CN206472085U - The structure-improved of adjustable solar board mount - Google Patents
The structure-improved of adjustable solar board mount Download PDFInfo
- Publication number
- CN206472085U CN206472085U CN201621380169.5U CN201621380169U CN206472085U CN 206472085 U CN206472085 U CN 206472085U CN 201621380169 U CN201621380169 U CN 201621380169U CN 206472085 U CN206472085 U CN 206472085U
- Authority
- CN
- China
- Prior art keywords
- fixed column
- locating dowel
- basal layer
- cable wire
- board mount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 239000007787 solid Substances 0.000 description 5
- 230000006378 damage Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 239000011449 brick Substances 0.000 description 3
- 230000003139 buffering effect Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000007774 longterm Effects 0.000 description 3
- 230000009545 invasion Effects 0.000 description 2
- 239000007769 metal material Substances 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 206010010356 Congenital anomaly Diseases 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000007665 sagging Methods 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Abstract
The utility model is related to a kind of structure-improved of adjustable solar board mount, and it is the combination of fixed column and locating dowel that utilization can be adjusted, locating dowel is made the adjustment of height, the problem of to solve uneven settlement of foundation.It is main, and by basal layer, fixed column and locating dowel, simultaneously fitted bolt is constituted, the basal layer system digs an appropriate depth on the ground, for fixed column is firm in basal layer, locating dowel set is loaded in fixed column again, and locating dowel can be locked in fixed column using bolt, locating dowel is adjusted height, coordinate and rigid support is combined between flexible cable wire, and can in response to the natural calamities such as typhoon, earthquake impact.
Description
Technical field
The utility model is related to a kind of structure-improved of adjustable solar board mount, and it is by fixed column and locating dowel two
The combination of intercept form, and the height of energy adjusting bracket lifting.
Background technology
In recent years development in science and technology, in order to improve the problem of environmental pollution that fossil energy is brought, and has green alternative energy source skill
Art is continually developing breakthrough, for example:The various green energy resource technologies such as solar energy, wind energy, regenerated resources are produced, wherein, most extensively
What it is for application is exactly solar power generation, and solar power generation is a kind of regenerative resource, and it is mainly by natural solar radiant energy
Electric energy is converted into use.
The installing mode of early sun energy plate, be all several pieces group horizontal array arrangement be arranged on a supporting structure on
A solar energy equipment is constituted, in order to effectively receive sunshine, solar panels are mainly installed on the exterior wall, roof or platform of building
Place, is converted into electric energy by the sunshine received and uses, however, the installation of the solar panels is steady according to the size of area, ground
Solidity, series ... of resistance to wind-force etc., its supporting structure belongs to relatively stiff structure, in order to reach resistance to strong winds, earthquake shadow
Ring, can dig ground is deeper bigger, therefore incurs a considerable or great expense, and adds earthquake magnitude now and is gradually increased, therefore the supporting structure is more
Be required to it is shatter-proof, otherwise once by natural calamity, may result in the torch that the supporting structure of arduous foundation is paid.
In view of supporting structure service life length, long-term rain immersion basis and the factor such as part geological environment is bad, when
Foundation uneven settlement is often resulted in, and causes structural instability, deform the situations such as excessive, structure tear, part breakage, it is practical new
Type designer in order to lifted too can positive plate service life and resistance to typhoon, the solar bracket system of aseismatic, and have this practicality
The structure-improved of novel adjustable solar panels support, can according to installation the need for adjust the height of locating rack, then coordinate flexibility
Cable wire, make support rigidity using flexible cable buffering, reach more tolerant to earthquake, the interference of typhoon.
Utility model content
The utility model is related to a kind of structure-improved of adjustable solar board mount, and it is the fixation that utilization can be adjusted
The combination of post and locating dowel, enables locating dowel to make the adjustment of height, the problem of to solve uneven settlement of foundation.It is main by base
Simultaneously fitted bolt is constituted for plinth layer, fixed column and locating dowel, and the basal layer system digs an appropriate depth on the ground, then will be solid
Fixed column after basal layer is solid, can make fixed column strong fix on basal layer, will then position column sleeve in basal layer
Load fixed column on, and the fixed column be provided with number screw, using bolt by locating dowel lock in fixed column, and by should
Screw enables both sides locating dowel to reach the effect of balance on uneven ground, then coordinate flexibility to adjust the height of locating dowel
Cable wire combine, rigid support is buffered, and be resistant to the invasion and attack of larger wind-force or earthquake.
To achieve the above object, the technical solution adopted in the utility model is:
A kind of structure-improved of adjustable solar board mount, it is characterised in that:It mainly by basal layer, fixed column and is determined
Simultaneously fitted bolt is constituted position post, and the basal layer is dug on the ground, and the fixed column inserts fixed in basal layer, the positioning column sleeve
Load in fixed column, several screws are additionally provided with the fixed column, the bolt fixes locating dowel locking at this through the screw
On post, the height of the locating dowel can be adjusted with the difference of screw.
Wherein, flexible cable wire is linked between two adjustable solar board mounts, the cable wire can be with solar energy
It is hardened to close.
Wherein, it is provided with rigid support between two adjacent cable wires.
On the assembling of adjustable solar plate, cable wire is stretching in the locating dowel of both sides, and by cable wire two ends by positioning
Post is pulled to downwards the earth anchor brick of subsurface, by Cable tension, after the completion of cable wire positioning, just can set the sun between two cable wires
Energy plate, and place restricted problem can be solved with such mounting means, and the cost of supporting structure can be greatly reduced, however, also
It is the steadiness of locating dowel to be influenceed by high wind.Therefore, system first measures appropriate position before installing, and then digs on the ground
One appropriate depth, then by basal layer laying on the ground, then fixed column is consolidated and is arranged on basal layer, then column sleeve will be positioned
It is located in fixed column, and the height of support can be adjusted in response to different landform, thus different terrain environments can be applicable, more
It is conveniently practical.
Furthermore, general supporting structure is arranged on subsurface, and ground, part geology ring are soaked by rainwater by long-term use
Border is bad or the factor such as earthquake, is easily caused land subsidence or ground inclination so that support differential settlement, and causes structure unstable
Fixed, deformation, structural damage are split or the situation such as part destruction;The utility model is improves surface subsidence problem, by bipartial
Support, and it can will order and adjust height in fixed column for post, recycle bolt to be consolidated by appropriate screw spiral shell, to keep each support
Balance, and with longer service life.
Wherein, the fixed column has the segmented screw that is arranged above and below, can be according to fabricating yard the need for, finely tune locating dowel
Height, when ground inclination side, both sides locating dowel can be made highly to reach using locating dowel is arranged on the screw of epimere
Unanimously, and via locating dowel is set in the structure for being used as support cable wire in fixed column, forms the support of two-part, coordinates soft
Property cable wire, and have splendid buffering effect, larger wind-force can be born, show more traditional branch that high wind is only resisted by rigid support
Support property is even more ideal.
Therefore, fixed column is arranged in basal layer by the utility model, then locating dowel is set in fixed column, and is formed
The support of two-part, is equipped with the cable wire of flexibility, and is provided with several sections of rigid materials in cable wire, especially reduces typhoon, earthquake ...
The impact caused etc. natural calamity, rocks, causes stent fatigue or pars intermedia for a long time while also improving cable wire on locating rack
The problem of position deformation is excessive, especially adjustable fixed column can carry out the height adjustment of locating dowel, effectively solution for surface subsidence
Certainly caused by Earth cave the problem of deformation, structure tear and damaged electro-optical components.
Brief description of the drawings
Fig. 1 is the schematic diagram of the utility model assembling.
Fig. 2 is the completion figure of the utility model assembling.
Fig. 3 is the schematic diagram that the utility model cable type solar panels are installed.
Fig. 4 is the completion schematic diagram that the utility model cable type solar panels are installed.
Scheme of installation when Fig. 5 is the utility model ground inclination.
Fig. 6 is the schematic diagram that the utility model strengthens cable wire stage casing part.
Description of reference numerals:1- ground;10- basal layers;21- fixed columns;211- segmented screws;22- locating dowels;23-
Cross bar;3- bolts;4- solar panels;40- cable wires;41- earth anchor bricks;5- rigid supports;6- attachment means.
Embodiment
First, refer to shown in Fig. 1, the utility model assembling schematic diagram, its mainly by basal layer 10, fixed column 21 and
Simultaneously fitted bolt 3 is constituted locating dowel 22, and the basal layer 10 first digs an appropriate depth on ground 1, then consolidates fixed column 21
It is scheduled in basal layer 10, after basal layer 10 is solid, the strong fix of fixed column 21 can be made on basal layer 10, then will positioning
22 sets of post loads in fixed column 21, and the fixed column 21 is provided with the segmented screw 211 being arranged above and below, will be fixed using bolt 3
Position post 22 locks in fixed column 21 (as shown in Figure 2), to adjust the height of locating dowel 22, both sides locating dowel 22 is reached flat
The effect of weighing apparatus, and the locating dowel 22 and the spiral shell of fixed column 21 it is solid after cushion space when can be swung as locating dowel 22.
On the assembling of adjustable solar plate 4, please continue to refer to shown in Fig. 3 and Fig. 4, cable wire 40 is stretching in both sides and determined
On the post 22 of position, and linked between homonymy locating dowel 22 using cross bar 23, and can be downward by locating dowel 22 by the two ends of cable wire 40
The earth anchor brick 41 under ground 1 is tensioned to, and cable wire 40 is pushed against on cross bar 23, just can be two after the completion of the positioning of cable wire 40
Solar panels 4 are set between cable wire 40, and the problem of place is limited can be solved with such mounting means, and support can be greatly reduced
The cost of structure, however, the mounting means still can be influenceed the steadiness of locating dowel 22 by high wind.Therefore, first surveyed before installing
The appropriate position of amount, then digs an appropriate depth on ground 1 by geological foundation layer 10, fixed column 21 then is stabilized in into basis
On layer 10, then locating dowel 22 is set in fixed column 21, can by the firm combination between locating dowel 22 and fixed column 21, with
Keep out the invasion and attack of high wind or earthquake.
Furthermore, general supporting structure is arranged on subsurface, and ground, part geology ring are soaked by rainwater by long-term use
Border is bad or the factor such as earthquake, is easily caused land subsidence so that support differential settlement, and cause structural instability, deformation, knot
Structure is by the situation such as damage and crack or part destruction;The utility model, referring again to shown in Fig. 5, is first laid to improve surface subsidence problem
One basal layer 10, then by the strong fix of fixed column 21 on basal layer 10, utilize the cable wire 40 that the rigid support assorted is flexible
Combination so that fixed column 21 is not influenceed by geological environment difference, and with longer service life.
Then, please referring still to shown in Fig. 5, the fixed column 21 has the segmented screw 211 being arranged above and below, when congenital ring
Border is bad, when causing ground to have gradient, can be according to fabricating yard the need for, the height of locating dowel 22 is finely tuned above and below progress, it is main
Screwhole position of the locating dowel 22 in fixed column 21 is adjusted, i.e., locating dowel 22 is locked in the screw 211 of the epimere of fixed column 21
It is interior, to lift the height of locating dowel 22, promote the height of both sides locating dowel 22 to reach unanimously, and it is solid via locating dowel 22 is set in
It is used as the structure of support solar panels 4 in fixed column 21, forms the support of two-part, coordinates flexible cable wire 40 and have splendid
Buffering effect, can bear larger wind-force, show more traditional supportive only by single support confrontation high wind even more ideal.
About the combination (Fig. 5 please be look back) of fixed column 21 of the present utility model and locating dowel 22, the circle shown in embodiment
Pipe, right its is alternatively square tube, quadrangle pipe or polygonal tube, can mainly merge for set and adjust height, and can effectively solve ground
Deformation caused by differential settlement, it is not only convenient but also practical.
In addition, referring again to shown in Fig. 6, the flexible cable wire 40 is stretching in the both sides (not shown) of locating dowel 22, because
This prolonged use and rock for a long time, be easily caused the problem of fatigue of cable wire 40 or sagging middle part deformation, cause steadiness
It is poor.Therefore, the utility model is provided with rigid support 5 in the middle section of cable wire 40, with the flexible cable wire of auxiliary flexible material
The 40 hypodynamic missings of support, and the rigid support 5 is the metal materials such as angle steel, square steel, angle bar, C-type steel, and utilize connection
Device 6 links together each rigid support 5, and forms the rigid support 5 of mutual close proximity, effectively strengthens rigidity branch
Steadiness of the frame 5 on cable wire 40, and the attachment means 6 are the metal materials such as angle steel, square steel, angle bar, C-type steel, it is possible to use
Flexible material, for example:Cable wire, steel wire rope, steel cable, reinforcing bar ... wait material, with the portion of the stage casing of reinforcement cable wire 40 more fragility
Point.
In summary, fixed column is arranged in basal layer by the utility model, then locating dowel is set in fixed column, and
The support of two-part is formed, the impact that the natural calamities such as typhoon, earthquake ... are caused especially is reduced, while it is tired also to improve cable wire stage casing
The problem of labor or excessive middle part deformation, especially adjustable fixed column can carry out the height of locating dowel for surface subsidence
Adjustment, the problem of effectively solving deformation caused by Earth cave, structure tear and damaged electro-optical components, it integrally has
Preferable resistance to wind-force and shatter-proof effect, and cost is low compared with conventional stent designses, and have splendid economic benefit.
Claims (3)
1. a kind of structure-improved of adjustable solar board mount, it is characterised in that:It is main by basal layer, fixed column and positioning
Simultaneously fitted bolt is constituted post, and the basal layer is dug on the ground, and the fixed column inserts fixed in basal layer, locating dowel suit
Enter in fixed column, several screws are additionally provided with the fixed column, the bolt locks the locating dowel in the fixed column through the screw
On, the height of the locating dowel can be adjusted with the difference of screw.
2. the structure-improved of adjustable solar board mount as claimed in claim 1, it is characterised in that two adjustable sun
Flexible cable wire can be linked between board mount, the cable wire can be combined with solar panels.
3. the structure-improved of adjustable solar board mount as claimed in claim 2, it is characterised in that two adjacent cable wires
Between be provided with rigid support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621380169.5U CN206472085U (en) | 2016-12-15 | 2016-12-15 | The structure-improved of adjustable solar board mount |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621380169.5U CN206472085U (en) | 2016-12-15 | 2016-12-15 | The structure-improved of adjustable solar board mount |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206472085U true CN206472085U (en) | 2017-09-05 |
Family
ID=59711665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621380169.5U Expired - Fee Related CN206472085U (en) | 2016-12-15 | 2016-12-15 | The structure-improved of adjustable solar board mount |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206472085U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112302160A (en) * | 2020-11-10 | 2021-02-02 | 江苏沪邦建材有限公司 | Assembled frame module house |
-
2016
- 2016-12-15 CN CN201621380169.5U patent/CN206472085U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112302160A (en) * | 2020-11-10 | 2021-02-02 | 江苏沪邦建材有限公司 | Assembled frame module house |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100911863B1 (en) | The foundation for installation of a solar panel and it's construction method | |
JP4219917B2 (en) | Solar panel support structure and solar power generation system | |
JP5912098B2 (en) | Solar power panel | |
KR100905069B1 (en) | Solar beam module support fundamental file | |
CN106059470B (en) | A kind of light roof photovoltaic bracket and its assemble method | |
CN216649565U (en) | Flexible photovoltaic support | |
JP2015104245A (en) | Photovoltaic power generation panel frame | |
CN206472085U (en) | The structure-improved of adjustable solar board mount | |
JP4906931B2 (en) | Civil engineering block | |
CN203911851U (en) | Self-locking inclination angle adjustable type photovoltaic support and photovoltaic power generation system | |
JP3210835U (en) | Adjustable solar panel stand structure | |
CN206490638U (en) | A kind of single column tripod and its support and photovoltaic plant waterborne | |
CN218868143U (en) | Multi-slope photovoltaic support structure with wind and light on same field | |
CN206060651U (en) | A kind of novel and portable roof photovoltaic bracket | |
JP3181892U (en) | Solar cell power generator | |
KR102449783B1 (en) | Supporting structure for solar photovoltaic power generation module | |
CN105696616B (en) | A kind of many conduit steel construction posture bases and construction method | |
KR101716662B1 (en) | Frameless solar modules and support structure for supporting the same | |
CN210421575U (en) | Cantilever truss space structure system | |
JP3172512U (en) | Supporting device for solar panel | |
JP2014163140A (en) | Trestle for photovoltaic power generation panel | |
WO2020198579A3 (en) | Roll-formed solar canopy structures and foundation structures and methods | |
CN219164468U (en) | Flexible photovoltaic bracket system with three-cable-connected structure | |
JP2012122320A (en) | Foundation structure of solar cell array | |
CN205438386U (en) | Flexible photovoltaic support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170905 |