CN206447489U - A kind of fibrous cement cable pipe aids in installation apparatus - Google Patents
A kind of fibrous cement cable pipe aids in installation apparatus Download PDFInfo
- Publication number
- CN206447489U CN206447489U CN201621341202.3U CN201621341202U CN206447489U CN 206447489 U CN206447489 U CN 206447489U CN 201621341202 U CN201621341202 U CN 201621341202U CN 206447489 U CN206447489 U CN 206447489U
- Authority
- CN
- China
- Prior art keywords
- stand
- crossbeam
- electric hoist
- guide rod
- cable pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Installation apparatus is aided in the utility model discloses a kind of fibrous cement cable pipe, including:Stand, crossbeam, longeron, electric hoist and hoisting mechanism, the stand is inclined cross in the both sides of cable laying groove, the electric hoist is arranged on crossbeam, the crossbeam includes first crossbeam section and second cross beam section, the first crossbeam section is connected between stand, and the second cross beam section is welded in stand and stretched out outside stand;The hoisting mechanism includes boatswain chair, guide rod and slide, and the middle part of the boatswain chair is hung under electric hoist by steel wire rope, and the guide rod is at least provided with two groups, and guide rod is connected on slide, and the slide is connected with electric hoist, and the through hole that may pass through guide rod is also set up on boatswain chair.The utility model can the laying of auxiliary fiber cement cable tube, improve pipe laying efficiency, and can prevent cable tube from shifting in hoisting process, mitigate labor strength, it is ensured that pipe laying is neat.
Description
Technical field
The utility model is related to cable protection pipe field, specifically a kind of fibrous cement cable pipe auxiliary installation apparatus.
Background technology
Fibre cement cable protection pipe also known as fibre-cement pipe, fibrous cement cable pipe, are a kind of first using electric reaming etc.
Enter technique, using high-strength free of contamination vinylon fibre as disk material, add high-strength height and rub the raw materials such as vinylon, string, with height
Grade cement is primary raw material, and the cable protection pipe rolled is taken by copying, with (1500 DEG C of acid-alkali-corrosive-resisting, high temperature resistant
Never degenerate above) good heat dissipation (heat the moon coefficient ∠ 1.0), to lay coefficient be 0.96, current-carrying capacity is big, not magnetic conduction, single-core cable, does not produce
Raw vortex, inner wall smooth, coefficient of friction ∠ 0.30, easy cutting processing, therefore it is to apply at present more the advantages of service life is long
One of extensive cable protection pipe.
Fibrous cement cable pipe can successively be superimposed laying often in laying, due to lacking relevant device, can only be by artificial
Carry to it, and need people to enter in laying groove, and fibre-cement pipe weight is larger, single people is difficult to complete, therefore laying effect
Rate is not high, also has and carries out lifting operation using hanging apparatus, but because duct length is longer, and pipeline can be around hanging in hoisting process
Rope is rotated, it is necessary to by that could be transferred after artificial righting, there is larger uncertainty.
Utility model content
The purpose of this utility model is to provide a kind of fibrous cement cable pipe auxiliary installation apparatus, to solve above-mentioned background
The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical scheme:
A kind of fibrous cement cable pipe aids in installation apparatus, including:Base, stand, crossbeam, longeron, electric hoist and lifting
Mechanism, the stand is inclined cross in the both sides of cable laying groove, and the electric hoist is arranged on crossbeam, and it is horizontal that the crossbeam includes first
Beam section and second cross beam section, the first crossbeam section are connected between stand, and the second cross beam section is welded in stand and stretched
Go out outside stand;The hoisting mechanism includes boatswain chair, guide rod and slide, and the middle part of the boatswain chair is hung in electric hoist by steel wire rope
Under, the guide rod is at least provided with two groups, and guide rod is connected on slide, and the slide is connected with electric hoist, and being also set up on boatswain chair can
Through the through hole of guide rod.
It is used as further program of the utility model:It is fixedly installed below the boatswain chair for clamping fibrous cement cable pipe
Lifting rope.
It is used as further program of the utility model:It is configured in nail, ground nail to set ground nail on the base.
It is used as further program of the utility model:The base bottom installs roller.
It is used as further program of the utility model:The electric hoist connects controller.
Compared with prior art, the beneficial effects of the utility model are:The utility model being capable of auxiliary fiber cement cable
Pipe is laid, and improves pipe laying efficiency, and can prevent cable tube from shifting in hoisting process, mitigates workman's work strong
Degree, it is ensured that pipe laying is neat.
Brief description of the drawings
Fig. 1 is main structure diagram of the present utility model.
Fig. 2 is side structure schematic view of the present utility model.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer in Fig. 1~2, the utility model embodiment, a kind of fibrous cement cable pipe aids in installation apparatus, including:
Base 2, stand 3, crossbeam, longeron 43, electric hoist 5 and hoisting mechanism, the stand 3 are inclined cross in the both sides of cable laying groove, institute
State electric hoist 5 to be arranged on crossbeam, the crossbeam includes first crossbeam section 41 and second cross beam section 42, the first crossbeam section 41
It is connected between stand 3, the second cross beam section 42 is welded in stand 3 and stretched out outside stand 3, and electric hoist 5 can be on crossbeam
It is mobile, the fibrous cement cable pipe outside stand 3 is hung in above cable laying groove;The hoisting mechanism includes boatswain chair 8, guide rod 7
With slide 6, the middle part of the boatswain chair 8 is hung under electric hoist 5 by steel wire rope, and the guide rod 7 is at least provided with two groups, and guide rod 7 is consolidated
It is connected on slide 6, the slide 6 is connected with electric hoist 5, and electric hoist 5 can be followed to be moved on crossbeam, and drives guide rod 7 to move,
The through hole that may pass through guide rod 7 is also set up on boatswain chair 8, in hoisting process, boatswain chair 8 follows electric hoist 5 to move, and by guide rod 7
Restriction effect, guide plate 8 can only be moved up and down, and can not be deflected around steel wire rope, and this guarantees fibrous cement cable pipe
All the time along the direction of cable laying groove in hoisting process, will not occur angle skew, it is ensured that cable tube laying is neat, also keeps away
The trouble for needing manually to align is exempted from.
