CN105735342B - A kind of device of pre-buried plant dust catcher basis anchor (bolt) hole - Google Patents
A kind of device of pre-buried plant dust catcher basis anchor (bolt) hole Download PDFInfo
- Publication number
- CN105735342B CN105735342B CN201610235586.9A CN201610235586A CN105735342B CN 105735342 B CN105735342 B CN 105735342B CN 201610235586 A CN201610235586 A CN 201610235586A CN 105735342 B CN105735342 B CN 105735342B
- Authority
- CN
- China
- Prior art keywords
- steel plate
- slider
- dust collector
- cross bar
- bolt holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Foundations (AREA)
Abstract
本发明公开了一种预埋电厂除尘器基础地脚螺栓孔的装置,改善了现有预留除尘器基础地脚螺栓孔效率过低,施工成本高的问题。本发明包括两个平行设置的支撑架,两个支撑架之间存在间隙,且在两个支撑架之间设有横杆;所述横杆下方设有与横杆相连的钢板;所述钢板上设有除尘器地脚螺栓;所述支撑架包括两个平行设置的竖直杆,设置于两个竖直杆之间的连接杆,以及设置于竖直杆底部的垫块;所述横杆与连接杆相连。本发明可重复使用,施工成本低;而且安装拆卸方便,能够一次性预埋多个螺栓孔,大大地提高了工作效率。
The invention discloses a device for pre-embedding foundation anchor bolt holes of a dust collector in a power plant, which improves the existing problems of low efficiency and high construction cost of reserving the foundation anchor bolt holes of the dust collector. The invention comprises two supporting frames arranged in parallel, there is a gap between the two supporting frames, and a cross bar is arranged between the two supporting frames; a steel plate connected with the cross bar is arranged under the cross bar; the steel plate There are dust collector anchor bolts; the support frame includes two vertical bars arranged in parallel, a connecting bar arranged between the two vertical bars, and a cushion block arranged at the bottom of the vertical bars; the horizontal The rod is connected to the connecting rod. The invention can be used repeatedly, and the construction cost is low; and the installation and disassembly are convenient, and multiple bolt holes can be pre-embedded at one time, which greatly improves the work efficiency.
Description
技术领域technical field
本发明涉及一种预埋电厂除尘器基础地脚螺栓孔的装置。The invention relates to a device for pre-embedding foundation bolt holes of a dust collector in a power plant.
背景技术Background technique
在电厂除尘器基础施工中,根据设计图纸要求,对除尘器基础地脚螺栓进行预埋,为了满足图纸及更高要求。在现有的施工方法中对除尘器基础地脚螺栓预埋的精度低,安装速度太慢,且不容易达到设计及规范要求,不仅施工进度缓慢,更多的采用人工调节,会使得人力消耗多,成本较高,最终会容易导致除尘器上部结构安装困难。In the foundation construction of the dust collector in the power plant, according to the requirements of the design drawings, the foundation bolts of the dust collector are pre-embedded, in order to meet the drawings and higher requirements. In the existing construction method, the precision of pre-embedding the foundation bolts of the dust collector is low, the installation speed is too slow, and it is not easy to meet the design and specification requirements. Not only is the construction progress slow, more manual adjustments are used, which will consume manpower Many, the cost is high, and it will easily lead to the difficulty of installing the upper structure of the dust collector.
发明内容Contents of the invention
为了改善上述问题,本发明的目的在于提供一种预埋电厂除尘器基础地脚螺栓孔的装置。In order to improve the above problems, the object of the present invention is to provide a device for pre-embedding the foundation bolt holes of the power plant dust collector.
为了实现上述目的,本发明采用的技术方案如下:In order to achieve the above object, the technical scheme adopted in the present invention is as follows:
一种预埋电厂除尘器基础地脚螺栓孔的装置,包括两个平行设置的支撑架,两个支撑架之间存在间隙,且在两个支撑架之间设有横杆;所述横杆下方设有与横杆相连的钢板;所述钢板上设有除尘器地脚螺栓;所述支撑架包括两个平行设置的竖直杆,设置于两个竖直杆之间的连接杆,以及设置于竖直杆底部的垫块;所述横杆与连接杆相连。A device for pre-embedding foundation bolt holes of a dust collector in a power plant, comprising two supporting frames arranged in parallel, a gap exists between the two supporting frames, and a cross bar is arranged between the two supporting frames; the cross bar There is a steel plate connected to the cross bar below; the steel plate is provided with dust collector anchor bolts; the support frame includes two vertical bars arranged in parallel, a connecting bar arranged between the two vertical bars, and A cushion block arranged at the bottom of the vertical bar; the horizontal bar is connected with the connecting bar.
进一步地,所述钢板顶部设有挂杆,该挂杆与横杆相连。Further, a hanging rod is provided on the top of the steel plate, and the hanging rod is connected with the cross bar.
再进一步地,所述钢板上设有四个除尘器地脚螺栓。Still further, the steel plate is provided with four dust collector anchor bolts.
更进一步地,所述钢板厚度为2cm。Furthermore, the thickness of the steel plate is 2cm.
另外,所述横杆套接有一个滑块,所述滑块上设有用于将滑块与横杆进行固定的锁紧螺杆;所述滑块一侧还设有竖直贯穿滑块的通孔,所述挂杆穿过通孔,所述挂杆外壁设有外螺纹,且在挂杆上设有位于滑块上方的螺母。In addition, the cross bar is sleeved with a slide block, and the slide block is provided with a locking screw for fixing the slide block and the cross bar; The hanging rod passes through the through hole, the outer wall of the hanging rod is provided with external threads, and the hanging rod is provided with a nut located above the slider.
此外,所述横杆的横截面为方形,所述滑块的横截面为方形。In addition, the cross section of the cross bar is square, and the cross section of the slider is square.
本发明与现有技术相比,具有以下优点及有益效果:Compared with the prior art, the present invention has the following advantages and beneficial effects:
本发明可重复使用,施工成本低;而且安装拆卸方便,能够一次性预埋多个螺栓孔,大大地提高了工作效率。The invention can be used repeatedly, and the construction cost is low; and the installation and disassembly are convenient, and multiple bolt holes can be pre-embedded at one time, which greatly improves the work efficiency.
附图说明Description of drawings
图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
其中,附图中标记对应的零部件名称为:1-横杆,2-钢板,3-除尘器地脚螺栓,4-竖直杆,5-连接杆,6-垫块,7-挂杆,8-滑块,9-锁紧螺杆,10-螺母。Among them, the names of parts corresponding to the marks in the drawings are: 1-horizontal bar, 2-steel plate, 3-dust collector anchor bolt, 4-vertical bar, 5-connecting bar, 6-cushion block, 7-hanging bar , 8-slider, 9-lock screw, 10-nut.
具体实施方式Detailed ways
下面结合附图和实施例对本发明作进一步说明,本发明的实施方式包括但不限于下列实施例。The present invention will be further described below with reference to the accompanying drawings and examples, and the embodiments of the present invention include but not limited to the following examples.
实施例Example
如图1所示,一种预埋电厂除尘器基础地脚螺栓孔的装置,包括两个平行设置的支撑架,两个支撑架之间存在间隙,且在两个支撑架之间设有横杆1;所述横杆下方设有与横杆相连的钢板2;所述钢板上设有除尘器地脚螺栓3;所述支撑架包括两个平行设置的竖直杆4,设置于两个竖直杆之间的连接杆5,以及设置于竖直杆底部的垫块6;所述横杆与连接杆相连。As shown in Figure 1, a device for pre-embedding the foundation bolt holes of a dust collector in a power plant includes two parallel support frames with a gap between the two support frames and a horizontal cross between the two support frames. Rod 1; a steel plate 2 connected to the cross bar is provided below the cross bar; dust collector anchor bolts 3 are provided on the steel plate; the support frame includes two vertical bars 4 arranged in parallel, arranged on two The connecting rods 5 between the vertical rods, and the pads 6 arranged at the bottom of the vertical rods; the cross rods are connected with the connecting rods.
通过上述设置,能够将本发明直接安装于除尘器基础承台外侧,然后进行螺栓孔的预埋即可,操作十分简单。Through the above arrangement, the present invention can be directly installed on the outside of the base cap of the dust collector, and then the bolt holes can be pre-embedded, and the operation is very simple.
具体地,所述钢板顶部设有挂杆7,该挂杆与横杆相连。通过设置挂杆,能够更加方便的将钢板与横杆相固定,操作简单。Specifically, a hanging rod 7 is provided on the top of the steel plate, and the hanging rod is connected with the cross bar. By setting the hanging rod, the steel plate and the cross bar can be fixed more conveniently, and the operation is simple.
具体地,所述钢板上设有四个除尘器地脚螺栓,当然也可设置二个、三个、五个等等,根据实际情况设置钢板的大小即可,从而实现一次性预埋多个螺栓孔。作为一种优选,所述钢板厚度为2cm。通过该厚度的钢板即可将除尘器地脚螺栓固定于其上,确保其不走位,之间相对位置准确,而且大大地降低了钢板的生产成本。Specifically, the steel plate is provided with four anchor bolts of the dust collector, of course, two, three, five, etc. can also be provided, and the size of the steel plate can be set according to the actual situation, so as to realize the pre-embedding of multiple bolts at one time. Bolt hole. As a preference, the thickness of the steel plate is 2cm. Through the steel plate of this thickness, the anchor bolts of the dust collector can be fixed on it to ensure that they do not move, and the relative positions between them are accurate, and the production cost of the steel plate is greatly reduced.
具体地,所述横杆套接有一个滑块8,所述滑块上设有用于将滑块与横杆进行固定的锁紧螺杆9;所述滑块一侧还设有竖直贯穿滑块的通孔,所述挂杆穿过通孔,所述挂杆外壁设有外螺纹,且在挂杆上设有位于滑块上方的螺母10。Specifically, the crossbar is sleeved with a slider 8, and the slider is provided with a locking screw 9 for fixing the slider and the crossbar; one side of the slider is also provided with a vertical through slide The through hole of the block, the hanging rod passes through the through hole, the outer wall of the hanging rod is provided with external threads, and the hanging rod is provided with a nut 10 located above the slider.
通过设置滑块,在滑块相对横杆移动,能够带动挂杆随着移动,从而实现挂杆相对横杆移动,最终实现调节挂杆与横杆的相对位置,上述锁紧螺杆可以通过旋转实现将滑块与横杆固定。而且本发明的挂杆可相对滑块上下移动,只需通过旋转螺母即可,从而实现钢板的上下移动,最终确定除尘器地脚螺栓的标高。值得说明的是,在浇筑完成后,需要将除尘器地脚螺栓拔出时,可通过旋转螺母使钢板上升,从而拔出除尘器地脚螺栓;当然本发明的除尘器地脚螺栓可在钢板上旋转,从而使得在浇筑时,能够旋转除尘器地脚螺栓,避免除尘器地脚螺栓固定的过于牢固,不便于拔出。By setting the slider, when the slider moves relative to the crossbar, it can drive the hanging rod to move with it, thereby realizing the movement of the hanging rod relative to the crossbar, and finally realizing the adjustment of the relative position of the hanging rod and the crossbar. The above-mentioned locking screw can be realized by rotating Secure the slider to the crossbar. Moreover, the hanging rod of the present invention can move up and down relative to the slide block, only by rotating the nut, so as to realize the up and down movement of the steel plate, and finally determine the elevation of the anchor bolts of the dust collector. It is worth noting that after the pouring is completed, when the anchor bolts of the dust collector need to be pulled out, the steel plate can be raised by rotating the nut, thereby pulling out the anchor bolts of the dust collector; of course, the anchor bolts of the dust collector of the present invention can Rotate upwards, so that the anchor bolts of the dust collector can be rotated during pouring, so as to avoid the anchor bolts of the dust collector being fixed too firmly and not easy to pull out.
作为一种优选,所述横杆的横截面为方形,所述滑块的横截面为方形。通过将横杆和滑块的横截面设置成方形的,在锁紧螺杆进行固定时,能够有效防止滑块与横杆相对转动。As a preference, the cross section of the cross bar is square, and the cross section of the slider is square. By arranging the cross-sections of the cross bar and the slide block to be square, when the locking screw is fixed, the relative rotation of the slide block and the cross bar can be effectively prevented.
按照上述实施例,便可很好地实现本发明。值得说明的是,基于上述结构设计的前提下,为解决同样的技术问题,即使在本发明上做出的一些无实质性的改动或润色,所采用的技术方案的实质仍然与本发明一样,故其也应当在本发明的保护范围内。According to the above-mentioned embodiments, the present invention can be well realized. It is worth noting that, based on the premise of the above-mentioned structural design, in order to solve the same technical problem, even if some insubstantial changes or polishes are made on the present invention, the essence of the adopted technical solution is still the same as the present invention. Therefore, it should also be within the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610235586.9A CN105735342B (en) | 2016-04-14 | 2016-04-14 | A kind of device of pre-buried plant dust catcher basis anchor (bolt) hole |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610235586.9A CN105735342B (en) | 2016-04-14 | 2016-04-14 | A kind of device of pre-buried plant dust catcher basis anchor (bolt) hole |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105735342A CN105735342A (en) | 2016-07-06 |
| CN105735342B true CN105735342B (en) | 2018-05-25 |
Family
ID=56255437
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610235586.9A Active CN105735342B (en) | 2016-04-14 | 2016-04-14 | A kind of device of pre-buried plant dust catcher basis anchor (bolt) hole |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105735342B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108104155A (en) * | 2017-12-28 | 2018-06-01 | 平煤神马建工集团有限公司 | A kind of linear pre-embedded bolt rapid installation device |
| CN108716221A (en) * | 2018-04-08 | 2018-10-30 | 五冶集团上海有限公司 | A kind of detachable pre-embedded bolt group supporting and mounting bracket and application method |
| CN112025582A (en) * | 2020-09-03 | 2020-12-04 | 中国三冶集团有限公司 | A reusable embedded bolt positioning device |
| CN113293794A (en) * | 2021-06-15 | 2021-08-24 | 青岛亿佰建工集团有限公司 | Mounting and construction method for embedded foundation bolts of steel structure plant foundation |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3793906B2 (en) * | 1998-02-18 | 2006-07-05 | 東芝プラントシステム株式会社 | Construction method of equipment foundation |
| CN203080547U (en) * | 2013-01-31 | 2013-07-24 | 北京燕化天钲建筑工程有限责任公司 | Locating mold of adjustable pre-buried foundation bolt |
| CN203924705U (en) * | 2014-06-23 | 2014-11-05 | 贵州平川塑业建材科技有限公司 | Rectangular beam die clamper |
| CN204059395U (en) * | 2014-07-14 | 2014-12-31 | 中国建筑第八工程局有限公司 | The pre-buried location structure of stone bolt |
| CN205502060U (en) * | 2016-04-14 | 2016-08-24 | 中国五冶集团有限公司 | Device in pre -buried power plant dust remover basis rag bolt hole |
-
2016
- 2016-04-14 CN CN201610235586.9A patent/CN105735342B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN105735342A (en) | 2016-07-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105735342B (en) | A kind of device of pre-buried plant dust catcher basis anchor (bolt) hole | |
| CN204235404U (en) | Sponge sanding block clothes hanger | |
| CN209902144U (en) | A new type of positioning device for main reinforcement of reinforcement cage | |
| CN107662880B (en) | An adjustment method for an adjustable spreader for flat-panel hoisting | |
| CN203223002U (en) | Large pre-burying board installing and leveling device | |
| CN203741866U (en) | Fixing frame structure for pre-buried screws in concrete foundation | |
| CN205502060U (en) | Device in pre -buried power plant dust remover basis rag bolt hole | |
| CN202865867U (en) | Pre-buried screw spatial locator | |
| CN109518942B (en) | Tool-based bracket system for controlling precision of two-dimensional component and application method thereof | |
| CN219196719U (en) | Cantilever support template for water inlet tower construction | |
| CN209384602U (en) | A kind of walltile level height location adjusting device | |
| CN206110137U (en) | Combination formula supporting adjusting device that can two -wayly adjust | |
| CN204843379U (en) | Railing production platform | |
| CN205817219U (en) | Photovoltaic module framing machine | |
| CN203237575U (en) | Backrest frame for glass transportation | |
| CN207684382U (en) | A kind of adjustable conveying equipment of the construction with dust-proof effect | |
| CN203180383U (en) | Mechanism case installation special device | |
| CN203947787U (en) | A kind of handling frame that i iron in pre-buried concrete fast, is accurately installed | |
| CN204370834U (en) | Supporting tool at the bottom of superposed beam beam | |
| CN220226284U (en) | Auxiliary installation device for welding ball net rack | |
| CN220666275U (en) | A positioning device for lattice columns | |
| CN205600196U (en) | Rack of welding section of jurisdiction steel construction | |
| CN204162236U (en) | Cage guide base unit | |
| CN106002186A (en) | Photovoltaic module framing machine | |
| CN221669462U (en) | Cable bridge support device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |