CN206522150U - A kind of pit mining low gaseous mine sump with ventilation unit - Google Patents

A kind of pit mining low gaseous mine sump with ventilation unit Download PDF

Info

Publication number
CN206522150U
CN206522150U CN201720142025.4U CN201720142025U CN206522150U CN 206522150 U CN206522150 U CN 206522150U CN 201720142025 U CN201720142025 U CN 201720142025U CN 206522150 U CN206522150 U CN 206522150U
Authority
CN
China
Prior art keywords
sump
ventilation unit
vertical duct
ring flange
pit mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720142025.4U
Other languages
Chinese (zh)
Inventor
李宗国
南锦玉
姜万腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG PROVINCE TIANZHUANG COAL MINE
Shandong Tianzhuang Coal Mining Co Ltd
Original Assignee
SHANDONG PROVINCE TIANZHUANG COAL MINE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG PROVINCE TIANZHUANG COAL MINE filed Critical SHANDONG PROVINCE TIANZHUANG COAL MINE
Priority to CN201720142025.4U priority Critical patent/CN206522150U/en
Application granted granted Critical
Publication of CN206522150U publication Critical patent/CN206522150U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The utility model is related to a kind of pit mining low gaseous mine sump with ventilation unit, and the pre- embedded ventilation unit at sump inner ring, absorbing well, absorption well and sump outer shroud makes sump inner ring, sump outer shroud be connected with sump pump house.The beneficial effects of the utility model are:1st, work link is reduced, the cleaning sump engineering time is shortened, reduces and takes equipment situation.2nd, the electricity charge saved, during rainy season three proofings, each sump is both needed to cleaning once.3rd, the creative pre-buried pipeline between sump and pump house, installation sleeve, when clearing up sump, opening sleeve forms regular ventilation.Closure sleeve formation closing space during sump retaining.4th, reduce peace in the past and remove ventilation equipment man hour of labour, reduction uses construction equipment, it is to avoid because equipment fault influences the factor of construction.5th, the labor intensity of workman is reduced.6th, the blower fan electricity charge are saved.

Description

A kind of pit mining low gaseous mine sump with ventilation unit
Technical field
The utility model is related to a kind of pit mining low gaseous mine sump, more particularly to a kind of well with ventilation unit Work exploits low gaseous mine sump.
Background technology
Mine sump inner and outer ring of constructing in the past usually requires to install the ventilation apparatus such as blower fan, switch.Used during bringing down stocks The electricity charge produced by blower fan are a kind of wastes, and mine sump cleaning is frequent, and removal of home construction times are more, and peace removes equipment conveying ring Section is more, takes the duration longer.
Utility model content
Technical problem to be solved in the utility model is:A kind of pit mining present low gas ore deposit with ventilation unit is provided Well water storehouse, to solve above-mentioned technical problem.
The technical scheme that the utility model is used by solution the problem of set forth above is:
A kind of pit mining low gaseous mine sump with ventilation unit, including outside sump inner ring 5, absorbing well, absorption well 6, sump Ring 7 and sump pump house 8, pre- embedded ventilation unit, makes sump inner ring 5, water at sump inner ring 5, absorbing well, absorption well 6 and sump outer shroud 7 Storehouse outer shroud 7 is connected with sump pump house 8.
Described ventilation unit is processed using a diameter of 325 steel pipe.
Described ventilation unit, including horizontal tube 1, vertical duct 2, bend pipe 3 and sleeve 4, the upper end of vertical duct 2 extends to sump Outer shroud, the lower end of vertical duct 2 connects horizontal tube 1 by bend pipe 3, and the other end of horizontal tube 1 extends to sump inner ring top, vertical duct 2 Upper end be provided with for block vertical duct 2 opening sleeve 4.
The upper and lower ends of described bend pipe 3 are respectively provided with ring flange, and the right-hand member of the horizontal tube 1 is provided with ring flange;It is described The ring flange of the ring flange of the upper end of bend pipe 3 and the right-hand member of horizontal tube 1 is bolted;The lower end of the vertical duct 2 is set There is ring flange;The ring flange of the lower end of bend pipe 3 and the ring flange of the lower end of vertical duct 2 are bolted.
Described vertical duct 2 is fixed on the inwall of absorbing well, absorption well 6 by anchor pole.
Described flange specification is DN300.
The described upper end of vertical duct 2 is provided with external screw thread, the one end open of sleeve 4, other end closing, the inner thread hole of sleeve 4 Provided with the internal thread coordinated with external screw thread, the vertical duct 2 coordinates with the screw thread of sleeve 4.
A high position for described sleeve 4 is 6cm.
The beneficial effects of the utility model are:1st, work link is reduced, the cleaning sump engineering time is shortened, reduction is accounted for Use equipment situation.2nd, the electricity charge saved, during rainy season three proofings, each sump is both needed to cleaning once.3rd, it is creative in sump The pre-buried pipeline between pump house, installation sleeve, when clearing up sump, opening sleeve forms regular ventilation.Set is closed during sump retaining Cylinder forms closing space.4th, reduce peace in the past and remove ventilation equipment man hour of labour, reduction uses construction equipment, it is to avoid because of equipment The factor of fault impact construction.5th, the labor intensity of workman is reduced.6th, the blower fan electricity charge are saved.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of ventilation unit.
Wherein, 1- horizontal tubes, 2- vertical ducts, 3- bend pipes, 4- sleeves, 5- sump inner ring, 6- absorbing well, absorption wells, 7- sump outer shrouds, 8- sump pump houses.
Embodiment
Embodiment of the present utility model is further illustrated below in conjunction with the accompanying drawings.
Reference picture 1-2, a kind of pit mining low gaseous mine water with ventilation unit described in present embodiment Storehouse, including sump inner ring 5, absorbing well, absorption well 6, sump outer shroud 7 and sump pump house 8, in sump inner ring 5, absorbing well, absorption well 6 and sump outer shroud 7 Locate pre- embedded ventilation unit, sump inner ring 5, sump outer shroud 7 is connected with sump pump house 8.
Described ventilation unit is processed using a diameter of 325 steel pipe.
Described ventilation unit, including horizontal tube 1, vertical duct 2, bend pipe 3 and sleeve 4, the upper end of vertical duct 2 extends to sump Outer shroud, the lower end of vertical duct 2 connects horizontal tube 1 by bend pipe 3, and the other end of horizontal tube 1 extends to sump inner ring top, vertical duct 2 Upper end be provided with for block vertical duct 2 opening sleeve 4.
The upper and lower ends of described bend pipe 3 are respectively provided with ring flange, and the right-hand member of the horizontal tube 1 is provided with ring flange;It is described The ring flange of the ring flange of the upper end of bend pipe 3 and the right-hand member of horizontal tube 1 is bolted;The lower end of the vertical duct 2 is set There is ring flange;The ring flange of the lower end of bend pipe 3 and the ring flange of the lower end of vertical duct 2 are bolted.
Described vertical duct 2 is fixed on the inwall of absorbing well, absorption well 6 by anchor pole.
Described flange specification is DN300.
The described upper end of vertical duct 2 is provided with external screw thread, the one end open of sleeve 4, other end closing, the inner thread hole of sleeve 4 Provided with the internal thread coordinated with external screw thread, the vertical duct 2 coordinates with the screw thread of sleeve 4.
A high position for described sleeve 4 is 6cm.
The beneficial effect of present embodiment is:By taking the in line sump of two levels as an example:
1st, reduce peace in the past and remove ventilation equipment man hour of labour, reduction uses construction equipment, it is to avoid because of equipment fault shadow Ring the factor of construction
During being brought down stocks to meet the requirements, it is necessary to install two 5.5KW blower fans,(One uses, and one standby), according to《Face Ore deposit group ration standard》, fortune peace one Fans, 8 works withdraw 6 works of a Fans, therefore one sump of cleaning is from starting to apply Work removes peace blower fan to construction end needs 28 works altogether, is calculated according to 165 yuan/work:Required labour cost=165 × 28=4620 yuan;
Using draft tube aeration, bring down stocks that 4620 yuan of labour costs can be saved every time.
2nd, the labor intensity of workman is reduced
Sump inner and outer rings length 374m, 8.93 square metres of section, sump amount of sludge 3340m3 according to《Lin Kuang groups quota Standard》, artificial desilting is by the calculating of 2.7m3/ works, it is contemplated that the folding work of work 1237.
Using draft tube aeration, bring down stocks that 1237 works can be saved every time.
3rd, the blower fan electricity charge are saved
According to every people of bottom class 4,12 people of garden class calculate, and need altogether 103 days,
Electricity consumption=24h/d × 103d=2474h needed for blower fan during desilting
Institute's subfam. Spiraeoideae=2474h × 11kw=27215kw*h during sump desilting(Note:Power of fan is 5.5 kw)
The electricity charge=27215kw*h × 1.5 yuan=40822 yuan needed for during bringing down stocks
At coal bunker 4, every year by bringing down stocks once to calculate, 163528 yuan of the electricity charge are needed altogether.
Therefore draft tube aeration is used, has reached the policy of ore deposit energy efficiency.
Specific embodiment of the utility model is not constituted to limitation of the present utility model, every to use phase of the present utility model Like structure and change, in protection domain of the present utility model.

Claims (5)

1. a kind of pit mining low gaseous mine sump with ventilation unit, it is characterised in that:Including sump inner ring(5), inhale Well(6), sump outer shroud(7)With sump pump house(8), in sump inner ring(5), absorbing well, absorption well(6)With sump outer shroud(7)Place is pre- embedded Ventilation unit, makes sump inner ring(5), sump outer shroud(7)With sump pump house(8)Connection.
2. a kind of pit mining low gaseous mine sump with ventilation unit as claimed in claim 1, it is characterised in that:Institute The ventilation unit stated is processed using a diameter of 325 steel pipe.
3. a kind of pit mining low gaseous mine sump with ventilation unit as claimed in claim 1, it is characterised in that:Institute The ventilation unit stated, including horizontal tube(1), vertical duct(2), bend pipe(3)And sleeve(4), vertical duct(2)Upper end extends to sump Outer shroud, vertical duct(2)Lower end passes through bend pipe(3)Connect horizontal tube(1), horizontal tube(1)The other end extends to sump inner ring top, Vertical duct(2)Upper end be provided with for blocking vertical duct(2)The sleeve of opening(4).
4. a kind of pit mining low gaseous mine sump with ventilation unit as claimed in claim 3, it is characterised in that:Institute The bend pipe stated(3)Upper and lower ends be respectively provided with ring flange, the horizontal tube(1)Right-hand member be provided with ring flange;The bend pipe(3) The ring flange of upper end and the horizontal tube(1)The ring flange of right-hand member is bolted;The vertical duct(2)Lower end be provided with Ring flange;The bend pipe(3)The ring flange of lower end and the vertical duct(2)The ring flange of lower end is bolted.
5. a kind of pit mining low gaseous mine sump with ventilation unit as claimed in claim 4, it is characterised in that:Institute The vertical duct stated(2)Absorbing well, absorption well is fixed on by anchor pole(6)Inwall.
CN201720142025.4U 2017-02-17 2017-02-17 A kind of pit mining low gaseous mine sump with ventilation unit Expired - Fee Related CN206522150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720142025.4U CN206522150U (en) 2017-02-17 2017-02-17 A kind of pit mining low gaseous mine sump with ventilation unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720142025.4U CN206522150U (en) 2017-02-17 2017-02-17 A kind of pit mining low gaseous mine sump with ventilation unit

Publications (1)

Publication Number Publication Date
CN206522150U true CN206522150U (en) 2017-09-26

Family

ID=59892493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720142025.4U Expired - Fee Related CN206522150U (en) 2017-02-17 2017-02-17 A kind of pit mining low gaseous mine sump with ventilation unit

Country Status (1)

Country Link
CN (1) CN206522150U (en)

Similar Documents

Publication Publication Date Title
CN104746531B (en) A kind of stainless steel composite pipe gallery
CN206522147U (en) A kind of ventilation unit
CN205477664U (en) Twin side heading method undercut tunnel utility tunnel
CN206522150U (en) A kind of pit mining low gaseous mine sump with ventilation unit
CN203053090U (en) Interleave-type buried pipe ground source heat pump system
CN204787025U (en) Indoor ventilation system
CN206522148U (en) Pit mining low gaseous mine sump ventilation unit
CN102121391A (en) Construction method for ventilation in construction of small-radius spiral tunnel
CN204551523U (en) A kind of stainless steel composite pipe gallery
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN204114974U (en) Flue Universal wind-proof cap
CN207805516U (en) A kind of system preventing pump house absorbing well, absorption well sedimentation
CN205742273U (en) A kind of fiberglass pipe gallery
CN205296343U (en) Be applied to waste fitting discharging in workshop
CN204293729U (en) River course immersible pump safety fire fighting system
CN205894519U (en) Structure of waterproof parapet of roofing stainless steel and open drain combination
CN204199803U (en) Diesel-driven generator underground garage sunk type air inlet structure
CN202627626U (en) Sectional-type single-barrel chimney with concrete structure
CN204493964U (en) A kind of bend pipe structure-improved of construction engineering ventilation duct
CN209429170U (en) Underground pipe gallery system and super-huge burning power plant
CN210718172U (en) Partitioned recharge type middle-deep geothermal energy collecting well
CN203049619U (en) Intelligent inspection well
CN205032899U (en) Rotatable riser tray
CN202899725U (en) Electric line electric pole anti-corrosion pulling rod
CN206736961U (en) A kind of Novel steel-plastic composite pipe corridor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170926

Termination date: 20190217

CF01 Termination of patent right due to non-payment of annual fee