CN206529813U - A kind of anchor jacked pile reaction frame support steel bracket structure - Google Patents
A kind of anchor jacked pile reaction frame support steel bracket structure Download PDFInfo
- Publication number
- CN206529813U CN206529813U CN201720021877.8U CN201720021877U CN206529813U CN 206529813 U CN206529813 U CN 206529813U CN 201720021877 U CN201720021877 U CN 201720021877U CN 206529813 U CN206529813 U CN 206529813U
- Authority
- CN
- China
- Prior art keywords
- reaction frame
- support steel
- jacked pile
- anchor
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model is related to a kind of anchor jacked pile reaction frame support steel bracket structure.It is in isolated footing(Or cushion cap)Planar dimension is smaller, do not possess piling hole punch in the case of, the support steel corbel corresponding to reaction frame is set in side of the base plate, steel corbel quantity can be at two, can also use cooperatively at only one and with the basic straining beam of opposite side.The utility model to set up anchor jacked pile construction under small size basic condition.Steel corbel is not only used to fix reaction frame in the construction stage, and the auxiliary of permanent service stage after piling completes envelope stake function.Compared with routinely increase concrete foundation or cutting piling hole implement two kinds of reinforcement means of anchor jacked pile, the utility model to key dimension strong adaptability, requirement of the reduction to construction machinery, facilitate site operation, shorten duration, reduction cost, reduce to construction environment noise and dust pollution, transformation requirement when more convenient completion is to original base Lack of support.
Description
Technical field
The utility model is related to anchor rod static pressure pile driving construction steel corbel, particularly a kind of anchor jacked pile reaction frame support
Steel bracket structure.
Background technology
In order to solve the not enough problem of foundation bearing capacity occurred during renovation of building, original base(Or original cushion cap)
Transformation is generally required, supplement anchor jacked pile is a kind of method than relatively straightforward raising bearing capacity, and this method requires original basis
Planar dimension is sufficiently large to open progress pressing pile construction in piling hole thereon.Current conditions are:Part isolated footing size is smaller,
Outer Bottom Plating of the part basis in stake position or post position does not have enough to open piling hole site.
In the case of substrate soil is weaker, foundation bearing capacity need to be such as improved, increase area of base effect is relatively slow and constructs numerous
Trivial difficulty, increases new stake for improving bearing capacity more directly effectively.
Even if original basis size meets new piling hole of opening and requires that cutting construction is also more difficult, especially in height of foundation
In the case of larger, and cause dust and noise pollution.
The content of the invention
The purpose of this utility model is to provide a kind of anchor jacked pile reaction frame support steel bracket structure, mainly solved
The problems of above-mentioned prior art.The utility model causes small size basis to have use anchor jacked pile possibility, big chi
The very little basis selection of another more convenient form of construction work more, while improving efficiency of construction, shortening the duration.The utility model
Pressing pile construction mode is simplified, the adaptability to original base is good, the scene of reducing cuts the noise and dust of original concrete
Pollute, reduce the requirement for pouring novel concrete to plant equipment, preferably solve construction of the pressing pile construction reaction frame to basis
It is required that.
To achieve these goals, the present invention is realized in.
A kind of anchor jacked pile reaction frame support steel bracket structure, it is characterised in that:It is passed through in the side on basis
Crab-bolt fixes support steel corbel, and sets reaction frame to fix on the basic straining beam of support steel corbel top surface and opposite position
Anchor hole, sets anchor jacked pile to be located between support steel corbel and basic straining beam.
Described anchor jacked pile reaction frame support steel bracket structure, it is characterised in that:Corner side on basis is consolidated
Surely steel corbel is supported.
Described anchor jacked pile reaction frame support steel bracket structure, it is characterised in that:The support steel corbel, which is set, to be added
Strength rib.
Described anchor jacked pile reaction frame support steel bracket structure, it is characterised in that:Crab-bolt is set in basic two sides
Put multiple, reaction frame fixes anchor hole and has 4, respectively set on the basic straining beam of support steel corbel top surface and opposite position
Put 2.
It should be noted when the utility model is used:
1st, reinforcement location in original basis is measured using reinforcing bar scanning scenograph, it is determined that installing crab-bolt position and drilling.
2nd, steel corbel is made in factory and is molded, and empty position drilling, in-site installation are bored on the basis of correspondence.
