CN206480034U - Power network 220kV line loss calculation systems - Google Patents

Power network 220kV line loss calculation systems Download PDF

Info

Publication number
CN206480034U
CN206480034U CN201720188257.3U CN201720188257U CN206480034U CN 206480034 U CN206480034 U CN 206480034U CN 201720188257 U CN201720188257 U CN 201720188257U CN 206480034 U CN206480034 U CN 206480034U
Authority
CN
China
Prior art keywords
server
data
power
file
line loss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720188257.3U
Other languages
Chinese (zh)
Inventor
蒋纯冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201720188257.3U priority Critical patent/CN206480034U/en
Application granted granted Critical
Publication of CN206480034U publication Critical patent/CN206480034U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of novel power grid 220kV line loss calculation systems, belongs to technical field of electric power;It is connected respectively with data server, application server, lan switch, client computer, file server, electric energy tariff management system including the data circuit I described in data server, application server, lan switch, client computer, data circuit I, file server, electric energy tariff management system, data circuit II and power system document management server;Data server is connected with application server;Lan switch is LAN switch;File server is connected with power system document management server by data circuit II;Power system file in power system document management server is D5000 electric power scheduling automatization system files;The utility model provides a kind of high, safe, convenient and swift, the time saving and energy saving power network 220kV line loss calculation systems of accuracy.

Description

Power network 220kV line loss calculation systems
Technical field
The utility model belongs to technical field of electric power, is related specifically to a kind of line loss calculation system.
Background technology
With the increasingly extension of power network, power network electric energy loss management coverage is more and more wider, it is desirable to increasingly become more meticulous, Workload is also increasing.Therefore power network line losses management needs to rely on effective calculation analysis tools carries for administrative staff For the aid decision foundation of science.The daily load that is normally based on of current power network line losses is surveyed and network loss theoretical calculation, The power network measured data obtained using typical load day, the calculating of network loss is realized by power network line losses calculation procedure. Calculated by being manually entered the typical daily load data of computer and device parameter, this need to be expended considerable time and effort, effect Rate is low, waste of manpower resource.
So, this area needs a kind of new technology badly to change such present situation.
The content of the invention
The technical problems to be solved by the invention:In view of the shortcomings of the prior art and defect, the utility model provides a kind of High, safe, convenient and swift, the time saving and energy saving power network 220kV line loss calculation systems of accuracy.
What the utility model was designed so as to:Power network 220kV line loss calculation systems, it is characterised in that:Including data, services Device, application server, lan switch, client computer, data circuit I, file server, electric energy tariff management system, data Circuit II, power system document management server;
Described data server is connected with application server;
Described data circuit I respectively with data server, application server, lan switch, client computer, file Server, the connection of electric energy tariff management system;
Described lan switch is LAN switch;
Described file server is connected with power system document management server by data circuit II;
Power system file in described power system document management server is D5000 electric power scheduling automatization systems File.
The quantity of described client computer is more than two.
Described data server, application server, lan switch, client computer, data circuit I, file service Device, electric energy tariff management system are arranged on a room;Described power system document management server is arranged on another room Between.
By above-mentioned design, the utility model can bring following beneficial effect:
1st, the utility model power network 220kV line loss calculation systems are to calculate special design for 220kV grid line loss first System, make 220kV grid line loss calculate no longer be only it is artificial calculate or experience is calculated, but data system true Meter is as a result more accurate with calculating.The computing system only needs a control, it is no longer necessary to various regions gathered data, operator Member is obtained with regional electric power line loss record and result in operating room, convenient and swift, time saving and energy saving.
2nd, the data server of the utility model power network 220kV line loss calculation systems, application server use different electricity Brain, does not influence each other, and one computer of technology goes wrong, and can also retain the data of another computer, safe and reliable.
3rd, the data server of the utility model power network 220kV line loss calculation systems, application server, lan switch, visitor Family end computer, data circuit I, file server, electric energy tariff management system are arranged on a room, power system file management Server is arranged on another room.Two parts are separated, do not influence each other, it is also safer.This system In, it is most important that power system document management server, electric power data is also stored within the inside, particularly important.In file clothes Business device and power system document management server between be provided with fire wall, protect power system document management server not by Any harm, it is safe.
4th, the power system in the power system document management server of the utility model power network 220kV line loss calculation systems File is D5000 electric power scheduling automatization system files, and D5000 electric power scheduling automatization systems are relatively advanced power schedulings System, is also current domestic conventional electric power dispatching system, and the data that line loss calculation system of the present utility model is used are all from D5000 electric power scheduling automatization systems, are with a wide range of applications.
Brief description of the drawings
The utility model is described in further detail with embodiment for explanation below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the utility model power network 220kV line loss calculation systems.
1- data servers, 2- application servers, 3-LAN interchangers, 4- clients, 5- data circuits I, 6- files in figure Server, 7- electric energy tariffs management system, 8- data circuits II, 9- power system document management servers.
Embodiment
Power network 220kV line loss calculation systems as depicted, it is characterised in that:Including data server 1, application server 2nd, lan switch 3, client computer 4, data circuit I 5, file server 6, electric energy tariff management system 7, data circuit II 8th, power system document management server 9;
Described data server 1 is connected with application server 2;
Described data circuit I 5 respectively with data server 1, application server 2, lan switch 3, client computer 4, File server 6 and electric energy tariff management system 7 are connected;
Described lan switch 3 be LAN switch, lan switch 3 by I 5 pairs of data servers 1 of data circuit, Data between application server 2, lan switch 3, client computer 4, file server 6 and electric energy tariff management system 7 are entered Row communication;
Described file server 6 is connected with power system document management server 9 by data circuit II 8;
The power system file stored in described power system document management server 9 is that D5000 power schedulings are automatic Change system file.
Described data server 1, application server 2 use independent computer.
The quantity of described client computer 4 is more than two.
Described data server 1, application server 2, lan switch 3, client computer 4, data circuit I 5, file Server 6, electric energy tariff management system 7 are arranged on a room;Described power system document management server 9 is arranged on another One room.
Fire wall is provided between described file server 6 and power system document management server 9, it is ensured that file takes The information security being engaged between device 6 and power system document management server 9.
The utility model is to calculate the system specially designed for 220kV grid line loss first, makes 220kV grid line loss meters It is no longer only that artificial calculating or experience are calculated to calculate, but data statistics and calculating true, and as a result more science is accurate Really.The computing system only needs a control, it is no longer necessary to which, to various regions gathered data, operating personnel can just obtain in operating room Regional electric power line loss record and result are obtained, it is convenient and swift, it is time saving and energy saving.
Data server 1 of the present utility model, application server 2 use independent computer, do not influence each other, even if One computer goes wrong, and can also retain the data of another computer, safe and reliable.
Data server 1 of the present utility model, application server 2, lan switch 3, client computer 4, data circuit I 5th, file server 6, electric energy tariff management system 7 are arranged on a room, and power system document management server 9 is arranged on another One room.Two parts are separated, do not influence each other, it is also safer.In this system, it is most important that electricity Force system document management server 9, electric power data is also stored within the inside, particularly important.In file server 6 and power system Fire wall is provided between document management server 9, protects power system document management server 9 not by any harm, peace Quan Xinggao.
Power system file in the utility model power system document management server 9 is automatic for D5000 power schedulings Change system file, D5000 electric power scheduling automatization systems are relatively advanced electric power dispatching systems, be also current domestic conventional Electric power dispatching system, the data that line loss calculation system of the present utility model is used are all from D5000 electric power scheduling automatization systems, It is convenient to carry out large-scale redevelopment, it is with a wide range of applications.

Claims (3)

1. power network 220kV line loss calculation systems, it is characterised in that:Handed over including data server (1), application server (2), LAN Change planes (3), client computer (4), data circuit I (5), file server (6), electric energy tariff management system (7), data circuit II (8) and power system document management server (9);
Described data server (1) is connected with application server (2);Described lan switch (3) is LAN switch;
Described data circuit I (5) is electric with data server (1), application server (2), lan switch (3), client respectively Brain (4), file server (6) and electric energy tariff management system (7) connection;
Described file server (6) is connected with power system document management server (9) by data circuit II (8);
Power system file in described power system document management server (9) is D5000 electric power scheduling automatization systems File.
2. power network 220kV line loss calculation systems according to claim 1, it is characterised in that:Described client computer (4) Quantity be more than two.
3. power network 220kV line loss calculation systems according to claim 1, it is characterised in that:Described data server (1), application server (2), lan switch (3), client computer (4), data circuit I (5), file server (6) and electricity Far management system (7) is arranged on a room;Described power system document management server (9) is arranged on another room Between.
CN201720188257.3U 2017-02-28 2017-02-28 Power network 220kV line loss calculation systems Expired - Fee Related CN206480034U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720188257.3U CN206480034U (en) 2017-02-28 2017-02-28 Power network 220kV line loss calculation systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720188257.3U CN206480034U (en) 2017-02-28 2017-02-28 Power network 220kV line loss calculation systems

Publications (1)

Publication Number Publication Date
CN206480034U true CN206480034U (en) 2017-09-08

Family

ID=59746913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720188257.3U Expired - Fee Related CN206480034U (en) 2017-02-28 2017-02-28 Power network 220kV line loss calculation systems

Country Status (1)

Country Link
CN (1) CN206480034U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110376464A (en) * 2019-07-23 2019-10-25 国网河北省电力有限公司故城县供电分公司 Interconnection type grid line loss monitoring system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110376464A (en) * 2019-07-23 2019-10-25 国网河北省电力有限公司故城县供电分公司 Interconnection type grid line loss monitoring system and method

Similar Documents

Publication Publication Date Title
CN103248122B (en) Power failure active reporting system
Devidas et al. Wireless smart grid design for monitoring and optimizing electric transmission in India
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN204391903U (en) A kind of line loss monitoring system
CN105182250A (en) Non-intruding type distributed power output monitoring device
CN107844922A (en) residential electricity consumption scheduling system based on cloud computing platform
CN203135591U (en) Micro-grid centralized monitoring system used for photovoltaic building integrated combination
CN111509857A (en) Low-voltage distribution transformer power-failure-free rapid monitoring system and method
CN204906004U (en) Distributed intelligent regional power grid of network layering
CN102338835A (en) Power quality dynamic monitoring system
CN206480034U (en) Power network 220kV line loss calculation systems
CN201860163U (en) Data center intelligent power supply control system
CN108181845A (en) A kind of intelligent electric meter information acquisition system
CN204557576U (en) A kind of system realizing electrical network statistical line losses synchronism
CN103475091A (en) Electric-energy metering and managing system of power grid gateway
CN103545805A (en) Modeling-based railway power supply arm monitoring method
Fan et al. Design and application of integrated distribution network line loss analysis system
CN105529824A (en) Intelligent power grid information system
CN103226793A (en) Combination method and system of electrical equipment state monitoring grid model data
CN204334123U (en) Intelligent power network power transmission and transforming equipment on-Line Monitor Device
CN209417585U (en) A kind of energy management system for current consuming apparatus
CN201804256U (en) Combined management and control system for water, electricity and gas
CN202584400U (en) Intelligent carrier wireless comprehensive meter reading system
CN207717126U (en) A kind of disconnecting switch operation mechanical parameter harvester
CN206270733U (en) A kind of communications equipment room energy consumption control system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170908

Termination date: 20190228

CF01 Termination of patent right due to non-payment of annual fee