CN206513098U - A kind of apparatus for work for being used to remove towering structure - Google Patents
A kind of apparatus for work for being used to remove towering structure Download PDFInfo
- Publication number
- CN206513098U CN206513098U CN201621128652.4U CN201621128652U CN206513098U CN 206513098 U CN206513098 U CN 206513098U CN 201621128652 U CN201621128652 U CN 201621128652U CN 206513098 U CN206513098 U CN 206513098U
- Authority
- CN
- China
- Prior art keywords
- towering
- remove
- guide rail
- towering structure
- anchor ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to technical field of building construction, more particularly, to a kind of apparatus for work for being used to remove towering structure.The apparatus for work for removing towering structure that the utility model is provided, it includes rail mechanism, mobile platform mechanism, safety protection mechanism, elevating mechanism;The utility model is simple in construction, reasonable in design, cheap, easy to use, and security is good, energy-conserving and environment-protective.
Description
Technical field
The utility model is related to technical field of building construction, more particularly, to a kind of operation for being used to remove towering structure
Device.
Background technology
The dismounting of towering structure such as high building, chimney and water tower etc. is extremely difficult thing, has both been polluted with demolition blasting
Environment, removes thing and secondary can not recycle again, while security cannot get absolute guarantee.
At present, removing the general of towering structure has four kinds of methods:1st, demolition blasting;2nd, mechanical removal;3rd, it is overall to fall
Remove;4th, manual demolition.The instrument or machinery that four kinds of methods are used are each different, and cost differs, and advantage and disadvantage are different, but due to field
In the case that ground limits or has harm etc. to other Adjacent Buildings, facility environment, the method for manual demolition or universal, this
Method use cost is low, safety and environmental protection, harmfulness are smaller.It is mainly at present pin hand using instrument used in manual demolition method
Frame, but the cost for building scaffold is higher, takes time and effort, and be inconvenient to remove, new is used to tear open accordingly, it would be desirable to a kind of
Except the apparatus for work of towering structure.
Utility model content
The purpose of this utility model is to provide a kind of apparatus for work for being used to remove towering structure, to solve existing skill
Exist in art built in manual demolition method scaffold cost it is higher, take time and effort, and be inconvenient to the technical problem removed.
In order to solve the above technical problems, the apparatus for work for being used to remove towering structure that the utility model is provided, it is wrapped
Include rail mechanism, mobile platform mechanism, safety protection mechanism, elevating mechanism;
The rail mechanism includes rail assembly, anchor ear and inclined support structure;The inner side of the rail assembly passes through described armful
Garter spring embraces the outer wall in towering structure, and the outside of the rail assembly is encircled in the outer of towering structure by inclined support structure
Cat ladder is connected with below ring, the rail assembly, has between the top of the cat ladder and the rail assembly and enters for human body
Enter the receiving space of mobile platform mechanism;
Mobile platform mechanism, the mobile platform mechanism includes setting on Fence structure and pulley assembly, the Fence structure
Have in backed working region, and its bottom is installed on the rail assembly by pulley assembly;
Safety protection mechanism, the safety protection mechanism includes safety net, safety buckle and wirerope, and the safety net is arranged at
The periphery in the working region, the Fence structure is slidably connected by safety buckle with the wirerope, the wirerope
Encircle on the outer wall of the towering structure;
Elevating mechanism, the elevating mechanism includes cucurbit, halliard, the first connector, the second connector, the halliard
One end is fixedly connected by the first connector with the anchor ear, and the other end is connected to cucurbit, and the cucurbit passes through the second connector
It is fixed on the top of towering structure.
Further, the rail assembly includes being in conplane first annular guide rail, the second ring-shaped guide rail, described
First annular guide rail encircles the outer wall in towering structure by the anchor ear, and second ring-shaped guide rail passes through inclined support structure ring
Embrace the outer shroud in towering structure.
Further, the first annular guide rail is arranged concentrically with the second ring-shaped guide rail, and the first annular guide rail with
Second ring-shaped guide rail is spliced by channel-section steel.
Further, the inclined support structure includes tilt stand, vertical rack and horizontal stand, and the horizontal stand is fixed
It is connected in the bottom of the second ring-shaped guide rail and with the anchor ear, axial restraint of the vertical rack along towering structure is described
Tilt stand is connected between the vertical rack and horizontal stand.
Further, the annular object that the anchor ear is made up of some band steels, angle steel, strengthening stud;The two of every section of band steel
A rescinded angle steel is welded at end, and the unwelded one side of the angle steel is provided with two bolts hole;By adding between the band steel and band steel
Strength bolt penetrates bolt hole and formed a fixed connection.
Further, the band steel centre position is provided with two bolts hole, and every section of band steel sets the position one of bolt hole
Cause.
Further, the quantity of the pulley assembly is even number.
Further, the Fence structure is provided with tool box.
Further, the Fence structure is provided with the limiting component for being used for fixing self-position.
Further, the cucurbit is electric block or bottle gouard moved by hands.
Using above-mentioned technical proposal, the utility model has the advantages that:
The apparatus for work for removing towering structure that the utility model is provided, it includes rail mechanism, mobile platform
Mechanism, safety protection mechanism, elevating mechanism;The utility model is simple in construction, reasonable in design, cheap, easy to use, safety
Good, the energy-conserving and environment-protective of property.
Brief description of the drawings
Below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, describe below
In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness
On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
The structure principle chart for being used to remove the apparatus for work of towering structure that Fig. 1 provides for the utility model embodiment;
The structural representation for being used to remove the apparatus for work of towering structure that Fig. 2 provides for the utility model embodiment.
Reference:
1- cucurbits;2- halliards;3- lighting devices;
4- safety nets;5- tool boxes;6- rail assemblies;
7- inclined support structures;8- anchor ears;9- wireropes;
10- Fence structures;11- cat ladders;12- towering structures;
13- gap.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described
Embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on the embodiment in the utility model, sheet
The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality
Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular
Directly ", the orientation or position relationship of the instruction such as " level ", " interior ", " outer " are, based on orientation shown in the drawings or position relationship, to be only
Described for the ease of description the utility model and simplifying, rather than to indicate or imply that signified device or element must have specific
Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the
One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model
Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly
Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
Concrete meaning of the language in the utility model.
The utility model is described in further detail below by specific embodiment and with reference to accompanying drawing.
As shown in Figure 1 to Figure 2, the present embodiment provides a kind of apparatus for work for being used to remove towering structure, and it includes rail
Road mechanism, mobile platform mechanism, safety protection mechanism, elevating mechanism;
Rail mechanism includes rail assembly 6, anchor ear 8 and inclined support structure 7;The inner side of rail assembly 6 is encircled by anchor ear 8
The outer wall of towering structure, the outside of rail assembly 6 encircles the outer shroud in towering structure, rail assembly 6 by inclined support structure 7
Lower section be connected with cat ladder 11, between the top of cat ladder 11 and rail assembly 6 have for human body enter mobile platform mechanism appearance
Receive space, as shown in Figure 2, towering structure 12 is the concrete chimney that top is provided with gap 13 in Fig. 2;
Mobile platform mechanism, the mobile platform mechanism includes Fence structure 10 and pulley assembly, the Fence structure 10
Be provided with is in that with backed working region, and its bottom is installed on the rail assembly 6 by pulley assembly;For
For Fence structure 10, upper-lower height can be adjusted by telescopic arm, the angle of backrest can also be adjusted by revolving part.
Safety protection mechanism, the safety protection mechanism includes safety net 4, safety buckle and wirerope 9, and the safety net 4 is set
The periphery in the working region is placed in, the Fence structure 10 is slidably connected by safety buckle with the wirerope 9, institute
Wirerope 9 is stated to encircle on the outer wall of the towering structure;
Elevating mechanism, the elevating mechanism includes cucurbit 1, halliard 2, the first connector, the second connector, the lifting
2 one end of restricting are fixedly connected by the first connector with the anchor ear 8, and the other end is connected to cucurbit 1, and the cucurbit 1 passes through second
Connector is fixed on the top of towering structure.
What deserves to be explained is, each above-mentioned structure in actual use, can be deleted with any combinations or adaptability.
For example:Rail mechanism can be directly replaced with common in job platform of annular etc..Moreover, for the shape of each structure
Shape, size can be adjusted flexibly according to actual needs, and figure is merely examples in Fig. 1, be understood for convenience with watching, herein not
Limit to again.
Specifically, the rail assembly 6 in the present embodiment includes leading in conplane first annular guide rail, the second annular
Rail, first annular guide rail encircles the outer wall in towering structure by anchor ear 8, and the second ring-shaped guide rail is encircled by inclined support structure 7
In the outer shroud of towering structure.
Preferably, first annular guide rail is arranged concentrically with the second ring-shaped guide rail, and first annular guide rail is led with the second annular
Rail is spliced by channel-section steel.
For inclined support structure 7, inclined support structure 7 includes tilt stand, vertical rack and horizontal stand, and horizontal stand is solid
Due to the second ring-shaped guide rail bottom and be connected with anchor ear 8, axial restraint of the vertical rack along towering structure, tilt stand connect
It is connected between vertical rack and horizontal stand.Its specific structure is similar to three-legged support.A-frame is fixed with anchor ear 8 to be connected
Connect, and the plane of A-frame formation was both vertical with the plane of the formation of anchor ear 8.
For anchor ear 8, its concrete form does not limit to, and can flexibly set according to actual needs.With following several excellent
Embodiment is selected to illustrate:
Embodiment one
The annular object that anchor ear 8 is made up of some band steels, angle steel, strengthening stud;Weld one section in the two ends of every section of band steel
Angle steel, the unwelded one side of angle steel is provided with two bolts hole;Bolt hole is penetrated between band steel and band steel by strengthening stud to be formed
It is fixedly connected.
Wherein, band steel centre position is provided with two bolts hole, and every section of band steel sets the position consistency of bolt hole.
Embodiment two
Anchor ear 8 connects steel pipe by hole for the expansion bolt, I-steel, nut, steel skeleton, steel plate and speed and constituted, and I-steel passes through steel
Skeleton is connected with steel plate, and having on I-steel in hole for the expansion bolt, the threaded anchor ear 8 in two ends has speed to connect steel pipe, and two ends are threaded
Anchor ear 8 be connected with the hole on steel plate after fastened with nut.
Embodiment three
Shroud ring is annular shape, is made up of multiple band irons, U-shaped screw and angle steel;The processing of angle steel one end is at a right angle, and the other end adds
Work L-type at a right angle;Band iron two ends are drilled with hole, use U-shaped fastened by screw;The right angle end lower surface of angle steel is welded with steel plate, another
Reinforcement steel plate is welded with the right angle L-type of end, strengthens interface security and stability.
Shroud ring one piece of band iron of welding at equal intervals, example T fonts and boxes out with shroud ring formation, is passed through with setscrew reserved
Setscrew hole is connected with the stack shell of chimney or water tower, it is ensured that the stable safety of shroud ring.Band iron welds one piece at a certain distance
Elliptical aperture is machined with angle steel, angle steel.
Preferably, the quantity of the pulley assembly in the present embodiment is even number.For example:Four, six, eight etc..
In addition, the Fence structure 10 in the present embodiment is provided with tool box 5, for holding power tool.
In addition, the Fence structure 10 in the present embodiment is provided with the limiting component for being used for fixing self-position, to make
Stable fixed effect is realized during industry.
In addition, the Fence structure 10 in the present embodiment is provided with lighting device 3, naturally it is also possible to be not provided with, this area work
Make personnel to be adjusted flexibly according to actual needs.
In practical work process, it is preferable that illustrated with specific examples below:
Band iron type anchor ear:Made using the thick band iron steel of the long * 8mm of the wide * 3000mm of 80mm, every 3 meters long one section of band iron anchor ear
Two ends using one section of thick long * 10mm of angle steel plane width 750mm*150mm angle steel, plane-welding on band iron anchor ear two ends,
Angle steel center up and down respectively set above and below bolt hole.Holes above and below aperture 22mm, every 3 meters of one section of angle steel two ends, this hole is as even
Next 3 meters of band iron anchor ears are connect, anchor ear quantity and length are set according to the girth for being removed thing.Cornet band iron anchor ear is made simultaneously
For adjusting girth size (note:Regulation anchor ear can make 1 meter, 30 centimetres, 50 centimetres etc.).
Further, on every 3 meters of one section of band iron anchor ears, the angle steel thick wide * 6mm of the long * 60mm of 3 100mm of welding forms three
Corner apertures, so that later stage triangle inclined strut platform is hooked.Each triangle pitch of holes 900mm, three delthyriums of every section of 3 meters of band iron anchor ears.
It is installed in series in band iron anchor ear, before wait is tightened up by bolt, according to being removed thing cylindrical type, circular platform type, circular cone
The analogous shape object such as type, 6 deciles or 8 deciles or 10 deciles or 12 deciles, decile quantity are divided into by this type objects girth
Determined according to girth size, determine should be while set same decile and using steel wire rope, steel wire rope after decile on band iron anchor ear
Chuck etc. makes suspension centre, and point quantity such as suspension centre quantity and girth setting is same.Suspension centre should tighten up band iron anchor ear after setting successfully to be made
Its band iron anchor ear can firmly be held tightly and be removed on cylindrical object.
Triangular support platform makes, and is to form (long 900mm*900mm using the parallel welding link of two gusseteds
It is wide) three-dimensional triangular support platform, gusseted body frame, diagonal brace are all using the angle steel making of the wide * 6mm thickness of 60mm, three
The thick band irons of the wide * 4mm of 40mm are welded in angular support platform plane, plane shop fixtures is used as.Three-dimensional triangular support platform into
After shape, welding square crotch is made at the preceding two ends of three-dimensional triangular support platform, crotch is made using 18mm round steel, crotch
In the delthyrium that the reserved wide cut 900mm of anchor ear band iron early stage is hooked on after formation.Successively by several three-dimensional triangles
Support platform is hooked on anchor ear band iron, and the external monoblock type 3-D triangle support platform of cylinder is encircled in formation.(note:It is each straight
Once it should be reinforced comprehensively at the crotch of angle, it is ensured that the three-dimensional triangular support platform of hook can firmly be hooked in anchor ear band iron
On.) after this platform formed, railing is welded setting, rail height is that 1000mm is high, using the thick band iron making of the wide * 4mm of 40mm
Into (railing, which makes, to make easy to disassemble and assembling sectional type column according to three-dimensional triangular support platform size
Bar).After several railings and complete three-dimensional triangular support platform, tighten up, make using 10mm wirerope-windings circle circle
Its all railing and three-dimensional triangular support platform are firmly connected.
It is after the completion of three-dimensional triangular support platform, the Along ent and anchor ear band iron of being removed the early stage setting of thing upper end is pre-
Stay the decile suspension centre made to connect, connected using cucurbit.(note:Thing upper end Along ent is removed, is that thing is removed using rejecting
Concrete, finds internal reinforcing bar and is used as suspension centre, after the completion of the dismounting of thing top is removed, is moved down by suspension centre.It is vertical
Run above and below body formula triangular support platform, be that, by two suspension centre attachments, cucurbit moves to be formed and run up and down.Run up and down
Before anchor ear bolt connection point need to be unclamped, allow its loosening to be easy to cucurbit to run).
After three-dimensional triangular support stage+module is improved, also need to carry out a comprehensive security maintenance, platform band iron ground
The color steel skin after 3mm should be used integrally to lay on the inside of upper and band iron railing, form annular hanging basket shape, while laying is close
The higher safety net prevention dust granule of degree descends slowly and lightly.
Circular outer frame hanging basket shape job platform, mainly facilitates and is similar to cylinder, cone, round platform with manual demolition
Body is similar chimney, water tower, cylinder, bridge pier etc..
This set job platform, when removing concrete chimney, is, by the broken rejecting of concrete chimney outer concrete layer, to find inner turns
To reinforcing bar as top suspension centre, by connecting the anchor ear suspension centre that bottom is securely fastened on chimney outer wall.In manual demolition concrete
Chimney is, operating personnel's operation on frame hanging basket shape job platform outside circle, by vertical near concrete upper chimney end suspension centre
Tick slot is rejected, concrete chimney is vertically slotted into several equal portions concretes by tick slot wide cut in 250mm or so, vertical slot height at 1.5 meters or so
Piece, when groove height is at 1.5 meters or so by laterally peeling off concrete and cutting off reinforcing bar by gas cutting and cucurbit forgets about it concrete piece and makes it
Fallen in being poured into inside chimney to chimney bottom.By such a method for dismounting layer by layer, manual demolition towering structure is realized.
Finally it should be noted that:Various embodiments above is only limited to illustrate the technical solution of the utility model, rather than to it
System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should
Understand:It can still modify to the technical scheme described in foregoing embodiments, or to which part or whole
Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly
The scope of each embodiment technical scheme of type.
Claims (10)
1. a kind of be used to remove the apparatus for work of towering structure, it is characterised in that including rail mechanism, mobile platform mechanism,
Safety protection mechanism, elevating mechanism;
The rail mechanism includes rail assembly, anchor ear and inclined support structure;The inner side of the rail assembly passes through the anchor ear ring
The outer wall in towering structure is embraced, the outside of the rail assembly encircles the outer shroud in towering structure, institute by inclined support structure
State and cat ladder is connected with below rail assembly, have between the top of the cat ladder and the rail assembly and enter movement for human body
The receiving space of platform mechanism;
Mobile platform mechanism, the mobile platform mechanism includes Fence structure and pulley assembly, and the Fence structure, which is provided with, is in
With backed working region, the Fence structure adjusts upper-lower height by telescopic arm, and the Fence structure passes through rotation
Turn the angle that part adjusts backrest, the bottom of the Fence structure is installed on the rail assembly by pulley assembly;
Safety protection mechanism, the safety protection mechanism includes safety net, safety buckle and wirerope, and the safety net is arranged at described
The periphery of Fence structure, the Fence structure is slidably connected by safety buckle with the wirerope, and the wirerope is encircled in institute
State on the outer wall of towering structure;
Elevating mechanism, the elevating mechanism includes cucurbit, halliard, the first connector, the second connector, described halliard one end
It is fixedly connected by the first connector with the anchor ear, the other end is connected to cucurbit, the cucurbit is fixed by the second connector
At the top of towering structure.
2. the apparatus for work according to claim 1 for being used to remove towering structure, it is characterised in that the rail assembly
Including in conplane first annular guide rail, the second ring-shaped guide rail, the first annular guide rail is encircled by the anchor ear
In the outer wall of towering structure, second ring-shaped guide rail encircles the outer shroud in towering structure by inclined support structure.
3. the apparatus for work according to claim 2 for being used to remove towering structure, it is characterised in that described first annular
Guide rail is arranged concentrically with the second ring-shaped guide rail, and the first annular guide rail is spliced with the second ring-shaped guide rail by channel-section steel.
4. the apparatus for work according to claim 3 for being used to remove towering structure, it is characterised in that the inclined support structure
Including tilt stand, vertical rack and horizontal stand, the horizontal stand be fixed on the bottom of the second ring-shaped guide rail and with it is described
Anchor ear connect, axial restraint of the vertical rack along towering structure, the tilt stand be connected to the vertical rack and
Between horizontal stand.
5. according to claim 4 be used to remove the apparatus for work of towering structure, it is characterised in that if the anchor ear by
Dry band steel, angle steel, the annular object of strengthening stud composition;A rescinded angle steel is welded at the two ends of every section of band steel, and the angle steel is not welded
The one side connect is provided with two bolts hole;Bolt hole is penetrated between the band steel and band steel by strengthening stud to form a fixed connection.
6. the apparatus for work according to claim 5 for being used to remove towering structure, it is characterised in that in the middle of the band steel
Position is provided with two bolts hole, and every section of band steel sets the position consistency of bolt hole.
7. the apparatus for work according to claim 6 for being used to remove towering structure, it is characterised in that the pulley assembly
Quantity be even number.
8. the apparatus for work according to claim 7 for being used to remove towering structure, it is characterised in that the Fence structure
It is provided with tool box.
9. the apparatus for work according to claim 8 for being used to remove towering structure, it is characterised in that the Fence structure
It is provided with the limiting component for being used for fixing self-position.
10. according to claim 9 be used to remove the apparatus for work of towering structure, it is characterised in that the cucurbit is
Electric block or bottle gouard moved by hands.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621128652.4U CN206513098U (en) | 2016-10-17 | 2016-10-17 | A kind of apparatus for work for being used to remove towering structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621128652.4U CN206513098U (en) | 2016-10-17 | 2016-10-17 | A kind of apparatus for work for being used to remove towering structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206513098U true CN206513098U (en) | 2017-09-22 |
Family
ID=59861396
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621128652.4U Active CN206513098U (en) | 2016-10-17 | 2016-10-17 | A kind of apparatus for work for being used to remove towering structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206513098U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112049462A (en) * | 2020-08-07 | 2020-12-08 | 新兴铸管股份有限公司 | Mechanical dismantling process for high-altitude building |
CN113463943A (en) * | 2021-07-08 | 2021-10-01 | 温州高达建设有限公司 | High-rise cast-in-place concrete building demolition construction method |
CN115288408A (en) * | 2022-07-29 | 2022-11-04 | 江汉大学 | Construction platform for blasting demolition of high-rise cylindrical structure and construction method thereof |
-
2016
- 2016-10-17 CN CN201621128652.4U patent/CN206513098U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112049462A (en) * | 2020-08-07 | 2020-12-08 | 新兴铸管股份有限公司 | Mechanical dismantling process for high-altitude building |
CN113463943A (en) * | 2021-07-08 | 2021-10-01 | 温州高达建设有限公司 | High-rise cast-in-place concrete building demolition construction method |
CN113463943B (en) * | 2021-07-08 | 2022-10-04 | 温州高达建设有限公司 | High-rise cast-in-place concrete building demolition construction method |
CN115288408A (en) * | 2022-07-29 | 2022-11-04 | 江汉大学 | Construction platform for blasting demolition of high-rise cylindrical structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967886B (en) | Assembly and installation methods of steel containment vessel of nuclear power station | |
CN206513098U (en) | A kind of apparatus for work for being used to remove towering structure | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN103470093B (en) | Concrete chimney dismantling method | |
CN111502304A (en) | Construction method for hoisting arched net rack | |
CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN106499201A (en) | A kind of dismountable safety rope tool-type holding clamp and its using method | |
CN203947756U (en) | Exterior wall protective frame | |
CN102182324A (en) | Anti-falling safety net | |
CN211689948U (en) | Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge | |
CN205145443U (en) | Transformer upper portion construction safety belt hanging device | |
CN202416824U (en) | Movable type exterior projecting scaffold for steel structure | |
CN107217912B (en) | A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction | |
CN103628692B (en) | A kind of floor beam mounting bracket and use it to install the method for floor beam | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN105311771A (en) | Safety belt suspending device for upper construction of transformer | |
CN202767547U (en) | Nuclear plant construction safety rope fixing clamping rod | |
CN206220460U (en) | For the operating platform of tower | |
CN105274977B (en) | Truss framed leg steel wire rope scaffold device and mounting method | |
CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN204252022U (en) | A kind of packaged type steel box-girder frange plate welding operation platform | |
CN209723570U (en) | Steel column docking installation operation platform | |
CN210561720U (en) | Pier stud maintenance repair operation platform | |
CN203846841U (en) | Power transmission line iron tower and rest platform thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |