CN206447489U - A kind of fibrous cement cable pipe aids in installation apparatus - Google Patents

A kind of fibrous cement cable pipe aids in installation apparatus Download PDF

Info

Publication number
CN206447489U
CN206447489U CN201621341202.3U CN201621341202U CN206447489U CN 206447489 U CN206447489 U CN 206447489U CN 201621341202 U CN201621341202 U CN 201621341202U CN 206447489 U CN206447489 U CN 206447489U
Authority
CN
China
Prior art keywords
stand
crossbeam
electric hoist
guide rod
cable pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621341202.3U
Other languages
Chinese (zh)
Inventor
王增泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN RITENPHY PIPE MANUFACTURING Co Ltd
Original Assignee
TIANJIN RITENPHY PIPE MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN RITENPHY PIPE MANUFACTURING Co Ltd filed Critical TIANJIN RITENPHY PIPE MANUFACTURING Co Ltd
Priority to CN201621341202.3U priority Critical patent/CN206447489U/en
Application granted granted Critical
Publication of CN206447489U publication Critical patent/CN206447489U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

Installation apparatus is aided in the utility model discloses a kind of fibrous cement cable pipe, including:Stand, crossbeam, longeron, electric hoist and hoisting mechanism, the stand is inclined cross in the both sides of cable laying groove, the electric hoist is arranged on crossbeam, the crossbeam includes first crossbeam section and second cross beam section, the first crossbeam section is connected between stand, and the second cross beam section is welded in stand and stretched out outside stand;The hoisting mechanism includes boatswain chair, guide rod and slide, and the middle part of the boatswain chair is hung under electric hoist by steel wire rope, and the guide rod is at least provided with two groups, and guide rod is connected on slide, and the slide is connected with electric hoist, and the through hole that may pass through guide rod is also set up on boatswain chair.The utility model can the laying of auxiliary fiber cement cable tube, improve pipe laying efficiency, and can prevent cable tube from shifting in hoisting process, mitigate labor strength, it is ensured that pipe laying is neat.

Description

A kind of fibrous cement cable pipe aids in installation apparatus
Technical field
The utility model is related to cable protection pipe field, specifically a kind of fibrous cement cable pipe auxiliary installation apparatus.
Background technology
Fibre cement cable protection pipe also known as fibre-cement pipe, fibrous cement cable pipe, are a kind of first using electric reaming etc. Enter technique, using high-strength free of contamination vinylon fibre as disk material, add high-strength height and rub the raw materials such as vinylon, string, with height Grade cement is primary raw material, and the cable protection pipe rolled is taken by copying, with (1500 DEG C of acid-alkali-corrosive-resisting, high temperature resistant Never degenerate above) good heat dissipation (heat the moon coefficient ∠ 1.0), to lay coefficient be 0.96, current-carrying capacity is big, not magnetic conduction, single-core cable, does not produce Raw vortex, inner wall smooth, coefficient of friction ∠ 0.30, easy cutting processing, therefore it is to apply at present more the advantages of service life is long One of extensive cable protection pipe.
Fibrous cement cable pipe can successively be superimposed laying often in laying, due to lacking relevant device, can only be by artificial Carry to it, and need people to enter in laying groove, and fibre-cement pipe weight is larger, single people is difficult to complete, therefore laying effect Rate is not high, also has and carries out lifting operation using hanging apparatus, but because duct length is longer, and pipeline can be around hanging in hoisting process Rope is rotated, it is necessary to by that could be transferred after artificial righting, there is larger uncertainty.
Utility model content
The purpose of this utility model is to provide a kind of fibrous cement cable pipe auxiliary installation apparatus, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical scheme:
A kind of fibrous cement cable pipe aids in installation apparatus, including:Base, stand, crossbeam, longeron, electric hoist and lifting Mechanism, the stand is inclined cross in the both sides of cable laying groove, and the electric hoist is arranged on crossbeam, and it is horizontal that the crossbeam includes first Beam section and second cross beam section, the first crossbeam section are connected between stand, and the second cross beam section is welded in stand and stretched Go out outside stand;The hoisting mechanism includes boatswain chair, guide rod and slide, and the middle part of the boatswain chair is hung in electric hoist by steel wire rope Under, the guide rod is at least provided with two groups, and guide rod is connected on slide, and the slide is connected with electric hoist, and being also set up on boatswain chair can Through the through hole of guide rod.
It is used as further program of the utility model:It is fixedly installed below the boatswain chair for clamping fibrous cement cable pipe Lifting rope.
It is used as further program of the utility model:It is configured in nail, ground nail to set ground nail on the base.
It is used as further program of the utility model:The base bottom installs roller.
It is used as further program of the utility model:The electric hoist connects controller.
Compared with prior art, the beneficial effects of the utility model are:The utility model being capable of auxiliary fiber cement cable Pipe is laid, and improves pipe laying efficiency, and can prevent cable tube from shifting in hoisting process, mitigates workman's work strong Degree, it is ensured that pipe laying is neat.
Brief description of the drawings
Fig. 1 is main structure diagram of the present utility model.
Fig. 2 is side structure schematic view of the present utility model.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer in Fig. 1~2, the utility model embodiment, a kind of fibrous cement cable pipe aids in installation apparatus, including: Base 2, stand 3, crossbeam, longeron 43, electric hoist 5 and hoisting mechanism, the stand 3 are inclined cross in the both sides of cable laying groove, institute State electric hoist 5 to be arranged on crossbeam, the crossbeam includes first crossbeam section 41 and second cross beam section 42, the first crossbeam section 41 It is connected between stand 3, the second cross beam section 42 is welded in stand 3 and stretched out outside stand 3, and electric hoist 5 can be on crossbeam It is mobile, the fibrous cement cable pipe outside stand 3 is hung in above cable laying groove;The hoisting mechanism includes boatswain chair 8, guide rod 7 With slide 6, the middle part of the boatswain chair 8 is hung under electric hoist 5 by steel wire rope, and the guide rod 7 is at least provided with two groups, and guide rod 7 is consolidated It is connected on slide 6, the slide 6 is connected with electric hoist 5, and electric hoist 5 can be followed to be moved on crossbeam, and drives guide rod 7 to move, The through hole that may pass through guide rod 7 is also set up on boatswain chair 8, in hoisting process, boatswain chair 8 follows electric hoist 5 to move, and by guide rod 7 Restriction effect, guide plate 8 can only be moved up and down, and can not be deflected around steel wire rope, and this guarantees fibrous cement cable pipe All the time along the direction of cable laying groove in hoisting process, will not occur angle skew, it is ensured that cable tube laying is neat, also keeps away The trouble for needing manually to align is exempted from.
The lifting rope 12 for clamping fibrous cement cable pipe 9 is fixedly installed in the lower section of boatswain chair 8.
It is configured in nail, ground nail to set ground nail 1 on the base 2, ground nail 1 is squeezed into ground end, stand 3 can be played Fixation.
Roller 11 is installed in the bottom of base 1, facilitates stand 3 to move.
The electric hoist 5 connects controller 10, and control electric hoist 5 is lifted and moved.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It may be appreciated other embodiment.

Claims (5)

1. a kind of fibrous cement cable pipe aids in installation apparatus, including:Base, stand, crossbeam, longeron, electric hoist and hoisting machine Structure, it is characterised in that:The stand is inclined cross in the both sides of cable laying groove, and the electric hoist is arranged on crossbeam, the crossbeam Including first crossbeam section and second cross beam section, the first crossbeam section is connected between stand, and the second cross beam section is welded on In stand and outside stretching stand;The hoisting mechanism includes boatswain chair, guide rod and slide, and the middle part of the boatswain chair is hung by steel wire rope Under electric hoist, the guide rod is at least provided with two groups, and guide rod is connected on slide, and the slide is connected with electric hoist, on boatswain chair Also set up the through hole that may pass through guide rod.
2. a kind of fibrous cement cable pipe auxiliary installation apparatus according to claim 1, it is characterised in that:Under the boatswain chair The lifting rope for clamping fibrous cement cable pipe is fixedly installed in side.
3. a kind of fibrous cement cable pipe auxiliary installation apparatus according to claim 1, it is characterised in that:On the base It is configured in nail, ground nail to set ground nail.
4. a kind of fibrous cement cable pipe auxiliary installation apparatus according to claim 1 or 3, it is characterised in that:The bottom Seat bottom is installed by roller.
5. a kind of fibrous cement cable pipe auxiliary installation apparatus according to claim 1, it is characterised in that:The electric hoist Connect controller.
CN201621341202.3U 2016-12-08 2016-12-08 A kind of fibrous cement cable pipe aids in installation apparatus Expired - Fee Related CN206447489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621341202.3U CN206447489U (en) 2016-12-08 2016-12-08 A kind of fibrous cement cable pipe aids in installation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621341202.3U CN206447489U (en) 2016-12-08 2016-12-08 A kind of fibrous cement cable pipe aids in installation apparatus

Publications (1)

Publication Number Publication Date
CN206447489U true CN206447489U (en) 2017-08-29

Family

ID=59661494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621341202.3U Expired - Fee Related CN206447489U (en) 2016-12-08 2016-12-08 A kind of fibrous cement cable pipe aids in installation apparatus

Country Status (1)

Country Link
CN (1) CN206447489U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109081142A (en) * 2018-10-23 2018-12-25 国运科技(大连)有限公司 A kind of ship unloaders multiple spot feeding-distribution device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109081142A (en) * 2018-10-23 2018-12-25 国运科技(大连)有限公司 A kind of ship unloaders multiple spot feeding-distribution device

Similar Documents

Publication Publication Date Title
CN206447489U (en) A kind of fibrous cement cable pipe aids in installation apparatus
CN204369491U (en) A kind of pipe hanger
CN202658867U (en) Overhanging construction platform
CN203039301U (en) A high-fall pipeline device
CN204675726U (en) Purlin lifting auxiliary device
CN207312995U (en) One kind self-control bridge-collision-avoidance wall form hanging device
CN206466801U (en) A kind of lift cable unreeling rack
CN204456891U (en) Mortar hopper is adopted mortar concrete to be transported to the device of floor
CN209721363U (en) A kind of lifting pipeline auxiliary device
CN105443026B (en) A kind of high-voltage line hanging ladder
CN207633776U (en) A kind of pipe of cement transport device
CN213212933U (en) Cable traction auxiliary device
CN204012480U (en) A kind of cable pulling hoisting machine
CN202872257U (en) Opening type slide cable hook
CN205978814U (en) Oblique la shizhi gallows
CN206611117U (en) A kind of electric cable support
CN204431204U (en) Suspension ring reeving tool in roof in GIS hyperbaric chamber
CN201629520U (en) Vertical cable installation speed controller
CN206232309U (en) A kind of glomeration building concrete hollow block wall piece banding system
CN109873367A (en) Aligning tool and construction method is straightened in a kind of magnesia cable of construction site
CN220538616U (en) Municipal administration is with minor diameter calandria ramming device
CN209692282U (en) A kind of pipe gallery cable bearer
CN206767586U (en) A kind of deckboard lifting device
CN108868098A (en) Support frame and its installation method are used outside a kind of novel hoistway
CN202625711U (en) Simple and easy lift bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170829

Termination date: 20191208