CN204530758U - Immersed tube tunnel steel end envelope wall and concrete fixed structure - Google Patents

Immersed tube tunnel steel end envelope wall and concrete fixed structure Download PDF

Info

Publication number
CN204530758U
CN204530758U CN201520091080.6U CN201520091080U CN204530758U CN 204530758 U CN204530758 U CN 204530758U CN 201520091080 U CN201520091080 U CN 201520091080U CN 204530758 U CN204530758 U CN 204530758U
Authority
CN
China
Prior art keywords
pipeline section
concrete
steel end
wall
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520091080.6U
Other languages
Chinese (zh)
Inventor
代敬辉
王朝辉
张志安
李建芳
郭建文
肖刚刚
梁素琴
廖建炜
叶忠厚
李盼
安然
张景华
尤天杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201520091080.6U priority Critical patent/CN204530758U/en
Application granted granted Critical
Publication of CN204530758U publication Critical patent/CN204530758U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Immersed tube tunnel steel end envelope wall and concrete fixed structure, this structure comprises pipeline section side wall concrete, angle steel, steel end envelope wall, rubber spacer, dowel screw, fixing top board; Described pipeline section side wall concrete and pipeline section steel end seal to form to join between wall and stitch, and the inner side being positioned at the pipeline section side wall concrete of handing-over seam is embedded with angle steel, dowel screw, wherein vertical the and angle steel of dowel screw, and each dowel screw is parallel to each other and is arranged symmetrically with; Be provided with rubber spacer between steel end envelope wall and angle steel, dowel screw one is fixed in pipeline section side wall concrete, and the other end seals wall through rubber spacer, steel end and is fixed on steel end Feng Qiang side by nut.Described pipeline section side wall concrete and pipeline section steel end seal the handing-over formed between wall and stitch top pre-installation and have fixing top board, and fixing top board one end is fixed in pipeline section side wall concrete, and the other end is cantilever construction, and steel end envelope coping is welded on bottom fixing top board.

