CN206438603U - A kind of rigidity staggered truss steel structure system in a balanced way - Google Patents
A kind of rigidity staggered truss steel structure system in a balanced way Download PDFInfo
- Publication number
- CN206438603U CN206438603U CN201621261105.3U CN201621261105U CN206438603U CN 206438603 U CN206438603 U CN 206438603U CN 201621261105 U CN201621261105 U CN 201621261105U CN 206438603 U CN206438603 U CN 206438603U
- Authority
- CN
- China
- Prior art keywords
- steel structure
- structure system
- rigidity
- truss steel
- staggered
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 31
- 239000010959 steel Substances 0.000 title claims abstract description 31
- 239000011229 interlayer Substances 0.000 claims abstract description 9
- 238000009432 framing Methods 0.000 claims description 12
- 238000003466 welding Methods 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 239000004744 fabric Substances 0.000 description 2
- 239000010410 layer Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621261105.3U CN206438603U (en) | 2016-11-22 | 2016-11-22 | A kind of rigidity staggered truss steel structure system in a balanced way |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621261105.3U CN206438603U (en) | 2016-11-22 | 2016-11-22 | A kind of rigidity staggered truss steel structure system in a balanced way |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206438603U true CN206438603U (en) | 2017-08-25 |
Family
ID=59644840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621261105.3U Active CN206438603U (en) | 2016-11-22 | 2016-11-22 | A kind of rigidity staggered truss steel structure system in a balanced way |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206438603U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107338865A (en) * | 2016-11-22 | 2017-11-10 | 浙江绿筑集成科技有限公司 | A kind of balanced staggered truss steel structure system of rigidity |
-
2016
- 2016-11-22 CN CN201621261105.3U patent/CN206438603U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107338865A (en) * | 2016-11-22 | 2017-11-10 | 浙江绿筑集成科技有限公司 | A kind of balanced staggered truss steel structure system of rigidity |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979162B (en) | Multi-story high-rise assembled steel structure frame - prestressed centrally-braced system | |
CN204753813U (en) | Steel construction conversion truss | |
CN103114648B (en) | Multi-high-layer assembly type steel structure frame-center supporting system | |
CN102979163B (en) | Multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system | |
CN206220247U (en) | A kind of novel fabricated cross support post | |
CN102635163A (en) | Assembled monolithic multilayer long-span bidirectional multi-span building with space steel grid box-type structures | |
CN102979166A (en) | Multi-story high-rise assembled steel structure frame - eccentrically-braced system | |
CN102758493A (en) | Steel plate built-in eccentric support type steel plate shear wall | |
CN106677397A (en) | Large-span fabricated mixed type steel open web sandwich plate floor system and manufacturing method | |
CN104895229A (en) | Prefabricated steel joint concrete slab-column structure and hoisting method thereof | |
CN107338865A (en) | A kind of balanced staggered truss steel structure system of rigidity | |
CN206438603U (en) | A kind of rigidity staggered truss steel structure system in a balanced way | |
CN206233656U (en) | Steel frame mill building structure | |
CN207295986U (en) | Assembled interlocks Bailey bracket steel building | |
CN107419806A (en) | A kind of grid solid beam-string structure system across X-type greatly and its construction method | |
CN105625567A (en) | High-rise and super high-rise concrete orthogonal-diagonal space lattice box type cylinder-in-cylinder structure and manufacturing method | |
CN206015917U (en) | A kind of outside reinforcement box column H profile steel beam connecting node | |
CN105421638A (en) | Hung interlayer structure and construction method thereof | |
CN204876252U (en) | Prefabricated assembled steel node concrete slab post structure | |
CN205557946U (en) | Novel truss composite floor slab | |
CN105133494B (en) | Cable-stayed bridge steel reinforced concrete synthetic rope beam anchoring structure | |
CN206360205U (en) | large-span concrete truss structure | |
CN203514510U (en) | Profile inner distributed cable supported net rack structure | |
CN207017489U (en) | There is the reinforced prefabricated member of biasing hole wall for assembling steel building | |
CN206233430U (en) | Assembly concrete floorboard system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Dongyue Green Building Integrated Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2019330000016 Denomination of utility model: Staggered-truss steel structure system with uniform stiffness Granted publication date: 20170825 License type: Common License Record date: 20190917 Assignee: Ningxia Green Building Integrated Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2019330000014 Denomination of utility model: Staggered-truss steel structure system with uniform stiffness Granted publication date: 20170825 License type: Common License Record date: 20190917 Assignee: Qinhuangdao Seiko Green Building Integrated Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2019330000017 Denomination of utility model: Staggered-truss steel structure system with uniform stiffness Granted publication date: 20170825 License type: Common License Record date: 20190917 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Henan Green Building Technology Development Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2019330000015 Denomination of utility model: Staggered-truss steel structure system with uniform stiffness Granted publication date: 20170825 License type: Common License Record date: 20190919 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Anhui changgu New Construction Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2020330000055 Denomination of utility model: A staggered truss steel structure system with balanced stiffness Granted publication date: 20170825 License type: Common License Record date: 20200806 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shandong Tianyuan Jinggong Green Integrated Building Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2020330000115 Denomination of utility model: A staggered truss steel structure system with balanced stiffness Granted publication date: 20170825 License type: Common License Record date: 20201216 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2023990000037 Denomination of utility model: A Staggered Truss Steel Structure System with Equilibrium Stiffness Granted publication date: 20170825 License type: Common License Record date: 20230113 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2023980034645 Denomination of utility model: A Staggered Truss Steel Structure System with Equilibrium Stiffness Granted publication date: 20170825 License type: Common License Record date: 20230413 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2023980034833 Denomination of utility model: A Staggered Truss Steel Structure System with Equilibrium Stiffness Granted publication date: 20170825 License type: Common License Record date: 20230421 |