CN206408469U - Pillow equipment is changed in a kind of overhaul - Google Patents

Pillow equipment is changed in a kind of overhaul Download PDF

Info

Publication number
CN206408469U
CN206408469U CN201621425444.0U CN201621425444U CN206408469U CN 206408469 U CN206408469 U CN 206408469U CN 201621425444 U CN201621425444 U CN 201621425444U CN 206408469 U CN206408469 U CN 206408469U
Authority
CN
China
Prior art keywords
plate
equipment
sleeper
excavator
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621425444.0U
Other languages
Chinese (zh)
Inventor
刘化忠
申景华
孙中华
顾瑞伟
周世毅
方东
丛宏堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PENGLAI AOSIBO MACHINERY Co Ltd
Original Assignee
PENGLAI AOSIBO MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PENGLAI AOSIBO MACHINERY Co Ltd filed Critical PENGLAI AOSIBO MACHINERY Co Ltd
Priority to CN201621425444.0U priority Critical patent/CN206408469U/en
Application granted granted Critical
Publication of CN206408469U publication Critical patent/CN206408469U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to technical field of rail traffic, pillow equipment is changed in especially a kind of overhaul, including excavator main body, flat car device, robot arm device, sleeper replacement device, conveyer belt, disclosed overhaul changes pillow method to substitute method and conversion method, equipment body is used as by using excavator, rotatable robot arm device is fixedly mounted in Vehicular body front, in lower car body space mounting conveyer belt, flat car is mounted in rear vehicle, sleeper replacement device is installed in robot arm device front portion, using substitute and replace change pillow method, substantially increase and change pillow operating efficiency height, labour can effectively be saved, sleeper replacement quality is high;By installing conveyer belt and mounting flat car, can effectively adapt to the narrow road section operation such as bridge, tunnel can effectively adapt to the operating environment of complexity, easy to use;By using duckbill sleeper tong, the contact area of sleeper tong and sleeper is increased, the stability of clamping sleeper is improved, it is safe and reliable.

Description

Pillow equipment is changed in a kind of overhaul
Technical field
The utility model is related to technical field of rail traffic, and pillow equipment is changed in especially a kind of overhaul.
Background technology
Railroad sleeper is under the use of long-term high load capacity, and sleeper bolt is easily deformed and damaged because of corrosion etc., because of rail Rest the head on bolt cast to be arranged on sleeper, it is therefore desirable to change sleeper.Existing overhaul changes pillow operation typically using artificial Replacement operation pattern, and artificial replacement operation pattern has that personnel labor intensity is big, operating efficiency is low, sleeper during pillow is changed Change the problems such as quality cannot be guaranteed;The existing overhaul pillow car that switches tracks is in the experimental stage, there is also many deficiencies, such as:Steel Rail needs to cut off and raise, rail easily invades the limitation of the conditions such as limit between line, and construction organization difficulty is big, and line facility quality is influenceed It is larger, and old sleeper after changing is usually put in track side, it is necessary to secondary operation, wastes a large amount of labours.
Utility model content
To solve the technical deficiency present in prior art, the utility model changes pillow equipment there is provided a kind of overhaul, the dress Put operating efficiency high, can effectively save labour, sleeper replacement quality is high, can effectively adapt to the operating environment of complexity, user Just.
The utility model solves its technical problem the technical scheme adopted is that pillow equipment is changed in a kind of overhaul, including is excavated Owner's body, flat car device, robot arm device, sleeper replacement device, conveyer belt;Excavator main body includes excavator cab, Excavate machine bottom board, excavator hook, excavator alloy wheel, excavator liftable steel wheel;Flat car device includes flat car bottom Plate, flat car alloy wheel, connects chain, old sleeper placement section, new sleeper placement section, flat car rotating device, flat car machinery Arm rotation unit, flat car mechanical arm, flat car folder pillow device, flat car support arm, sleeper places plate;Robot arm device includes The big arm rotation unit of equipment, equipment large arm, equipment forearm, the small arm rotation unit of equipment;Sleeper replacement device includes pedestal, sleeper Fixture, takes off tiny fragments of stone, coal, etc. plate, slewing equipment;Sleeper fixture includes pedestal, slewing equipment, first hydraulic cylinder, second hydraulic cylinder, clamp first Clamping plate, clamp second clamping plate;Taking off tiny fragments of stone, coal, etc. plate includes taking off in tiny fragments of stone, coal, etc. plate main body, rail to take off outside tiny fragments of stone, coal, etc. plate, the first rail to take off outside tiny fragments of stone, coal, etc. plate, the second rail taking off the tiny fragments of stone, coal, etc. Plate, the first clamp rail mouthful, the second clamp rail mouthful, roller, reinforcing bar body, raised sawtooth, slewing equipment, pedestal;Conveyer belt includes conveyer belt Main body, conveyer belt chaining, disk roller;Excavator cab is located at excavator body top, excavates machine bottom board and is located at excavator main body Middle part, excavator hook is located at excavator back body, and excavator alloy wheel and excavator liftable steel wheel are located at excavator Lower body part, excavator alloy wheel and excavator liftable steel wheel are connected with excavating machine bottom board, excavator liftable steel wheel Positioned at excavator alloy wheel front and rear part;Flat car alloy wheel lower contacts railway, top connection flat board car bottom plate, flat car The excavator hook of connects chain and excavator back body be connected, old sleeper placement section is put with new sleeper placement section positioned at sleeper Put on plate, sleeper is placed plate and is located above flat board car bottom plate, flat car rotating device is located at sleeper and places plate top, two ends difference Connect sleeper and place plate and flat car support arm, flat car machinery arm rotation unit two ends connect flat car support arm peace respectively Wooden handcart mechanical arm, flat car mechanical arm two ends connect the peaceful wooden handcart folder pillow device of the mechanical arm rotation unit of flat car respectively;Equipment Big arm rotation unit, which is located at, to be excavated on machine bottom board, and equipment large arm two ends connect the big arm rotation unit of equipment and the rotation of equipment forearm respectively Rotary device, the small arm rotation unit two ends of equipment connect equipment large arm and equipment forearm respectively;Pedestal one end is connected with equipment forearm, The other end is by slewing equipment respectively with sleeper fixture and taking off tiny fragments of stone, coal, etc. plate and being connected;It is right before and after clamp first clamping plate and clamp second clamping plate Title is hinged on slewing equipment lower end, and clamp first clamping plate and clamp second clamping plate collectively constitute sleeper tong, first hydraulic cylinder and The cylinder ends of second hydraulic cylinder and piston rod end are hinged with clamp first clamping plate and clamp second clamping plate respectively, revolution dress Put connection pedestal and sleeper fixture;Take off outside tiny fragments of stone, coal, etc. plate, the first rail to take off outside tiny fragments of stone, coal, etc. plate and the second rail in rail and take off tiny fragments of stone, coal, etc. plate and all taking off tiny fragments of stone, coal, etc. plate main body On, collectively constitute and take off tiny fragments of stone, coal, etc. plate main body, the first clamp rail mouthful takes off hollow space between tiny fragments of stone, coal, etc. plate, second to be taken off in rail outside tiny fragments of stone, coal, etc. plate and the first rail Clamp rail mouthful takes off hollow space between tiny fragments of stone, coal, etc. plate to be taken off in rail outside tiny fragments of stone, coal, etc. plate and the second rail, roller is located at the first clamp rail mouthful and the second clamp rail mouthful Tiny fragments of stone, coal, etc. plate body interior is taken off in rail mouthful top, reinforcing bar body injection, and tiny fragments of stone, coal, etc. plate and pedestal are taken off in slewing equipment connection, and pedestal connects equipment forearm, Raised sawtooth, which is arranged on, takes off tiny fragments of stone, coal, etc. plate bottom part body;Conveyer belt main body is connected by conveyer belt chaining with excavating machine bottom board, disk roller Intersect the vacant position in end with conveyer belt chaining positioned at conveyer belt main body;Flat car device passes through connects chain and excavator back body Excavator hook be connected;Robot arm device is located at excavator body front part, is connected with excavating machine bottom board;Sleeper replacement is filled It is anterior setting in robot arm device, it is connected with equipment forearm;Conveyer belt, which is located at, excavates machine bottom board bottom and excavator alloy car Interior volume between wheel.
Robot arm device can 180 ° of rotations of horizontal direction, 90 ° of rotations of vertical direction.
Conveyer belt front-end and back-end protrude 1-2 meters of excavator main body.
Conveyer belt can fore-and-aft direction cyclic transfer.
Clamp first clamping plate and clamp second clamping plate inner surface are provided with multiple equally distributed raised sawtooth.
Clamp first clamping plate and clamp second clamping plate are duckbill, are become narrow gradually from top to bottom, and bottom is pointed.
Old sleeper placement section and new sleeper placement section are equal in magnitude.
Raised sawtooth, which is evenly distributed on, takes off tiny fragments of stone, coal, etc. plate bottom part body, and length is 5-20cm, and material is steel alloy.
The rail mouthful spacing of first clamp rail mouthful and the second clamp rail mouthful matches with railroad track.
Roller is cylinder, highly identical with railroad track width.
The beneficial effects of the utility model are that pillow equipment is changed in a kind of overhaul, by using excavator as equipment body, Rotatable robot arm device is fixedly mounted in Vehicular body front, and in lower car body space mounting conveyer belt, flat board is mounted in rear vehicle Car, sleeper replacement device is installed in robot arm device front portion, is substantially increased and is changed pillow operating efficiency height, can effectively save work Power, sleeper replacement quality is high;By installing conveyer belt and mounting flat car, the narrow road sections such as bridge, tunnel work can be effectively adapted to Industry can effectively adapt to the operating environment of complexity, easy to use;By using duckbill sleeper tong, sleeper tong and rail are increased The contact area of pillow, improves the stability of clamping sleeper, safe and reliable;Take off tiny fragments of stone, coal, etc. plate bottom part body and uniform raised saw is set Tooth, makes to take off the tiny fragments of stone, coal, etc. more thoroughly fully, tiny fragments of stone, coal, etc. quality is taken off in raising, and can filter out harmful handstone and reduce potential safety hazard.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is the utility model overall structure diagram.
Fig. 2 is the utility model excavator agent structure schematic diagram.
Fig. 3 is the utility model flat car apparatus structure schematic diagram.
Fig. 4 is the utility model robot arm device structural representation.
Fig. 5 is the utility model sleeper replacement apparatus structure schematic diagram.
Fig. 6 is the utility model sleeper clamp structure schematic diagram.
Fig. 7 is that the utility model takes off tiny fragments of stone, coal, etc. plate structure schematic diagram.
Fig. 8 is the utility model conveyer structure schematic diagram.
1. excavator main body in figure, 2. flat car devices, 3. robot arm devices, 4. sleeper replacement devices, 5. conveyer belts, 6. Excavator cab, 7. excavate machine bottom board, and 8. excavators are linked up with, 9. excavator alloy wheels, 10. excavator liftable steel wheels, 11. flat board car bottom plate, 12. flat car alloy wheels, 13. connects chains, 14. old sleeper placement sections, 15. new sleeper placement sections, 16. Flat car rotating device, 17. flat cars machinery arm rotation unit, 18. flat car mechanical arms, 19. flat cars folder pillow device, 20. Flat car support arm, 21. sleepers place plate, the big arm rotation unit of 22. equipment, 23. equipment large arm, 24. equipment forearm rotating dress Put, 25. equipment forearms, 26. pedestals, 27. sleeper fixtures, 28. take off tiny fragments of stone, coal, etc. plate, 29. slewing equipments, 30. first hydraulic cylinders, 31. folders Clamp to take off outside tiny fragments of stone, coal, etc. plate, 34. first rails to take off outside tiny fragments of stone, coal, etc. plate, 35. second rails in first clamping plate, 32. clamp second clamping plates, 33. rails and take off tiny fragments of stone, coal, etc. plate, 36. the first clamp rail mouthful, 37. second clamp rails mouthful, 38. rollers, 39. reinforcing bar bodies, 40. raised sawtooth, 41. take off tiny fragments of stone, coal, etc. plate main body, and 42. pass Send band main body, 43. disk rollers, 44. conveyer belt chainings, 45 second hydraulic cylinders.
Embodiment
Referring to the drawings, pillow equipment, including excavator main body 1, flat car device 2, robot arm device 3, rail are changed in a kind of overhaul Rest the head on more changing device 4, conveyer belt 5;Excavator main body 1 includes excavator cab 6, excavates machine bottom board 7, and excavator hook 8 is excavated Machine alloy wheel 9, excavator liftable steel wheel 10;Flat car device 2 include flat board car bottom plate 11, flat car alloy wheel 12, Connects chain 13, old sleeper placement section 14, new sleeper placement section 15, flat car rotating device 16, flat car machinery arm rotation unit 17, flat car mechanical arm 18, flat car folder pillow device 19, flat car support arm 20, sleeper places plate 21;Robot arm device 3 is wrapped Include the big arm rotation unit 22 of equipment, equipment large arm 23, the small arm rotation unit 24 of equipment, equipment forearm 25;Sleeper replacement device 4 is wrapped Pedestal 26 is included, sleeper fixture 27 takes off tiny fragments of stone, coal, etc. plate 28, slewing equipment 29;Sleeper fixture 27 includes pedestal 26, slewing equipment 29, first Hydraulic cylinder 30, clamp first clamping plate 31, clamp second clamping plate 32, second hydraulic cylinder 45;Taking off tiny fragments of stone, coal, etc. plate 28 includes taking off tiny fragments of stone, coal, etc. plate main body 41, Take off outside tiny fragments of stone, coal, etc. plate 33, the first rail to take off in rail and tiny fragments of stone, coal, etc. plate 35 is taken off outside tiny fragments of stone, coal, etc. plate 34, the second rail, the first clamp rail mouthful 36, the second clamp rail mouthful 37, roller 38, reinforcing bar body 39, raised sawtooth 40, slewing equipment 29, pedestal 26;Conveyer belt 5 includes conveyer belt main body 42, conveyer belt chaining 44, disk roller 43;Excavator cab 6 is located at the top of excavator main body 1, excavates machine bottom board 7 and is located at the middle part of excavator main body 1, digs Pick machine hook 8 is located at the rear portion of excavator main body 1, and excavator alloy wheel 9 and excavator liftable steel wheel 10 are located at excavator main The bottom of body 1, excavator alloy wheel 9 and excavator liftable steel wheel 10 are connected with excavating machine bottom board 7, excavator liftable steel Wheel 10 is located at the front and rear part of excavator alloy wheel 9;The lower contacts railway of flat car alloy wheel 12, top connection flat board car bottom plate 11, the connects chain 13 of flat car is connected with the excavator hook 8 at the rear portion of excavator main body 1, old sleeper placement section 14 and new sleeper Placement section 15 is located at sleeper and placed on plate 21, and sleeper places plate 21 and is located at the top of flat board car bottom plate 11, flat car rotating device 16 The top of plate 21 is placed positioned at sleeper, two ends connect sleeper and place plate 21 and flat car support arm 20, the rotation of flat car mechanical arm respectively The two ends of rotary device 17 connect flat car support arm 20 and flat car mechanical arm 18 respectively, and the two ends of flat car mechanical arm 18 are connected respectively Flat car machinery arm rotation unit 17 and flat car folder pillow device 19;The big arm rotation unit 22 of equipment, which is located at, to be excavated on machine bottom board 7, The two ends of equipment large arm 23 connect the big arm rotation unit 22 of equipment and the small arm rotation unit 24 of equipment, the small arm rotation unit of equipment respectively 24 two ends connect equipment large arm 23 and equipment forearm 25 respectively;The one end of pedestal 26 is connected with equipment forearm 25, and the other end is by returning Rotary device 29 is respectively with sleeper fixture 27 and taking off tiny fragments of stone, coal, etc. plate 28 and being connected;It is symmetrical before and after clamp first clamping plate 31 and clamp second clamping plate 32 The lower end of slewing equipment 29 is hinged on, clamp first clamping plate 31 and clamp second clamping plate 32 collectively constitute sleeper tong, the first hydraulic pressure The cylinder ends and piston rod end of cylinder 30 and second hydraulic cylinder 45 respectively with clamp first clamping plate 31 and clamp second clamping plate 32 It is hinged, the connection pedestal 26 of slewing equipment 29 and sleeper fixture 27;Taken off in rail outside tiny fragments of stone, coal, etc. plate 33, the first rail and take off the rail of tiny fragments of stone, coal, etc. plate 34 and second Take off the tiny fragments of stone, coal, etc. 35 outside all taking off in tiny fragments of stone, coal, etc. plate main body 41, collectively constitute and take off tiny fragments of stone, coal, etc. plate main body 41, the first clamp rail mouthful 36 is to take off the He of tiny fragments of stone, coal, etc. plate 33 in rail Hollow space between tiny fragments of stone, coal, etc. plate 34 is taken off outside first rail, the second clamp rail mouthful 37 is to take off outside the rail of tiny fragments of stone, coal, etc. plate 33 and second to take off between tiny fragments of stone, coal, etc. plate 35 in rail Hollow space, roller 38 is located at the clamp rail mouthful 37 rails mouthful top of the first clamp rail mouthful 36 and second, and tiny fragments of stone, coal, etc. plate main body is taken off in the injection of reinforcing bar body 39 Inside 41, tiny fragments of stone, coal, etc. plate 28 and pedestal 26 are taken off in the connection of slewing equipment 29, and pedestal 26 connects equipment forearm 25, and raised sawtooth 40, which is arranged on, to be taken off The bottom of tiny fragments of stone, coal, etc. plate main body 41;Conveyer belt main body 42 is connected by conveyer belt chaining 44 with excavating machine bottom board 7, and disk roller 43 is located at transmission Band main body 42 intersects the vacant position in end with conveyer belt chaining 44;Flat car device 2 passes through connects chain 13 and the rear portion of excavator main body 1 Excavator hook 8 be connected;Robot arm device 3 is located at the front portion of excavator main body 1, is connected with excavating machine bottom board 7;Sleeper is more Changing device 4 is located at the front portion of robot arm device 3, is connected with equipment forearm 25;Conveyer belt 5, which is located at, excavates the bottom of machine bottom board 7 with digging Interior volume between pick machine alloy wheel 9.
Robot arm device 3 can 180 ° of rotations of horizontal direction, 90 ° of rotations of vertical direction.
The front-end and back-end of conveyer belt 5 protrude 1-2 meters of excavator main body.
Conveyer belt 5 can fore-and-aft direction cyclic transfer.
Clamp first clamping plate 31 and the inner surface of clamp second clamping plate 32 are provided with multiple equally distributed raised sawtooth.
Clamp first clamping plate 31 and clamp second clamping plate 32 are duckbill, are become narrow gradually from top to bottom, and bottom is pointed.
Old sleeper placement section 14 and new sleeper placement section 15 are equal in magnitude.
Raised sawtooth 40, which is evenly distributed on, takes off tiny fragments of stone, coal, etc. plate bottom part body, and length is 5-20cm, and material is steel alloy.
The rail mouthful spacing of the clamp rail mouthful 37 of first clamp rail mouthful 36 and second matches with railroad track.
Roller 38 is cylinder, highly identical with railroad track width.

Claims (10)

1. pillow equipment, including excavator main body, flat car device, robot arm device, sleeper replacement device, transmission are changed in a kind of overhaul Band;Excavator main body includes excavator cab, excavates machine bottom board, and excavator hook, excavator alloy wheel, excavator can rise Steel wheel drops;Flat car device includes flat board car bottom plate, and flat car alloy wheel, connects chain, old sleeper placement section, new sleeper is placed Portion, flat car rotating device, flat car machinery arm rotation unit, flat car mechanical arm, flat car folder pillow device, flat car support Arm, sleeper places plate;Robot arm device includes the big arm rotation unit of equipment, equipment large arm, equipment forearm, equipment forearm rotating dress Put;Sleeper replacement device includes pedestal, and sleeper fixture takes off tiny fragments of stone, coal, etc. plate, slewing equipment;Sleeper fixture includes pedestal, slewing equipment, the One hydraulic cylinder, clamp first clamping plate, clamp second clamping plate, second hydraulic cylinder;Taking off tiny fragments of stone, coal, etc. plate includes taking off in tiny fragments of stone, coal, etc. plate main body, rail taking off the tiny fragments of stone, coal, etc. Taken off outside plate, the first rail and tiny fragments of stone, coal, etc. plate is taken off outside tiny fragments of stone, coal, etc. plate, the second rail, the first clamp rail mouthful, the second clamp rail mouthful, roller, reinforcing bar body, raised sawtooth, Slewing equipment, pedestal;Conveyer belt includes conveyer belt main body, conveyer belt chaining, disk roller;Characterized in that, excavator cab position In excavator body top, excavate machine bottom board and be located in the middle part of excavator main body, excavator hook is located at excavator back body, digs Pick machine alloy wheel and excavator liftable steel wheel are located at excavator lower body part, excavator alloy wheel and excavator liftable Steel wheel is connected with excavating machine bottom board, and excavator liftable steel wheel is located at excavator alloy wheel front and rear part;Flat car alloy car Lower contacts railway is taken turns, top connection flat board car bottom plate, the connects chain of flat car is linked up with the excavator of excavator back body It is connected, old sleeper placement section is located at sleeper with new sleeper placement section and placed on plate, and sleeper is placed plate and is located above flat board car bottom plate, Flat car rotating device is located at sleeper and places plate top, and two ends connect sleeper and place plate and flat car support arm, flat car respectively Mechanical arm rotation unit two ends connect flat car support arm and flat car mechanical arm respectively, and flat car mechanical arm two ends are connected respectively The peaceful wooden handcart folder pillow device of flat car machinery arm rotation unit;The big arm rotation unit of equipment, which is located at, to be excavated on machine bottom board, and equipment is big Arm two ends connect the big arm rotation unit of equipment and the small arm rotation unit of equipment respectively, and the small arm rotation unit two ends of equipment are connected respectively Equipment large arm and equipment forearm;Pedestal one end is connected with equipment forearm, the other end by slewing equipment respectively with sleeper fixture and Take off the connection of tiny fragments of stone, coal, etc. plate;Symmetrically slewing equipment lower end, clamp first clamping plate are hinged on before and after clamp first clamping plate and clamp second clamping plate Sleeper tong, the cylinder ends and tailpiece of the piston rod part of first hydraulic cylinder and second hydraulic cylinder are collectively constituted with clamp second clamping plate It is not hinged with clamp first clamping plate and clamp second clamping plate, slewing equipment connection pedestal and sleeper fixture;Tiny fragments of stone, coal, etc. plate is taken off in rail, the Taken off outside one rail outside tiny fragments of stone, coal, etc. plate and the second rail and take off tiny fragments of stone, coal, etc. plate and all taking off in tiny fragments of stone, coal, etc. plate main body, collectively constituted and take off tiny fragments of stone, coal, etc. plate main body, the first clamp rail mouthful is Taken off in rail and hollow space between tiny fragments of stone, coal, etc. plate is taken off outside tiny fragments of stone, coal, etc. plate and the first rail, the second clamp rail mouthful takes off tiny fragments of stone, coal, etc. plate to be taken off in rail outside tiny fragments of stone, coal, etc. plate and the second rail Between hollow space, roller is located at the first clamp rail mouthful and the second clamp rail mouthful rail mouthful top, and tiny fragments of stone, coal, etc. plate body interior is taken off in the injection of reinforcing bar body, Tiny fragments of stone, coal, etc. plate and pedestal are taken off in slewing equipment connection, and pedestal connects equipment forearm, and raised sawtooth, which is arranged on, takes off tiny fragments of stone, coal, etc. plate bottom part body;Conveyer belt Main body is connected by conveyer belt chaining with excavating machine bottom board, and it is vacant that disk roller intersects end with conveyer belt chaining positioned at conveyer belt main body Position;Flat car device is connected by connects chain with the excavator hook of excavator back body;Robot arm device, which is located at, to be dug Pick machine body front part, is connected with excavating machine bottom board;Sleeper replacement device is located at robot arm device front portion, is connected with equipment forearm Connect;Conveyer belt is located at the interior volume excavated between machine bottom board bottom and excavator alloy wheel.
2. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that the robot arm device can horizontal direction 180 ° of rotations, 90 ° of rotations of vertical direction.
3. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that dashed forward the conveyer belt front-end and back-end Go out 1-2 meters of excavator main body.
4. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that the conveyer belt can fore-and-aft direction circulation Transmission.
5. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that the clamp first clamping plate and clamp Second splint inner surface is provided with multiple equally distributed raised sawtooth.
6. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that the clamp first clamping plate and clamp Second splint is duckbill, is become narrow gradually from top to bottom, and bottom is pointed.
7. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that the old sleeper placement section and new sleeper Placement section is equal in magnitude.
8. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that the raised sawtooth, which is evenly distributed on, to be taken off Tiny fragments of stone, coal, etc. plate bottom part body, length is 5-20cm, and material is steel alloy.
9. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that first clamp rail mouthful and the second clamp rail The rail mouthful spacing of mouth matches with railroad track.
10. pillow equipment is changed in a kind of overhaul according to claim 1, it is characterised in that the roller is cylinder, highly with Railroad track width is identical.
CN201621425444.0U 2016-12-23 2016-12-23 Pillow equipment is changed in a kind of overhaul Withdrawn - After Issue CN206408469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621425444.0U CN206408469U (en) 2016-12-23 2016-12-23 Pillow equipment is changed in a kind of overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621425444.0U CN206408469U (en) 2016-12-23 2016-12-23 Pillow equipment is changed in a kind of overhaul

Publications (1)

Publication Number Publication Date
CN206408469U true CN206408469U (en) 2017-08-15

Family

ID=59551451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621425444.0U Withdrawn - After Issue CN206408469U (en) 2016-12-23 2016-12-23 Pillow equipment is changed in a kind of overhaul

Country Status (1)

Country Link
CN (1) CN206408469U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842537A (en) * 2018-07-14 2018-11-20 陈芮 Railroad tie is laid with vehicle
CN108842538A (en) * 2018-07-14 2018-11-20 陈芮 Installation apparatus for the sleeper that places an iron railway
CN108842539A (en) * 2018-07-14 2018-11-20 陈芮 A kind of railroad tie laying apparatus
CN109487648A (en) * 2018-04-25 2019-03-19 刘保平 Collapsible gapless line enters scouring machine automatically and gapless line is extracted into slot operational method
CN109944121A (en) * 2017-12-21 2019-06-28 中车沈阳机车车辆有限公司 Ballast track sleeper paving is changed trains and Ballast track sleeper paving changes method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944121A (en) * 2017-12-21 2019-06-28 中车沈阳机车车辆有限公司 Ballast track sleeper paving is changed trains and Ballast track sleeper paving changes method
CN109487648A (en) * 2018-04-25 2019-03-19 刘保平 Collapsible gapless line enters scouring machine automatically and gapless line is extracted into slot operational method
CN109487648B (en) * 2018-04-25 2020-08-18 刘保平 Folding type automatic groove entering machine for long steel rail and operation method for extracting and entering long steel rail into groove
CN108842537A (en) * 2018-07-14 2018-11-20 陈芮 Railroad tie is laid with vehicle
CN108842538A (en) * 2018-07-14 2018-11-20 陈芮 Installation apparatus for the sleeper that places an iron railway
CN108842539A (en) * 2018-07-14 2018-11-20 陈芮 A kind of railroad tie laying apparatus
CN108842539B (en) * 2018-07-14 2019-10-29 江苏金洋机械有限公司 A kind of railroad tie laying apparatus

Similar Documents

Publication Publication Date Title
CN206408469U (en) Pillow equipment is changed in a kind of overhaul
CN106592351B (en) Pillow device and method are changed in a kind of overhaul
CN204417938U (en) A kind of railway changes pillow and pushes away the multi-functional maintenance machine of quarrel
CN103696335B (en) Railway sleeper replacement vehicle
CA2556312C (en) Machine for the transport of track switches, and method
CN110055832B (en) Sleeper capable of being combined vertically and horizontally and convenient to disassemble and assemble
CN108221513B (en) A kind of railroad turnout steel rail construction Transport Machinery
CN208362824U (en) A kind of railway tunnel bridge railway ballast cleaning vehicle
CN205529718U (en) Multifunctional excavator
CN114892458A (en) Integrated rail-uncut replacement and recovery sleeper operation vehicle
CN111041909B (en) Ballast turnout inserting and laying construction method
CN208088031U (en) A kind of railway tunnel bridge ballast screen scarifier
CN210886781U (en) Ballast scraping device
CN217499805U (en) Integrated rail-uncut replacement and recovery sleeper operation vehicle
CN203625732U (en) Railway sleeper replacing cart
CN202644323U (en) Rail fixing device combined with carrier roller
CN211079781U (en) Ballast removing device for track for ballast hopper car
CN103669134B (en) The manufacture method that railroad sleeper is more changed trains
CN213232987U (en) Hydraulic ballast hanging bolster replacing machine
CN219547455U (en) Combined light pillow changing machine
CN210886782U (en) Switch bed excavating trolley
CN214301212U (en) Heavy landing stage is from removal transposition system of taking power
CN216586716U (en) Sleeper hopper
CN204875395U (en) Receive pillow device
CN204959502U (en) Simple formula tamping tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170815

Effective date of abandoning: 20180629