beams (5) are fixed between, the two ends of plate lower secondary beam (5), which are respectively arranged under two plates, to be supported On beam (4);Support beam (4) under the plate, template (6) is set on plate lower secondary beam (5).
2. a kind of formwork support structure of hole to be provided top cover construction according to claim 1, it is characterised in that the shaped steel Beam (1) is connected with hole to be provided side wall by Bar Anchorage.
3. a kind of formwork support structure of hole to be provided top cover construction according to claim 1, it is characterised in that the type of both sides Some the first floor stringers (7) parallel to section steel beam (1), the two ends of first floor stringer (7) are additionally provided between girder steel (1) By Bar Anchorage in hole to be provided side wall.
4. the formwork support structure of a kind of hole to be provided top cover construction according to claim 1, it is characterised in that under two plates Some the second floor stringers (8) parallel to support beam under plate (4), the second floor stringer (8) welding are additionally provided between support beam (4) In plate lower secondary beam (5).
5. the formwork support structure of a kind of hole to be provided top cover construction according to claim 1, it is characterised in that adjacent two Spacing between secondary beam (2), adjacent two plate lower secondary beams (5), which is respectively less than, is equal to 2m.
6. a kind of formwork support structure of hole to be provided top cover construction according to claim 1, it is characterised in that section steel beam (1) upper surface welded reinforcement head (9), the base of support scaffolding (3) sets the jack matched with the steel bar end (9), branch Spike hand cradle (3) is inserted in steel bar end (9).
7. a kind of formwork support structure of hole to be provided top cover construction according to claim 1, it is characterised in that the secondary beam (2) set two layers, be respectively welded at the upper and lower surface of section steel beam (1).
8. a kind of formwork support structure of hole to be provided top cover construction according to claim 1, it is characterised in that the shaped steel Beam (1) uses support beam (4) under 25#b I-steel, plate to use 25#a I-steel.
9. a kind of formwork support structure of hole to be provided top cover construction according to claim 1, it is characterised in that the secondary beam (2), plate lower secondary beam (5) is steel pipe.
10. a kind of formwork support structure of hole to be provided top cover construction according to claim 3, any two adjacent first auxiliary Help uniform laying batten plate (10) between beam (7).
CN201720217442.0U 2017-03-07 2017-03-07 A kind of formwork support structure of hole to be provided top cover construction Active CN206530053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720217442.0U CN206530053U (en) 2017-03-07 2017-03-07 A kind of formwork support structure of hole to be provided top cover construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720217442.0U CN206530053U (en) 2017-03-07 2017-03-07 A kind of formwork support structure of hole to be provided top cover construction

Publications (1)

Publication Number Publication Date
CN206530053U true CN206530053U (en) 2017-09-29

Family

ID=59918188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720217442.0U Active CN206530053U (en) 2017-03-07 2017-03-07 A kind of formwork support structure of hole to be provided top cover construction

Country Status (1)

Country Link
CN (1) CN206530053U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760500A (en) * 2017-03-07 2017-05-31 中国五冶集团有限公司 A kind of formwork support structure of hole to be provided top cover construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760500A (en) * 2017-03-07 2017-05-31 中国五冶集团有限公司 A kind of formwork support structure of hole to be provided top cover construction

Similar Documents

Publication Publication Date Title
CN103967277B (en) Super High Core Walls Structure tilts the construction method of shear wall
CN109629810A (en) Closed builder's jack system and construction method
CN205012666U (en) High altitude steel construction vestibule integrally lift up support structure
AU2013212529A1 (en) Automated formwork climbing system
CN106437123A (en) Supporting leg automatic turnover type overall lifting elevator well operation platform
CN206530053U (en) A kind of formwork support structure of hole to be provided top cover construction
CN106760500A (en) A kind of formwork support structure of hole to be provided top cover construction
CN109424072A (en) The connecting node and construction method of spacer bar concrete column on a kind of girder steel
CN105971110A (en) Construction method for fire control corridor steel structure supporting system
CN109235280A (en) The operation platform and construction method of bridge coping
CN209194347U (en) The operation platform of bridge coping
CN105696782A (en) Novel mobile operation platform
CN206784919U (en) One kind builds recessed corridor flange beam formwork platform
CN216892017U (en) Tie beam integral casting template in template connecting piece and lower stand
CN215978618U (en) Concrete pouring platform
CN113006529A (en) Back-jacking supporting structure and construction method thereof
CN107587708A (en) Foldable high-altitude construction platform and high-altitude construction method
CN209066488U (en) A kind of mass concrete invert reinforcing steel support system
CN221193747U (en) Connecting piece for reinforcing steel corridor cantilever frame
CN207726560U (en) A kind of interim attachment device of building hoist
CN112854702A (en) Large-span silo roof construction platform and erection method
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN215331671U (en) Back supporting structure
CN204370796U (en) Hoistway formwork platform
CN212129846U (en) Scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant