CN206464570U - Three-dimensional rig - Google Patents

Three-dimensional rig Download PDF

Info

Publication number
CN206464570U
CN206464570U CN201720037475.7U CN201720037475U CN206464570U CN 206464570 U CN206464570 U CN 206464570U CN 201720037475 U CN201720037475 U CN 201720037475U CN 206464570 U CN206464570 U CN 206464570U
Authority
CN
China
Prior art keywords
fixture
fixation wall
rotating shaft
clamp
borehole drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720037475.7U
Other languages
Chinese (zh)
Inventor
徐武荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Wu Rong Valve Co., Ltd.
Original Assignee
Wenzhou Wu Rong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Wu Rong Technology Co Ltd filed Critical Wenzhou Wu Rong Technology Co Ltd
Priority to CN201720037475.7U priority Critical patent/CN206464570U/en
Application granted granted Critical
Publication of CN206464570U publication Critical patent/CN206464570U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of three-dimensional rig, its drip irrigation device includes frame, fixation wall is provided with the upside of the frame, the middle part of the fixation wall is towards being provided with fixture on the side of frame, the fixation wall is in being provided with borehole drill construction and drive the feed mechanism of the borehole drill construction to the side slip of fixture one on the both sides and upside of fixture, the fixture is towards opening is provided with the side of three borehole drill constructions, and the utility model has fixture clamped one time in place, improves drilling efficiency;Swivel joint is set to carry out the effect that high-pressure water delivery accelerates drill bit cooling in rotating shaft.

Description

Three-dimensional rig
Technical field
The utility model is related to a kind of drilling machine, and more specifically it is related to a kind of three-dimensional rig.
Background technology
Drilling machine is used for carrying out drilling operation to workpiece, and in actual processing, a workpiece is generally required to the multiple of workpiece The drilling operation in face.
A kind of drilling of pipe drilling pin pressing machine is disclosed in Authorization Notice No. is CN204277467U Chinese patent Device, including frame, travelling platform and detent mechanism, rig, hydraulic pressure or baric systerm, regulator cubicle etc., the middle part of frame is along vertical To steel pipe locating slot is provided with, steel pipe locating slot front and back ends are respectively equipped with fixture, and drilling dress is set at the rear portion of walking mechanism Put;The both sides that drilling equipment includes being installed on travelling platform rear end pile slide plate, are respectively fixed with monosymmetric slide plate Rig.
The similar above-mentioned drilling equipment of drilling machine of the prior art, by setting rig respectively in workpiece both sides, is once filled Folder, you can both sides are all carried out with drilling operation, but when needing to be processed the workpiece of three face drillings, it is necessary to repeatedly fill Folder, inefficiency.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of three-dimensional rig, clamped one time, Drilling operation can be carried out to three faces of workpiece simultaneously, boring positioning is accurate, efficiency high.
To achieve the above object, the utility model provides following technical scheme:A kind of three-dimensional rig, including frame, institute State and fixation wall is provided with the upside of frame, the middle part of the fixation wall is towards being provided with fixture, the fixation on the side of frame Wall is in being provided with borehole drill construction and drive the feeding of the borehole drill construction to the side slip of fixture one on the both sides and upside of fixture Mechanism, the fixture is towards being provided with opening on the side of three borehole drill constructions;
The fixture includes quiet clamp, dynamic clamp and actuator, and the quiet clamp and dynamic clamp are oppositely arranged, the quiet folder Body is fixed in fixation wall, and the dynamic clamp sliding is connected in fixation wall, and the actuator is connected with dynamic clamp, drives dynamic folder Dignity is to quiet clamp side or away from the quiet side slip of clamp one;
The feed mechanism includes fixed seat and hydraulic cylinder, and the side of the fixed seat is fixedly connected in fixation wall, institute State hydraulic cylinder and be fixedly connected on side of the fixed seat away from fixation wall, the hydraulic cylinder is provided with feeding on the side away from fixture Axle, feed shaft is connected to borehole drill construction;
The borehole drill construction includes motor and main shaft, is provided with rotating shaft in the main shaft, the rotating shaft away from fixture one Side and motor connection so that motor drives axis of rotation, the rotating shaft is provided with for installing drill bit towards the side of fixture Mounting hole.
By using above-mentioned technical proposal, fixation wall is set in frame, at the middle part of fixation wall towards the side of frame Upper setting fixture, fixture trihedral opening after fixed workpiece, and fixation wall are provided with the both sides and upside of fixture Borehole drill construction and feed mechanism, therefore after fixture is fixed to clamping workpiece, by driving fixture to three feed mechanisms and drilling Mechanism is drilled successively to three faces on workpiece.So as to only need to carry out workpiece clamped one time with regard to many of workpiece can be completed Face drills, so that Workpiece boring efficiency is being improved, simultaneously because reducing the number of times of clamping so that rig is to each on workpiece The positioning in face is more accurate.
By the way that fixture is placed between quiet clamp and dynamic clamp, dynamic clamp is driven to slide by actuator, so as to realize Fixation to workpiece open on three sides, is convenient for three-phase drilling.
Fixed seat is fixed in fixation wall so that feed mechanism will not produce the displacement relative to fixation wall;And hydraulic cylinder Feed shaft be arranged far from the side of fixture so that during borehole drill construction adjacent gripper, the conveying capacity of feed shaft is fewer so that When borehole drill construction drills to the workpiece on fixture, hydraulic cylinder can provide more stable holding power.
Drill bit is installed on the mounting hole of rotating shaft, motor operation drives main axis, so as to reach the effect of drilling; And owner's axle is covered in rotating shaft, main shaft provides protection for rotating shaft so that when borehole drill construction slides, and the rotation of auger spindle will not be provided Influence.
The utility model is further arranged to:The actuator is cylinder, and the cylinder is arranged at fixation wall away from quiet folder The side of body.
By using above-mentioned technical proposal, cylinder is arranged on side of the fixation wall away from quiet clamp, the drive that can stablize Dynamic clamp carries out the sliding perpendicular to fixation wall, so as to realize the clamping of fixture with separating.
The utility model is further arranged to:The fixed seat is provided with what is slid for main shaft on the side away from fixation wall It is provided with slip hole, the side of the slip hole on stopper slot, the main shaft and is provided with the limit being connected in the stopper slot Position edge.
By using above-mentioned technical proposal, slip hole is that main shaft is spacing to main shaft progress, and provides stable holding power, is made The sliding that auger spindle is stablized can be driven by obtaining main shaft when hydraulic cylinder starts;And the spacing edge on main shaft is connected to slip hole In stopper slot, so as to limit main shaft so that main shaft can not be rotated during sliding, further strengthen main shaft sliding Stability.
The utility model is further arranged to:The borehole drill construction also includes connection motor and the gear-box of rotating shaft, sets Side of the gear-box away from rotating shaft for pressing from both sides ambilateral two borehole drill constructions is provided with support block, the fixation wall is remote The side of state's reservation is horizontally disposed the slideway slid for support block.
By using above-mentioned technical proposal, gear-box connection rotating shaft and motor, and can adjust between rotating shaft and motor Rotating ratio, to control the rotating speed that auger spindle is exported;And support block is set on the gear-box of the borehole drill construction of both sides, set in fixation wall The slideway of level;It is that gear-box and motor provide support force that support block, which is pressed on slideway, is that the borehole drill construction of both sides is sliding When stable holding power is provided.
The utility model is further arranged to:The bottom of the support block is provided with roller.
By using above-mentioned technical proposal, the sliding friction between support block and slideway is converted into rolling friction by roller, So that support block slides more smooth on slideway.
The utility model is further arranged to:The frame is provided with water leg below fixture.
By using above-mentioned technical proposal, when three-dimensional rig carries out Drilling operation to the workpiece in body fixture, in order to Drill bit cooling is given, substantial amounts of water can be used to be cooled down for drill bit;Water leg is set by the lower section for being arranged on fixture, to from fixture The water that side is fallen is collected, so as to carry out recycling to cooling water.
The utility model is further arranged to:The rotating shaft is quill shaft, and the one end of the rotating shaft away from fixture is provided with Swivel joint.
By using above-mentioned technical proposal, swivel joint is used for water receiving, and swivel joint can carry out high-pressure water delivery so that Cooling water is rapidly passed through in rotating shaft, is flowed out from the other end of rotating shaft, so as to effectively improve cooling effect of the rotating shaft to drill bit.
In summary, the utility model has advantages below:
The 1st, the fixture of open on three sides is set in fixation wall;And be respectively provided with the left and right of fixture on three sides feed mechanism and Borehole drill construction so that workpiece need to only carry out clamping successively, the drilling with regard to that can carry out three faces, had both improved the efficiency of drilling, rig Also improve the accuracy of workpiece positioning;
2nd, it is provided with to be horizontally disposed with support block, fixation wall on the borehole drill construction for being arranged at the fixation wall left and right sides and has cunning Road so that when borehole drill construction enters line slip, support block provides stable holding power for borehole drill construction, improves both sides borehole drill construction and consolidates Fixed steadiness;
3rd, rotating shaft is that the swivel joint for water receiving is provided with quill shaft, and one end of rotating shaft, and swivel joint can enter Horizontal high voltage water delivery so that cooling water can be quickly passed through in rotating shaft to radiate to drill bit, improves radiating of the rotating shaft to drill bit and imitates Really;
4th, frame sets water leg in the lower section of fixture, and the cooling water used during to drilling, which is reclaimed, to be utilized, and is played Save the effect of the energy.
Brief description of the drawings
Fig. 1 is to highlight the positive structural representation of embodiment one;
Fig. 2 is the partial enlarged drawing of A in Fig. 1;
Fig. 3 is the structure schematic diagram for highlighting embodiment one;
Fig. 4 is the partial enlarged drawing of B in Fig. 3;
Fig. 5 is the sectional view of fixed seat in embodiment one;
Fig. 6 is the partial enlarged drawing of C in Fig. 3;
Fig. 7 is the structural representation of rotating shaft in embodiment two.
Description of reference numerals:1st, frame;101st, fixation wall;102nd, water leg;103rd, slideway;2nd, feed mechanism;201st, it is solid Reservation;202nd, hydraulic cylinder;203rd, feed shaft;204th, slip hole;205th, stopper slot;3rd, borehole drill construction;301st, main shaft;302nd, gear Case;303rd, motor;304th, rotating shaft;305th, limited block;306th, mounting hole;307th, support block;308th, roller;309th, waist-shaped hole; 310th, swivel joint;4th, fixture;401st, quiet clamp;402nd, clamp is moved;403rd, cylinder.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment one:A kind of three-dimensional rig, as shown in figure 1, including frame 1, the side of the upper surface of frame 1 has been upwardly extended Fixation wall 101.One middle side part of fixation wall 101 towards frame 1 is provided with fixture 4;Fixation wall 101 is shaped as convex, and solid Left and right, upper three directions for determining wall 101 relative to fixture 4 are mounted on one-to-one feed mechanism 2 and borehole drill construction 3.Three Individual feed mechanism 2 is fixedly mounted in fixation wall 101, and three borehole drill constructions 3 are slidably connected on feed mechanism 2 respectively.Work When making, workpiece is by clamping at fixture 4, and feed mechanism 2 promotes borehole drill construction 3 close to fixture 4, simultaneously or right step by step to workpiece Workpiece carries out the drilling operation in multiple faces.
As shown in figure 1, frame 1 is provided with water leg 102 in the lower section of fixture 4, for collecting back to drill bit cooling water Receive, convenient cooling water reuse.
Referring again to Fig. 2 and 3, fixture 4 includes quiet clamp 401, dynamic clamp 402 and cylinder 403, quiet clamp 401 and dynamic clamp 402 are oppositely arranged, and the dynamic sliding of clamp 402 is connected in fixation wall 101, the lower lateral side of fixation wall 101 extension of quiet clamp 401 And be fixedly connected with fixation wall 101, cylinder 403 is arranged at side of the fixation wall 101 away from quiet clamp 401, and cylinder 403 is with moving Side of the clamp 402 away from quiet clamp 401 is fixedly connected;Dynamic clamp 402 can be driven when cylinder 403 is run to quiet clamp 401 1 side slips, realize the clamping to workpiece, or drive dynamic clamp 402 to away from the quiet side slip of clamp 401 1, realize to work The separation of part.
With reference to Fig. 1,3,5, feed mechanism 2 includes fixed seat 201 and hydraulic cylinder 202, and fixed seat 201 is bolted to fixation On wall 101, hydraulic cylinder 202 is symmetricly set in the both sides of fixed seat 201, and fixed seat 201 is set between two hydraulic cylinders 202 Have and be provided with stopper slot 205 on slip hole 204, the side side wall of slip hole 204, two hydraulic cylinders 202 are away from fixture 4 Direction is provided with feed shaft 203.Hydraulic cylinder 202 can drive feed shaft 203 to carry out away from or towards folder under hydraulic-driven Has the motion in 4 directions.
With reference to Fig. 1 and 4, borehole drill construction 3 includes motor 303, gear-box 302, main shaft 301 and rotating shaft 304, and main shaft 301 is inserted Connect and be fixed in slip hole 204, and limited location edge is set on the side of the lateral wall of main shaft 301, spacing edge is connected in stopper slot 205 so that when main shaft 301 is slided in fixed seat 201, it is not susceptible to rotate.Rotating shaft 304 is rotationally connected with main shaft 301, is turned The side of axle 304 towards fixture 4 is provided with the mounting hole 306 for installing drill bit;So that motor 303 and rotating shaft 304 pass through tooth Roller box 302 is connected, and gear-box 302 is installed on an end terminal of the main shaft 301 away from fixture 4, and motor 303 is installed on gear-box 302 The upper side away from main shaft 301.The waist-shaped hole 309 of correspondence feed shaft 203 position is provided with gear-box 302, feed shaft 203 is consolidated Connect calmly in this waist-shaped hole 309, the mode of the welding of limited block 305 is employed in the present embodiment to fix, bolt can be also used The modes such as connection.
The feed mechanism 2 in three orientation is similar with the structure of borehole drill construction 3 in fixation wall 101, referring to Fig. 1 and 6, but two Support block 307 is also fixedly connected with the gear-box 302 set in horizontal direction, the bottom of support block 307 is provided with roller 308, and the slideway 103 of twice level is provided with fixation wall 101, roller 308 is against on slideway 103, when support block 307 is in cunning When carrying out sliding with the direction of motion of main shaft 301 on road 103, support block 307 is the support that borehole drill construction 3 provides a vertical direction Power.
Work three-dimensional rig process, first places workpiece between quiet clamp 401 and dynamic clamp 402, then driving gas Cylinder 403 is by Workpiece clamping;Drill bit is installed in three mounting holes 306, three motors 303 of driving start;Driving is pressed from both sides successively afterwards Has the hydraulic cylinder 202 of 4 left and right, upper three sides so that the feed shaft 203 of left and right, upper three side drives the main shaft of left and right, upper three side 301 entirety are close successively or away from fixture 4, and drill bit carries out drilling successively to left and right, upper three side on workpiece, so that The drilling in three faces is realized in the case of clamped one time.
Embodiment two, as shown in fig. 7, rotating shaft in the structure for being rotating shaft 304 different from embodiment one, embodiment two 304 be that swivel joint 310, one end of swivel joint 310 are provided with quill shaft, and the one end of rotating shaft 304 away from mounting hole 306 It is connected with water pipe, carries out high-pressure water delivery;Bearing is provided with the other end of swivel joint 310, inner ring and the rotating shaft 304 of bearing are consolidated Fixed connection so that rotating shaft 304 is when rotating, and swivel joint 310 can keep relative standing;And on the mounting hole 306 of rotating shaft 304 Bored to coordinate swivel joint 310 to be provided with violence, violence drilled through water outlet in rotating shaft 304 and cooled down, so as to countershaft 304 drilling efficiency is effectively lifted.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, it is all in this practicality Within new design concept, any modification, equivalent substitution and improvements made etc. should be included in protection of the present utility model Within the scope of.

Claims (7)

1. a kind of three-dimensional rig, including frame (1), it is characterised in that:Fixation wall (101) is provided with the upside of the frame (1), The middle part of the fixation wall (101) is towards fixture (4) is provided with the side of frame (1), and the fixation wall (101) is in fixture (4) borehole drill construction (3) is provided with both sides and upside and the borehole drill construction (3) is driven to the side slip of fixture (4) one Feed mechanism (2), the fixture (4) is towards being provided with opening on the side of three borehole drill constructions (3);
The fixture (4) includes quiet clamp (401), dynamic clamp (402) and actuator, the quiet clamp (401) and dynamic clamp (402) it is oppositely arranged, the quiet clamp (401) is fixed in fixation wall (101), dynamic clamp (402) sliding is connected to solid Determine on wall (101), the actuator is connected with dynamic clamp (402), drive dynamic clamp (402) towards quiet clamp (401) side or Away from the quiet side slip of clamp (401) one;
The feed mechanism (2) includes fixed seat (201) and hydraulic cylinder (202), and the side of the fixed seat (201) is fixedly connected In in fixation wall (101), the hydraulic cylinder (202) is fixedly connected on side of the fixed seat (201) away from fixation wall (101), institute State and be provided with feed shaft (203) on side of the hydraulic cylinder (202) away from fixture (4), feed shaft (203) is connected to borehole drill construction (3);
The borehole drill construction (3) includes being provided with rotating shaft (304), institute in motor (303) and main shaft (301), the main shaft (301) State side of the rotating shaft (304) away from fixture (4) to be connected with motor (303) so that motor (303) drives rotating shaft (304) to rotate, institute State rotating shaft (304) and mounting hole (306) for installing drill bit is provided with towards the side of fixture (4).
2. three-dimensional rig according to claim 1, it is characterised in that:The actuator is cylinder (403), the cylinder (403) it is arranged at side of the fixation wall (101) away from quiet clamp (401).
3. three-dimensional rig according to claim 1, it is characterised in that:The remote fixation wall (101) of the fixed seat (201) It is provided with side on the slip hole (204) for main shaft (301) sliding, the side of the slip hole (204) and is provided with stopper slot (205), it is provided with the spacing edge being connected in the stopper slot (205) on the main shaft (301).
4. three-dimensional rig according to claim 3, it is characterised in that:The borehole drill construction (3) includes connection motor (303) With the gear-box (302) of rotating shaft (304), the gear-box (302) of two borehole drill constructions (3) of fixture (4) both sides is arranged at Side away from rotating shaft (304) is provided with support block (307), and side of the fixation wall (101) away from state's reservation is horizontally disposed with There is the slideway (103) for support block (307) sliding.
5. three-dimensional rig according to claim 4, it is characterised in that:The bottom of the support block (307) is provided with roller (308)。
6. three-dimensional rig according to claim 1, it is characterised in that:The frame (1) is provided with below fixture (4) Water leg (102).
7. three-dimensional rig according to claim 1, it is characterised in that:The rotating shaft (304) is quill shaft, and the rotating shaft is remote One end from fixture (4) is provided with swivel joint (310).
CN201720037475.7U 2017-01-12 2017-01-12 Three-dimensional rig Expired - Fee Related CN206464570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720037475.7U CN206464570U (en) 2017-01-12 2017-01-12 Three-dimensional rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720037475.7U CN206464570U (en) 2017-01-12 2017-01-12 Three-dimensional rig

Publications (1)

Publication Number Publication Date
CN206464570U true CN206464570U (en) 2017-09-05

Family

ID=59705498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720037475.7U Expired - Fee Related CN206464570U (en) 2017-01-12 2017-01-12 Three-dimensional rig

Country Status (1)

Country Link
CN (1) CN206464570U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108161061A (en) * 2017-12-27 2018-06-15 宁波德深机械设备有限公司 A kind of three face drilling equipment of cylindrical parts
CN108161059A (en) * 2017-12-19 2018-06-15 利马新材料(苏州)有限公司 A kind of high-precision alloy pipe punching apparatus
CN108971550A (en) * 2018-09-14 2018-12-11 山东亨通机械科技有限公司 A kind of column cap drilling equipment
CN108971550B (en) * 2018-09-14 2024-10-01 山东亨通机械科技有限公司 Column head drilling device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108161059A (en) * 2017-12-19 2018-06-15 利马新材料(苏州)有限公司 A kind of high-precision alloy pipe punching apparatus
CN108161061A (en) * 2017-12-27 2018-06-15 宁波德深机械设备有限公司 A kind of three face drilling equipment of cylindrical parts
CN108161061B (en) * 2017-12-27 2019-03-26 宁波德深机械设备有限公司 A kind of three face drilling equipment of cylindrical parts
CN108971550A (en) * 2018-09-14 2018-12-11 山东亨通机械科技有限公司 A kind of column cap drilling equipment
CN108971550B (en) * 2018-09-14 2024-10-01 山东亨通机械科技有限公司 Column head drilling device

Similar Documents

Publication Publication Date Title
CN106761396B (en) A kind of weak seam gas drilling machine automatic loading and unloading boring rod set and its application method
CN106696097A (en) Drilling robot for mounting air conditioner
CN101839112B (en) Adjusting device of frame pillar drilling machine
CN206464570U (en) Three-dimensional rig
CN206625782U (en) A kind of colliery automatic liquid drilol press
CN113062758B (en) Anchor rod construction device for civil engineering
CN106567674B (en) Underground coal mine crawler type high-speed auger creeps into drilling machine
CN212079348U (en) Auxiliary device for pneumatic jumbolter
CN116335532A (en) Powerful multifunctional drilling machine for SWSD
CN101845952B (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN211692302U (en) Novel wireless remote control crawler-type sampling drilling machine
CN107442799A (en) A kind of board drilling equipment of firm fixation
CN208137850U (en) All-hydraulic sampler drill
CN2397250Y (en) Portable hydraulic drilling machine with high efficient dust-removing series
CN201747267U (en) Operation mechanism of mine deep-hole drilling carriage
CN201057045Y (en) Multi-bit rock drill
CN207547664U (en) One kind consolidates fixed board drilling equipment
CN213683955U (en) Wheeled mountain drilling machine for geological exploration
CN207194832U (en) Light new types of masts and the lightweight modularization core-drill(ing) machine with the mast
CN112664139B (en) Adjustable multi-angle drilling rig for coal mining
CN209892111U (en) Directional blasting positioning and punching device
CN210858601U (en) Multi-angle full-hydraulic portable drilling machine for railway engineering investigation
CN112343506A (en) Underground coal mine low-azimuth drilling method and hydraulic drill carriage thereof
CN209604008U (en) Rock gangway planer-type heading and anchoring integrated machine
CN211258500U (en) Hydraulic rock drill for mine rock drilling and blasting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180207

Address after: 056000 Hebei city of Handan province Cheng'an Juliang Handan Road North Road West

Patentee after: Hebei Wu Rong Valve Co., Ltd.

Address before: Ao North Street of Dongtou District Changxin road 325700 Zhejiang city of Wenzhou province (No. 13 Wenzhou shuangte Valve Co. Ltd. hospital the first layer of the second workshop)

Patentee before: Wenzhou Wu Rong Technology Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170905

Termination date: 20200112

CF01 Termination of patent right due to non-payment of annual fee