3rd, steel corbel is fixed using installation bolt in basic corner, and in the position of the corresponding pressure pile reaction frame of steel corbel top surface
2 fixing bolt hole drillings of completion are put, and other 2 fixing bolt hole drillings are completed in the basic back of offside.
4th, steel corbel and apron piece install pressure pile reaction frame, piling as bearing.
5th, after the completion of pressing pile construction, reaction frame is removed, angle steel is installed using fixed bolt hole in steel corbel top surface and pushes down stake
Top, steel corbel and angle steel turn into a part for permanent envelope stake construction.
6th, steel corbel can set ribbed stiffener to ensure upper limb using the transformation of the side wing edge steel of T-steel cut portion half
Listrium as reaction frame bearing stabilization.
7th, because positioned at basic corner, its installation bolt can set multiple fixing bolts in the orthogonal two sides in basis.
8th, requirement for anticorrosion, steel member considers galvanizing, and brushing anti-corrosion material in the finished.
The beneficial effects of the utility model are:
1st, the utility model integrated structure mechanics, the mechanics of materials, construction technology, simplify processing anchor jacked pile constructing structure.
2nd, difficulty of construction is reduced, the requirement to plant equipment is reduced.
3rd, shorten the transformation time to a certain degree, reduce cost.
4th, different size original base conditions are adapted to extensively.
5th, implement to add a kind of selection mode of reaction frame support to set up anchor jacked pile.
6th, noise, dust pollution of the reduction construction to surrounding environment.
Brief description of the drawings
Fig. 1 is overall axle side schematic diagram of the present utility model.
Fig. 2 is plane projection schematic diagram of the present utility model.
Fig. 3 is positive elevational schematic view of the present utility model.
Fig. 4 is side elevation schematic diagram of the present utility model.
Fig. 5 is the single steel bracket structure figure one of the utility model.
Fig. 6 is the single steel bracket structure figure two of the utility model.
Fig. 7 is the utility model permanent envelope stake schematic diagram after piling.
In figure:1- bases;2- bases straining beam;3- posts;4- anchor jacked piles;5- supports steel corbel;6- ribbed stiffeners;7- anchors
Bolt;8- reaction frames fix anchor hole;9- seals stake angle steel.
Embodiment
Fig. 1-7 are referred to, the utility model discloses a kind of anchor jacked pile reaction frame support steel bracket structure.As schemed
It is shown:It is by installing crab-bolt 7 to set support steel corbel 5 in basic 1 side, and in the support top surface of steel corbel 5 and its offside
The opposite position of basic straining beam 2 be drilled to reaction frame and fix anchor hole 8, set anchor jacked pile 4 to be located at support steel corbel 5 and base
Between plinth straining beam 2.Then pressing pile construction reaction frame is installed, and implements pressing pile construction, it is permanent that envelope stake angle steel 9 is installed in piling afterwards in place
It is fixed.
In the utility model, the corner side on basis 1 fixes support steel corbel 5.
In the utility model, the support steel corbel sets ribbed stiffener 6.
In the utility model, post 3 is provided with the basis 1.Basis 1, basic straining beam 2 and post 3 are existing structure.
In the utility model, crab-bolt 7 sets multiple in basic 1 two sides, and reaction frame fixes anchor hole 8 and has 4, in branch
Support each setting 2 on the basic straining beam 2 of the top surface of steel corbel 5 and opposite position.
As preferred structure, basic straining beam 2 can be substituted by another support steel corbel in the basic corner of offside.
As preferred structure, the support steel corbel 5 of basic 1 side can be multiple, to meet many pile demands of increase.
As alternative construction, the support steel corbel 5 can change the positive side that basis 1 is arranged on after construction or basic straining beam
2 sides.
During manufacture, the position of crab-bolt 7 can be determined after instrument measures original basis reinforcement location;
During manufacture, reaction frame fixes anchor hole 8 can be after support steel corbel 5 be installed in original basis top surface of the beam drilling shape
Into;
Steel corbel 5 is supported to be made in factory, to avoid being influenceed exhausted in-site installation convenient by live bore error, supporting steel ox
Reaction frame is fixed anchor hole perforate and can suitably amplified on leg 5, and uses small perforate backing plate at the scene, and is welded after bolt installation
Backing plate and bracket.
The reaction frame of the top surface of steel corbel 5 is supported to fix anchor hole, it is in place and after removing reaction frame in piling, envelope can be used as
Stake angle steel fixing hole.
Here description and application of the present utility model are illustrative, are not wishing to scope of the present utility model being limited in
State in embodiment.The deformation and change of embodiments disclosed herein are possible, for the ordinary skill people of those this areas
Replacing with equivalent various parts for embodiment is known for member.It should be appreciated by the person skilled in the art that not taking off
In the case of spirit or essential characteristics of the present utility model, the utility model can in other forms, structure, construction, ratio,
And realized with other components, material and part., can be to this in the case where not departing from the utility model scope and spirit
In disclosed embodiment carry out other deformations and change.
Claims (4)
1. a kind of anchor jacked pile reaction frame support steel bracket structure, it is characterised in that:It is on basis(1)Side pass through
Crab-bolt(7)Fixed support steel corbel(5), and in support steel corbel(5)The basic straining beam of top surface and opposite position(2)On set
Put reaction frame and fix anchor hole(8), anchor jacked pile is set(4)Positioned at support steel corbel(5)With basic straining beam(2)Between.
2. anchor jacked pile reaction frame according to claim 1 support steel bracket structure, it is characterised in that:On basis
(1)Corner side fix support steel corbel(5).
3. anchor jacked pile reaction frame according to claim 2 support steel bracket structure, it is characterised in that:The supporting steel
Bracket(5)Ribbed stiffener is set(6).
4. the anchor jacked pile reaction frame support steel bracket structure according to claim 1 or 2 or 3, it is characterised in that:Anchor
Bolt(7)On basis(1)Two sides set multiple, and reaction frame fixes anchor hole(8)4 are had, in support steel corbel(5)Top surface with
And the basic straining beam of opposite position(2)Upper each setting 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720021877.8U CN206529813U (en) | 2017-01-10 | 2017-01-10 | A kind of anchor jacked pile reaction frame support steel bracket structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720021877.8U CN206529813U (en) | 2017-01-10 | 2017-01-10 | A kind of anchor jacked pile reaction frame support steel bracket structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206529813U true CN206529813U (en) | 2017-09-29 |
Family
ID=59917186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720021877.8U Active CN206529813U (en) | 2017-01-10 | 2017-01-10 | A kind of anchor jacked pile reaction frame support steel bracket structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206529813U (en) |
-
2017
- 2017-01-10 CN CN201720021877.8U patent/CN206529813U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105715068B (en) | Existing brick mix structure shock isolating pedestal underpinning structure and its construction method | |
CN104762967A (en) | Improved anchor rod static pressure pile sealing device and construction method | |
CN203200745U (en) | Strengthening support of underground diaphragm wall in inverse construction method | |
CN106245642A (en) | A kind of pre-stressed concrete pipe pile foundation and construction method thereof | |
CN206529813U (en) | A kind of anchor jacked pile reaction frame support steel bracket structure | |
CN102926382B (en) | A kind of construction method of SMW engineering method | |
KR20100006805U (en) | Holding plate for engineering and construction | |
JP3736555B2 (en) | Method for measuring ground contact pressure between foundation and supporting ground to use foundation of existing structure | |
KR100489336B1 (en) | Metal elevator pit | |
CN105951863A (en) | Construction device of active assembling type open caisson and construction method using same | |
JP5316897B2 (en) | Seismic isolation method | |
CN204676591U (en) | Trough rim construction elevator basis | |
CN201148617Y (en) | Wrapping opening-shaped pile tip | |
CN210622366U (en) | Underpinning processing device for damaged reinforced concrete column | |
CN202745081U (en) | Large-size rubble concrete settlement joint template system | |
CN102226343A (en) | Combined anchor-rod static pressure pile | |
JP3488454B1 (en) | H-shaped steel pile for temporary work | |
CN207244649U (en) | A kind of lightweight steel construction assembles the basis of decoration integrated building | |
CN2820960Y (en) | Check shape underground wall self standing wall protection structure | |
KR200364617Y1 (en) | Bearing power increase apparatus of plant file | |
CN219568905U (en) | Foundation pit support structure | |
CN220538644U (en) | Device for cleaning soil between TRD section steel and SMW construction method pile type steel piles | |
CN218843114U (en) | Steel pipe pile and steel purlin combined enclosure system for local deep pit or foundation pit corner | |
CN218622309U (en) | Sheet pile-anchor rod assembly type retaining wall | |
CN115130167B (en) | II-shaped support design method, support method applying II-shaped support and support design system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |