CN105529824A - Intelligent power grid information system - Google Patents

Intelligent power grid information system Download PDF

Info

Publication number
CN105529824A
CN105529824A CN201410512882.XA CN201410512882A CN105529824A CN 105529824 A CN105529824 A CN 105529824A CN 201410512882 A CN201410512882 A CN 201410512882A CN 105529824 A CN105529824 A CN 105529824A
Authority
CN
China
Prior art keywords
energy
electricity
power
intelligent
transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410512882.XA
Other languages
Chinese (zh)
Inventor
李福霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410512882.XA priority Critical patent/CN105529824A/en
Publication of CN105529824A publication Critical patent/CN105529824A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to the electrical field, and particularly relates to an intelligent power grid information system, which can acquire information timely. The intelligent power grid information system comprises an energy part, a transmission part, a transformation part, an intelligent scheduling part, a distribution part and a power utilization part, and is characterized in that the energy part comprises thermal power, hydropower and new energies; the energy part transmits electric energy to the transformation part via the transmission part; the transformation part regulates current and voltage, under effects of the intelligent scheduling part, and the current and the voltage are transmitted to the power utilization part via the distribution part.

Description

Intelligent grid information system
Technical field
The invention belongs to electricity field, particularly relate to a kind of intelligent grid information system.
Background technology
Along with the development of modern communications, calculating, network and control technology, information technology uses the continuous developing in field, the combination of information and energy technology becomes a kind of inexorable trend of development already, and this combination has also expedited the emergence of a new concept: the wisdom energy, namely advanced information technology is utilized, promote energy conservation level, realize the further precise treatment regulation and control of the energy.The problem of tradition electrical network in efficiency of energy utilization, the feature of environmental protection etc. is more outstanding.The energy use efficiency of North America electric power system in 2008 is about 1/3, and the energy loss of generating and power transmission and distribution but accounts for 2/3.Meanwhile, the electric power of more than 65% all comes from fossil energy (coal, natural gas), larger for environmental pollution.For addressing these problems, following intelligent grid will improve the operating structure of existing electrical network, and a large amount of distributed power generation facilities built based on new forms of energy will be introduced into network system, and the supply of electric power is by diversification; Simultaneously electric power terminal also will become elasticity more with electric model.Following intelligent grid will show the characteristic similar with many distributed computing systems, and the research of intelligent grid is by tightr with contacting of computing network system.Conventional electric power system is faced with series of problems at present, as " severe power shortage " when peak value uses, acquisition of information not in time and the low problem of the utilization rate of equipment and installations caused.
Summary of the invention
The present invention is exactly for the problems referred to above, provides a kind of acquisition of information a kind of intelligent grid information system timely.
To achieve these goals, the present invention adopts following technical scheme, the present invention includes energy part, transmission of electricity part, power transformation part, intelligent scheduling part, distribution section and electricity consumption part, it is characterized in that, Ministry of Energy divides and comprises thermoelectricity, water power and new forms of energy, energy part by transmission of electricity part by power delivery to power transformation part, after current/voltage adjusts by power transformation part under the effect of intelligent scheduling part through distribution section carry electricity consumption part.
As a kind of preferred version, described intelligent scheduling part regulates transmission of electricity part, regenerative resource part and distribution section, regenerative resource enters distribution section after intelligent scheduling partial adjustment after transmission of electricity part power transformation part, preferably supplies electricity consumption part.
Beneficial effect of the present invention.
Intelligent grid of the present invention is the comprehensive several thing hybrid systems integrating sensing, communication, calculating, decision-making and control built on the basis of traditional electrical network, by obtaining the running status of each node layer resource of electrical network and equipment, carry out with different levels control and management and electric power allotment, realize the very high integrity of energy flow, information flow and Business Stream, improve power system operation stability, equipment efficiency of usage is improved to greatest extent to reach, improve security reliability, energy-saving and emission-reduction, improve customer power supply quality, improve the utilization ratio of regenerative resource.Intelligent grid final goal reduces Energy Consumption Cost, improves residential electricity consumption quality, reduces operation power cost, thus promote national economic development.
Accompanying drawing explanation
Fig. 1 is schematic block circuit diagram of the present invention.
Embodiment
As shown in the figure, the present invention includes energy part, transmission of electricity part, power transformation part, intelligent scheduling part, distribution section and electricity consumption part, it is characterized in that, Ministry of Energy divides and comprises thermoelectricity, water power and new forms of energy, energy part by transmission of electricity part by power delivery to power transformation part, after current/voltage adjusts by power transformation part under the effect of intelligent scheduling part through distribution section carry electricity consumption part.
As a kind of preferred version, described intelligent scheduling part regulates transmission of electricity part, regenerative resource part and distribution section, regenerative resource enters distribution section after intelligent scheduling partial adjustment after transmission of electricity part power transformation part, preferably supplies electricity consumption part.
Intelligent grid, is often referred to new network system contemporary information systems being incorporated traditional energy network formation.Thus make electrical network have better controllability and ornamental, solve the problem such as low, the interactive difference of conventional electric power system energy utilance, security and stability analysis difficulty; Simultaneously based on the real-time monitoring of energy flow, be convenient to distributed new generating, the access of distributed energy storage system and use.1st distinguishing feature of intelligent grid is that ornamental is strong.Namely by information network technique, the information of each node of real-time electric power monitoring system.The 1st level that such as IBM defines intelligent grid 3 levels be exactly " realize to operation of power networks state, asset equipment state and client's power information real-time, monitor comprehensively and in detail; eliminate monitoring point ", think that intelligent grid is that two nets of conventional electric power system network and Electricity Information Network merge and interact.
Utilization rate of equipment and installations is improved while intelligent grid principal security power grid security, stable and reliability.Due to the coupling of network system height, scheduling controlling is improper, and single failure can cause cascading failure, even causes large area blackout and device damage, thus causes immeasurable direct and consequential damage, therefore network system is very high for the requirement of reliability.The intelligent scheduling of intelligent grid is exactly to ensure safe and reliable basis solve the collection of Wide-area Measurement Information, transmission, treatment and analysis problem.Realize the interaction of generating and electricity consumption.The essential characteristic of electrical network is the balance of generating and electricity consumption.From the angle of terminal use, user can get the operational factor of electrical network by intelligent electric power terminal, thus adjusts the electricity usage situation of oneself.And for network system, then can build accurate load model according to the power information of power consumption equipment, effectively improve power supplying efficiency.The construction of tradition electrical network based on sending out-defeated-become-join-unidirectional thinking, bulk redundancy causes waste, intelligent grid is based on the measurement communication system of real-time higher (a few tens of milliseconds level), can by controlling in real time to reach generation load balance, thus stand-by heat can be reduced, and improve the stability of system.
The access of batch (-type) regenerative resource.New forms of energy mainly refer to wind-powered electricity generation and photovoltaic generation, and the wind power resources of China mainly concentrates on northwestern, and these areas are also the more rich areas of solar energy resources equally.The area that Electricity Demand is larger then concentrates on the central and east, therefore causes the new forms of energy electric power of China to necessarily pass long-distance transmissions and could arrive loading zone.This just requires that electrical network must be optimized configuration to generation of electricity by new energy in China.Meanwhile, because generation of electricity by new energy itself has randomness and intermittent feature, if be directly incorporated into electrical network, then the stability of network system entirety may be affected.As wind power generation due to objective meteorological reason off-grid on a large scale, may will cause the imbalance that electric power system is instantaneous, then affect overall stability.

Claims (2)

1. intelligent grid information system, comprise energy part, transmission of electricity part, power transformation part, intelligent scheduling part, distribution section and electricity consumption part, it is characterized in that, Ministry of Energy divides and comprises thermoelectricity, water power and new forms of energy, energy part by transmission of electricity part by power delivery to power transformation part, after current/voltage adjusts by power transformation part under the effect of intelligent scheduling part through distribution section carry electricity consumption part.
2. intelligent grid information system according to claim 1, it is characterized in that: described intelligent scheduling part regulates transmission of electricity part, regenerative resource part and distribution section, regenerative resource enters distribution section after intelligent scheduling partial adjustment after transmission of electricity part power transformation part, preferably supplies electricity consumption part.
CN201410512882.XA 2014-09-29 2014-09-29 Intelligent power grid information system Pending CN105529824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410512882.XA CN105529824A (en) 2014-09-29 2014-09-29 Intelligent power grid information system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410512882.XA CN105529824A (en) 2014-09-29 2014-09-29 Intelligent power grid information system

Publications (1)

Publication Number Publication Date
CN105529824A true CN105529824A (en) 2016-04-27

Family

ID=55771881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410512882.XA Pending CN105529824A (en) 2014-09-29 2014-09-29 Intelligent power grid information system

Country Status (1)

Country Link
CN (1) CN105529824A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896612A (en) * 2016-05-25 2016-08-24 国网天津武清供电有限公司 Distributed type power supply information collection analysis dispatching system
CN107294092A (en) * 2017-07-18 2017-10-24 国网山东省电力公司潍坊供电公司 A kind of alleviation power distribution network drop coordinated based on three-level damages system and method
CN108109074A (en) * 2017-11-30 2018-06-01 国网浙江省电力公司湖州供电公司 A kind of grid-connected information management platform of distributed generation resource and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896612A (en) * 2016-05-25 2016-08-24 国网天津武清供电有限公司 Distributed type power supply information collection analysis dispatching system
CN107294092A (en) * 2017-07-18 2017-10-24 国网山东省电力公司潍坊供电公司 A kind of alleviation power distribution network drop coordinated based on three-level damages system and method
CN108109074A (en) * 2017-11-30 2018-06-01 国网浙江省电力公司湖州供电公司 A kind of grid-connected information management platform of distributed generation resource and method

Similar Documents

Publication Publication Date Title
US9618914B2 (en) Energy resource-grid-load automatic control system of smart microgrid and control methods thereof
CN103441520B (en) Micro-grid distribution type new energy storage system
CN105470982A (en) Generated power control system and control method for intelligent micro-grid with medium energy storage function
CN203205889U (en) DC (direct current) micro grid system
CN104052150A (en) Intelligent home energy efficiency management system of household distributed photovoltaic power generation system
KR101109187B1 (en) Operation method for power system using real-time power information
CN104052159A (en) Energy management controller used for wind and light storage micro-grid system
CN108599379B (en) Power monitoring system for micro-grid group
CN103187735A (en) Bidirectional intelligent gateway device for distributed new energy grid connection
CN105260840A (en) Comprehensive scheduling system for Internet and schedulable loads
CN102340167A (en) Oil field oil pumping unit distributed grid connected type wind power generation complementary power supply system
Kumar et al. Design and implementation of wireless sensor network based smart DC grid for smart cities
CN105529824A (en) Intelligent power grid information system
Qin et al. Overview of micro-grid energy management system research status
CN116316860B (en) Distributed photovoltaic collection control interaction system based on HPLC communication
CN103378604A (en) Smart micro-grid
CN104201704A (en) Method for determining reserve capacity of regional power grid containing small hydropower group and wind power
Wada et al. Frequency control using fast demand response in power system with a large penetration of renewable energy sources
CN108631324A (en) A kind of more reactive voltage devices of power grid are without distribution of work coordinated control system and method
CN111859608A (en) Energy storage site selection and volume fixing optimization method considering scene of relieving electric power gap
Yun et al. Optimization of Operation Strategy of Virtual Power Plants Involved in Peak Shaving
CN205017094U (en) Intelligence microgrid control system
Zhang Study on the Effects of Different Measures in Promoting Renewable Energy Consumption
CN103280823A (en) Power grid real-time and automatic scheduling strategy based on mobile energy storage equipment
CN207069960U (en) A kind of electric net device based on PLC controls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160427

WD01 Invention patent application deemed withdrawn after publication