CN206512859U - A kind of prefabricated buildings wall panel assembly - Google Patents

A kind of prefabricated buildings wall panel assembly Download PDF

Info

Publication number
CN206512859U
CN206512859U CN201621375856.8U CN201621375856U CN206512859U CN 206512859 U CN206512859 U CN 206512859U CN 201621375856 U CN201621375856 U CN 201621375856U CN 206512859 U CN206512859 U CN 206512859U
Authority
CN
China
Prior art keywords
section bar
main body
centre
panel
prefabricated buildings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621375856.8U
Other languages
Chinese (zh)
Inventor
赖炳南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Nanze Electric & Mechanicla Equipment Co Ltd
Original Assignee
Foshan Nanze Electric & Mechanicla Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Nanze Electric & Mechanicla Equipment Co Ltd filed Critical Foshan Nanze Electric & Mechanicla Equipment Co Ltd
Priority to CN201621375856.8U priority Critical patent/CN206512859U/en
Application granted granted Critical
Publication of CN206512859U publication Critical patent/CN206512859U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of prefabricated buildings wall panel assembly, including one group of main body frame and one group of central frame, the main body frame is formed by main body section bar and main body panel forced fit, the bottom two ends of the main body section bar are provided with base channel, the central frame is formed by middle section bar and centre panel forced fit, the top two ends of the main body section bar are provided with main body packing undercut, the two ends of the main body panel section bar are provided with main body connection side, the bottom two ends of the centre section bar are provided with packing undercut in the middle of one group, the two ends of the centre panel section bar are provided with middle connection side, the two ends of the centre section bar are provided with expansion pipe sleeve.The prefabricated buildings wall panel assembly convenient disassembly, without welding, will not destroy profile material, it is to avoid the problem of profile material intensity decreases caused by welding, and the mode of combination assembling brings great convenience to transport, has saved cost of transportation.