The lifting rope 12 for clamping fibrous cement cable pipe 9 is fixedly installed in the lower section of boatswain chair 8.
It is configured in nail, ground nail to set ground nail 1 on the base 2, ground nail 1 is squeezed into ground end, stand 3 can be played
Fixation.
Roller 11 is installed in the bottom of base 1, facilitates stand 3 to move.
The electric hoist 5 connects controller 10, and control electric hoist 5 is lifted and moved.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It may be appreciated other embodiment.
Claims (5)
1. a kind of fibrous cement cable pipe aids in installation apparatus, including:Base, stand, crossbeam, longeron, electric hoist and hoisting machine
Structure, it is characterised in that:The stand is inclined cross in the both sides of cable laying groove, and the electric hoist is arranged on crossbeam, the crossbeam
Including first crossbeam section and second cross beam section, the first crossbeam section is connected between stand, and the second cross beam section is welded on
In stand and outside stretching stand;The hoisting mechanism includes boatswain chair, guide rod and slide, and the middle part of the boatswain chair is hung by steel wire rope
Under electric hoist, the guide rod is at least provided with two groups, and guide rod is connected on slide, and the slide is connected with electric hoist, on boatswain chair
Also set up the through hole that may pass through guide rod.
2. a kind of fibrous cement cable pipe auxiliary installation apparatus according to claim 1, it is characterised in that:Under the boatswain chair
The lifting rope for clamping fibrous cement cable pipe is fixedly installed in side.
3. a kind of fibrous cement cable pipe auxiliary installation apparatus according to claim 1, it is characterised in that:On the base
It is configured in nail, ground nail to set ground nail.
4. a kind of fibrous cement cable pipe auxiliary installation apparatus according to claim 1 or 3, it is characterised in that:The bottom
Seat bottom is installed by roller.
5. a kind of fibrous cement cable pipe auxiliary installation apparatus according to claim 1, it is characterised in that:The electric hoist
Connect controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621341202.3U CN206447489U (en) | 2016-12-08 | 2016-12-08 | A kind of fibrous cement cable pipe aids in installation apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621341202.3U CN206447489U (en) | 2016-12-08 | 2016-12-08 | A kind of fibrous cement cable pipe aids in installation apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206447489U true CN206447489U (en) | 2017-08-29 |
Family
ID=59661494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621341202.3U Expired - Fee Related CN206447489U (en) | 2016-12-08 | 2016-12-08 | A kind of fibrous cement cable pipe aids in installation apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206447489U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109081142A (en) * | 2018-10-23 | 2018-12-25 | 国运科技(大连)有限公司 | A kind of ship unloaders multiple spot feeding-distribution device |
-
2016
- 2016-12-08 CN CN201621341202.3U patent/CN206447489U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109081142A (en) * | 2018-10-23 | 2018-12-25 | 国运科技(大连)有限公司 | A kind of ship unloaders multiple spot feeding-distribution device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206447489U (en) | A kind of fibrous cement cable pipe aids in installation apparatus | |
CN204369491U (en) | A kind of pipe hanger | |
CN202658867U (en) | Overhanging construction platform | |
CN203039301U (en) | A high-fall pipeline device | |
CN204675726U (en) | Purlin lifting auxiliary device | |
CN207312995U (en) | One kind self-control bridge-collision-avoidance wall form hanging device | |
CN206466801U (en) | A kind of lift cable unreeling rack | |
CN204456891U (en) | Mortar hopper is adopted mortar concrete to be transported to the device of floor | |
CN209721363U (en) | A kind of lifting pipeline auxiliary device | |
CN105443026B (en) | A kind of high-voltage line hanging ladder | |
CN207633776U (en) | A kind of pipe of cement transport device | |
CN213212933U (en) | Cable traction auxiliary device | |
CN204012480U (en) | A kind of cable pulling hoisting machine | |
CN202872257U (en) | Opening type slide cable hook | |
CN205978814U (en) | Oblique la shizhi gallows | |
CN206611117U (en) | A kind of electric cable support | |
CN204431204U (en) | Suspension ring reeving tool in roof in GIS hyperbaric chamber | |
CN201629520U (en) | Vertical cable installation speed controller | |
CN206232309U (en) | A kind of glomeration building concrete hollow block wall piece banding system | |
CN109873367A (en) | Aligning tool and construction method is straightened in a kind of magnesia cable of construction site | |
CN220538616U (en) | Municipal administration is with minor diameter calandria ramming device | |
CN209692282U (en) | A kind of pipe gallery cable bearer | |
CN206767586U (en) | A kind of deckboard lifting device | |
CN108868098A (en) | Support frame and its installation method are used outside a kind of novel hoistway | |
CN202625711U (en) | Simple and easy lift bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170829 Termination date: 20191208 |