CN206512859U - A kind of prefabricated buildings wall panel assembly - Google Patents
A kind of prefabricated buildings wall panel assembly Download PDFInfo
- Publication number
- CN206512859U CN206512859U CN201621375856.8U CN201621375856U CN206512859U CN 206512859 U CN206512859 U CN 206512859U CN 201621375856 U CN201621375856 U CN 201621375856U CN 206512859 U CN206512859 U CN 206512859U
- Authority
- CN
- China
- Prior art keywords
- section bar
- main body
- centre
- panel
- prefabricated buildings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a kind of prefabricated buildings wall panel assembly, including one group of main body frame and one group of central frame, the main body frame is formed by main body section bar and main body panel forced fit, the bottom two ends of the main body section bar are provided with base channel, the central frame is formed by middle section bar and centre panel forced fit, the top two ends of the main body section bar are provided with main body packing undercut, the two ends of the main body panel section bar are provided with main body connection side, the bottom two ends of the centre section bar are provided with packing undercut in the middle of one group, the two ends of the centre panel section bar are provided with middle connection side, the two ends of the centre section bar are provided with expansion pipe sleeve.The prefabricated buildings wall panel assembly convenient disassembly, without welding, will not destroy profile material, it is to avoid the problem of profile material intensity decreases caused by welding, and the mode of combination assembling brings great convenience to transport, has saved cost of transportation.
Description
Technical field
The utility model is related to wall body structure field, specially a kind of prefabricated buildings wall panel assembly.
Background technology
In construction, the weight capacity and intensity of wall body structure have significant effect to the quality of building, now
In the wall body structure used, widely, but section material for wall is more by the way of welding when being coordinated at present for the application of section bar
Carry out, the mode of welding can cause damage, the intensity of influence shaping back wall to the material of section bar weld.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated buildings wall panel assembly, to solve in above-mentioned background technology
The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of prefabricated buildings wall panel assembly, bag
One group of main body frame and one group of central frame are included, the main body frame is formed by main body section bar and main body panel forced fit,
The bottom two ends of the main body section bar are provided with base channel, and the central frame is by middle section bar and median surface template
Material, which coordinates, to be formed, and the top two ends of the main body section bar are provided with main body packing undercut, the two of the main body panel section bar
End is provided with main body connection side, the main body connection side and main body packing undercut adaptation, the bottom of the centre section bar
Portion two ends are provided with packing undercut in the middle of one group, and the two ends of the centre panel section bar are provided with middle connection side, described
Centre connection side and the middle packing undercut adaptation, the main body panel section bar are arranged on the top of the main body section bar,
The centre panel section bar is arranged on the bottom of the centre section bar, and the two ends of the centre section bar are provided with expansion
Pipe sleeve.
It is preferred that, the main body section bar, the main body panel section bar, the centre section bar, the centre panel
Section bar is made by carrying out the galvanized steel material of antirust treatment after Multi-path circulation rolling and angle PROCESS FOR TREATMENT.
It is preferred that, in the U grooves of the main body section bar after filling insulation material, fire proofing material or foamed concrete,
Again by the main body panel section bar and the U-shaped forced fit of the main body.
It is preferred that, the main body section bar, the main body panel section bar, the centre section bar, the centre panel
Product moulding is preceding first to make pressure pit processing of the pointed pinch roller of triangle.
It is preferred that, the main body section bar, the main body panel section bar, the centre section bar are positioned by locating pin
Coordinate, the main body section bar, the centre panel section bar, the centre panel section bar are also by locating pin location fit.
It is preferred that, one end of the centre section bar is provided with sphenocephaly, the centre section bar be provided with it is described
One end of sphenocephaly is provided with an expansion pipe sleeve, and the centre section bar is being not provided with one end of the sphenocephaly
It is provided with two expansion pipe sleeves.
Compared with prior art, the beneficial effects of the utility model are:The prefabricated buildings wall panel assembly is in use, main
The cooperation that body section bar and main body panel section bar connect side by main body packing undercut and main body is attached, and constitutes body frame
Frame, middle section bar and centre panel section bar are attached by middle packing undercut and the middle cooperation for connecting side, in composition
Between framework, central frame and main body frame adaptation, central frame and main body frame can pass through locating pin and carry out location fit, positioning
Nail can select rivet or screw, base channel and middle packing undercut adaptation, by locating pin by central frame and main body frame into
Group connection forms ash wall body plate, and expansion tube is covered for installing expansion tube, realizes the connection between wall and wall;Present apparatus dismounting side
Just, without welding, profile material will not be destroyed, it is to avoid the problem of profile material intensity decreases caused by welding, combination assembling
Mode brings great convenience to transport, has saved cost of transportation.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the end face structure schematic diagram of the utility model main body section bar.
Fig. 3 is the end face structure schematic diagram of the utility model main body panel section bar.
Fig. 4 is the end face structure schematic diagram of section bar in the middle of the utility model.
Fig. 5 is the end face structure schematic diagram of the utility model centre panel section bar.
Fig. 6 is to iris out the close-up schematic view of part in Fig. 1.
Fig. 7 is Fig. 1 top view.
Fig. 8 is dimensional structure diagram of the present utility model.
Fig. 9 is Fig. 1 right view.
In figure:1st, main body frame, 2, central frame, 3, main body section bar, 4, main body panel section bar, 5, base channel, 6, in
Between section bar, 7, centre panel section bar, 8, main body packing undercut, 9, main body connection side, 10, middle packing undercut, 11, middle
Connect side, 12, expansion pipe sleeve, 13, locating pin, 14, sphenocephaly.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-9 are referred to, the utility model provides a kind of technical scheme:A kind of prefabricated buildings wall panel assembly, including
One group of main body frame 1 and one group of central frame 2, the main body frame 1 with main body section bar 3 and main body panel section bar 4 and
Into the bottom two ends of the main body section bar 3 are provided with base channel 5, and the central frame 2 is by middle section bar 6 with
Between panel section bar 7 coordinate form, the top two ends of the main body section bar 3 are provided with main body packing undercut 8, the main body
The two ends of panel section bar 4 are provided with main body connection side 9, and the main body connection side 9 and the main body packing undercut 8 are adapted to, institute
The bottom two ends for stating middle section bar 6 are provided with packing undercut 10 in the middle of one group, and the two ends of the centre panel section bar 7 are equal
Middle connection side 11 is provided with, the middle connection side 11 and the middle packing undercut 10 are adapted to, the main body panel section bar 4
The top of the main body section bar 3 is arranged on, the centre panel section bar 7 is arranged on the bottom of the centre section bar 6, institute
The two ends for stating middle section bar 6 are provided with expansion pipe sleeve 12, the main body section bar 3, the main body panel section bar 4, institute
State middle section bar 6, the centre panel section bar 7 and pass through Multi-path circulation by carrying out the galvanized steel material of antirust treatment
It is made after rolling and angle PROCESS FOR TREATMENT, filling insulation material, fire proofing material or foaming in the U grooves of the main body section bar 3
After concrete, then the main body panel section bar 4 coordinated with the main body section bar 3, it is the main body section bar 3, described
Main body panel section bar 4, the centre section bar 6, the centre panel section bar 7 are first pressed before being molded with the pointed pinch roller of triangle
Pit processing, the main body section bar 3, the main body panel section bar 4, the centre section bar 6 position 13 by locating pin
Coordinate, the main body section bar 3, the centre panel section bar 6, the centre panel section bar 7 are matched somebody with somebody also by the positioning of locating pin 13
Close, one end of the centre section bar 6 is provided with sphenocephaly 14, and the centre section bar 6 is being provided with the sphenocephaly 14
One end be provided with an expansion pipe sleeve 12, the centre section bar 6 sets in the one end for being not provided with the sphenocephaly 14
It is equipped with two expansion pipe sleeves 12.
Operation principle:When using the prefabricated buildings wall panel assembly, main body section bar 3 and main body panel section bar 4 are logical
Cross main body packing undercut 8 and the cooperation on main body connection side 9 is attached, constitute main body frame 1, middle section bar 6 and median surface
Profile material 7 is attached by middle packing undercut 10 and the middle cooperation for connecting side 11, constitutes central frame 2, central frame 2
It is adapted to main body frame 1, central frame 2 and main body frame 1 can carry out location fit by locating pin 13, and locating pin 13 can select
Rivet or screw, base channel 5 and middle packing undercut 10 are adapted to, by locating pin 13 by central frame 2 and main body frame 1 in groups
Connection forms ash wall body plate, and expansion pipe sleeve 13 is used to install expansion tube, realizes the connection between wall and wall.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of prefabricated buildings wall panel assembly, including one group of main body frame(1)With one group of central frame(2), its feature exists
In:The main body frame(1)By main body section bar(3)With main body panel section bar(4)Cooperation is formed, the main body section bar
(3)Bottom two ends be provided with base channel(5), the central frame(2)By middle section bar(6)With centre panel section bar
(7)Cooperation is formed, the main body section bar(3)Top two ends be provided with main body packing undercut(8), the main body panel
Section bar(4)Two ends be provided with main body connection side(9), the main body connection side(9)With the main body packing undercut(8)It is suitable
Match somebody with somebody, the centre section bar(6)Bottom two ends be provided with packing undercut in the middle of one group(10), the centre panel section bar
(7)Two ends be provided with middle connection side(11), the middle connection side(11)With the middle packing undercut(10)Adaptation,
The main body panel section bar(4)It is arranged on the main body section bar(3)Top, the centre panel section bar(7)It is arranged on institute
State middle section bar(6)Bottom, the centre section bar(6)Two ends be provided with expansion pipe sleeve(12).
2. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The main body section bar
(3), the main body panel section bar(4), the centre section bar(6), the centre panel section bar(7)By carrying out antirust
The galvanized steel material of processing is made after Multi-path circulation rolling and angle PROCESS FOR TREATMENT.
3. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The main body section bar
(3)U grooves in after filling insulation material, fire proofing material or foamed concrete, then by the main body panel section bar(4)With institute
State main body section bar(3)Coordinate.
4. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The main body section bar
(3), the main body panel section bar(4), the centre section bar(6), the centre panel section bar(7)First with three before shaping
The top of the horn shape pinch roller does pressure pit processing.
5. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The main body section bar
(3), the main body panel section bar(4), the centre section bar(6)Pass through locating pin(13)Location fit, the main body is U-shaped
Section bar(3), the centre panel section bar(6), the centre panel section bar(7)Also by locating pin(13)Location fit.
6. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The centre section bar
(6)One end be provided with sphenocephaly(14), the centre section bar(6)It is being provided with the sphenocephaly(14)One end set
There is an expansion pipe sleeve(12), the centre section bar(6)It is being not provided with the sphenocephaly(14)One end be provided with
Two expansion pipe sleeves(12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621375856.8U CN206512859U (en) | 2016-12-15 | 2016-12-15 | A kind of prefabricated buildings wall panel assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621375856.8U CN206512859U (en) | 2016-12-15 | 2016-12-15 | A kind of prefabricated buildings wall panel assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206512859U true CN206512859U (en) | 2017-09-22 |
Family
ID=59862976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621375856.8U Expired - Fee Related CN206512859U (en) | 2016-12-15 | 2016-12-15 | A kind of prefabricated buildings wall panel assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206512859U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110512722A (en) * | 2019-08-08 | 2019-11-29 | 武汉迈特绿色建筑科技股份有限公司 | The light steel house connection frame of modular assembly formula |
CN110512760A (en) * | 2019-08-08 | 2019-11-29 | 武汉迈特绿色建筑科技股份有限公司 | House modular assembly wall |
-
2016
- 2016-12-15 CN CN201621375856.8U patent/CN206512859U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110512722A (en) * | 2019-08-08 | 2019-11-29 | 武汉迈特绿色建筑科技股份有限公司 | The light steel house connection frame of modular assembly formula |
CN110512760A (en) * | 2019-08-08 | 2019-11-29 | 武汉迈特绿色建筑科技股份有限公司 | House modular assembly wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206512859U (en) | A kind of prefabricated buildings wall panel assembly | |
CN206140944U (en) | Quick welding equipment of accurate plastic conduit | |
CN202577787U (en) | Color profiled steel plate with engagement structure | |
CN106078105A (en) | A kind of production technology of aluminum alloy pattern plate | |
CN206366571U (en) | A kind of efficient medium plate end pre-bending building mortion | |
CN208718313U (en) | A kind of inner corner trim plastering utensil | |
CN105281171B (en) | A kind of commutator segment of commutator | |
CN202299053U (en) | Truss structure for stone decorative rib of glass curtain wall | |
CN207568164U (en) | A kind of socket joint type key slot type scaffold end branch stake tool | |
CN206581451U (en) | A kind of prefabricated partition board based on light steel skeleton and lightweight concrete | |
CN206319546U (en) | A kind of edge closing bar between embedded cabinet and metope | |
CN109098380B (en) | Stone honeycomb core composite board | |
CN204531072U (en) | A kind of light thermal-insulation partition board connected without slurry | |
CN204960032U (en) | Wall composite sheet | |
CN106906978A (en) | A kind of combined wall board bracket and the wall body structure using the bracket | |
CN102071799A (en) | Internal corner template | |
CN201802066U (en) | Negative angle shuttering | |
CN202787970U (en) | Template fixing piece | |
CN208195325U (en) | Building iron template right angle squeezes rib machine | |
CN206360294U (en) | A kind of wood moulding external corner line keeps off moulding | |
CN106753446A (en) | Combined forming die for construction of coke oven flue crown and construction method thereof | |
CN218670939U (en) | Secondary structure wall construction structure is worn to heat preservation tuber pipe | |
CN204850425U (en) | Aluminum alloy template | |
CN204638937U (en) | Rectangular thin-wall steel pipe ripple forming fixture | |
CN202470350U (en) | Box body structure of combined type air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170922 Termination date: 20181215 |
|
CF01 | Termination of patent right due to non-payment of annual fee |