Description

Immersed tube tunnel steel end envelope wall and concrete fixed structure
Technical field
The utility model relates to the outer waterproof of a kind of immersed tube tunnel immersed tube pipeline section and fixed structure, belongs to immersed tube tunnel technical field of construction.
Background technology
The outer waterproof of immersed tube tunnel immersed tube pipeline section is one of key issue in immersed tube tunnel design and construction, its waterproof effect directly has influence on floating, transportation by driving, the sinking of immersed tube, usually, seam waterproof is handed over to pipeline section steel end envelope wall (steel work) and pipeline section concrete structure, mainly brush epoxy-polyurethane coating at the pipeline section surface junction of the edges of two sheets of paper, wherein cover note layer of glass layer (form two and be coated with a cloth) as enhancement Layer.But because the shrinkage value of bi-material between pre-buried angle steel with pipeline section concrete differs quite large, and steel end seals in shingle nail and pre-buried angle steel welding process, due to the effect of thermal stresses, causes angle steel to be out of shape, and has occurred crack between concrete; End envelope wall and the stressed more complicated of angle steel weld, weld seam there will be crack.A small amount of crack and water leakage is still had in construction.
Summary of the invention
The purpose of this utility model is to provide a kind of immersed tube tunnel steel end to seal wall and concrete fixed structure, this structure not only can ensure immersed tube pipeline section waterproof effect, and easy construction quality easy to control, under the prerequisite ensureing design, construction quality and safety, solve in the past immersed tube tunnel in the drawback of pipeline section steel end envelope wall in pipeline section concrete structure handing-over seam crack and water leakage.
For achieving the above object, the technical solution adopted in the utility model is immersed tube tunnel steel end envelope wall and concrete fixed structure, and this structure comprises pipeline section side wall concrete 1, angle steel 2, steel end envelope wall 3, rubber spacer 4, dowel screw 5, fixing top board 6; Described pipeline section side wall concrete 1 and pipeline section steel end seal to form to join between wall 3 and stitch, and the inner side being positioned at the pipeline section side wall concrete 1 of handing-over seam is embedded with angle steel 2, dowel screw 5, wherein vertical the and angle steel 2 of dowel screw 5, and each dowel screw 5 is parallel to each other and is arranged symmetrically with; Be provided with rubber spacer 4 between steel end envelope wall 3 and angle steel 2, dowel screw 5 one is fixed in pipeline section side wall concrete 1, and the other end seals wall 3 through rubber spacer 4, steel end and is fixed on steel end envelope wall 3 side by nut.
Described pipeline section side wall concrete 1 and pipeline section steel end seal the handing-over formed between wall 3 and stitch top pre-installation and have fixing top board 6, fixing top board 6 one end is fixed in pipeline section side wall concrete 1, the other end is cantilever construction, and the welded top of steel end envelope wall 3 is bottom fixing top board 6.
The external surface of described pipeline section side wall concrete 1 scribbles epoxy resin.
Described fixing top board 6 bracketed part length is 2.5-3.5 times of steel end envelope wall 3 thickness.
The spacing that described angle steel 2 and steel end seals wall 3 is 0.9-0.95 times of rubber spacer 4 thickness.
Compared with prior art, the beneficial effects of the utility model are as follows.
1, this structure adopts partly welding, half bolt to be connected and fixed mode, and immersed tube steel end envelope wall and pipeline section concrete structure are joined stitch waterproof fixed structure and carry out optimal design again, can effectively ensure immersed tube pipeline section waterproof effect and quality, and easy construction quality easy to control.
2, the utility model is to the pre-buried angle steel in immersed tube pipeline section concrete side, concrete external surface is provided with epoxy resin scratch coat, ensure that immersed tube tunnel stitches waterproof effect quality at pipeline section steel end envelope wall in joining with pipeline section concrete structure, avoiding occurring handing over gaping of joints to occur infiltration.
Accompanying drawing explanation
Fig. 1 is that pipeline section steel end envelope wall and pipeline section concrete structure join schematic diagram.
Fig. 2 is I-I position partial structurtes amplification view in Fig. 1.
In figure: 1-pipeline section side wall concrete, 2-angle steel, 3-steel end envelope wall, 4-rubber spacer, 5-dowel screw, 6-fixes top board.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is described in further detail.
As shown in Figure 1-2, immersed tube tunnel steel end envelope wall and concrete fixed structure, this structure comprises pipeline section side wall concrete 1, angle steel 2, steel end envelope wall 3, rubber spacer 4, dowel screw 5, fixing top board 6; Described pipeline section side wall concrete 1 and pipeline section steel end seal to form to join between wall 3 and stitch, and the inner side being positioned at the pipeline section side wall concrete 1 of handing-over seam is embedded with angle steel 2, dowel screw 5, wherein vertical the and angle steel 2 of dowel screw 5, and each dowel screw 5 is parallel to each other and is arranged symmetrically with; Be provided with rubber spacer 4 between steel end envelope wall 3 and angle steel 2, dowel screw 5 one is fixed in pipeline section side wall concrete 1, and the other end seals wall 3 through rubber spacer 4, steel end and is fixed on steel end envelope wall 3 side by nut.
Described pipeline section side wall concrete 1 and pipeline section steel end seal the handing-over formed between wall 3 and stitch top pre-installation and have fixing top board 6, fixing top board 6 one end is fixed in pipeline section side wall concrete 1, the other end is cantilever construction, and the welded top of steel end envelope wall 3 is bottom fixing top board 6.
The external surface of described pipeline section side wall concrete 1 scribbles epoxy resin.
The specific implementation process of this structure is as follows, and pipeline section side wall concrete 1, in prefabrication process, installs dowel screw 5, fixing top board 6 according to the size of steel end envelope wall 3; Basal plane derusting by sandblasting is carried out to the steel end envelope wall 3 of pipeline section; After base cleaning, repairing are carried out to pipeline section side wall concrete 1 surface, carry out the spraying application of epoxy resin scratch coat; Rubber spacer 4 is fitted through bolton between pipeline section side wall concrete 1, steel end envelope wall 3; By steel end envelope wall 3 top and fixing top board 6 bottom welding, complete whole prefabrication process.
Although composition graphs is described the utility model above; but the utility model is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; instead of it is restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; when not departing from the utility model aim, can also make a lot of distortion, these all belong within protection of the present utility model.

Claims (4)

1. immersed tube tunnel steel end envelope wall and concrete fixed structure, is characterized in that: this structure comprises pipeline section side wall concrete (1), angle steel (2), steel end envelope wall (3), rubber spacer (4), dowel screw (5), fixing top board (6); Described pipeline section side wall concrete (1) and pipeline section steel end seal to form to join between wall (3) and stitch, the inner side being positioned at the pipeline section side wall concrete (1) of handing-over seam is embedded with angle steel (2), dowel screw (5), the wherein vertical and angle steel (2) of dowel screw (5), each dowel screw (5) is parallel to each other and is arranged symmetrically with; Between steel end envelope wall (3) and angle steel (2), rubber spacer (4) is installed, dowel screw (5) one is fixed in pipeline section side wall concrete (1), and the other end seals wall (3) through rubber spacer (4), steel end and is fixed on steel end envelope wall (3) side by nut;
Described pipeline section side wall concrete (1) and pipeline section steel end seal the handing-over formed between wall (3) and stitch top pre-installation and have fixing top board (6), fixing top board (6) one end is fixed in pipeline section side wall concrete (1), the other end is cantilever construction, and the welded top of steel end envelope wall (3) is in fixing top board (6) bottom.
2. immersed tube tunnel steel end envelope wall according to claim 1 and concrete fixed structure, is characterized in that: the external surface of described pipeline section side wall concrete (1) scribbles epoxy resin.
3. immersed tube tunnel steel end envelope wall according to claim 1 and concrete fixed structure, is characterized in that: described fixing top board (6) bracketed part length is 2.5-3.5 times of steel end envelope wall (3) thickness.
4. immersed tube tunnel steel end according to claim 1 envelope wall and concrete fixed structure, is characterized in that: the spacing that described angle steel (2) and steel end seal wall (3) is 0.9-0.95 times of rubber spacer (4) thickness.
CN201520091080.6U 2015-02-09 2015-02-09 Immersed tube tunnel steel end envelope wall and concrete fixed structure Expired - Fee Related CN204530758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520091080.6U CN204530758U (en) 2015-02-09 2015-02-09 Immersed tube tunnel steel end envelope wall and concrete fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520091080.6U CN204530758U (en) 2015-02-09 2015-02-09 Immersed tube tunnel steel end envelope wall and concrete fixed structure

Publications (1)

Publication Number Publication Date
CN204530758U true CN204530758U (en) 2015-08-05

Family

ID=53744783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520091080.6U Expired - Fee Related CN204530758U (en) 2015-02-09 2015-02-09 Immersed tube tunnel steel end envelope wall and concrete fixed structure

Country Status (1)

Country Link
CN (1) CN204530758U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975068A (en) * 2017-11-22 2018-05-01 中南大学 A kind of immersed tube tunnel section disconnector alternating expression fireproof construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975068A (en) * 2017-11-22 2018-05-01 中南大学 A kind of immersed tube tunnel section disconnector alternating expression fireproof construction

Similar Documents

Publication Publication Date Title
CN204492159U (en) A kind of for concrete wall seam areas formwork seal bracing means
CN110388531B (en) Reinforcing structure and reinforcing method for pipeline
CN103758358A (en) Steel plate angle iron combined constructional column and anchor adhering steel plate brickwork reinforcing structure and construction method
CN202745404U (en) External repairing and reinforcing device of reinforced concrete chimney cylinder wall after tapping and sampling
CN204530758U (en) Immersed tube tunnel steel end envelope wall and concrete fixed structure
CN202577350U (en) Steel shell and concrete lap structure at end of immersed tunnel
CN203034493U (en) Rear-mounted replaceable type basement deformation joint waterproof device
CN211286754U (en) Opposite-pulling type steel plate shear wall reinforcing construction structure
CN203145542U (en) Ordinary reinforced concrete crack-resistant no-seepage pool with large volume
CN207260191U (en) A kind of class rectangle pipe gallery section of jurisdiction connection structure
CN207278272U (en) It is a kind of using arc channel steel and the tunnel duct piece connector of carbon cloth composite consolidation
CN204728362U (en) Containing immersed tube tunnel end box hat and the concrete bridging arrangement of pointing
CN102433939A (en) Connecting waterproof structure for prefabricated wall panel
CN202577366U (en) Immersed tube tunnel lap joint structure of steel end sealing wall and concrete
CN205777472U (en) A kind of steel wood veneer template
CN211572333U (en) Stone material wall and metal wall handing-over department seal structure
CN204112719U (en) A kind of external angle formwork of reinforced concrete member installs structure
CN204356915U (en) The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall
CN211173065U (en) Basement outer wall construction joint anti-seepage template structure
CN204386625U (en) A kind of railway tunnel hoop seam uses steel plate self-adhesion water stop band
CN103924694B (en) A kind of mending-leakage processing method of water proofing property concrete extension joint
CN203403445U (en) Steel sleeve used for plugging basement tube well
CN205348421U (en) A bury formula waterproof construction for side wall movement joint
CN210888957U (en) Basalt fiber reinforced concrete shield segment with edge steel
CN205242840U (en) Sealed integrated board in angle is pieced together to hem

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

CF01 Termination of patent right due to non-payment of annual fee