Description

A kind of prefabricated buildings wall panel assembly
Technical field
The utility model is related to wall body structure field, specially a kind of prefabricated buildings wall panel assembly.
Background technology
In construction, the weight capacity and intensity of wall body structure have significant effect to the quality of building, now In the wall body structure used, widely, but section material for wall is more by the way of welding when being coordinated at present for the application of section bar Carry out, the mode of welding can cause damage, the intensity of influence shaping back wall to the material of section bar weld.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated buildings wall panel assembly, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of prefabricated buildings wall panel assembly, bag One group of main body frame and one group of central frame are included, the main body frame is formed by main body section bar and main body panel forced fit, The bottom two ends of the main body section bar are provided with base channel, and the central frame is by middle section bar and median surface template Material, which coordinates, to be formed, and the top two ends of the main body section bar are provided with main body packing undercut, the two of the main body panel section bar End is provided with main body connection side, the main body connection side and main body packing undercut adaptation, the bottom of the centre section bar Portion two ends are provided with packing undercut in the middle of one group, and the two ends of the centre panel section bar are provided with middle connection side, described Centre connection side and the middle packing undercut adaptation, the main body panel section bar are arranged on the top of the main body section bar, The centre panel section bar is arranged on the bottom of the centre section bar, and the two ends of the centre section bar are provided with expansion Pipe sleeve.
It is preferred that, the main body section bar, the main body panel section bar, the centre section bar, the centre panel Section bar is made by carrying out the galvanized steel material of antirust treatment after Multi-path circulation rolling and angle PROCESS FOR TREATMENT.
It is preferred that, in the U grooves of the main body section bar after filling insulation material, fire proofing material or foamed concrete, Again by the main body panel section bar and the U-shaped forced fit of the main body.
It is preferred that, the main body section bar, the main body panel section bar, the centre section bar, the centre panel Product moulding is preceding first to make pressure pit processing of the pointed pinch roller of triangle.
It is preferred that, the main body section bar, the main body panel section bar, the centre section bar are positioned by locating pin Coordinate, the main body section bar, the centre panel section bar, the centre panel section bar are also by locating pin location fit.
It is preferred that, one end of the centre section bar is provided with sphenocephaly, the centre section bar be provided with it is described One end of sphenocephaly is provided with an expansion pipe sleeve, and the centre section bar is being not provided with one end of the sphenocephaly It is provided with two expansion pipe sleeves.
Compared with prior art, the beneficial effects of the utility model are:The prefabricated buildings wall panel assembly is in use, main The cooperation that body section bar and main body panel section bar connect side by main body packing undercut and main body is attached, and constitutes body frame Frame, middle section bar and centre panel section bar are attached by middle packing undercut and the middle cooperation for connecting side, in composition Between framework, central frame and main body frame adaptation, central frame and main body frame can pass through locating pin and carry out location fit, positioning Nail can select rivet or screw, base channel and middle packing undercut adaptation, by locating pin by central frame and main body frame into Group connection forms ash wall body plate, and expansion tube is covered for installing expansion tube, realizes the connection between wall and wall;Present apparatus dismounting side Just, without welding, profile material will not be destroyed, it is to avoid the problem of profile material intensity decreases caused by welding, combination assembling Mode brings great convenience to transport, has saved cost of transportation.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the end face structure schematic diagram of the utility model main body section bar.
Fig. 3 is the end face structure schematic diagram of the utility model main body panel section bar.
Fig. 4 is the end face structure schematic diagram of section bar in the middle of the utility model.
Fig. 5 is the end face structure schematic diagram of the utility model centre panel section bar.
Fig. 6 is to iris out the close-up schematic view of part in Fig. 1.
Fig. 7 is Fig. 1 top view.
Fig. 8 is dimensional structure diagram of the present utility model.
Fig. 9 is Fig. 1 right view.
In figure:1st, main body frame, 2, central frame, 3, main body section bar, 4, main body panel section bar, 5, base channel, 6, in Between section bar, 7, centre panel section bar, 8, main body packing undercut, 9, main body connection side, 10, middle packing undercut, 11, middle Connect side, 12, expansion pipe sleeve, 13, locating pin, 14, sphenocephaly.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-9 are referred to, the utility model provides a kind of technical scheme:A kind of prefabricated buildings wall panel assembly, including One group of main body frame 1 and one group of central frame 2, the main body frame 1 with main body section bar 3 and main body panel section bar 4 and Into the bottom two ends of the main body section bar 3 are provided with base channel 5, and the central frame 2 is by middle section bar 6 with Between panel section bar 7 coordinate form, the top two ends of the main body section bar 3 are provided with main body packing undercut 8, the main body The two ends of panel section bar 4 are provided with main body connection side 9, and the main body connection side 9 and the main body packing undercut 8 are adapted to, institute The bottom two ends for stating middle section bar 6 are provided with packing undercut 10 in the middle of one group, and the two ends of the centre panel section bar 7 are equal Middle connection side 11 is provided with, the middle connection side 11 and the middle packing undercut 10 are adapted to, the main body panel section bar 4 The top of the main body section bar 3 is arranged on, the centre panel section bar 7 is arranged on the bottom of the centre section bar 6, institute The two ends for stating middle section bar 6 are provided with expansion pipe sleeve 12, the main body section bar 3, the main body panel section bar 4, institute State middle section bar 6, the centre panel section bar 7 and pass through Multi-path circulation by carrying out the galvanized steel material of antirust treatment It is made after rolling and angle PROCESS FOR TREATMENT, filling insulation material, fire proofing material or foaming in the U grooves of the main body section bar 3 After concrete, then the main body panel section bar 4 coordinated with the main body section bar 3, it is the main body section bar 3, described Main body panel section bar 4, the centre section bar 6, the centre panel section bar 7 are first pressed before being molded with the pointed pinch roller of triangle Pit processing, the main body section bar 3, the main body panel section bar 4, the centre section bar 6 position 13 by locating pin Coordinate, the main body section bar 3, the centre panel section bar 6, the centre panel section bar 7 are matched somebody with somebody also by the positioning of locating pin 13 Close, one end of the centre section bar 6 is provided with sphenocephaly 14, and the centre section bar 6 is being provided with the sphenocephaly 14 One end be provided with an expansion pipe sleeve 12, the centre section bar 6 sets in the one end for being not provided with the sphenocephaly 14 It is equipped with two expansion pipe sleeves 12.
Operation principle:When using the prefabricated buildings wall panel assembly, main body section bar 3 and main body panel section bar 4 are logical Cross main body packing undercut 8 and the cooperation on main body connection side 9 is attached, constitute main body frame 1, middle section bar 6 and median surface Profile material 7 is attached by middle packing undercut 10 and the middle cooperation for connecting side 11, constitutes central frame 2, central frame 2 It is adapted to main body frame 1, central frame 2 and main body frame 1 can carry out location fit by locating pin 13, and locating pin 13 can select Rivet or screw, base channel 5 and middle packing undercut 10 are adapted to, by locating pin 13 by central frame 2 and main body frame 1 in groups Connection forms ash wall body plate, and expansion pipe sleeve 13 is used to install expansion tube, realizes the connection between wall and wall.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of prefabricated buildings wall panel assembly, including one group of main body frame(1)With one group of central frame(2), its feature exists In:The main body frame(1)By main body section bar(3)With main body panel section bar(4)Cooperation is formed, the main body section bar (3)Bottom two ends be provided with base channel(5), the central frame(2)By middle section bar(6)With centre panel section bar (7)Cooperation is formed, the main body section bar(3)Top two ends be provided with main body packing undercut(8), the main body panel Section bar(4)Two ends be provided with main body connection side(9), the main body connection side(9)With the main body packing undercut(8)It is suitable Match somebody with somebody, the centre section bar(6)Bottom two ends be provided with packing undercut in the middle of one group(10), the centre panel section bar (7)Two ends be provided with middle connection side(11), the middle connection side(11)With the middle packing undercut(10)Adaptation, The main body panel section bar(4)It is arranged on the main body section bar(3)Top, the centre panel section bar(7)It is arranged on institute State middle section bar(6)Bottom, the centre section bar(6)Two ends be provided with expansion pipe sleeve(12).
2. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The main body section bar (3), the main body panel section bar(4), the centre section bar(6), the centre panel section bar(7)By carrying out antirust The galvanized steel material of processing is made after Multi-path circulation rolling and angle PROCESS FOR TREATMENT.
3. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The main body section bar (3)U grooves in after filling insulation material, fire proofing material or foamed concrete, then by the main body panel section bar(4)With institute State main body section bar(3)Coordinate.
4. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The main body section bar (3), the main body panel section bar(4), the centre section bar(6), the centre panel section bar(7)First with three before shaping The top of the horn shape pinch roller does pressure pit processing.
5. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The main body section bar (3), the main body panel section bar(4), the centre section bar(6)Pass through locating pin(13)Location fit, the main body is U-shaped Section bar(3), the centre panel section bar(6), the centre panel section bar(7)Also by locating pin(13)Location fit.
6. a kind of prefabricated buildings wall panel assembly according to claim 1, it is characterised in that:The centre section bar (6)One end be provided with sphenocephaly(14), the centre section bar(6)It is being provided with the sphenocephaly(14)One end set There is an expansion pipe sleeve(12), the centre section bar(6)It is being not provided with the sphenocephaly(14)One end be provided with Two expansion pipe sleeves(12).
CN201621375856.8U 2016-12-15 2016-12-15 A kind of prefabricated buildings wall panel assembly Expired - Fee Related CN206512859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621375856.8U CN206512859U (en) 2016-12-15 2016-12-15 A kind of prefabricated buildings wall panel assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621375856.8U CN206512859U (en) 2016-12-15 2016-12-15 A kind of prefabricated buildings wall panel assembly

Publications (1)

Publication Number Publication Date
CN206512859U true CN206512859U (en) 2017-09-22

Family

ID=59862976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621375856.8U Expired - Fee Related CN206512859U (en) 2016-12-15 2016-12-15 A kind of prefabricated buildings wall panel assembly

Country Status (1)

Country Link
CN (1) CN206512859U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512722A (en) * 2019-08-08 2019-11-29 武汉迈特绿色建筑科技股份有限公司 The light steel house connection frame of modular assembly formula
CN110512760A (en) * 2019-08-08 2019-11-29 武汉迈特绿色建筑科技股份有限公司 House modular assembly wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512722A (en) * 2019-08-08 2019-11-29 武汉迈特绿色建筑科技股份有限公司 The light steel house connection frame of modular assembly formula
CN110512760A (en) * 2019-08-08 2019-11-29 武汉迈特绿色建筑科技股份有限公司 House modular assembly wall

Similar Documents

Publication Publication Date Title
CN206512859U (en) A kind of prefabricated buildings wall panel assembly
CN206966511U (en) A kind of bending device for rebars based on industrial building materials
CN206140944U (en) Quick welding equipment of accurate plastic conduit
CN202577787U (en) Color profiled steel plate with engagement structure
CN106078105A (en) A kind of production technology of aluminum alloy pattern plate
CN206366571U (en) A kind of efficient medium plate end pre-bending building mortion
CN208718313U (en) A kind of inner corner trim plastering utensil
CN105281171B (en) A kind of commutator segment of commutator
CN202299053U (en) Truss structure for stone decorative rib of glass curtain wall
CN207568164U (en) A kind of socket joint type key slot type scaffold end branch stake tool
CN206581451U (en) A kind of prefabricated partition board based on light steel skeleton and lightweight concrete
CN206319546U (en) A kind of edge closing bar between embedded cabinet and metope
CN109098380B (en) Stone honeycomb core composite board
CN204531072U (en) A kind of light thermal-insulation partition board connected without slurry
CN204960032U (en) Wall composite sheet
CN106906978A (en) A kind of combined wall board bracket and the wall body structure using the bracket
CN102071799A (en) Internal corner template
CN201802066U (en) Negative angle shuttering
CN202787970U (en) Template fixing piece
CN206360294U (en) A kind of wood moulding external corner line keeps off moulding
CN206139685U (en) Curved system frock of railing steel pipe
CN218670939U (en) Secondary structure wall construction structure is worn to heat preservation tuber pipe
CN204850425U (en) Aluminum alloy template
CN204638937U (en) Rectangular thin-wall steel pipe ripple forming fixture
CN204850424U (en) Aluminum alloy template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170922

Termination date: 20181215

CF01 Termination of patent right due to non-payment of annual fee