CN204530758U - Immersed tube tunnel steel end envelope wall and concrete fixed structure - Google Patents
Immersed tube tunnel steel end envelope wall and concrete fixed structure Download PDFInfo
- Publication number
- CN204530758U CN204530758U CN201520091080.6U CN201520091080U CN204530758U CN 204530758 U CN204530758 U CN 204530758U CN 201520091080 U CN201520091080 U CN 201520091080U CN 204530758 U CN204530758 U CN 204530758U
- Authority
- CN
- China
- Prior art keywords
- pipeline section
- concrete
- steel end
- wall
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 78
- 239000010959 steel Substances 0.000 title claims abstract description 78
- 229920001971 elastomer Polymers 0.000 claims abstract description 16
- 125000006850 spacer group Chemical group 0.000 claims abstract description 16
- 238000010276 construction Methods 0.000 claims abstract description 10
- 238000009434 installation Methods 0.000 claims abstract description 4
- 239000003822 epoxy resin Substances 0.000 claims description 5
- 229920000647 polyepoxide Polymers 0.000 claims description 5
- 230000010485 coping Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 3
- 238000009417 prefabrication Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000003321 amplification Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 239000011527 polyurethane coating Substances 0.000 description 1
- 238000005488 sandblasting Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 230000008646 thermal stress Effects 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Immersed tube tunnel steel end envelope wall and concrete fixed structure, this structure comprises pipeline section side wall concrete, angle steel, steel end envelope wall, rubber spacer, dowel screw, fixing top board; Described pipeline section side wall concrete and pipeline section steel end seal to form to join between wall and stitch, and the inner side being positioned at the pipeline section side wall concrete of handing-over seam is embedded with angle steel, dowel screw, wherein vertical the and angle steel of dowel screw, and each dowel screw is parallel to each other and is arranged symmetrically with; Be provided with rubber spacer between steel end envelope wall and angle steel, dowel screw one is fixed in pipeline section side wall concrete, and the other end seals wall through rubber spacer, steel end and is fixed on steel end Feng Qiang side by nut.Described pipeline section side wall concrete and pipeline section steel end seal the handing-over formed between wall and stitch top pre-installation and have fixing top board, and fixing top board one end is fixed in pipeline section side wall concrete, and the other end is cantilever construction, and steel end envelope coping is welded on bottom fixing top board.
Description
Technical field
The utility model relates to the outer waterproof of a kind of immersed tube tunnel immersed tube pipeline section and fixed structure, belongs to immersed tube tunnel technical field of construction.
Background technology
The outer waterproof of immersed tube tunnel immersed tube pipeline section is one of key issue in immersed tube tunnel design and construction, its waterproof effect directly has influence on floating, transportation by driving, the sinking of immersed tube, usually, seam waterproof is handed over to pipeline section steel end envelope wall (steel work) and pipeline section concrete structure, mainly brush epoxy-polyurethane coating at the pipeline section surface junction of the edges of two sheets of paper, wherein cover note layer of glass layer (form two and be coated with a cloth) as enhancement Layer.But because the shrinkage value of bi-material between pre-buried angle steel with pipeline section concrete differs quite large, and steel end seals in shingle nail and pre-buried angle steel welding process, due to the effect of thermal stresses, causes angle steel to be out of shape, and has occurred crack between concrete; End envelope wall and the stressed more complicated of angle steel weld, weld seam there will be crack.A small amount of crack and water leakage is still had in construction.
Summary of the invention
The purpose of this utility model is to provide a kind of immersed tube tunnel steel end to seal wall and concrete fixed structure, this structure not only can ensure immersed tube pipeline section waterproof effect, and easy construction quality easy to control, under the prerequisite ensureing design, construction quality and safety, solve in the past immersed tube tunnel in the drawback of pipeline section steel end envelope wall in pipeline section concrete structure handing-over seam crack and water leakage.
For achieving the above object, the technical solution adopted in the utility model is immersed tube tunnel steel end envelope wall and concrete fixed structure, and this structure comprises pipeline section side wall concrete 1, angle steel 2, steel end envelope wall 3, rubber spacer 4, dowel screw 5, fixing top board 6; Described pipeline section side wall concrete 1 and pipeline section steel end seal to form to join between wall 3 and stitch, and the inner side being positioned at the pipeline section side wall concrete 1 of handing-over seam is embedded with angle steel 2, dowel screw 5, wherein vertical the and angle steel 2 of dowel screw 5, and each dowel screw 5 is parallel to each other and is arranged symmetrically with; Be provided with rubber spacer 4 between steel end envelope wall 3 and angle steel 2, dowel screw 5 one is fixed in pipeline section side wall concrete 1, and the other end seals wall 3 through rubber spacer 4, steel end and is fixed on steel end envelope wall 3 side by nut.
Described pipeline section side wall concrete 1 and pipeline section steel end seal the handing-over formed between wall 3 and stitch top pre-installation and have fixing top board 6, fixing top board 6 one end is fixed in pipeline section side wall concrete 1, the other end is cantilever construction, and the welded top of steel end envelope wall 3 is bottom fixing top board 6.
The external surface of described pipeline section side wall concrete 1 scribbles epoxy resin.
Described fixing top board 6 bracketed part length is 2.5-3.5 times of steel end envelope wall 3 thickness.
The spacing that described angle steel 2 and steel end seals wall 3 is 0.9-0.95 times of rubber spacer 4 thickness.
Compared with prior art, the beneficial effects of the utility model are as follows.
1, this structure adopts partly welding, half bolt to be connected and fixed mode, and immersed tube steel end envelope wall and pipeline section concrete structure are joined stitch waterproof fixed structure and carry out optimal design again, can effectively ensure immersed tube pipeline section waterproof effect and quality, and easy construction quality easy to control.
2, the utility model is to the pre-buried angle steel in immersed tube pipeline section concrete side, concrete external surface is provided with epoxy resin scratch coat, ensure that immersed tube tunnel stitches waterproof effect quality at pipeline section steel end envelope wall in joining with pipeline section concrete structure, avoiding occurring handing over gaping of joints to occur infiltration.
Accompanying drawing explanation
Fig. 1 is that pipeline section steel end envelope wall and pipeline section concrete structure join schematic diagram.
Fig. 2 is I-I position partial structurtes amplification view in Fig. 1.
In figure: 1-pipeline section side wall concrete, 2-angle steel, 3-steel end envelope wall, 4-rubber spacer, 5-dowel screw, 6-fixes top board.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is described in further detail.
As shown in Figure 1-2, immersed tube tunnel steel end envelope wall and concrete fixed structure, this structure comprises pipeline section side wall concrete 1, angle steel 2, steel end envelope wall 3, rubber spacer 4, dowel screw 5, fixing top board 6; Described pipeline section side wall concrete 1 and pipeline section steel end seal to form to join between wall 3 and stitch, and the inner side being positioned at the pipeline section side wall concrete 1 of handing-over seam is embedded with angle steel 2, dowel screw 5, wherein vertical the and angle steel 2 of dowel screw 5, and each dowel screw 5 is parallel to each other and is arranged symmetrically with; Be provided with rubber spacer 4 between steel end envelope wall 3 and angle steel 2, dowel screw 5 one is fixed in pipeline section side wall concrete 1, and the other end seals wall 3 through rubber spacer 4, steel end and is fixed on steel end envelope wall 3 side by nut.
Described pipeline section side wall concrete 1 and pipeline section steel end seal the handing-over formed between wall 3 and stitch top pre-installation and have fixing top board 6, fixing top board 6 one end is fixed in pipeline section side wall concrete 1, the other end is cantilever construction, and the welded top of steel end envelope wall 3 is bottom fixing top board 6.
The external surface of described pipeline section side wall concrete 1 scribbles epoxy resin.
The specific implementation process of this structure is as follows, and pipeline section side wall concrete 1, in prefabrication process, installs dowel screw 5, fixing top board 6 according to the size of steel end envelope wall 3; Basal plane derusting by sandblasting is carried out to the steel end envelope wall 3 of pipeline section; After base cleaning, repairing are carried out to pipeline section side wall concrete 1 surface, carry out the spraying application of epoxy resin scratch coat; Rubber spacer 4 is fitted through bolton between pipeline section side wall concrete 1, steel end envelope wall 3; By steel end envelope wall 3 top and fixing top board 6 bottom welding, complete whole prefabrication process.
Although composition graphs is described the utility model above; but the utility model is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; instead of it is restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; when not departing from the utility model aim, can also make a lot of distortion, these all belong within protection of the present utility model.
Claims (4)
1. immersed tube tunnel steel end envelope wall and concrete fixed structure, is characterized in that: this structure comprises pipeline section side wall concrete (1), angle steel (2), steel end envelope wall (3), rubber spacer (4), dowel screw (5), fixing top board (6); Described pipeline section side wall concrete (1) and pipeline section steel end seal to form to join between wall (3) and stitch, the inner side being positioned at the pipeline section side wall concrete (1) of handing-over seam is embedded with angle steel (2), dowel screw (5), the wherein vertical and angle steel (2) of dowel screw (5), each dowel screw (5) is parallel to each other and is arranged symmetrically with; Between steel end envelope wall (3) and angle steel (2), rubber spacer (4) is installed, dowel screw (5) one is fixed in pipeline section side wall concrete (1), and the other end seals wall (3) through rubber spacer (4), steel end and is fixed on steel end envelope wall (3) side by nut;
Described pipeline section side wall concrete (1) and pipeline section steel end seal the handing-over formed between wall (3) and stitch top pre-installation and have fixing top board (6), fixing top board (6) one end is fixed in pipeline section side wall concrete (1), the other end is cantilever construction, and the welded top of steel end envelope wall (3) is in fixing top board (6) bottom.
2. immersed tube tunnel steel end envelope wall according to claim 1 and concrete fixed structure, is characterized in that: the external surface of described pipeline section side wall concrete (1) scribbles epoxy resin.
3. immersed tube tunnel steel end envelope wall according to claim 1 and concrete fixed structure, is characterized in that: described fixing top board (6) bracketed part length is 2.5-3.5 times of steel end envelope wall (3) thickness.
4. immersed tube tunnel steel end according to claim 1 envelope wall and concrete fixed structure, is characterized in that: the spacing that described angle steel (2) and steel end seal wall (3) is 0.9-0.95 times of rubber spacer (4) thickness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520091080.6U CN204530758U (en) | 2015-02-09 | 2015-02-09 | Immersed tube tunnel steel end envelope wall and concrete fixed structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520091080.6U CN204530758U (en) | 2015-02-09 | 2015-02-09 | Immersed tube tunnel steel end envelope wall and concrete fixed structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204530758U true CN204530758U (en) | 2015-08-05 |
Family
ID=53744783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520091080.6U Expired - Fee Related CN204530758U (en) | 2015-02-09 | 2015-02-09 | Immersed tube tunnel steel end envelope wall and concrete fixed structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204530758U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107975068A (en) * | 2017-11-22 | 2018-05-01 | 中南大学 | A kind of immersed tube tunnel section disconnector alternating expression fireproof construction |
-
2015
- 2015-02-09 CN CN201520091080.6U patent/CN204530758U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107975068A (en) * | 2017-11-22 | 2018-05-01 | 中南大学 | A kind of immersed tube tunnel section disconnector alternating expression fireproof construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204492159U (en) | A kind of for concrete wall seam areas formwork seal bracing means | |
CN110388531B (en) | Reinforcing structure and reinforcing method for pipeline | |
CN103758358A (en) | Steel plate angle iron combined constructional column and anchor adhering steel plate brickwork reinforcing structure and construction method | |
CN202745404U (en) | External repairing and reinforcing device of reinforced concrete chimney cylinder wall after tapping and sampling | |
CN204530758U (en) | Immersed tube tunnel steel end envelope wall and concrete fixed structure | |
CN202577350U (en) | Steel shell and concrete lap structure at end of immersed tunnel | |
CN203034493U (en) | Rear-mounted replaceable type basement deformation joint waterproof device | |
CN211286754U (en) | Opposite-pulling type steel plate shear wall reinforcing construction structure | |
CN203145542U (en) | Ordinary reinforced concrete crack-resistant no-seepage pool with large volume | |
CN207260191U (en) | A kind of class rectangle pipe gallery section of jurisdiction connection structure | |
CN207278272U (en) | It is a kind of using arc channel steel and the tunnel duct piece connector of carbon cloth composite consolidation | |
CN204728362U (en) | Containing immersed tube tunnel end box hat and the concrete bridging arrangement of pointing | |
CN102433939A (en) | Connecting waterproof structure for prefabricated wall panel | |
CN202577366U (en) | Immersed tube tunnel lap joint structure of steel end sealing wall and concrete | |
CN205777472U (en) | A kind of steel wood veneer template | |
CN211572333U (en) | Stone material wall and metal wall handing-over department seal structure | |
CN204112719U (en) | A kind of external angle formwork of reinforced concrete member installs structure | |
CN204356915U (en) | The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall | |
CN211173065U (en) | Basement outer wall construction joint anti-seepage template structure | |
CN204386625U (en) | A kind of railway tunnel hoop seam uses steel plate self-adhesion water stop band | |
CN103924694B (en) | A kind of mending-leakage processing method of water proofing property concrete extension joint | |
CN203403445U (en) | Steel sleeve used for plugging basement tube well | |
CN205348421U (en) | A bury formula waterproof construction for side wall movement joint | |
CN210888957U (en) | Basalt fiber reinforced concrete shield segment with edge steel | |
CN205242840U (en) | Sealed integrated board in angle is pieced together to hem |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 |
|
CF01 | Termination of patent right due to non-payment of annual fee |