CN206527455U - A kind of all-weather weld job moves canopy - Google Patents

A kind of all-weather weld job moves canopy Download PDF

Info

Publication number
CN206527455U
CN206527455U CN201720052137.0U CN201720052137U CN206527455U CN 206527455 U CN206527455 U CN 206527455U CN 201720052137 U CN201720052137 U CN 201720052137U CN 206527455 U CN206527455 U CN 206527455U
Authority
CN
China
Prior art keywords
canopy
rail groove
steel
weld job
weather
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720052137.0U
Other languages
Chinese (zh)
Inventor
覃仁林
王洪建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Consultants
Original Assignee
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Consultants filed Critical CCCC Third Harbor Consultants
Priority to CN201720052137.0U priority Critical patent/CN206527455U/en
Application granted granted Critical
Publication of CN206527455U publication Critical patent/CN206527455U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

It is made up of the utility model discloses a kind of all-weather weld job movement canopy rail groove, car bumper, steel construction canopy, road wheel, locking device, tool box, steel platform, the folding door that keeps out the wind, ventilation fan, welding electrode drying bucket, fire extinguisher, explosion-proof lamp;The rail groove is longitudinally arranged two according to weld job point, and the rail groove is on cast in situ concrete foundation, and the rail groove is welded and fixed with the steel dowel being embedded in cast in situ concrete foundation beam, and is weldingly connected with the ground connection steel below reinforcing bar;Described four terminations of rail groove set car stop respectively;The locking device being connected with steel construction canopy is set in the medium position of the rail groove, being locked for canopy is moved during for severe strong wind weather;Region between two rail grooves is provided with drainage grade or drainage groove, work scene when welding is in the region.Road wheel is provided with below steel construction canopy.The utility model substantially improves the working environment of outdoor weld job.

Description

A kind of all-weather weld job moves canopy
Technical field
The utility model is related to a kind of operation canopy, and in particular to a kind of weld job moves canopy, can improve and ensure small-sized The environment at welding for steel structure job execution scene, it is ensured that all weather operations, especially by the sea under the environment such as windy, rainy, damp and hot, More highlight advantage of the present utility model.
Background technology
The project constructions such as current highway, municipal administration, civil engineering or harbour build be in field, can all be related to substantially reinforcing bar, The small shaped steel structure such as built-in fitting, pipeline, limited by the factor such as narrow field and construction of temporary facilities cost, it is impossible to steel construction plus Full-closed structure factory building is built up in work welding field, builds interim factory building even if satisfying the requirements, can only also be built because of gesture, it will input is very Big cost goes to reforming processing place, builds enclosed construction and supporting related facility etc., has not only increased cost but also has wasted treasured The expensive duration, for cost-saving and duration, common way is to build up simple type factory building.And constructed in the area such as mountain area, seashore Prominent wind or typhoon are frequently encountered, easy mill construction is difficult to resist excessive wind-force, often therefore causes factory building, equipment It is destroyed, the increase of fund cost and duration cost can be further brought because of the repairerment of simple factory building and the maintenance of equipment.Also Some contractors just it is clear-cut do not build it is any block facility, thus can only, wind-force fine in the weather condition such as less meet will Ability operation, greatly reduces the effective operation time of time limit for contract in the case of asking, and live small formed steel construction processing is welded Construction operation progress causes very big influence, has to the operation under the conditions of atrocious weather if as duration reason, then applies The hidden danger such as working medium amount and safety is difficult to ensure that again, certainly, can not meet safety construction requirement.So, seem very simple One small formed steel construction steel construction processing welding procedure operation, bring many worries to working and contracting unit really.In order to The cost of investment faced and built should be reduced, accomplish again it is safe, time saving, be applicable, it is necessary to be processed to conventional factory building formula or open-air Mode is transformed, and changes into all-weather weld job movement canopy mode.
Utility model content
The purpose of this utility model, is to develop a kind of live small shaped steel structure processing weld job of adaptation, takes up an area small, operation Safely, using all weather working shed of flexible packaged type, construction construction of temporary facilities cost is reduced, reduces and uses process Safety go along with sb. to guard him, improve job site steel structure processing welding effective time and operating efficiency.
The technical scheme that the utility model is used is as follows:
A kind of all-weather weld job movement canopy by rail groove 1, car bumper 2, steel construction canopy 3, road wheel 4, locking device 5, Tool box 6, steel platform 7, the folding door 8 that keeps out the wind, ventilation fan 9, welding electrode drying bucket 10, fire extinguisher 11, explosion-proof lamp 12 are constituted;
The rail groove 1 is longitudinally arranged two according to weld job point, and the rail groove 1 is located at cast in situ concrete foundation 20 On, the rail groove 1 is welded and fixed with the steel dowel 22 being embedded in cast in situ concrete foundation beam 20, and with connecing below reinforcing bar Ground steel is weldingly connected, and is easy to ground wire overlap joint during weld job to use;Described 1 four terminations of rail groove set car stop 2 respectively, it is ensured that Mobile canopy road wheel does not roll rail groove 1 away from, it is ensured that safety;Set and be connected with steel construction canopy 3 in the medium position of the rail groove 1 Locking device 5, canopy is moved during for severe strong wind weather and is locked, it is ensured that Windproof safety;Two rail grooves 1 it Between region be provided with drainage grade or drainage groove, the region for welding when work scene.
The main body framework of steel construction canopy 3 is welded to connect based on light-duty square steel between node, mainly by column, crossbar, wall Face diagonal brace 19, top surface crossbeam 18 are constituted;Top surface and both sides metope are laid by slim color steel tile, and top is fixed in by tapping screw On face crossbeam 18, the bottom of steel construction canopy 3 is provided with road wheel 4, may move;The side of steel construction canopy 3 sets tool box 6 can storing name Stud sets steel platform 7 to be used to place electric welding machine 15 and control electronic box 16 in the middle part of tool and welding rod, opposite side, is easy to electric welding Machine 15 is moved with mobile canopy, set on the top of steel platform 7 rain cover positive plate 13, stud sets welding electrode drying bucket 10, takes into account Storage and rainy season construction phase welding electrode drying function, it is ensured that welding rod deposits constant mass;Set in the middle part of the ceiling of steel construction canopy 3 anti- Quick-fried lamp 12, ventilation fan 9 is set in metope tip position;The folding door 8 that keeps out the wind is set before and after steel construction canopy 3, for wind raining working When windproof and rain proof use;Stud bottom sets fire extinguisher 11, is used for fire-fighting emergent.
It is preferred that diameter 1cm osculum 13 is opened in the side of rail groove 1 in the 5 meters of positions in interval;
It is preferred that the locking device 5 is made up of ground anchor ring and chain connection, ground anchor ring connects the rail groove 1, chain Connect road wheel 4.
It is preferred that the junction of the rail groove 1 and steel construction canopy 3 is provided with and strengthens gusset 17;
It is preferred that provided with node connecting plate 21 and being welded to connect between the node.
Operating method of the present utility model:When operation completes to need to hang away the steel structure welded or needs to hang to come material or accessory When, mobile canopy can be removed, only need to 2 ~ 4 workmans when mobile selects bar along rail groove direction level, and passage is arrived Stopping means is used behind precalculated position(Taper iron plate jam track)It is fixed on rail groove, preventing and treating is unexpected to be moved.In strong wind , it is necessary to mobile canopy be shifted onto locking device position in the middle part of track, the locking device of four angular positions before rainstorm weather arrives All it is connected and locks with rail groove, preventing and treating beam wind topples, meanwhile, front and rear wind blocking door is locked, the electricity being connected with outside is cut off Source switch.For welding elongated member, such as the welding of filling pile cage of reinforcement, strip girder steel, small iron ware processing welding etc., Only need to mobile canopy to be moved to weld job position, next position is arrived in mobile canopy passage again after the position is welded.If making The influence of industry scene wind-engaging rain ice snow, can close up color steel casement door before and after mobile canopy, be formed the room for having masking completely Interior operating environment, while can be with the ventilation fan of open top part, it is ensured that operating environment meets occupational health requirement in canopy;It is cruel in temperature The summer of heat, front/rear door is fully open, and a cool environment of sunshade can be provided for Work places.No matter wind and rain or fine My god, carried out under conditions of can ensureing weld job in proximate chamber.Higher weldering is required to natural environments such as humidity, wind-force Operation is connect, first the accessory processed can be put along welding job face, mobile canopy is elapsed to precalculated position according to welding sequence It can be carried out weld job.
Compared with prior art, the utility model can combine live site condition well, can meet compared with polymorphic type Welding for steel structure operation, adaptability is stronger, and simple in construction, making material is saved, low manufacture cost, and maintenance and maintenance are also convenient for Save trouble, with extraordinary economy and practicality, to improve job site welding for steel structure operating efficiency, reduction construction investment All many-sides such as expense, the career safety & health accordance for strengthening operating environment show the advantage of uniqueness.
Brief description of the drawings
Fig. 1 is a kind of all-weather weld job movement canopy plan of the utility model;
Fig. 2 for Fig. 1 A-A to sectional view;
Fig. 3 is Fig. 1 B-B direction sectional view;
Fig. 4 for Fig. 1 C-C to sectional view;
Fig. 5 is Fig. 1 leftschematic diagram;
Fig. 6 is Fig. 1 upside schematic diagram;
Fig. 7 is welding electrode drying of the present utility model 10 connection diagrams of bucket;
Fig. 8 for Fig. 7 D-D to sectional view;
Fig. 9 is the connection diagram between road wheel 4 of the present utility model, rail groove 1, steel dowel 22;
Figure 10 is the structural representation of the utility model car bumper 2;
Figure 11 is the structural representation of the utility model fixing device 5;
Figure 12 is the structural representation in the utility model tool box 6.
Embodiment
As shown in figs. 1-12, a kind of all-weather weld job movement canopy is by rail groove 1, car bumper 2, steel construction canopy 3, walking It is wheel 4, locking device 5, tool box 6, steel platform 7, the folding door 8 that keeps out the wind, ventilation fan 9, welding electrode drying bucket 10, fire extinguisher 11, anti- Quick-fried lamp 12 is constituted;
The rail groove 1 is longitudinally arranged two according to weld job point, and the rail groove 1 is located at cast in situ concrete foundation 20 On, the rail groove 1 is welded and fixed with the steel dowel 22 being embedded in cast in situ concrete foundation beam 20, and with connecing below reinforcing bar Ground steel is weldingly connected, and is easy to ground wire overlap joint during weld job to use;Described 1 four terminations of rail groove set car stop 2 respectively, it is ensured that Mobile canopy road wheel does not roll rail groove 1 away from, it is ensured that safety;Set and be connected with steel construction canopy 3 in the medium position of the rail groove 1 Locking device 5, canopy is moved during for severe strong wind weather and is locked, it is ensured that Windproof safety;Two rail grooves 1 it Between region be provided with drainage grade or drainage groove, the region for welding when work scene.
The main body framework of steel construction canopy 3 is provided with node connecting plate 21 and is welded to connect based on light-duty square steel, between node, main To be made up of column, crossbar, metope diagonal brace 19, top surface crossbeam 18;Top surface and both sides metope are laid by slim color steel tile, by certainly Attack screw to be fixed on top surface crossbeam 18, the bottom of steel construction canopy 3 is provided with road wheel 4, may move;The side of steel construction canopy 3 Set tool box 6 can storing tools and welding rod, stud sets steel platform 7 to be used to place the He of electric welding machine 15 in the middle part of opposite side Control electronic box 16, be easy to electric welding machine 15 to be moved with mobile canopy, set on the top of steel platform 7 rain cover positive plate 13, stud sets Welding electrode drying bucket 10, takes into account storage and rainy season construction phase welding electrode drying function, it is ensured that welding rod deposits constant mass;Steel knot Explosion-proof lamp 12 is set in the middle part of the ceiling of structure canopy 3, ventilation fan 9 is set in metope tip position;Folding of keeping out the wind is set before and after steel construction canopy 3 Door 8, windproof and rain proof is used during for wind raining working;Stud bottom sets fire extinguisher 11, is used for fire-fighting emergent.It is described Diameter 1cm osculum 13 is opened being spaced 5 meters of positions in the side of rail groove 1;The locking device 5 is by ground anchor ring and chain connection group Into ground anchor ring connects the rail groove 1, chain connection road wheel 4.The junction of the rail groove 1 and steel construction canopy 3, which is provided with, to be added Strong gusset 17.

Claims (5)

1. a kind of all-weather weld job movement canopy by rail groove, car bumper, steel construction canopy, road wheel, locking device, tool box, Steel platform, the folding door that keeps out the wind, ventilation fan, welding electrode drying bucket, fire extinguisher, explosion-proof lamp composition;It is characterized in that:
The rail groove is longitudinally arranged two according to weld job point, and the rail groove is described on cast in situ concrete foundation Rail groove is welded and fixed with the steel dowel being embedded in cast in situ concrete foundation beam, and welds phase with the ground connection steel below reinforcing bar Even, it is easy to ground wire overlap joint during weld job to use;Described four terminations of rail groove set car stop respectively, it is ensured that mobile canopy road wheel Do not roll rail groove away from, it is ensured that safety;The locking device being connected with steel construction canopy is set in the medium position of the rail groove, is used for Movement canopy is locked during severe strong wind weather, it is ensured that Windproof safety;Region between two rail grooves is provided with draining The gradient or drainage groove, work scene when welding is in the region;
Steel construction canopy main body framework is based on light-duty square steel, by being welded to connect between node, mainly by column, crossbar, metope Diagonal brace, top surface crossbeam composition;Top surface and both sides metope are laid by slim color steel tile, and top surface crossbeam is fixed in by tapping screw On, the bottom of steel construction canopy is provided with road wheel, may move;Steel construction canopy side set tool box can storing tools and welding rod, Stud sets steel platform to be used to place electric welding machine and control electronic box in the middle part of opposite side, is easy to electric welding machine to be moved with mobile canopy It is dynamic, set on steel platform top rain cover positive plate, stud sets welding electrode drying bucket, takes into account storage and rainy season construction phase welding rod Drying function, it is ensured that welding rod deposits constant mass;Explosion-proof lamp is set in the middle part of steel construction ceiling canopy, set in metope tip position Ventilation fan;The folding door that keeps out the wind is set before and after steel construction canopy, and windproof and rain proof is used during for wind raining working;Stud bottom is set Fire extinguisher, is used for fire-fighting emergent.
2. all-weather weld job as claimed in claim 1 moves canopy, it is characterised in that:The rail groove side is at interval 5 Open diameter 1cm osculum in rice position.
3. all-weather weld job as claimed in claim 1 moves canopy, it is characterised in that:The locking device by ground anchor ring and Chain connection composition, ground anchor ring connects the rail groove, chain connection road wheel.
4. all-weather weld job as claimed in claim 1 moves canopy, it is characterised in that:The rail groove and steel construction canopy Junction is provided with reinforcement gusset.
5. all-weather weld job as claimed in claim 1 moves canopy, it is characterised in that:Connect between the node provided with node Fishplate bar is simultaneously welded to connect.
CN201720052137.0U 2017-01-17 2017-01-17 A kind of all-weather weld job moves canopy Expired - Fee Related CN206527455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720052137.0U CN206527455U (en) 2017-01-17 2017-01-17 A kind of all-weather weld job moves canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720052137.0U CN206527455U (en) 2017-01-17 2017-01-17 A kind of all-weather weld job moves canopy

Publications (1)

Publication Number Publication Date
CN206527455U true CN206527455U (en) 2017-09-29

Family

ID=59920436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720052137.0U Expired - Fee Related CN206527455U (en) 2017-01-17 2017-01-17 A kind of all-weather weld job moves canopy

Country Status (1)

Country Link
CN (1) CN206527455U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442525A (en) * 2018-04-13 2018-08-24 上海绿地建设设计研究院有限公司 A kind of construction awning mobile system
CN109667346A (en) * 2019-01-22 2019-04-23 中建三局集团有限公司 A kind of mobile steel structure closing canopy

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442525A (en) * 2018-04-13 2018-08-24 上海绿地建设设计研究院有限公司 A kind of construction awning mobile system
CN108442525B (en) * 2018-04-13 2024-05-24 上海绿地建设设计研究院有限公司 Construction awning moving system
CN109667346A (en) * 2019-01-22 2019-04-23 中建三局集团有限公司 A kind of mobile steel structure closing canopy

Similar Documents

Publication Publication Date Title
CN101845857B (en) Metal mesh built-in insulating outer wall and construction method thereof
CN206527455U (en) A kind of all-weather weld job moves canopy
CN206352400U (en) Positively fixed type parapet of roofing position waterproof modular repair structure
CN109797874A (en) A kind of high level Multi-tower post-cast strip advance water stop construction method
CN210713552U (en) Roof structure with inverted concrete slab protection layer
CN106193115A (en) A kind of concrete prefabricated groove
CN104947662B (en) A kind of soil-nail wall support system based on the recyclable technique of assembled
CN207003685U (en) A kind of connecting node of Side fascia and floor
CN204676533U (en) A kind of soil-nail wall support system based on the recyclable technique of assembling
CN107975163A (en) A kind of mountable double-deck Side fascia and mounting structure and horizontal vertical waterproof construction
CN202899319U (en) Waterproof panel point of side wall of existing building and roof of new-built building
CN205153244U (en) Metal roof waterproof people pore structure
CN212248384U (en) Sealing device for post-cast strip of top plate of underground chamber
CN210597802U (en) Flat change slope roofing node structure
CN108589793A (en) A kind of poured band of outer wall of basement postposition assembled advance water stop construction method
CN104895259B (en) A kind of steel structural plant roof water leak preventing structure
CN211736089U (en) Tower crane penetrating structure waterproof device
CN109695320A (en) A kind of roof waterproof node
CN209538419U (en) A kind of sealing element and waterproofing node easy to install
CN206737496U (en) A kind of integral prefabricated concrete assembled base station room
CN106869412B (en) A kind of device for preventing pitched roof waterproof roll and its upper structural layer from falling off
CN205975677U (en) Precast concrete slot
CN208167769U (en) Assembled ground
CN206231922U (en) Mobile open-type closing garbage pool
CN214498486U (en) Pier column type anti-typhoon component for reinforcing high-mountain movable plank house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929

Termination date: 20200117

CF01 Termination of patent right due to non-payment of annual fee