CN206440206U - A kind of pre-buried copper tip of railway roadbed highly controls chi - Google Patents

A kind of pre-buried copper tip of railway roadbed highly controls chi Download PDF

Info

Publication number
CN206440206U
CN206440206U CN201621137398.4U CN201621137398U CN206440206U CN 206440206 U CN206440206 U CN 206440206U CN 201621137398 U CN201621137398 U CN 201621137398U CN 206440206 U CN206440206 U CN 206440206U
Authority
CN
China
Prior art keywords
inverted
supporting leg
type
square
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621137398.4U
Other languages
Chinese (zh)
Inventor
刘绩
陈付平
赵文君
刘大伟
张红乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201621137398.4U priority Critical patent/CN206440206U/en
Application granted granted Critical
Publication of CN206440206U publication Critical patent/CN206440206U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)
  • Length-Measuring Instruments Using Mechanical Means (AREA)

Abstract

The utility model belongs to a kind of pre-buried copper tip of railway roadbed and highly controls chi, is made up of horizon rule pipe, inverted " t " type measurement supporting leg two parts, the inverted " t " type measurement supporting leg passes through the square through hole set on horizon rule pipe, is fixedly connected using fastening bolt.The utility model has following advantage compared with prior art, mainly:1st, directly perceived, quick pre-buried terminal apical side height, the measurement work without carrying out other forms can be determined;2nd, can be in the continuously display pre-buried terminal height of job position, you can while carrying out pre-buried terminal welding job using the measurement supporting leg design of inverted " t " type;3rd, using the movable inverted " t " type measurement supporting leg design with scale, the measurement of pre-buried terminal height and positioning work of various different designs height are applicable to.

Description

A kind of pre-buried copper tip of railway roadbed highly controls chi
[technical field]
The utility model belongs to engineering technology file, is related to the pre-buried copper tip of ballast bed of track and highly controls the design of chi to grind Hair.
[background technology]
In China's track engineering, copper tip fully makes as railway roadbed drainage terminal, anti-fan stream terminal, measurement terminal etc. With.Generally, design requirement copper tip surface and railway roadbed surface level, error is between 0mm~+3mm.At present, scene is applied Work mainly still uses tape measure, substantially measures height of the rail away from copper tip and is positioned, because rail and copper tip are in sky Between it is upper and non-intersect, therefore the precision that this mode is measured is extremely limited, it is impossible to meets construction requirement, often results in railway roadbed and pour After the completion of, copper tip is too high or too low, and very big trouble is brought to follow-up electromechanical construction.
[content of the invention]
The purpose of this utility model is:Design a kind of pre-buried copper tip of special railway roadbed and highly control chi, to meet copper The demand of the pre-buried operation of terminal.
The utility model is made up of horizon rule pipe, inverted " t " type measurement supporting leg two parts.Inverted " t " type measurement supporting leg passes through water The square through hole set on leveling ruler pipe, is fixedly connected using fastening bolt.
Horizon rule pipe is made up of customization square tube, reading magnifier, handle.Reading magnifier is fixed by screws in customization side The left and right termination of pipe, handle is arranged on the middle part top of customization square tube by screw.Customization square tube left and right sides corresponding positions are installed Appropriately sized square through hole is put, to measure supporting leg through inverted " t " type.
Inverted " t " type measurement supporting leg is made up of miter square bar, horizontal gauge head, and miter square bar is erected at the middle part of horizontal gauge head, It is fixed using screw, middle part relevant position indicates scale.Horizontal gauge head is made up of a relatively short square tube.
The pre-buried copper tip of railway roadbed highly controls chi application method.
1st, according to the track structure size that provides of design, calculate road bed surface and rail surface the distance between, as copper Distance of the terminal surface away from rail surface.
In the square through hole that the 2nd, inverted " t " type is measured to the both sides of supporting leg insertion horizon rule pipe 1, reading is adjusted, is horizon rule pipe Distance between bottom surface and horizontal gauge head bottom surface is equal to the distance of copper tip identity distance rail surface.
3rd, horizon rule pipe is placed on two strands of tracks, sliding horizon rule pipe makes the horizontal pre-buried position of gauge head covering copper tip Put.
4th, horizontal gauge head bottom surface is withstood into copper tip face in pre-buried position, at this moment copper tip is highly design height, i.e., It can be welded.Notice that terminal surface should not be firmly excessive when withstanding horizontal gauge head bottom surface, cause horizon rule pipe side to be taken off with rail From.
The utility model has following advantage compared with prior art, mainly:
1st, directly perceived, quick pre-buried terminal apical side height, the measurement work without carrying out other forms can be determined.
2nd, can be in the continuously display pre-buried terminal height of job position, you can simultaneously using the measurement supporting leg design of inverted " t " type Carry out pre-buried terminal welding job.
3rd, using the movable inverted " t " type measurement supporting leg design with scale, it is applicable to the pre- of various different designs height Bury terminal height measurement and positioning work.
[brief description of the drawings]
The pre-buried copper tip of Fig. 1 a-1c railway roadbeds highly controls chi structure composition three-view diagram
Fig. 2 horizon rules tubular construction composition figure
Fig. 3 inverted " t "s type measurement leg structure composition figure
The pre-buried copper tip of Fig. 4 a-4c railway roadbeds highly controls chi to use schematic diagram
Description of symbols in figure
1 horizon rule pipe, 2 inverted " t " types measurement supporting leg, 1-1 customization square tubes, 1-2 reading magnifiers, 1-3 handles, 2-1 is vertical Chi bar, the horizontal gauge heads of 2-2,3 copper tips, 4 rail.
[embodiment]
For make the utility model purpose, principle and construction become apparent from understanding, below in conjunction with drawings and the specific embodiments make into One step is illustrated.
As illustrated by figures 1 a-1 c, a kind of pre-buried copper tip of special railway roadbed highly controls chi, to meet the pre-buried operation of copper tip Demand.It is main to be made up of horizon rule pipe 1, inverted " t " type measurement two parts of supporting leg 2.Inverted " t " type measurement supporting leg 2 passes through horizon rule The square through hole set on pipe 1, is fixedly connected using fastening bolt.
As shown in Fig. 2 horizon rule pipe 1 is made up of customization square tube 1-1, reading magnifier 1-2, handle 1-3.Reading magnifier 1-2 is fixed by screws in customization square tube 1-1 left and right termination, and handle 1-3 is arranged on customization square tube 1-1 middle part by screw Top.Customize square tube 1-1 left and right sides relevant position and appropriately sized square through hole is set, to measure branch through inverted " t " type Leg 2.
As shown in figure 3, inverted " t " type measurement supporting leg 2 is made up of miter square bar 2-1, horizontal gauge head 2-2, miter square bar 2-1 is erected Horizontal gauge head 2-2 middle part is stood in, is fixed using screw, middle part relevant position indicates scale.Horizontal gauge head 2-2 is by one Relatively short square tube composition.
The pre-buried copper tip of railway roadbed highly controls chi application method.
1st, according to the track structure size that provides of design, calculate road bed surface and rail surface the distance between, as copper Distance of the terminal surface away from rail surface.
2nd, inverted " t " type measurement supporting leg 2 is inserted in the square through hole of the both sides of horizon rule pipe 1, adjusts reading, be horizon rule pipe Distance between 1 bottom surface and horizontal gauge head 2-2 bottom surfaces is equal to the distance of copper tip identity distance rail surface.
3rd, horizon rule pipe 1 is placed on two strands of tracks, sliding horizon rule pipe 1 makes horizontal gauge head 2-2 coverings copper tip pre- Bury position.
4th, horizontal gauge head 2-2 bottom surfaces are withstood into copper tip face in pre-buried position, at this moment copper tip is highly design height, It can be welded.Notice that terminal surface should not be firmly excessive when withstanding horizontal gauge head 2-2 bottom surfaces, cause the side of horizon rule pipe 1 with Rail departs from.As depicted in figure 4 a-4 c.

Claims (2)

1. a kind of pre-buried copper tip of railway roadbed highly controls chi, it is characterised in that measure supporting leg two by horizon rule pipe, inverted " t " type It is grouped into, the inverted " t " type measurement supporting leg passes through the square through hole set on horizon rule pipe, and company is fixed using fastening bolt Connect;
The horizon rule pipe is made up of customization square tube, reading magnifier, handle, and the reading magnifier is fixed by screws in fixed The left and right termination of square tube processed, handle is arranged on the middle part top of customization square tube by screw,
Customize square tube left and right sides relevant position and appropriately sized square through hole is set, to measure supporting leg through inverted " t " type.
2. a kind of pre-buried copper tip of railway roadbed as claimed in claim 1 highly controls chi, it is characterised in that the inverted " t " type is surveyed Amount supporting leg is made up of miter square bar, horizontal gauge head, and miter square bar is erected at the middle part of horizontal gauge head, is fixed using screw, Middle part relevant position indicates scale, and the horizontal gauge head is made up of a relatively short square tube.
CN201621137398.4U 2016-10-19 2016-10-19 A kind of pre-buried copper tip of railway roadbed highly controls chi Expired - Fee Related CN206440206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621137398.4U CN206440206U (en) 2016-10-19 2016-10-19 A kind of pre-buried copper tip of railway roadbed highly controls chi

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621137398.4U CN206440206U (en) 2016-10-19 2016-10-19 A kind of pre-buried copper tip of railway roadbed highly controls chi

Publications (1)

Publication Number Publication Date
CN206440206U true CN206440206U (en) 2017-08-25

Family

ID=59644782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621137398.4U Expired - Fee Related CN206440206U (en) 2016-10-19 2016-10-19 A kind of pre-buried copper tip of railway roadbed highly controls chi

Country Status (1)

Country Link
CN (1) CN206440206U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301266A (en) * 2018-01-19 2018-07-20 中铁上海工程局集团有限公司 Urban track traffic railway roadbed construction copper tip height controller and application method
CN109112904A (en) * 2018-10-22 2019-01-01 华东交通大学 Whether one kind is needed reinforcement evaluation method based on apparent measurement road-bridge transition section roadbed
CN111023943A (en) * 2020-01-22 2020-04-17 中铁五局集团有限公司 Multi-functional scale of measurationing of ballastless track
CN111299911A (en) * 2019-10-31 2020-06-19 中铁一局集团新运工程有限公司 Labyrinth flow elimination terminal welding control device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301266A (en) * 2018-01-19 2018-07-20 中铁上海工程局集团有限公司 Urban track traffic railway roadbed construction copper tip height controller and application method
CN109112904A (en) * 2018-10-22 2019-01-01 华东交通大学 Whether one kind is needed reinforcement evaluation method based on apparent measurement road-bridge transition section roadbed
CN109112904B (en) * 2018-10-22 2020-06-23 华东交通大学 Evaluation method for judging whether roadbed of road bridge transition section needs to be reinforced based on apparent measurement
CN111299911A (en) * 2019-10-31 2020-06-19 中铁一局集团新运工程有限公司 Labyrinth flow elimination terminal welding control device
CN111299911B (en) * 2019-10-31 2022-07-19 中铁一局集团新运工程有限公司 Labyrinth flow elimination terminal welding control device
CN111023943A (en) * 2020-01-22 2020-04-17 中铁五局集团有限公司 Multi-functional scale of measurationing of ballastless track

Similar Documents

Publication Publication Date Title
CN206440206U (en) A kind of pre-buried copper tip of railway roadbed highly controls chi
CN102864745B (en) The girder pre-stressed pipeline three-dimensional locating device of PC
CN107695372A (en) A kind of steel tube drilling device
CN201115893Y (en) Saddle port cutting machine
CN211291264U (en) Measuring device for building structure engineering
CN102296497A (en) CRTSII type plate type turnout ballastless track turnout plate fine adjustment construction method
CN109468896A (en) Non-fragment orbit track pouring construction localization tool
CN208042973U (en) Accurately crack vertical strain monitoring device
CN109137737A (en) Cable guide pipe positioning device
CN203704831U (en) Expansion joint measuring scale
CN205399104U (en) Adjustment of support rail groove rail and locking device
CN104141023B (en) Blast furnace slag iron runner Cathetometer and method
CN211114873U (en) Concrete leveling device for floor construction
CN206496717U (en) A kind of medium-and low-speed maglev gauge measures frock
CN209673084U (en) A kind of full framing preloading monitoring device
CN204924241U (en) Highway side slope measuring apparatu
CN216845999U (en) Lower horizontal column pier measuring tool
CN206944932U (en) A kind of urban track traffic trackside equipment installation site measuring system
CN206192238U (en) Welded joint flange of rail welds muscle height measurement device
CN208309399U (en) A kind of mobile awning of beam portion construction
CN206289475U (en) CRTSI type ballastless track bed board template elevation calibration controllers
CN205537433U (en) Asphalt pavement paving depth measurement ruler
CN206399330U (en) A kind of novel bridge pier stud diameter measuring device
CN111765835A (en) Quick measuring device of switch rail spare vector degree of buckling
CN206223159U (en) A kind of measurement apparatus of well lane engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170825