CN206457692U - A kind of road side stone mounting structure - Google Patents

A kind of road side stone mounting structure Download PDF

Info

Publication number
CN206457692U
CN206457692U CN201720031254.9U CN201720031254U CN206457692U CN 206457692 U CN206457692 U CN 206457692U CN 201720031254 U CN201720031254 U CN 201720031254U CN 206457692 U CN206457692 U CN 206457692U
Authority
CN
China
Prior art keywords
kerbstone
fixing hole
road side
vertical
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720031254.9U
Other languages
Chinese (zh)
Inventor
郑书慧
付彦荣
沈燕
陈煜初
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang humanities garden Limited by Share Ltd
Original Assignee
ZHEJIANG HUMANITIES LANDSCAPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG HUMANITIES LANDSCAPE Co Ltd filed Critical ZHEJIANG HUMANITIES LANDSCAPE Co Ltd
Priority to CN201720031254.9U priority Critical patent/CN206457692U/en
Application granted granted Critical
Publication of CN206457692U publication Critical patent/CN206457692U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of road side stone mounting structure, including rammed earth layer, rigid mat, harden basic unit, road deck and road side rock layers, rammed earth layer, rigid mat, from bottom to top laying is formed successively for hardening basic unit and road deck, the side for hardening basic unit and road deck is provided with road side rock layers, road side rock layers are tiled successively by road side stone to be formed, road side stone includes horizontal kerbstone portion, vertical kerbstone portion and corner protector portion, vertical kerbstone portion is arranged at the top of road side stone, horizontal kerbstone portion and corner protector portion are arranged at the bottom of road side stone, the left side of the bottom in vertical kerbstone portion connects horizontal kerbstone portion, the right side connection corner protector portion of the bottom in vertical kerbstone portion.The road side stone mounting structure is simple, reasonable, cost novel in design is relatively low, reliability and durability, can effectively solve kerbstone and occur the defect such as differential settlement, loosening, inclination, displacement.

Description

A kind of road side stone mounting structure
Technical field
The utility model is related to a kind of road side stone mounting structure.
Background technology
Traditional road side stone mounting structure, is generally divided into two in road bottom hardening basic unit with kerbstone bottom hardening basic unit Secondary construction, and kerbstone bottom substrate is narrow, the easily depression or because element native holding force deficiency in bottom causes kerbstone after rainy season in winter Go to a grassroots level (generally concrete base layer or cement stabilizing binder basic unit) fracture, thus cause kerbstone differential settlement or Toppled to kerbstone reverse side.In addition, cause the maintenance after this breaking-up and doing over again can cause the broken angle of kerbstone to damage, maintenance The straightway and curved section in rear side stone face are obstructed, and the situation of sinking again is also easily caused after maintenance.
Utility model content
The purpose of this utility model is to provide a kind of road side stone mounting structure, the road side stone mounting structure is simple, Reasonable, cost novel in design is relatively low, reliability and durability, effectively can occur differential settlement, loosening, inclination, position by solving road kerbstone The defect such as shifting.
In order to solve the above-mentioned technical problem, adopt the following technical scheme that:
A kind of road side stone mounting structure, including rammed earth layer, rigid mat, hardening basic unit, road deck and road Kerbstone layer, rammed earth layer, rigid mat, hardening basic unit and road deck from bottom to top successively laying forms, hardening basic unit with The side of road deck is provided with road side rock layers, and road side rock layers are tiled successively by road side stone to be formed, and road side stone includes water Flat kerbstone portion, vertical kerbstone portion and corner protector portion, vertical kerbstone portion are arranged at the top of road side stone, horizontal kerbstone portion and corner protector portion The bottom of road side stone is arranged at, the left side of the bottom in vertical kerbstone portion connects horizontal kerbstone portion, the bottom in vertical kerbstone portion Right side connection corner protector portion.Being integral property of basic unit is hardened, can carry out rolling compacting construction simultaneously in construction, it is ensured that rigidity The compactness and holding force effect of bed course, while ensure that hardening basic unit (is generally concrete base layer or cement stabilizing binder Basic unit) globality and extend on the outside of kerbstone as reinforcing, ensure that hardening basic unit is not broken kerbstone and do not settled with this.Corner protector Portion uses cement mortar corner protector, and cement mortar ratio is 1:More than 3, to ensure toppling for kerbstone.
Further, road side stone is provided with fixing hole, and fixing hole includes vertical fixing hole and horizontal fixing hole, vertical fixed Hole is vertically arranged, and vertical fix bar is provided with vertical fixing hole, and horizontal fixing hole is horizontally disposed with, and level is provided with horizontal fixing hole Fix bar, vertical fixing hole and horizontal fixing hole run through road side stone., will by setting vertical fix bar and horizontal fix bar Road side stone carries out the fixation on horizontal direction and vertical direction, and road side stone tiles to form an entirety, makes total more It is good firm.
Further, vertical fixing hole includes the first vertical fixing hole and the second vertical fixing hole, and the first vertical fixing hole is set The side in vertical kerbstone portion is placed in, the second vertical fixing hole is arranged at the opposite side in vertical kerbstone portion.
Further, horizontal fixing hole includes first level fixing hole and the second horizontal fixing hole, and first level fixing hole is set The side in horizontal kerbstone portion is placed in, the second horizontal fixing hole is arranged at the opposite side in horizontal kerbstone portion.
Further, mounting groove is formed between hardening basic unit and road deck, mounting groove matches with horizontal kerbstone portion.
Further, expansion joint is provided between vertical kerbstone portion and road deck.By setting expansion joint, it is easy to preferably pacify Fill road side stone.
Further, vertical kerbstone portion is provided with water-flowing trough, and water-flowing trough is vertically arranged.By setting water-flowing trough can be by road surface The rainwater of upper deposition is discharged to underground, prevents surface gathered water from causing trouble to pedestrian and vehicle.
Further, corner protector portion is provided with logical spool.It is used to wear electricity in logical spool, logical spool by designing in corner protector portion Line, so that electric wire is arranged in road side rock layers, compared to the mode that electric wire is directly installed on to underground, can effectively prevent Only electric wire is damaged, and safeguards more convenient.
Due to using above-mentioned technical proposal, have the advantages that:
The utility model is a kind of road side stone mounting structure, the road side stone mounting structure is simple, modern design is reasonable, Cost is relatively low, reliability and durability, effectively can occur the defect such as differential settlement, loosening, inclination, displacement by solving road kerbstone.Hardening Being integral property of basic unit, can carry out rolling compacting construction, it is ensured that the compactness and holding force of rigid mat simultaneously in construction Effect, while ensure that globality and the extension of hardening basic unit (generally concrete base layer or cement stabilizing binder basic unit) Go out on the outside of kerbstone as reinforcing, ensure that hardening basic unit is not broken kerbstone and do not settled with this.Corner protector portion uses cement mortar corner protector, Cement mortar ratio is 1:More than 3, to ensure toppling for kerbstone.
By setting vertical fix bar and horizontal fix bar, road side stone is subjected to consolidating in horizontal direction and vertical direction Fixed, road side stone tiles to form an entirety, makes total more preferably firm.
By setting expansion joint, it is easy to that road side stone is preferably installed.
By setting water-flowing trough the rainwater deposited on road surface can be discharged into underground, prevent surface gathered water to pedestrian and vehicle Cause trouble.
It is used to wear electric wire in logical spool, logical spool by designing in corner protector portion, so that electric wire is arranged on into road side It in rock layers, compared to the mode that electric wire is directly installed on to underground, effectively can prevent electric wire from damaging, and safeguard more square Just.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is a kind of structural representation of road side stone mounting structure in the utility model;
Fig. 2 is the structural representation of road side stone in the utility model.
In figure:1- rammed earths layer;2- rigid mats;3- hardens basic unit;5- road decks;6- road side rock layers;7- water Flat kerbstone portion;The vertical kerbstone portions of 8-;9- corner protectors portion;The vertical fix bars of 10-;The horizontal fix bars of 11-;The vertical fixing holes of 12- first; The vertical fixing holes of 13- second;14- first level fixing holes;The horizontal fixing holes of 15- second;16- mounting grooves;17- expansion joints;18- Water-flowing trough;19- leads to spool.
Embodiment
As shown in Figure 1 to Figure 2, a kind of road side stone mounting structure, including rammed earth layer 1, rigid mat 2, hardening base Layer 3, road deck 5 and road side rock layers 6, rammed earth layer 1, rigid mat 2, hardening basic unit 3 and road deck 5 are from bottom to top Laying is formed successively, and the side of hardening basic unit 3 and road deck 5 is provided with road side rock layers 6, and road side rock layers 6 are by road side stone Tiling is formed successively, and road side stone includes horizontal kerbstone portion 7, vertical kerbstone portion 8 and corner protector portion 9, and vertical kerbstone portion 8 is arranged at The top of road side stone, horizontal kerbstone portion 7 and corner protector portion 9 are arranged at the bottom of road side stone, the left side of the bottom in vertical kerbstone portion 8 Connect horizontal kerbstone portion 7, the right side connection corner protector portion 9 of the bottom in vertical kerbstone portion 8.The being integral property of basic unit 3 is hardened, in construction When can carry out rolling compacting construction simultaneously, it is ensured that the compactness and holding force effect of rigid mat 2, while ensure that hardening base The globality of layer 3 (generally concrete base layer or cement stabilizing binder basic unit) is simultaneously extended as reinforcing on the outside of kerbstone, Ensure that hardening basic unit 3 is not broken kerbstone and do not settled with this.Corner protector portion 9 uses cement mortar corner protector, and cement mortar ratio is 1:3 with On, to ensure toppling for kerbstone.
Road side stone is provided with fixing hole, and fixing hole includes vertical fixing hole and horizontal fixing hole, and vertical fixing hole is vertical Set, vertical fix bar 10 is provided with vertical fixing hole, horizontal fixing hole is horizontally disposed with, and is fixed in horizontal fixing hole provided with level Bar 11, vertical fixing hole and horizontal fixing hole run through road side stone.Vertical fixing hole includes the first vertical fixing hole 12 and the Two vertical fixing holes 13, the first vertical fixing hole 12 is arranged at the side in vertical kerbstone portion 8, and the second vertical fixing hole 13 is arranged at The opposite side in vertical kerbstone portion 8.Horizontal fixing hole includes the horizontal fixing hole 15 of first level fixing hole 14 and second, first level Fixing hole 14 is arranged at the side in horizontal kerbstone portion 7, and the second horizontal fixing hole 15 is arranged at the opposite side in horizontal kerbstone portion 7.It is logical Cross and vertical fix bar 10 and horizontal fix bar 11 are set, road side stone is subjected to the fixation in horizontal direction and vertical direction, road Road side stone tiles to form an entirety, makes total more preferably firm.
Mounting groove 16 is formed between hardening basic unit 3 and road deck 5, mounting groove 16 matches with horizontal kerbstone portion 7.
Expansion joint 17 is provided between kerbstone portion 8 and road deck 5 vertically.By setting expansion joint 17, it is easy to preferably pacify Fill road side stone.
Vertical kerbstone portion 8 is provided with water-flowing trough 18, and water-flowing trough 18 is vertically arranged.By setting water-flowing trough 18 can be by road surface The rainwater of upper deposition is discharged to underground, prevents surface gathered water from causing trouble to pedestrian and vehicle.
Corner protector portion 9 is provided with logical spool 19.It is used to wear in logical spool 19, logical spool 19 by designing in corner protector portion 9 Electric wire, so that electric wire is arranged in road side rock layers 6, can be effective compared to the mode that electric wire is directly installed on to underground Ground prevents electric wire from damaging, and safeguards more convenient.
Specific embodiment of the utility model is these are only, but technical characteristic of the present utility model is not limited thereto.Appoint How based on the utility model, to solve essentially identical technical problem, essentially identical technique effect is realized, madely Simple change, equivalent substitution or modification etc., are all covered by among protection domain of the present utility model.

Claims (8)

1. a kind of road side stone mounting structure, including rammed earth layer, rigid mat, hardening basic unit, road deck and road side Rock layers, it is characterised in that:The rammed earth layer, the rigid mat, the hardening basic unit and the road deck by lower and On successively laying form, it is described hardening basic unit and the road deck side be provided with the road side rock layers, the road side Rock layers are tiled and formed successively by road side stone, and the road side stone includes horizontal kerbstone portion, vertical kerbstone portion and corner protector portion, described Vertical kerbstone portion is arranged at the top of the road side stone, and the horizontal kerbstone portion and the corner protector portion are arranged at the road side The bottom of stone, the left side of the bottom in the vertical kerbstone portion connects the horizontal kerbstone portion, the bottom in the vertical kerbstone portion Right side connects the corner protector portion.
2. a kind of road side stone mounting structure according to claim 1, it is characterised in that:The road side stone is provided with solid Determine hole, the fixing hole includes vertical fixing hole and horizontal fixing hole, and the vertical fixing hole is vertically arranged, the vertical fixation Vertical fix bar is provided with hole, the horizontal fixing hole is horizontally disposed with, horizontal fix bar is provided with the horizontal fixing hole, it is described Vertical fixing hole and the horizontal fixing hole run through the road side stone.
3. a kind of road side stone mounting structure according to claim 2, it is characterised in that:The vertical fixing hole includes the One vertical fixing hole and the second vertical fixing hole, the first vertical fixing hole are arranged at the side in the vertical kerbstone portion, institute State the opposite side that the second vertical fixing hole is arranged at the vertical kerbstone portion.
4. a kind of road side stone mounting structure according to claim 2, it is characterised in that:The horizontal fixing hole includes the One horizontal fixing hole and the second horizontal fixing hole, the first level fixing hole are arranged at the side in the horizontal kerbstone portion, institute State the opposite side that the second horizontal fixing hole is arranged at the horizontal kerbstone portion.
5. a kind of road side stone mounting structure according to claim 1, it is characterised in that:The hardening basic unit and the road Mounting groove is formed between supercrust, the mounting groove matches with the horizontal kerbstone portion.
6. a kind of road side stone mounting structure according to claim 1, it is characterised in that:The vertical kerbstone portion with it is described Expansion joint is provided between road deck.
7. a kind of road side stone mounting structure according to claim 1, it is characterised in that:The vertical kerbstone portion is provided with Water-flowing trough, the water-flowing trough is vertically arranged.
8. a kind of road side stone mounting structure according to claim 1, it is characterised in that:The corner protector portion is provided with logical line Pipe.
CN201720031254.9U 2017-01-11 2017-01-11 A kind of road side stone mounting structure Active CN206457692U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720031254.9U CN206457692U (en) 2017-01-11 2017-01-11 A kind of road side stone mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720031254.9U CN206457692U (en) 2017-01-11 2017-01-11 A kind of road side stone mounting structure

Publications (1)

Publication Number Publication Date
CN206457692U true CN206457692U (en) 2017-09-01

Family

ID=59698551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720031254.9U Active CN206457692U (en) 2017-01-11 2017-01-11 A kind of road side stone mounting structure

Country Status (1)

Country Link
CN (1) CN206457692U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440575A (en) * 2018-10-16 2019-03-08 安徽宏路新材料科技有限公司 A kind of imitation stone road side stone collecting greening function one

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440575A (en) * 2018-10-16 2019-03-08 安徽宏路新材料科技有限公司 A kind of imitation stone road side stone collecting greening function one

Similar Documents

Publication Publication Date Title
CN107386047B (en) Water permeable brick pavement structure and construction method thereof
CN110904823B (en) Bridge head bump treatment construction structure and construction method in high soft soil filling area
CN103266622A (en) L-shaped retaining wall structure with cross-over type special-shaped counterfort
CN102102315B (en) Method for constructing sleeper bolted elastic crossing
CN110863405B (en) Assembled photovoltaic power generation-high-performance concrete pavement structure and construction method
CN206457692U (en) A kind of road side stone mounting structure
CN208981282U (en) A kind of high earthquake territory concrete face rockfill dam dam crest structure
CN214992786U (en) Municipal administration road design road surface domatic structure
CN206189211U (en) Road subgrade sedimentation preventing facility
CN216551386U (en) New old bituminous paving basic unit of environment-friendly links up structure
CN202194048U (en) Pavement structure for joining part of new and old roads
EP2154293A2 (en) Road surface construction
CN211006302U (en) Stone arch bridge
CN105200887A (en) Integrally elastic buffer crossing
CN105155387A (en) Garden road structure
CN205077393U (en) Seamless expansion joint structure
CN213772759U (en) Building engineering foundation
CN209384097U (en) A kind of Simple telescopic crack structure
JP2018115475A (en) Concrete block and laying structure using the same
CN207314485U (en) A kind of loessial gulch area bridge lower part drainage system
CN207525571U (en) A kind of anti-crack concrete layer structure
CN214143090U (en) Crack control type bituminous paving structure
CN111304993A (en) Road surface adds muscle structure
CN205934639U (en) Temporary road surface system
CN213013754U (en) Flexible base asphalt pavement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310000 No. 223 Tianmu Mountain Road, Hangzhou, Zhejiang, Xihu District

Patentee after: Zhejiang humanities garden Limited by Share Ltd

Address before: 310000 No. 223 Tianmu Mountain Road, Hangzhou, Zhejiang, Xihu District

Patentee before: Zhejiang Humanities Landscape Co., Ltd.