CN206448522U - A kind of concrete placings fixing device for building - Google Patents
A kind of concrete placings fixing device for building Download PDFInfo
- Publication number
- CN206448522U CN206448522U CN201720052546.0U CN201720052546U CN206448522U CN 206448522 U CN206448522 U CN 206448522U CN 201720052546 U CN201720052546 U CN 201720052546U CN 206448522 U CN206448522 U CN 206448522U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- fixing device
- platform
- motor
- steel bushing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a kind of concrete placings fixing device for building, is related to the realm of building construction.The concrete placings fixing device for building, including movable platform, the top two ends of the movable platform are installed with the first contiguous block, the bottom of first contiguous block and support bar rotates connection, the top of the support bar rotates with the second contiguous block and is connected, second contiguous block is fixedly connected with the first outer wall for holding set tightly, described first holds the inwall of set tightly and pours the wall contacts of steel bushing, set is held tightly for two first to be fixedly connected by the first bolt, the bottom outer wall for pouring steel bushing is provided with the second holding set, set is held tightly for two second to be fixedly connected by the second bolt.The concrete placings fixing device for building, drive the second screw rod to rotate by the second motor, movable platform is lifted along guide rod, while also driving the first holding to be enclosed on pours lifting on steel bushing, so as to reduce artificial fixation eminence template, operating efficiency can be greatly increased.
Description
Technical field
The utility model is related to technical field of building construction, specially a kind of concrete placings fixing device for building.
Background technology
Nowadays socio-economic development is rapid, drives real estate and construction industry to greatly develop.Various regions build energetically house and
Various buildings, in order to firm, will build support column during building construction, but support column is by reinforced concrete combination
Form, it is necessary to a kind of fixing device at the beginning of construction, so as to ensure to reach defined shape and size after concreting.Mesh
Preceding most of fixing device be all it is artificial wooden template or steel form are fixed, the efficiency that not only wastes time and energy is low, and
And aloft operation when also have danger.
Utility model content
(One)The technical problem of solution
In view of the shortcomings of the prior art, the utility model provides a kind of concrete placings fixing device for building, solves
State the most of fixing device mentioned all be it is artificial wooden template or steel form are fixed, the efficiency that not only wastes time and energy is low,
And aloft operation when the problem of also have danger.
(Two)Technical scheme
To realize object above, the utility model is achieved by the following technical programs:A kind of concrete placings for building are consolidated
Determine device, including movable platform, the top two ends of the movable platform are installed with the first contiguous block, first connection
The bottom of block and support bar rotates connection, and the top of the support bar rotates with the second contiguous block and is connected, second contiguous block
It is fixedly connected with the first outer wall for holding set tightly, described first holds the inwall of set tightly and pour the wall contacts of steel bushing, two first
Hold set tightly to be fixedly connected by the first bolt, the bottom outer wall for pouring steel bushing is provided with the second holding set, two second armful
Tight set is fixedly connected by the second bolt, and the described second outer wall for holding set tightly is fixedly connected with one end of thread rack, the spiral shell
Line support is socketed in the first screw surface away from second one end for holding set tightly, and the right-hand member of first screw rod is defeated with the first motor
Shaft is fixedly connected, and the bottom of first motor is fixedly connected with base top, the top of the base bottom and fixed platform
Portion is fixedly connected, and the base is provided with guide rod, the bottom of the guide rod and fixed platform away from the side for pouring steel bushing
Top be fixedly connected, the top of the guide rod is through movable platform and extends to the top of movable platform, the guide rod
The side for pouring steel bushing is provided with the second motor, the bottom of second motor with being fixedly connected at the top of fixed platform,
The top of second motor is fixedly connected with the bottom of reductor, and the top of the reductor and the bottom of the second screw rod are fixed
Connection, the top of second screw rod runs through movable platform and extends to the top of movable platform, the top of the fixed platform
Contacted with the bottom of nut, the bottom of the nut and the top movable of setscrew are connected, and the bottom of the setscrew is passed through
Fasten fixed platform and extend to ground depths.
It is preferred that, the quantity of the nut is four, and the rectangular top for being evenly distributed on fixed platform of four nuts.
It is preferred that, the quantity of first bolt is four, and four the first bolts are one group with two and are symmetricly set on
First holds the both sides of set tightly.
It is preferred that, the quantity of the guide rod is four, and four guide rods are evenly distributed on the top four of fixed platform
Angle.
It is preferred that, the quantity of second motor is four, and four the second motors are evenly distributed on the top of fixed platform
Portion corner.
It is preferred that, the quantity of first motor is two, and two the first motors using the center line for pouring steel bushing be symmetrical
Axial symmetry is arranged on the both sides for pouring steel bushing.
(Three)Beneficial effect
The utility model provides a kind of concrete placings fixing device for building.Possesses following beneficial effect:
1st, concrete placings fixing device for building, by setting the second motor on the stationary platform and being fixedly mounted on
At the top of fixed platform and through the guide rod of movable platform, when the second motor drives the second screw rod through movable platform to rotate,
So that movable platform is lifted along guide rod, by the first contiguous block being fixedly mounted in movable platform, itself and fixation are allowed
Hold the second contiguous block put tightly installed in first to connect by support bar, when movable platform is lifted, while also driving first
Holding is enclosed on to pour and lifted on steel bushing, so as to reduce artificial fixation eminence template, can greatly increase the efficiency of operation.
2nd, the concrete placings fixing device for building, by the guide rod of setting, so that movable platform lifting will not be offset,
So that first holds set lifting tightly steadily.
3rd, the concrete placings fixing device for building, by the first motor of setting, makes the first motor coordinate with thread rack
Use, so as to effectively fix the bottom for pouring steel bushing.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is vertical view figure structure schematic representation of the present utility model.
In figure:1 movable platform, 2 first contiguous blocks, 3 support bars, 4 second contiguous blocks, 5 first hold tightly set, 6 pour steel bushing,
7 first bolts, 8 second holding sets, 9 second bolts, 10 thread racks, 11 first screw rods, 12 first motors, 13 bases, 14 are consolidated
Fixed platform, 15 guide rods, 16 second motors, 17 reductors, 18 second screw rods, 19 nuts, 20 setscrews.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
The utility model embodiment provides a kind of concrete placings fixing device for building, as shown in Figure 1-2, including movable platform
1, the top two ends of movable platform 1 are installed with the first contiguous block 2, and the bottom of the first contiguous block 2 and support bar 3 rotates company
Connect, the top of support bar 3 rotates with the second contiguous block 4 and is connected, the second contiguous block 4 is fixedly connected with the first outer wall for holding set 5 tightly,
First holds the inwall of set 5 tightly and pours the wall contacts of steel bushing 6, holds set 5 tightly for two first and is fixedly connected by the first bolt 7,
The quantity of first bolt 7 is four, and four the first bolts 7 are one group with two and are symmetricly set on the both sides that the first holding covers 5,
The bottom outer wall for pouring steel bushing 6 is provided with the second holding set 8, holds set 8 tightly for two second and is fixedly connected by the second bolt 9, the
Two outer walls for holding set 8 tightly are fixedly connected with one end of thread rack 10, and thread rack 10 is away from the second one end socket for holding set 8 tightly
On the surface of the first screw rod 11, the right-hand member of the first screw rod 11 is fixedly connected with the output shaft of the first motor 12, the number of the first motor 12
Measure as two, and two the first motors 12 are symmetricly set on using to pour the center line of steel bushing 6 as symmetry axis and pour the both sides of steel bushing 6,
First motor 12 is used cooperatively with thread rack 10, so that the bottom for pouring steel bushing 6 is effectively fixed, the bottom of the first motor 12
It is fixedly connected with the top of base 13, the bottom of base 13 is fixedly connected with the top of fixed platform 14, base 13 is remote to pour steel bushing 6
Side be provided with guide rod 15, the quantity of guide rod 15 is four, and four guide rods 15 are evenly distributed on fixed platform 14
Top corner, the lifting of movable platform 1 is not offset so that first to hold the lifting of set 5 tightly steady, the bottom of guide rod 15 with it is solid
The top of fixed platform 14 is fixedly connected, and the top of guide rod 15 runs through movable platform 1 and extends to the top of movable platform 1, leads
The side for pouring steel bushing 6 is provided with the second motor 16 to bar 15, the quantity of the second motor 16 is four, and four second electricity
Machine 16 is evenly distributed on the top corner of fixed platform 14, and the bottom of the second motor 16 is fixed with the top of fixed platform 14 to be connected
Connect, the top of the second motor 16 is fixedly connected with the bottom of reductor 17, the top of reductor 17 and the bottom of the second screw rod 18
It is fixedly connected, the top of the second screw rod 18 runs through movable platform 1 and extends to the top of movable platform 1, when the band of the second motor 16
Dynamic the second screw rod 18 through movable platform 1 is rotated, so that movable platform 1 is lifted along guide rod 15, by being fixedly mounted
The first contiguous block 2 in movable platform 1, allow its be fixedly mounted on the first holding set 5 on the second contiguous block 4 pass through support
Bar 3 is connected, when movable platform 1 is lifted, and is lifted while also driving first to hold set 5 tightly on steel bushing 6 is poured, so as to reduce artificial
Fixation eminence template, operating efficiency can be greatly increased, the top of fixed platform 14 is contacted with the bottom of nut 19, nut 19
Quantity be four, and the rectangular top for being evenly distributed on fixed platform 14 of four nuts 19, the bottom of nut 19 and expansion
The top movable connection of screw 20, the bottom of setscrew 20 runs through fixed platform 14 and extends to ground depths.
Operation principle:When the concrete placings fixing device for building in use, driving the second screw rod 18 by the second motor 16
Rotate, so as to allow movable platform 1 to be moved along guide rod 15, the support bar 3 in movable platform 1 drives first to hold set tightly
5 move on steel bushing 6 is poured, and may finally effectively change the height of the first holding set 5 with the change for pouring the height of steel bushing 6
Degree, is fixed to pouring steel bushing 6.
In summary, this, which is built, uses concrete placings fixing device, by the second motor 16 for being arranged in fixed platform 14 and
The top of fixed platform 14 is fixedly mounted on and through the guide rod 15 of movable platform 1, when the second motor 16 is driven through movable flat
Second screw rod 18 of platform 1 is rotated, so that movable platform 1 is lifted along guide rod 15, by being fixedly mounted in movable platform 1
The first contiguous block 2, allow its be fixedly mounted on the first holding set 5 on the second contiguous block 4 be connected by support bar 3, work as work
When moving platform 1 is lifted, lifted while also driving first to hold set 5 tightly on steel bushing 6 is poured, so as to reduce artificial fixation eminence mould
Plate, can greatly reduce danger during operation, by the guide rod 15 of setting, so that the lifting of movable platform 1 will not be offset,
So that first holds the lifting of set 5 tightly steadily.
Also, by the first motor 12 of setting, the first motor 12 is used cooperatively with thread rack 10, so that effectively solid
It is fixed to live to pour the bottom of steel bushing 6.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those
Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment
Intrinsic key element.In the absence of more restrictions, by sentence " including one ... the key element limited, it is not excluded that
Also there is other identical element in process, method, article or equipment including the key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of concrete placings fixing device for building, including movable platform(1), the movable platform(1)Top two ends it is solid
Dingan County is equipped with the first contiguous block(2), it is characterised in that:First contiguous block(2)With support bar(3)Bottom rotate connection,
The support bar(3)Top and the second contiguous block(4)Rotate connection, second contiguous block(4)Hold tightly and cover with first(5)'s
Outer wall is fixedly connected, and described first holds set tightly(5)Inwall and pour steel bushing(6)Wall contacts, two first hold tightly set(5)
Pass through the first bolt(7)It is fixedly connected, it is described to pour steel bushing(6)Bottom outer wall be provided with the second holding set(8), two second
Hold set tightly(8)Pass through the second bolt(9)It is fixedly connected, described second holds set tightly(8)Outer wall and thread rack(10)One end
It is fixedly connected, the thread rack(10)Set is held tightly away from second(8)One end be socketed in the first screw rod(11)Surface, described
One screw rod(11)Right-hand member and the first motor(12)Output shaft be fixedly connected, first motor(12)Bottom and base
(13)Top is fixedly connected, the base(13)Bottom and fixed platform(14)Top be fixedly connected, the base(13)Far
From pouring steel bushing(6)Side be provided with guide rod(15), the guide rod(15)Bottom and fixed platform(14)Top
It is fixedly connected, the guide rod(15)Top run through movable platform(1)And extend to movable platform(1)Top, it is described to lead
To bar(15)It is remote to pour steel bushing(6)Side be provided with the second motor(16), second motor(16)Bottom and fixation
Platform(14)Top be fixedly connected, second motor(16)Top and reductor(17)Bottom be fixedly connected, it is described
Reductor(17)Top and the second screw rod(18)Bottom be fixedly connected, second screw rod(18)Top it is flat through activity
Platform(1)And extend to movable platform(1)Top, the fixed platform(14)Top and nut(19)Bottom contact, institute
State nut(19)Bottom and setscrew(20)Top movable connection, the setscrew(20)Bottom through fixed flat
Platform(14)And extend to ground depths.
2. a kind of concrete placings fixing device for building according to claim 1, it is characterised in that:The nut(19)Number
Measure as four, and four nuts(19)It is rectangular to be evenly distributed on fixed platform(14)Top.
3. a kind of concrete placings fixing device for building according to claim 1, it is characterised in that:First bolt(7)
Quantity be four, and four the first bolts(7)It is one group with two and is symmetricly set on the first holding set(5)Both sides.
4. a kind of concrete placings fixing device for building according to claim 1, it is characterised in that:The guide rod(15)'s
Quantity is four, and four guide rods(15)It is evenly distributed on fixed platform(14)Top corner.
5. a kind of concrete placings fixing device for building according to claim 1, it is characterised in that:Second motor(16)
Quantity be four, and four the second motors(16)It is evenly distributed on fixed platform(14)Top corner.
6. a kind of concrete placings fixing device for building according to claim 1, it is characterised in that:First motor(12)
Quantity be two, and two the first motors(12)To pour steel bushing(6)Center line be symmetricly set on for symmetry axis and pour steel bushing
(6)Both sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720052546.0U CN206448522U (en) | 2017-01-17 | 2017-01-17 | A kind of concrete placings fixing device for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720052546.0U CN206448522U (en) | 2017-01-17 | 2017-01-17 | A kind of concrete placings fixing device for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206448522U true CN206448522U (en) | 2017-08-29 |
Family
ID=59672237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720052546.0U Active CN206448522U (en) | 2017-01-17 | 2017-01-17 | A kind of concrete placings fixing device for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206448522U (en) |
-
2017
- 2017-01-17 CN CN201720052546.0U patent/CN206448522U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204844405U (en) | Fixed mould platform is used in synchronous vibration device and production of PC component | |
CN203334680U (en) | Upper reversed beam lifting mold for concrete pouring | |
CN206448522U (en) | A kind of concrete placings fixing device for building | |
CN207829282U (en) | A kind of polymer light block molding machine | |
CN204040450U (en) | A kind of for angle connector in tools type section steel builder's jack | |
CN204590589U (en) | Precast facade level connection joint ater-casting steel template | |
CN211161873U (en) | Sand box turnover machine | |
CN102322138A (en) | The modular sliding formwork | |
CN105735342B (en) | A kind of device of pre-buried plant dust catcher basis anchor (bolt) hole | |
CN207863305U (en) | A kind of building iron concrete structure column contracture device | |
CN202899440U (en) | Prefabricated structural column | |
CN207290421U (en) | A kind of easy-to-dismount resilient support block mould | |
CN206360348U (en) | A kind of stair prefabricated mould | |
CN205935679U (en) | Prefabricated building mould dismouting device | |
CN214272997U (en) | Cement that civil engineering construction was used sprays curing means | |
CN2040128U (en) | Sectionally formwork-sliding unit used for concrete buildings | |
CN213971750U (en) | A firm formwork structure for bridge and culvert engineering | |
CN208105089U (en) | A kind of culvert building wall device | |
CN210256623U (en) | Rotatable assembled building structure | |
CN205502060U (en) | Device in pre -buried power plant dust remover basis rag bolt hole | |
CN104453217A (en) | Elevator shaft whole formwork lifting construction method | |
CN221256166U (en) | Building templates fixing device of transformer substation's capital construction | |
CN216552055U (en) | Can improve equipment stand concrete foundation typical forms of construction benefit | |
CN213509513U (en) | Scaffold convenient to build for building construction | |
CN208009900U (en) | A kind of building formwork for placing fixed mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Room 12A02, Building A, Hongding Building, Xuanlongqiao Road, Wenzhou City, Zhejiang Province, 325000 Patentee after: Wenzhou Huahong Construction Co., Ltd. Address before: Room 12A02, Building A, Hongding Building, Xuanlongqiao Road, Wenzhou City, Zhejiang Province, 325000 Patentee before: Grand municipal garden engineering Construction Company Limited of China of Wenzhou City |
|
CP01 | Change in the name or title of a patent holder |