CN206513400U - A kind of detection pipe for Tunnel Second Lining vault concrete construction - Google Patents

A kind of detection pipe for Tunnel Second Lining vault concrete construction Download PDF

Info

Publication number
CN206513400U
CN206513400U CN201720151291.3U CN201720151291U CN206513400U CN 206513400 U CN206513400 U CN 206513400U CN 201720151291 U CN201720151291 U CN 201720151291U CN 206513400 U CN206513400 U CN 206513400U
Authority
CN
China
Prior art keywords
tunnel
detection pipe
lining
concrete construction
lining vault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720151291.3U
Other languages
Chinese (zh)
Inventor
孙超
徐洪球
孟桦
胡昌发
杨赫然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Huatie Engineering Design Group Co Ltd
Original Assignee
China Railway Huatie Engineering Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Huatie Engineering Design Group Co Ltd filed Critical China Railway Huatie Engineering Design Group Co Ltd
Priority to CN201720151291.3U priority Critical patent/CN206513400U/en
Application granted granted Critical
Publication of CN206513400U publication Critical patent/CN206513400U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of detection pipe for Tunnel Second Lining vault concrete construction, including body(1)And rubber stopper(2), body(1)One end is provided with cross-shaped aperture(3), rubber stopper(2)It is sleeved on cross-shaped aperture(3)Place.The beneficial effect of the utility model compared with prior art is:Pass through the improvement to existing detection pipe so that tunnel double-lining vault leakiness probability is down to 5% by 65%, the two uncompacted quality problems of lining vault concrete are greatly reduced, technique effect is obvious.

Description

A kind of detection pipe for Tunnel Second Lining vault concrete construction
Technical field
The utility model is related to Tunnel Second Lining vault technical field of concrete construction, more particularly to a kind of for tunnel The detection pipe of secondary lining vault concrete construction.
Background technology
At present, be also easy to produce in Tunnel Second Lining vault concreting come to nothing, the technological deficiency, this meeting such as thickness deficiency Potential safety hazard is caused during to tunnel operation, how to overcome two lining vaults to come to nothing the technical problem not enough with thickness, just becomes Ensure two emphasis for serving as a contrast construction quality.Existing common practice is to pass through detection pipe in lining trolley drilling, and its one end is worn Cross form stop to be placed near the splash guard of laying, the other end is then fixed on lining trolley.It is skill that the technical scheme, which exists, Art defect is:If lining waterproof plate is withstood in detection pipe one end, splash guard is easily caused damaged.If detection pipe end is not withstood Splash guard, reserved height(Detect height of the pipe end apart from splash guard)It is easily caused two lining concreting leakiness or de- It is empty.
Patent No. ZL201610763000.6 Chinese invention patent discloses a kind of prevention tunnel double-lining vault and come to nothing Device and its construction method, vertical Grouting Pipe in device therein(5)With longitudinal Grouting Pipe(3)Between, vertical blast pipe(6) With longitudinal blast pipe(2)Between pass through three-way connection device respectively(9)Carry out " T-shaped " connection;Method therein includes following step Suddenly:Longitudinal blast pipe is arranged Step 1: making first(2)With longitudinal Grouting Pipe(3), Step 2: by vertical blast pipe(6)With Longitudinal blast pipe(2), vertical Grouting Pipe(5)With longitudinal Grouting Pipe(3)" T-shaped " connection is carried out, step 3 is by vertical Grouting Pipe(5) With vertical blast pipe(6)Drawn out in two lining chassis reserving holes and the slurry pipe that overflows is installed(7), step 4, the lining concrete of progress two Construction.It is simple in construction, easy construction;Effectively prevent vault from coming to nothing, substantially increase secondary lining quality.But the utility model is still suffered from Following technological deficiency:If overflowing slurry pipe(7)Lining waterproof plate is withstood in one end, easily causes splash guard damaged.If overflowing slurry pipe(7) Do not withstand splash guard, reserved height in termination(Detect height of the pipe end apart from splash guard)It is easily caused two lining concretings not It is closely knit or come to nothing.Therefore urgently further improve.
Utility model content
In order to solve the technological deficiency that above-mentioned existing excessive slurry pipe is present, the technical solution of the utility model is specific as follows:
A kind of detection pipe for Tunnel Second Lining vault concrete construction, including body and rubber stopper, the body One end is provided with cross-shaped aperture, and the rubber stopper is sleeved at the cross-shaped aperture.
Preferably, the depth of the cross-shaped aperture is not more than 3cm.
In any of the above-described scheme preferably, the rubber stopper wraps up the depth of the body no more than 1cm.
In any of the above-described scheme preferably, the bottom thickness of the rubber stopper is 1cm.
In any of the above-described scheme preferably, including detachable supporting steel plate, the body other end with it is described can Detachable supporting steel plate is connected.
It is preferably in any of the above-described scheme, including the first fixation steel plate and the second fixation steel plate, it is described detachable The both sides of supporting steel plate are connected with first fixation steel plate and the second fixation steel plate respectively by the first bolt and the second bolt Connect.
In any of the above-described scheme preferably, the bottom of the body is provided with valve.
In any of the above-described scheme preferably, the rubber stopper uses fluorubber.
In any of the above-described scheme preferably, the rubber stopper uses silicon rubber.
In any of the above-described scheme preferably, the rubber stopper uses nitrile rubber.
The beneficial effect of the utility model compared with prior art is:Pass through the improvement to existing detection pipe so that tunnel Two lining vault leakiness probability are down to 5% by 65%, and the two uncompacted quality problems of lining vault concrete, technology effect are greatly reduced Fruit is substantially.
Brief description of the drawings
Fig. 1 is as according to the one preferred of the detection pipe of the present utility model for Tunnel Second Lining vault concrete construction The main sectional view of embodiment.
Fig. 2 is real as Fig. 1 according to the detection pipe of the present utility model for Tunnel Second Lining vault concrete construction Apply A-A direction views in example.
Fig. 3 is real as Fig. 1 according to the detection pipe of the present utility model for Tunnel Second Lining vault concrete construction Apply the mounting structure schematic diagram of example.
Fig. 4 is the mounting structure schematic diagram of existing detection pipe.
Description of reference numerals:
1 body;2 rubber stoppers;3 cross-shaped apertures;4 valves;5 detachable supporting steel plates;6 first fixation steel plates;7 second Fixation steel plate;8 first bolts;9 second bolts;10 lining shuttering faces;11 existing detection pipes.
Embodiment
The present embodiment is only an optimal technical scheme, wherein each involved building block and annexation are not limited The setting and connection of each building block in a kind of this following embodiment described by the embodiment, the preferred scheme Relation can carry out arbitrary permutation and combination and form complete technical scheme.
As Figure 1-3, a kind of detection pipe for Tunnel Second Lining vault concrete construction, including body 1 and rubber Plug 2, one end of body 1 is provided with cross-shaped aperture 3, and rubber stopper 2 is sleeved at cross-shaped aperture 3, the depth of cross-shaped aperture 3 No more than 3cm, the depth of the parcel body 1 of rubber stopper 2 is no more than 1cm, and the bottom thickness of rubber stopper 2 is 1cm, effectively to prevent The contact wear of the detection pipe and splash guard.Including detachable supporting steel plate 5, the other end of body 1 and detachable support Steel plate 5 is connected.Including the first fixation steel plate 6 and the second fixation steel plate 7, the both sides of detachable supporting steel plate 5 pass through first The bolt 9 of bolt 8 and second is connected with the first fixation steel plate 6 and the second fixation steel plate 7 respectively.The bottom of body 1 is provided with valve Door 4.Rubber stopper 2 can use fluorubber or silicon rubber or nitrile rubber.
As shown in figure 4, illustrating for the existing detection pipe mounting structure for Tunnel Second Lining vault concrete construction Figure.When being constructed using existing detection pipe 11, two serve as a contrast vault leakiness probability up to 65%.
The utility model is able to ensure that detection pipe can directly withstand splash guard in work progress, because splash guard has one Fixed slackness, can also overflow directly by splash guard top to first branch face finally by the position for being not more than 2cm apart from first branch face Slurry, so as to realize Tunnel Second Lining vault concrete compaction, the technique effect do not lost gap, do not stay dead angle.Through construction verification, It is only 5% using the leakiness probability after the utility model, the two uncompacted quality problems of lining vault concrete is greatly reduced, Technique effect is obvious.
The secondary lining is the form concrete or armored concrete applied on the inside of tunnel construction supporting in the early stage Lining cutting, composite lining is collectively constituted with preliminary bracing.The general provision of the secondary lining:Tunnel Second Lining structure coagulation Soil should closely knit, surfacing be smooth, curvilinear circular is suitable, meets design strength, waterproof and life requirement.Secondary lining coagulation soil application Cement, fine aggregate, coarse aggregate, mixing and maintenance is tackled before work to be tested with raw material such as water, additive, admixtures, it is every Technical indicator should echo the relevant regulations of acceptance criteria.According to the concrete condition at scene, it should suitably increase the outer of secondary lining and put Value(Construction positive error), in order to avoid invade limit.Tunnel arch backbreak part should use with secondary lining with strength grade concrete once Pour.The order of Second Lining Construction is that inverted arch is advanced, wall, arch one-piece casting.The position of abutment wall height of foundation(Divergence Seam)The maximum section of shearing should be avoided, and makees water-proofing treatment by design requirement.Concrete production, which should be used, has automatic gauge dress The blending station put, mix and stir waggon, concrete pump, plug-in type the machanized line vibrated is combined with adhesion type.It is secondary The concrete of lining cutting, from the inspection and selection of raw material, the proportioning of concrete and mixing, the control of placing temperature and vibrate, to The each operation of lining cutting maintenance must be operated on request, prevent the generation of Lining Crack.
The secondary lining applies condition:(1)Secondary lining, which applies general deformed in country rock and preliminary bracing, tends to be steady Carried out after fixed.(2)In tunnel portal section, Shallow Section, country rock loose crushing section, secondary lining should be applied as early as possible, and answer reinforcing line Build structure.(3)Carry out preliminary bracing, waterproof layer, ring longitudinal drainage system of operation section of secondary lining etc. and check and accept conjunction Lattice;Waterproof layer surface dust has been removed totally.(4)Splash guard paving location answers advanced Second Lining Construction.(5)Secondary lining is applied Tunnel center line, elevation and cross dimensions are checked before work, it is necessary to meet design requirement.(6)Packed layer or shop fixtures on inverted arch, which are adjusted, to be looked for Flat bed, which has been constructed, to be finished;Underground water reasonable ejectment;Construction joint handles qualified by design requirement;Basic part no-sundries, product Water.(7)The illumination of secondary lining operating area, power supply, water supply, drainage system can be met in lining cutting normal construction requirement, tunnel Ventilation condition is good.Inverted arch and construction of bottom plates:(1)The empty slag of Tunnel Base, debris, mud, ponding etc. are cleaned out before construction, And with high-pressure blast by tunnel bottom blowing wash clean, part of backbreaking is using concrete backfill at the same level.(2)During inverted arch one-piece casting, done to be anti- Disturb operation and use trestle, to ensure that working space and young concrete structure are without damage.(3)Tunnel bottom is applied in time after excavating Inverted arch or screed-coat, inverted arch or underplate concrete answer one-piece casting, once-forming, and fill concrete should be in inverted arch concrete final set After carry out.(4)Inverted arch construction joint and movement joint should make water-proofing treatment.
The fluorubber has heat-resisting quantity, can be used in -30 DEG C -+250 DEG C environment, powerful oxidation corrosion resistance agent, oil resistant, resistance to Soda acid.It is generally used in high temperature, high vacuum and hyperbaric environment, is suitable for oils environment.The silicon rubber has prominent resistance to height Cryogenic property, what holding was good within the temperature range of -70 DEG C -+260 DEG C uses elasticity, and has resistance to ozone, Weather-resistant etc. Advantage.The nitrile rubber has a performances such as excellent oil resistant and aromatic solvent, but intolerant to ketone, ester and chlorination through etc. medium, because This oil resistant sealing article is based on use nitrile rubber.

Claims (10)

1. a kind of detection pipe for Tunnel Second Lining vault concrete construction, including body(1), it is characterised in that also wrap Include rubber stopper(2), body(1)One end is provided with cross-shaped aperture(3), rubber stopper(2)It is sleeved on cross-shaped aperture(3)Place.
2. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 1, it is characterised in that cross Shape opening(3)Depth be not more than 3cm.
3. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 1, it is characterised in that rubber Plug(2)Wrap up body(1)Depth be no more than 1cm.
4. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 3, it is characterised in that rubber Plug(2)Bottom thickness be 1cm.
5. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 1, it is characterised in that including Detachable supporting steel plate(5), body(1)The other end and detachable supporting steel plate(5)It is connected.
6. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 5, it is characterised in that including First fixation steel plate(6)With the second fixation steel plate(7), detachable supporting steel plate(5)Both sides pass through the first bolt(8)With Two bolts(9)Respectively with the first fixation steel plate(6)With the second fixation steel plate(7)It is connected.
7. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 1, it is characterised in that body (1)Bottom be provided with valve(4).
8. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 1, it is characterised in that rubber Plug(2)Using fluorubber.
9. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 1, it is characterised in that rubber Plug(2)Using silicon rubber.
10. it is used for the detection pipe of Tunnel Second Lining vault concrete construction as claimed in claim 1, it is characterised in that rubber Plug(2)Using nitrile rubber.
CN201720151291.3U 2017-02-20 2017-02-20 A kind of detection pipe for Tunnel Second Lining vault concrete construction Active CN206513400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720151291.3U CN206513400U (en) 2017-02-20 2017-02-20 A kind of detection pipe for Tunnel Second Lining vault concrete construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720151291.3U CN206513400U (en) 2017-02-20 2017-02-20 A kind of detection pipe for Tunnel Second Lining vault concrete construction

Publications (1)

Publication Number Publication Date
CN206513400U true CN206513400U (en) 2017-09-22

Family

ID=59868556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720151291.3U Active CN206513400U (en) 2017-02-20 2017-02-20 A kind of detection pipe for Tunnel Second Lining vault concrete construction

Country Status (1)

Country Link
CN (1) CN206513400U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939416A (en) * 2017-11-15 2018-04-20 中铁四局集团有限公司 A kind of method for early warning for preventing tunnel vault concrete void
CN109441543A (en) * 2018-11-28 2019-03-08 中铁工程装备集团有限公司 Formwork jumbo tunnel vault cavity prior-warning device
CN110455236A (en) * 2019-07-30 2019-11-15 山东大学 A kind of pressure sensitive device and application method for tunnel double-lining thickness monitor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939416A (en) * 2017-11-15 2018-04-20 中铁四局集团有限公司 A kind of method for early warning for preventing tunnel vault concrete void
CN109441543A (en) * 2018-11-28 2019-03-08 中铁工程装备集团有限公司 Formwork jumbo tunnel vault cavity prior-warning device
CN110455236A (en) * 2019-07-30 2019-11-15 山东大学 A kind of pressure sensitive device and application method for tunnel double-lining thickness monitor

Similar Documents

Publication Publication Date Title
CN101852031B (en) Construction method of soil covering tank
CN204343312U (en) A kind of plugging device of precipitation well in foundation pit
CN101985882B (en) Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel
CN206513400U (en) A kind of detection pipe for Tunnel Second Lining vault concrete construction
CN103643740B (en) A kind of steel pipe column concrete lifting construction method
CN107059903A (en) Bottom plate plugging dewatering well construction method is worn in foundation ditch
CN205662837U (en) Overhead bridge transformation structure
CN113833480A (en) Shield initial tunneling and arrival construction method
CN106759462A (en) A kind of prefabricated piping lane and its construction method suitable for narrow construction site
CN105804769A (en) Method for reinforcing tunnel lining through corrugated steel plate
CN107916945A (en) Using the waterproof spray-up structure and its construction method of impervious gunite concrete
CN201943086U (en) Underground building wall body
CN206513380U (en) A kind of tunnel double-lining vault with rubber seal reserves Grouting Pipe
CN105926470A (en) Transformation method of elevated bridge
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN111503368A (en) Pipe jacking construction method under sandy gravel geological condition
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN102535518B (en) Plugging method of large seam of underground diaphragm wall
CN203363529U (en) Concrete pipe repairing device of water supply prestress steel cylinder
CN104060590B (en) The reinforcement leakage preventing structure of a kind of pressure diversion tunnel and construction method thereof
CN108709027A (en) A kind of anti-stick sundries formula concrete plug
CN110939197A (en) Connection type reinforced concrete anti-seismic system
CN102535493B (en) Method for constructing inverted type foundation beam
CN109137986A (en) Urban road inspection shaft walling crib green promotes reinforced construction method
CN106567415A (en) Drain sleeve for preventing basement floating upward and use method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant