CN206366571U - A kind of efficient medium plate end pre-bending building mortion - Google Patents

A kind of efficient medium plate end pre-bending building mortion Download PDF

Info

Publication number
CN206366571U
CN206366571U CN201621360247.5U CN201621360247U CN206366571U CN 206366571 U CN206366571 U CN 206366571U CN 201621360247 U CN201621360247 U CN 201621360247U CN 206366571 U CN206366571 U CN 206366571U
Authority
CN
China
Prior art keywords
bending
mould
plate end
building mortion
medium plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621360247.5U
Other languages
Chinese (zh)
Inventor
顾正洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jia Fang Steel Tube Group Taicang Co Ltd
Original Assignee
Shanghai Jia Fang Steel Tube Group Taicang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jia Fang Steel Tube Group Taicang Co Ltd filed Critical Shanghai Jia Fang Steel Tube Group Taicang Co Ltd
Priority to CN201621360247.5U priority Critical patent/CN206366571U/en
Application granted granted Critical
Publication of CN206366571U publication Critical patent/CN206366571U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

The utility model discloses a kind of efficient medium plate end pre-bending building mortion, including pre-bending shaping dies on a hydraulic press is installed, the pre-bending shaping dies includes upper die and lower die, and the upper mould is in the arc-shaped of evagination, on the walking beam of hydraulic press;The lower mould is in the arc-shaped of indent, on the support of hydraulic press.Efficient medium plate end pre-bending building mortion of the present utility model is simple and reasonable for structure, using convenient, pre-flanging process is completed using pre-flanging mould and hydraulic press, punching press preform is carried out to steel plate end by pre-bending shaping dies, finally obtain the steel plate that two ends carry circular arc, easy and effective, cost is low, efficiency high, can be good at the need for meeting actual production.The problem of straight steel plate is not easily accessible roll when edge rolling is processed is solved, and obtained preform steel plate vertical masonry joint interface circularity during rear pipe crimping is high, docking degree is good, eliminates correction process, substantially increases the quality and efficiency of pipe crimping.

