CN206487210U - Anti-corrosion concrete chimney in granite - Google Patents

Anti-corrosion concrete chimney in granite Download PDF

Info

Publication number
CN206487210U
CN206487210U CN201720164716.4U CN201720164716U CN206487210U CN 206487210 U CN206487210 U CN 206487210U CN 201720164716 U CN201720164716 U CN 201720164716U CN 206487210 U CN206487210 U CN 206487210U
Authority
CN
China
Prior art keywords
granite
slabstone
concrete chimney
corrosion
chimney
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720164716.4U
Other languages
Chinese (zh)
Inventor
赵文强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Mingxin Green Environmental Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720164716.4U priority Critical patent/CN206487210U/en
Application granted granted Critical
Publication of CN206487210U publication Critical patent/CN206487210U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)

Abstract

Anti-corrosion concrete chimney in a kind of granite, including concrete chimney body, side is provided with granite anticorrosive coat in described concrete chimney body, described granite anticorrosive coat is rearranged by the granite slabstone of rectangle, two adjacent edges of the granite slabstone are provided with gomphosis groove, other two adjacent edge of the granite slabstone is provided with chimeric chimb, and the chimeric chimb of the granite slabstone of arranged adjacent is embedded in relative gomphosis groove and passes through the gluing docking for realizing each granite slabstone.The utility model is using corrosion-proof lining of the granite slabstone as concrete chimney, with excellent acid-alkali-corrosive-resisting performance, while the effective slabstone seam that solves easily occurs to leak and influence chimney intensity, and stone material is easy to fall off causes the problem of corrosion-proof lining fails.The utility model uses brick plate building construction different from the past, completes interior anticorrosive coat construction simultaneously during concrete chimney body moulding by casting, and short construction period, engineering cost is low, and the overall performance of concrete chimney and corrosion-proof lining is good, and intensity is high.

Description

Anti-corrosion concrete chimney in granite
Technical field
The utility model is related to chimney, and in particular to anti-corrosion concrete chimney in a kind of granite.
Background technology
Glass flake or fiberglass and line with rubber technique, its resistance to elevated temperatures being used the interior anti-corrosion of current concrete chimney more Difference, the easily carbonization failure in hot environment.Have high temperature resistant and decay resistance strong as the interior anti-corrosion of chimney using titanium plate The characteristics of, but it involves great expense.The characteristics of brick plate inside lining anti-corrosive has high temperature resistant and relatively low cost, but its brick plate seam Easily occur leakage and influence chimney intensity, cause corrosion-proof lining to fail while brick plate is easy to fall off, brick plate liner is hindered as current The widely used main cause of anti-corrosion.
The content of the invention
The purpose of this utility model is in view of the above-mentioned problems, improving anti-corrosion concrete chimney in a kind of granite, the flower Anti-corrosion concrete chimney is rotten with excellent acid and alkali-resistance using corrosion-proof lining of the granite slabstone as concrete chimney in the rock of hilllock Corrosion energy, while the effective slabstone seam that solves easily occurs to leak and influence chimney intensity, and stone material is easy to fall off causes to prevent The problem of rotten liner fails.
Realizing the technical scheme of above-mentioned purpose is:Anti-corrosion concrete chimney in a kind of granite, including concrete chimney body, Side is provided with granite anticorrosive coat in described concrete chimney body, and described granite anticorrosive coat is arranged by the granite slabstone of rectangle Row composition, two adjacent edges of the granite slabstone are provided with gomphosis groove, and other two adjacent edge of the granite slabstone is provided with chimeric Chimb, the chimeric chimb of the granite slabstone of arranged adjacent is embedded in relative gomphosis groove and realizes each granite by gluing The docking of slabstone.
Anti-corrosion concrete chimney in above-mentioned granite, the back side of the granite slabstone it is gluing be connected with it is embedded described Granite embedded block in concrete chimney body, the granite embedded block is rectangle slabstone of four sides in inclined-plane.
Outer reinforcement skeleton is provided with anti-corrosion concrete chimney in above-mentioned granite, described concrete chimney body and interior Layer framework of steel reinforcement.
The beneficial effects of the utility model:
1st, using corrosion-proof lining of the granite building material as concrete chimney, with excellent acid-alkali-corrosive-resisting performance, and By the Qian He and gluing docking of granite slabstone chimb and groove, effectively solve granite slabstone seam and easily let out Leak and influence chimney intensity, and slabstone is easy to fall off causes the problem of corrosion-proof lining fails.
2nd, by the back side of granite slabstone it is gluing connection granite embedded block, further increase granite slabstone with The being firmly combined with property of concrete chimney body.
The 3rd, inside and outside double steel bar skeleton is set in concrete chimney body, can be improved while reinforcing bar usage amount is reduced The intensity of chimney.
4th, using brick plate building construction different from the past, completed simultaneously during concrete chimney body moulding by casting Anticorrosive coat is constructed in stone material, and short construction period, engineering cost is low, and the overall performance of concrete chimney and corrosion-proof lining is good.
5th, granite anticorrosive coat of the present utility model is not only applicable to columnar structure, is equally applicable to square, trapezoidal The internal layer anti-corrosion of uiform section body.
Brief description of the drawings
Fig. 1 is anti-corrosion concrete stack cross section schematic diagram in this granite.
Fig. 2 is the granite slabstone front view of anti-corrosion concrete chimney in this granite.
Fig. 3 is Fig. 2 top view.
Fig. 4 is the granite slabstone front view that the back side is adhesive with granite embedded block.
Fig. 5 is Fig. 4 top view.
In figure:1st, concrete chimney body;2nd, granite anticorrosive coat;3rd, granite embedded block;4th, outer reinforcement skeleton;5th, it is interior Layer framework of steel reinforcement;21st, granite slabstone;22nd, gomphosis groove;23rd, it is fitted together to chimb.
Embodiment
Embodiment of the present utility model is illustrated with reference to the accompanying drawings and examples.
As shown in Figure 1, Figure 2 and Fig. 3, anti-corrosion concrete chimney includes concrete chimney body 1, the concrete chimney in this granite It is provided with body 1 close to the outer reinforcement skeleton 4 of the outer surface of concrete chimney body 1 and close to the interior of the inner surface of concrete chimney body 1 Layer framework of steel reinforcement 5.The outer reinforcement skeleton 4 and internal layer framework of steel reinforcement 5 of Fig. 1 embodiments are respectively by horizontally disposed annular reinforcing bar Constituted with the mat reinforcement cylinder that vertical reinforcing bar is combined, the inside and outside double steel bar skeleton structure is reducing the same of reinforcing bar usage amount When can improve the intensity of chimney.Concrete chimney body 1 inwall be provided with granite anticorrosive coat 2, the granite anticorrosive coat 2 by The granite slabstone 21 of rectangle is rearranged along the circumferential and axial of chimney, and two adjacent edges of the granite slabstone 21 are provided with chimeric Groove 22, other two adjacent edge of the granite slabstone 21 is provided with the chimeric chimb 23 being coincide with described gomphosis groove 22, attached Figure embodiment is the gomphosis groove 22 and chimeric chimb 23 of square-section.The chimeric chimb 23 of the granite slabstone 21 of arranged adjacent Bonded in embedded relative gomphosis groove 22 and by adhesive glue and realize that the circumferential and axial of each granite slabstone 21 are docked.This glues The preferred high-temperature-resistant epoxy resin glue of gum deposit.Granite has excellent acid-alkali-corrosive-resisting as the corrosion-proof lining of concrete chimney Can, while by the Qian He and gluing docking of granite slabstone chimb and groove, granite slabstone seam can be prevented effectively from Generation is leaked and slabstone comes off, and the service life for being used in the concrete chimney of acid and alkali corrosion fume emission is greatly improved.
The granite anticorrosive coat 2 of anti-corrosion concrete chimney is provided with embedded concrete chimney body 1 in such as Fig. 1, this granite Granite embedded block 3, for further improving the fastness that granite anticorrosive coat 2 is combined with concrete chimney body 1.Such as Fig. 4 And Fig. 5, one granite embedded block 3 bonded by adhesive glue at the middle part at the back side of granite slabstone 21, the granite embedded block 3 is Four sides are arranged to the rectangle granite chippings material of inside side inclined ramp.The adhesive glue bonded used in granite embedded block 3 is preferably resistance to High temperature epoxy resinses glue.
In this granite the length of the granite slabstone 21 of anti-corrosion concrete chimney and it is wide be adapted to selection for 120mm ~ 150mm, Thickness is 20mm ~ 30mm.The length of granite embedded block 3 and wide to be adapted to selection be that 40mm ~ 50mm, thickness are 10mm ~ 15mm.It is chimeric The width and depth of groove 22 may be selected to be 1/3rd of the thickness of granite slabstone 21.

Claims (3)

1. anti-corrosion concrete chimney in a kind of granite, including concrete chimney body(1), it is characterized in that:Described concrete cigarette Chimney body(1)Inner side is provided with granite anticorrosive coat(2), described granite anticorrosive coat(2)By the granite slabstone of rectangle(21)Row Row composition, the granite slabstone(21)Two adjacent edges be provided with gomphosis groove(22), the granite slabstone(21)Other two-phase Adjacent side is provided with chimeric chimb(23), the granite slabstone of arranged adjacent(21)Chimeric chimb(23)Embedded relative gomphosis groove (22)It is interior and realize each granite slabstone by gluing(21)Docking.
2. anti-corrosion concrete chimney in granite according to claim 1, it is characterized in that:In the granite slabstone(21) The back side gluing be connected with the embedded concrete chimney body(1)Interior granite embedded block(3), the granite embedded block(3) It is in the rectangle slabstone on inclined-plane for four sides.
3. anti-corrosion concrete chimney in granite according to claim 1 or 2, it is characterized in that:Described concrete chimney Body(1)It is interior to be provided with outer reinforcement skeleton(4)With internal layer framework of steel reinforcement(5).
CN201720164716.4U 2017-02-23 2017-02-23 Anti-corrosion concrete chimney in granite Expired - Fee Related CN206487210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720164716.4U CN206487210U (en) 2017-02-23 2017-02-23 Anti-corrosion concrete chimney in granite

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720164716.4U CN206487210U (en) 2017-02-23 2017-02-23 Anti-corrosion concrete chimney in granite

Publications (1)

Publication Number Publication Date
CN206487210U true CN206487210U (en) 2017-09-12

Family

ID=59762108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720164716.4U Expired - Fee Related CN206487210U (en) 2017-02-23 2017-02-23 Anti-corrosion concrete chimney in granite

Country Status (1)

Country Link
CN (1) CN206487210U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639502A (en) * 2017-02-23 2017-05-10 赵文强 Concrete chimney capable of achieving internal corrosion prevention through granite

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639502A (en) * 2017-02-23 2017-05-10 赵文强 Concrete chimney capable of achieving internal corrosion prevention through granite

Similar Documents

Publication Publication Date Title
CN202745404U (en) External repairing and reinforcing device of reinforced concrete chimney cylinder wall after tapping and sampling
CN110388531A (en) A kind of the reinforcing structure and its reinforcement means of pipeline
CN106287001B (en) Penstock reinforcing bar composite concrete pipe and the pipeline and production method being made from it
CN204004910U (en) A kind of corrugated nozzle cuff structure connecting for corrugated steel culvert
CN206487210U (en) Anti-corrosion concrete chimney in granite
CN204267915U (en) Strengthen the two rubber sealing reinforced concrete sewer pipe of jacking construction corrosion protection
CN211282903U (en) Wear-resistant conveying pipe
CN104912208A (en) Anticorrosion structure and treatment method of outer bottom edge board of gas chamber
CN205676788U (en) A kind of antiseep assembling type steel bellows for culvert
CN201347626Y (en) Anticorrosive double-layer chimney
CN106639502A (en) Concrete chimney capable of achieving internal corrosion prevention through granite
CN104929254A (en) Antiseptic and processing method for margin plate at bottom outside gas chamber
CN203285457U (en) Bored tunnel structure with high water resistance and high air impermeability
CN204459618U (en) Silicon carbide wear-resistant anticorrosion composite pipe
CN206001105U (en) A kind of jet chimney embedded underground structure
CN204717234U (en) Directional traversing pipeline sheath tube end annular space waterproof construction
CN210568513U (en) Maintenance anti-corrosion structure of metal chimney leakage area
CN208762525U (en) Be in the milk anti-channeling material device in blast furnace hot face
CN204386625U (en) A kind of railway tunnel hoop seam uses steel plate self-adhesion water stop band
CN209638623U (en) A kind of high abrasion ceramics steel pipe
CN104213515B (en) The method repairing corrugated steel embedded structure with steel fibrous shotcrete
CN202140102U (en) Anti-corrosion anchor rod
CN202927293U (en) Composite lining repair structure and pipeline
CN102466090A (en) Novel corrosion-resistant heat-preserving pipe
CN204530758U (en) Immersed tube tunnel steel end envelope wall and concrete fixed structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181114

Address after: 110000 Liaoning free trade pilot area Shenyang area 109-1, 2 level 247-2211 room.

Patentee after: Liaoning Mingxin Green Environmental Engineering Co.,Ltd.

Address before: 066000 85 Qinshan Road, Qinhuangdao, Hebei

Patentee before: Zhao Wenqiang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170912

CF01 Termination of patent right due to non-payment of annual fee