Description

A kind of efficient medium plate end pre-bending building mortion
Technical field
The utility model belongs to steel plate edge rolling manufacture field, more particularly to a kind of efficient medium plate end is pre-bent to shape dress Put.
Background technology
Steel pipes with straight is rolled by steel plate and is welded, the characteristics of with high-intensity high-tenacity, be mainly used in feedwater, draining, The Transportation Engineering of coal gas, liquefied petroleum gas.The manufacture of steel pipe of different bores and wall thickness has differences, large diameter thick wall steel pipe Manufacturing process mainly includes plate spy, milling side, pre-flanging, the technical process such as rolls, welds, and wherein pre-flanging is exactly by steel plate two ends The circular arc that curvature is consistent when prebuckling is into follow-up edge rolling, relatively difficult link when being steel pipes with straight production, if die for fisrt forming Tool is bad to be likely to occur steel plate two ends pipe crimping process circularity is poor, steel pipe bus joint close goes out the problem of warpage seriously docks difficulty, Have a strong impact on production efficiency and product efficiency.
Pre-flanging technique can lean on three roll veneer reeling machines or four roll veneer reeling machines to complete, but straight steel plate exists in processing It is relatively difficult during into roll, and the steel plate end processed does not often reach expected curvature, the conjunction of steel pipe bus easily occurs Stitch out the problem of warpage seriously docks difficulty.
Utility model content
Utility model purpose:In order to overcome problem above, the purpose of this utility model is to provide a kind of efficient medium plate End pre-bending building mortion, solves the problem of straight steel plate is not easily accessible roll when edge rolling is processed, and obtained preform Steel plate vertical masonry joint interface circularity during rear pipe crimping is high, docking degree is good, eliminates correction process, substantially increases the matter of pipe crimping Amount and efficiency.
Technical scheme:A kind of efficient medium plate end pre-bending building mortion, including being pre-bent on a hydraulic press is installed Shape mould, the pre-bending shaping dies includes upper die and lower die, and the upper mould is in the arc-shaped of evagination, installed in the work of hydraulic press On dynamic beam;The lower mould is in the arc-shaped of indent, on the support of hydraulic press.Efficient medium plate end of the present utility model Portion's pre-bending building mortion is simple and reasonable for structure, and using convenient, pre-flanging process is completed using pre-flanging mould and hydraulic press, By pre-bending shaping dies to steel plate end carry out punching press preform, finally obtain two ends carry circular arc steel plate, it is easy and effective, Cost is low, efficiency high, can be good at the need for meeting actual production.Solve the straight steel plate when edge rolling is processed and be not easily accessible and roll The problem of roller, and obtained preform steel plate vertical masonry joint interface circularity during rear pipe crimping is high, docking degree is good, eliminates strong Positive process, substantially increases the quality and efficiency of pipe crimping.
Further, above-mentioned efficient medium plate end pre-bending building mortion, the side of the lower mould is additionally provided with baffle plate. Baffle plate is available for steel plate to be used when placing alignment, it is ensured that the stability of pre-bending shaping, and the shape regularity of circular arc is high.
Further, above-mentioned efficient medium plate end pre-bending building mortion, in addition to material conveying mechanism, the thing Material conveyer structure includes objective table, upper material table and lower material table, and the lower material table is located on objective table, and can be along loading Platform any direction rotates;The upper material table can be moved horizontally on lower material table along lower material table.Material conveyor Structure is rational in infrastructure, wherein, steel plate is transported to pre-bending shaping dies by upper material table, and punching press preform is carried out to steel plate end, then Rotated by lower material table, finally obtain the steel plate that two ends carry circular arc, it is easy to use.
Further, above-mentioned efficient medium plate end pre-bending building mortion, the half of the arc-shaped of the upper mould evagination Footpath and pre-roll pipe diameter are equal.The arc-shaped of upper mould evagination it is rational in infrastructure, may be directly applied to steel plate edge rolling processing, And orthopedic processing need not be carried out again, shortened the time, added production efficiency.
Further, above-mentioned efficient medium plate end pre-bending building mortion, the half of the arc-shaped of the lower mould indent Footpath and pre-roll outer diameter of steel pipes are equal.The arc-shaped of lower mould indent it is rational in infrastructure, may be directly applied to steel plate edge rolling processing, And orthopedic processing need not be carried out again, shortened the time, added production efficiency.
Further, above-mentioned efficient medium plate end pre-bending building mortion, the baffle plate is the trapezoidal baffle plate in section, And it is disposed far from material conveying mechanism side.Baffle arrangement is reasonable, it is easy to accomplish, regularity is high.
Above-mentioned technical proposal can be seen that the utility model and have the advantages that:It is described in the utility model efficient Medium plate end pre-bending building mortion, it is simple and reasonable for structure, using convenient, steel plate two ends can be made to reach pre-bending purpose, and And because lower mould is designed with baffle plate, the shape regularity of circular arc is high.This mould solve the straight steel plate when edge rolling is processed be difficult into The problem of entering roll, it is to avoid medium plate is likely to occur steel pipe bus joint close and goes out warpage in edge rolling process seriously docks difficulty Problem, reduces follow-up correction work, easy and effective, improves product quality and production efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of efficient medium plate end pre-bending building mortion described in the utility model;
Fig. 2-7 is the structural representation of the course of work of efficient medium plate end pre-bending building mortion described in the utility model Figure;
Fig. 8 is the structural representation of steel plate of the two ends described in the utility model with circular arc.
In figure:10 pre-bending shaping dies, mould on 1,2 times moulds, 3 baffle plates, 4 material conveying mechanisms, 5 objective tables, material on 6 Platform, 7 times material tables, 8 steel plates.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the utility model is further elucidated.
Embodiment
Efficient medium plate end pre-bending building mortion as shown in Figure 1-2, including being pre-bent on a hydraulic press is installed Shape mould 10, the pre-bending shaping dies 10 includes upper mould 1 and lower mould 2, and the upper mould 1 is in the arc-shaped of evagination, installed in liquid On the walking beam of press;The lower mould 2 is in the arc-shaped of indent, on the support of hydraulic press.
Wherein, the radius and pre-roll pipe diameter of the arc-shaped of the evagination of upper mould 1 are equal, the arc-shaped of the lower indent of mould 2 Radius and pre-roll outer diameter of steel pipes it is equal.In addition, the side of the lower mould 2 is additionally provided with baffle plate 3.The baffle plate 3 is that section is trapezoidal Baffle plate 3, and be disposed far from the side of material conveying mechanism 4.
Further, above-mentioned efficient medium plate end pre-bending building mortion, in addition to material conveying mechanism 4, it is described Material conveying mechanism 4 includes objective table 5, upper material table 6 and lower material table 7, and the lower material table 7 is on objective table 5, and energy It is enough to be rotated along any direction of objective table 5;The upper material table 6 can be moved on lower material table 7 along the lower level of material table 7 It is dynamic.
During work, the architecture basics based on more than, as Figure 2-3, material conveying mechanism 4 transport steel plate 8 to being pre-bent to The top of shape mould 10, wherein, upper material table 6 is moved horizontally along lower material table 7 to the direction of pre-bending shaping dies 10.Adjust steel plate 8 Alignd to its end with the baffle plate 3 on lower mould 2.Start mould 1 on hydraulic press, hydraulic press walking beam driven mold to transport downwards It is dynamic, as shown in figure 4, the pressure lower steel plate in upper mould 1 is deformed into and fitted completely with upper 1 time mould of mould 2, after the pressurize of 30 seconds, Upper mould 1 is risen and removes pressure, the so far one end pre-bending shaping of steel plate 8 is finished.
As shown in figure 5, upper material table 6 is moved horizontally along lower material table 7 to away from the direction of pre-bending shaping dies 10.Enter one Step, as shown in fig. 6, lower material table 7 horizontally rotates 180 degree along objective table 5, adjustment steel plate 8 position makes its end exceed upper material The edge certain distance of platform 6.As shown in fig. 7, upper material table 6 continues to move along lower material table 7 to the direction level of pre-bending shaping dies 10 It is dynamic, the end of steel plate 8 is reached on mould 2, same pre-bending forming process is carried out to the unshaped end of steel plate 8, is finally given such as Fig. 8 Shown two ends carry the steel plate 8 of circular arc.
In summary, this efficient medium plate end pre-bending building mortion solve the straight steel plate when edge rolling is processed be difficult into The problem of entering roll, the pre-flanging medium plate circular arc regularity that processes is high, circularity is good, it is to avoid steel plate can in edge rolling process Steel pipe bus joint close can occur and go out the problem of warpage seriously docks difficulty, reduce follow-up correction work, it is easy and effective, improve Product quality and production efficiency.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvement can also be made, these improvement also should be regarded as Protection domain of the present utility model.

Claims (6)

1. a kind of efficient medium plate end pre-bending building mortion, it is characterised in that:Including installation being pre-bent on a hydraulic press Shape mould(10), the pre-bending shaping dies(10)Including upper mould(1)With lower mould(2), the upper mould(1)In the circular arc of evagination Shape, on the walking beam of hydraulic press;The lower mould(2)In the arc-shaped of indent, on the support of hydraulic press.
2. efficient medium plate end pre-bending building mortion according to claim 1, it is characterised in that:The lower mould(2) Side be additionally provided with baffle plate(3).
3. efficient medium plate end pre-bending building mortion according to claim 2, it is characterised in that:Also include material defeated Send mechanism(4), the material conveying mechanism(4)Including objective table(5), upper material table(6)With lower material table(7), the lower thing Expect platform(7)Located at objective table(5)On, and can be along objective table(5)Any direction rotates;The upper material table(6)Located at lower thing Expect platform(7)On, and can be along lower material table(7)Move horizontally.
4. efficient medium plate end pre-bending building mortion according to claim 1, it is characterised in that:The upper mould(1) The radius and pre-roll pipe diameter of the arc-shaped of evagination are equal.
5. efficient medium plate end pre-bending building mortion according to claim 1, it is characterised in that:The lower mould(2) The radius and pre-roll outer diameter of steel pipes of the arc-shaped of indent are equal.
6. efficient medium plate end pre-bending building mortion according to claim 3, it is characterised in that:The baffle plate(3) For the trapezoidal baffle plate in section(3), and it is disposed far from material conveying mechanism(4)Side.
CN201621360247.5U 2016-12-13 2016-12-13 A kind of efficient medium plate end pre-bending building mortion Active CN206366571U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621360247.5U CN206366571U (en) 2016-12-13 2016-12-13 A kind of efficient medium plate end pre-bending building mortion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621360247.5U CN206366571U (en) 2016-12-13 2016-12-13 A kind of efficient medium plate end pre-bending building mortion

Publications (1)

Publication Number Publication Date
CN206366571U true CN206366571U (en) 2017-08-01

Family

ID=59393369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621360247.5U Active CN206366571U (en) 2016-12-13 2016-12-13 A kind of efficient medium plate end pre-bending building mortion

Country Status (1)

Country Link
CN (1) CN206366571U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107716627A (en) * 2017-10-26 2018-02-23 天津天重中直科技工程有限公司 A kind of large-scale pressure bending system
CN109226369A (en) * 2018-11-08 2019-01-18 中国水利水电第三工程局有限公司 A kind of steel plate rolls pre-bending auxiliary device and steel plate rolls pre-bending processing method
JP2021142553A (en) * 2020-03-13 2021-09-24 株式会社アマダ End-bending die metal mold and end-bending metal mold set
CN115608820A (en) * 2022-10-27 2023-01-17 番禺珠江钢管有限公司 A steel plate pre-bending machine

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107716627A (en) * 2017-10-26 2018-02-23 天津天重中直科技工程有限公司 A kind of large-scale pressure bending system
CN109226369A (en) * 2018-11-08 2019-01-18 中国水利水电第三工程局有限公司 A kind of steel plate rolls pre-bending auxiliary device and steel plate rolls pre-bending processing method
CN109226369B (en) * 2018-11-08 2024-03-22 中国水利水电第三工程局有限公司 Steel plate rolling pre-bending auxiliary device and steel plate rolling pre-bending processing method
JP2021142553A (en) * 2020-03-13 2021-09-24 株式会社アマダ End-bending die metal mold and end-bending metal mold set
JP7421965B2 (en) 2020-03-13 2024-01-25 株式会社アマダ End bending die mold and end bending mold set
CN115608820A (en) * 2022-10-27 2023-01-17 番禺珠江钢管有限公司 A steel plate pre-bending machine

Similar Documents

Publication Publication Date Title
CN206366571U (en) A kind of efficient medium plate end pre-bending building mortion
CN107263031A (en) Cylinder is without pre-bending edge rolling moulding process
US20130239642A1 (en) Production line of large diameter longitudinal welded pipe
CN102500662A (en) Whole diameter rounding method for large pipe fitting
CN107081346A (en) It is a kind of not wait the method that wall thickness arc makes large diameter steel pipe with two pieces
CN105312858B (en) A kind of mold used in submersible sewage pump pump case forming method and this method
CN202006238U (en) Mould for pre-flanging machine
CN206215700U (en) Longitudinal submerged arc welded pipe is in a pout apparatus for correcting
CN105268761A (en) Large-diameter thick-walled longitudinal submerged-arc welding pipe based on J-forming C-forming O-forming and Compression to make round (JCOC) forming process
RU2543657C1 (en) Production method of longitudinally welded main pipes
CN205254535U (en) Dual -purpose continuous production transversal joint submerged arc weld pipe's of slab band production facility
CN102641917A (en) Round setting technique for pipe end of large-size pipe fitting
RU2486981C1 (en) Production of large-diameter welded tubes
CN101797610A (en) Drawing forming method for steel tilted tees
CN101157102A (en) Rectangular fillet corrugated pipe expansion joint machining method
CN104097871A (en) Container, arc-shaped-waved side plate therefor, side plate manufacturing equipment and side plate manufacturing method
CN203936191U (en) A kind of novel culvert corrugated steel punch
CN205926732U (en) Palintrope processingequipment
CN205763591U (en) A kind of shaped device forging blower fan main shaft
CN206512859U (en) A kind of prefabricated buildings wall panel assembly
CN104338782A (en) Processing method of welded tube with wall having different thicknesses
CN103659180B (en) The shaping splicing method of manufacturing technology of main shaft of large water turbine cold breakdown
CN205128739U (en) Y shape tee bend suppression forming die
CN202922148U (en) Welding pad roller for spiral submerged-arc welding former
CN209062546U (en) Nuclear power station steel lining reinforcing section forming device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant