CN103669134B - The manufacture method that railroad sleeper is more changed trains - Google Patents

The manufacture method that railroad sleeper is more changed trains Download PDF

Info

Publication number
CN103669134B
CN103669134B CN201310669630.3A CN201310669630A CN103669134B CN 103669134 B CN103669134 B CN 103669134B CN 201310669630 A CN201310669630 A CN 201310669630A CN 103669134 B CN103669134 B CN 103669134B
Authority
CN
China
Prior art keywords
excavator
slideway
chassis
sleeper
quartering hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201310669630.3A
Other languages
Chinese (zh)
Other versions
CN103669134A (en
Inventor
冯政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pizhou Jingpeng Venture Capital Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310669630.3A priority Critical patent/CN103669134B/en
Publication of CN103669134A publication Critical patent/CN103669134A/en
Application granted granted Critical
Publication of CN103669134B publication Critical patent/CN103669134B/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

一种铁路轨枕更换车的制造方法,结构由底盘、挖掘机、滑道和破碎锤组成。在底盘的上方设有两个横向滑道,滑道的总体长度大于底盘的宽度;滑道的两端部分能够下垂和平铺,滑道和底盘相连成一体。在滑道上安装挖掘机,在挖掘机的斗臂上安装破碎锤,将破碎锤的圆形钎杆的横截面改制成方或长方形,钎杆的顶端仍为锥状体,在破碎锤的一侧设有钩头,钩头用于起吊移动新的轨枕使用。

A method for manufacturing a railway sleeper replacement vehicle, the structure of which is composed of a chassis, an excavator, a slideway and a breaking hammer. Two transverse slideways are arranged above the chassis, the overall length of the slideways is greater than the width of the chassis; both ends of the slideway can be drooped and flattened, and the slideway and the chassis are connected into one body. Install the excavator on the slideway, install the breaker on the bucket arm of the excavator, and change the cross section of the circular drill rod of the breaker into a square or rectangular shape. The top of the drill rod is still a cone. There is a hook head on the side, which is used for lifting and moving new sleepers.

Description

铁路轨枕更换车的制造方法Method for manufacturing railway sleeper replacement car

技术领域technical field

一种铁路轨枕更换车的制造方法,属于铁路维护设备领域。The invention discloses a manufacturing method of a railway sleeper replacement vehicle, which belongs to the field of railway maintenance equipment.

背景技术Background technique

在铁路的维护中,局部或个别的更换损坏的钢混轨枕,是一项经常性的工作。传统的做法是:由人工扒开轨枕周围的石渣后,把旧的轨枕取出后换上新的。然后,再回填石渣捣固密实。不仅劳动强度大,作业速度慢,而且还无法就地处理报废的轨枕,不适应现代化铁路的养护需要。In railway maintenance, partial or individual replacement of damaged steel-concrete sleepers is a regular task. The traditional way is: after manually removing the gravel around the sleeper, take out the old sleeper and replace it with a new one. Then, backfill the gravel and tamp it tightly. Not only is the labor intensity high and the operation speed is slow, but also it is impossible to dispose of scrapped sleepers on the spot, which is not suitable for the maintenance needs of modern railways.

发明内容Contents of the invention

本发明的目的,是要提供一种铁路轨枕更换车的制造方法,以此代替人工作业。该车的结构由底盘、挖掘机、滑道和破碎锤组成。底盘可以采用各种铁路的平板车辆。在底盘的一端上方增加两个相互平行的横向滑道,滑道和底盘的纵轴线相互垂直。两个滑道的中心宽度,等于该挖掘机两个驱动轮的中心宽度。滑道的总体长度大于底盘的宽度;每个滑道分成三段,分别为两个下垂段和一个中间段铰接相连组成,制作时,两个滑道的四个下垂段的长度相等。滑道采用该挖掘机的一段履带,滑道的两端超过底盘宽度的部分下垂在底盘的两侧,为下垂段,如有的履带板的外侧咬合口处影响履带的外翻下垂,应将其影响部分割除。使下垂段能够顺利下垂。将下垂段的每一块的履带板连接处焊接固定,使其成为一块平的板体。两个滑道的中间段平铺在底盘的上方,然后焊接固定,使滑道的中间段和底盘相连成一体。在滑道的下垂段和所对应的底盘的底梁之间,分别焊接连接座,每个连接座由两块呈U形的平行板体组成,在板体的中部设有销孔,供铰接时插入销子使用。在连接座上安装液压油缸,液压油缸的两端分别通过销子和连接座铰接相连成一体。将液压油缸的油路及操纵系统连接在挖掘机的操控台上。操纵液压油缸的伸缩,能够使下垂段完成由垂直向平铺的位置转变,以此延长滑道的长度。调整挖掘机的行走轮与履带的轨道之间的距离(有的挖掘机不需要调整),使挖掘机的驱动轮轮齿与平铺的履带齿槽充分啮合,以便于挖掘机的行走轮在滑道上距常行走。The purpose of the present invention is to provide a method for manufacturing a railway sleeper replacement car, so as to replace manual work. The structure of the vehicle is composed of chassis, excavator, slideway and breaker. The chassis can adopt flat vehicles of various railways. Two parallel transverse slideways are added above one end of the chassis, and the longitudinal axes of the slideways and the chassis are perpendicular to each other. The central width of the two slideways is equal to the central width of the two driving wheels of the excavator. The overall length of the slideway is greater than the width of the chassis; each slideway is divided into three sections, which are respectively composed of two drooping sections and a middle section hingedly connected to each other. During manufacture, the lengths of the four drooping sections of the two slideways are equal. The slideway adopts a section of crawler belt of the excavator. The parts of the two ends of the slideway that exceed the width of the chassis hang down on both sides of the chassis, which is a drooping section. Its effects are partially removed. Make the drooping section droop smoothly. Weld and fix the track shoe joints of each piece of the drooping section to make it a flat plate body. The middle sections of the two slideways are flatly laid on the top of the chassis, and then welded and fixed, so that the middle sections of the slideways and the chassis are connected as one. Between the drooping section of the slideway and the corresponding bottom beam of the chassis, the connecting seats are respectively welded. Each connecting seat is composed of two U-shaped parallel plates, and a pin hole is provided in the middle of the plates for hinged joints. When inserting the pin to use. A hydraulic oil cylinder is installed on the connecting seat, and the two ends of the hydraulic oil cylinder are hingedly connected to the connecting seat through pins to form a whole. Connect the oil circuit and control system of the hydraulic cylinder to the console of the excavator. Manipulating the expansion and contraction of the hydraulic cylinder can make the drooping section complete the transition from vertical to flat, thereby extending the length of the slideway. Adjust the distance between the walking wheel of the excavator and the track of the track (some excavators do not need to be adjusted), so that the driving wheel teeth of the excavator are fully meshed with the tiled track teeth, so that the walking wheel of the excavator can Walking distance on the slide.

在滑道上安装挖掘机,使挖掘机的行走部分处在滑道上,挖掘机能够在滑道上左右走动位移。挖掘机选用小型挖掘机。将挖掘机的挖斗部分卸掉。在挖掘机的斗臂(小臂)上安装与之相配套的破碎锤,使挖掘机具有破碎功能。将破碎锤的圆形钎杆的横截面改制成方或长方形,钎杆的顶端仍为锥状体,以此增加钎杆的截面积,提高钎杆在左右移动时驱动石渣的能力。在破碎锤的一侧设有钩头,钩头和破碎锤相连成一体,钩头用于起吊移动新的轨枕使用。The excavator is installed on the slideway so that the walking part of the excavator is on the slideway, and the excavator can move left and right on the slideway. The excavator is a small excavator. Remove the bucket section of the excavator. Install the matching breaking hammer on the bucket arm (small arm) of the excavator to make the excavator have a crushing function. The cross-section of the circular drill rod of the breaking hammer is changed into a square or rectangular shape, and the top of the drill rod is still a cone, so as to increase the cross-sectional area of the drill rod and improve the ability of the drill rod to drive the stone slag when it moves left and right. There is a hook head on one side of the breaking hammer, the hook head is connected with the breaking hammer as a whole, and the hook head is used for lifting and moving new sleepers.

使用时,将铁路轨枕更换车运行至需要更换轨枕的工作区间,启动挖掘机,操纵液压油缸使下垂段处于平铺位置,操纵破碎锤击打报废的轨枕,使报废的轨枕就地破碎成路基石渣的规格。操纵挖掘机左右沿滑道行走或左右摆动破碎锤,使破碎锤的钎杆插入石渣后左右移动,用钎杆移动的侧面清空路基石渣、螺丝和钢筋。操纵挖掘机的破碎锤升高旋转至底盘轨枕垛的上方,用钩头吊起新的轨枕位移至路基上,放入新的轨枕定位后,将清空出来的石渣回填到原位捣实即可。When in use, run the railway sleeper replacement vehicle to the working area where the sleeper needs to be replaced, start the excavator, operate the hydraulic cylinder to make the drooping section in the flat laying position, and manipulate the breaker to hit the scrapped sleeper, so that the scrapped sleeper can be broken into roads on the spot The specifications of the foundation stone slag. Manipulate the excavator to walk left and right along the slideway or swing the breaker left and right, so that the drill rod of the breaker moves left and right after inserting the stone slag, and use the side of the drill rod to empty the roadbed stone slag, screws and steel bars. Manipulate the breaking hammer of the excavator to raise and rotate to the top of the sleeper stack on the chassis, lift the new sleeper with the hook head and move it to the roadbed, put the new sleeper in position, and then backfill the emptied gravel to the original position and compact it. Can.

附图说明Description of drawings

图1、铁路轨枕更换车主视图图2、铁路轨枕更换车(局部)侧视图Fig. 1. Front view of railway sleeper replacement vehicle Fig. 2. Side view of railway sleeper replacement vehicle (partial)

1、底盘,2、挖掘机,3、滑道,4、下垂段,5、中间段,6、液压油缸,7、破碎锤,8、钩头,9、轨枕垛,10、钎杆,11、连接座。1. Chassis, 2. Excavator, 3. Slideway, 4. Drooping section, 5. Middle section, 6. Hydraulic cylinder, 7. Breaking hammer, 8. Hook head, 9. Sleeper stack, 10. Drilling rod, 11 ,Connecting seat.

具体实施方式Detailed ways

如图1、2所示,提供一种铁路轨枕更换车的制造方法,以此代替人工作业。该车的结构由底盘1、挖掘机2、滑道3和破碎锤7组成。底盘1可以采用各种铁路的平板车辆。在底盘1的一端上方增加两个相互平行的横向滑道3,滑道3和底盘1的纵轴线相互垂直。两个滑道3的中心宽度,等于该挖掘机2两个驱动轮的中心宽度。滑道3的总体长度大于底盘1的宽度;每个滑道3分成三段,分别为两个下垂段4和一个中间段5铰接相连组成,制作时,两个滑道3的四个下垂段4的长度相等。滑道3采用该挖掘机2的一段履带,滑道3的两端超过底盘1宽度的部分下垂在底盘的两侧,为下垂段4,如有的履带板的外侧咬合口处影响履带的外翻下垂,应将其影响部分割除。使下垂段4能够顺利下垂。将下垂段4的每一块的履带板连接处焊接固定,使其成为一块平的板体。两个滑道3的中间段5平铺在底盘1的上方,然后焊接固定,使滑道3的中间段5和底盘1相连成一体。在滑道3的下垂段和所对应的底盘1的底梁之间,分别焊接连接座11,每个连接座11由两块呈U形的平行板体组成,在板体的中部设有销孔,供铰接时插入销子使用。在连接座11上安装液压油缸6,液压油缸6的两端分别和连接座11铰接相连成一体。将液压油缸6的油路及操纵系统连接在挖掘机2的操控台上。操纵液压油缸6的伸缩,能够使下垂段4完成由垂直向平铺的位置转变,以此延长滑道3的长度。调整挖掘机2的行走轮与履带的轨道之间的距离(有的挖掘机不需要调整),使挖掘机2的驱动轮轮齿与平铺的履带齿槽充分啮合,以便于挖掘机2的行走轮在滑道上正常行走。As shown in Figures 1 and 2, a method for manufacturing a railway sleeper replacement vehicle is provided to replace manual operations. The structure of this car is made up of chassis 1, excavator 2, slideway 3 and breaking hammer 7. Chassis 1 can adopt the flat vehicle of various railways. Two parallel transverse slideways 3 are added above one end of the chassis 1, and the longitudinal axes of the slideways 3 and the chassis 1 are perpendicular to each other. The central width of the two slideways 3 is equal to the central width of the two driving wheels of the excavator 2 . The overall length of the slideway 3 is greater than the width of the chassis 1; each slideway 3 is divided into three sections, which are respectively composed of two drooping sections 4 and a middle section 5 hingedly connected to each other. When making, the four drooping sections of the two slideways 3 4 are of equal length. The slideway 3 adopts a section of crawler belt of the excavator 2, and the parts of the two ends of the slideway 3 that exceed the width of the chassis 1 hang down on both sides of the chassis, which is the drooping section 4. Turn over drooping, its influence part should be cut off. Make the drooping section 4 droop smoothly. Weld and fix the joints of the track shoes of each piece of the drooping section 4 to make it a flat plate body. The middle sections 5 of the two slideways 3 are flatly laid on the top of the chassis 1, and then welded and fixed, so that the middle sections 5 of the slideways 3 and the chassis 1 are connected into one body. Between the drooping section of the slideway 3 and the corresponding bottom beam of the chassis 1, connecting seats 11 are respectively welded. Each connecting seat 11 is composed of two U-shaped parallel plates, and pins are arranged in the middle of the plates. Holes for inserting pins when hinged. The hydraulic oil cylinder 6 is installed on the connecting seat 11, and the two ends of the hydraulic oil cylinder 6 are respectively hingedly connected with the connecting seat 11 to form a whole. Connect the oil circuit and the control system of the hydraulic cylinder 6 to the console of the excavator 2 . Manipulating the expansion and contraction of the hydraulic cylinder 6 can make the drooping section 4 complete the transition from vertical to flat, thereby extending the length of the slideway 3 . Adjust the distance between the walking wheel of the excavator 2 and the track of the track (some excavators do not need to be adjusted), so that the teeth of the driving wheel of the excavator 2 are fully meshed with the flat track tooth grooves, so that the excavator 2 can move freely. The walking wheels walk normally on the slideway.

在滑道3上安装挖掘机2,使挖掘机2的行走部分处在滑道3上,挖掘机2能够在滑道3上左右走动位移。挖掘机2选用小型挖掘机。将挖掘机2的挖斗部分卸掉。在挖掘机2的斗臂(小臂)上安装与之相配套的破碎锤7,使挖掘机2具有破碎功能。将破碎锤7的圆形钎杆10的横截面改制成方或长方形,钎杆10的顶端仍为锥状体,以此增加钎杆10的截面积,提高钎杆10在左右移动时驱动石渣的能力。在破碎锤7的一侧设有钩头8,钩头8和破碎锤7相连成一体,钩头8用于起吊移动新的轨枕使用。The excavator 2 is installed on the slideway 3, so that the walking part of the excavator 2 is on the slideway 3, and the excavator 2 can move left and right on the slideway 3. The excavator 2 is a small excavator. The bucket part of the excavator 2 is removed. On the bucket arm (little arm) of the excavator 2, the matching breaker 7 is installed, so that the excavator 2 has a crushing function. Change the cross-section of the round drill rod 10 of the breaking hammer 7 into a square or rectangular shape, and the top of the drill rod 10 is still a cone, so as to increase the cross-sectional area of the drill rod 10 and improve the driving force of the drill rod 10 when it moves left and right. slag ability. One side of the breaking hammer 7 is provided with a hook head 8, the hook head 8 and the breaking hammer 7 are connected as one, and the hook head 8 is used for lifting and moving new sleepers.

使用时,将铁路轨枕更换车运行至需要更换轨枕的工作区间,启动挖掘机2,操纵液压油缸6使下垂段4处于平铺位置,操纵破碎锤7击打报废的轨枕,使报废的轨枕就地破碎成路基石渣的规格。操纵挖掘机2左右沿滑道3行走或左右摆动破碎锤7,使破碎锤7的钎杆10插入石渣后左右移动,用钎杆10移动的侧面清空路基石渣、螺丝和钢筋。操纵挖掘机2的破碎锤7升高旋转至底盘1的轨枕垛9的上方,用钩头8吊起新的轨枕位移至路基上,放入新的轨枕定位后,将清空出来的石渣回填到原位捣实即可。When in use, run the railway sleeper replacement vehicle to the working area where the sleeper needs to be replaced, start the excavator 2, operate the hydraulic cylinder 6 to make the drooping section 4 be in the flat laying position, and manipulate the breaker 7 to hit the scrapped sleeper, so that the scrapped sleeper Ground crushed into roadbed gravel specifications. Manipulate the excavator 2 to walk left and right along the slideway 3 or swing the breaker 7 left and right, so that the drill rod 10 of the breaker 7 is inserted into the gravel and move left and right, and the roadbed gravel, screws and steel bars are emptied with the side of the drill rod 10 moving. Manipulate the breaking hammer 7 of the excavator 2 to raise and rotate to the top of the sleeper stack 9 of the chassis 1, lift the new sleeper with the hook head 8 and move it to the roadbed, put the new sleeper in position, and backfill the emptied gravel Just tamp it in place.

Claims (1)

1. a railroad sleeper manufacture method of more changing trains, replaces manual work with this; Feature is: the structure of this car is made up of chassis (1), excavator (2), slideway (3) and quartering hammer (7); Chassis (1) can adopt the dull and stereotyped vehicle of different kinds of railways; Above one end of chassis (1), increase by two transverse slipwaies be parallel to each other (3), slideway (3) is mutually vertical with the longitudinal axis of chassis (1); The center width of two slideways (3), equals the center width of two driving wheels of this excavator (2); The overall length of slideway (3) is greater than the width of chassis (1); Each slideway (3) is divided into three sections, is respectively two drooping sections (4) and an interlude (5) is hinged and connected composition, and during making, the length of four drooping sections (4) of two slideways (3) is equal; Slideway (3) adopts one section of crawler belt of this excavator (2), the two ends of slideway (3) exceed the sagging both sides on chassis of part of chassis (1) width, for drooping section (4), if any to affect turning up of crawler belt sagging the articulation port place, outside of creeper tread, it should be affected part and cut off; Make drooping section (4) can be sagging smoothly; The creeper tread junction of each block of drooping section (4) is welded and fixed, becomes one piece of flat plate body; The interlude (5) of two slideways (3) is laid in the top of chassis (1), is then welded and fixed, and the interlude of slideway (3) (5) and chassis (1) are connected as a body; Between the drooping section and the bottom girder of corresponding chassis (1) of slideway (3), be welded to connect seat (11) respectively, each Connection Block (11) is made up of the parallel plates that two pieces take the shape of the letter U, be provided with pin-and-hole at the middle part of plate body, insert pin for time hinged; Connection Block (11) is installed hydraulic jack (6), and the two ends of hydraulic jack (6) are hinged and connected integral with Connection Block (11) respectively; The oil circuit of hydraulic jack (6) and control system are connected on the operation bench of excavator (2); Stretching of operating hydraulically operated oil cylinder (6), can make drooping section (4) complete the position transition tiled by Vertical dimension, extend the length of slideway (3) with this; Distance between the road wheel of adjustment excavator (2) and the track of crawler belt, the driving wheel gear teeth of excavator (2) are fully engaged, so that the road wheel of excavator (2) is normally walked on slideway with the crawler belt teeth groove of tiling;
Slideway (3) is installed excavator (2), makes the running gear of excavator (2) be on slideway (3), excavator (2) can be walked about in the upper left and right of slideway (3) displacement; Mini-excavator selected by excavator (2); The bucket part of excavator (2) is laid down; The arm of excavator (2) is installed the quartering hammer (7) matched with it, makes excavator (2) have crushing function; By the cross section side of changing system into of the circular drill steel (10) of quartering hammer (7) or rectangle, the top of drill steel (10) is still cone, increasing the sectional area of drill steel (10) with this, improving drill steel (10) drives rock ballast ability when moving left and right; Be provided with gib head (8) in the side of quartering hammer (7), gib head (8) and quartering hammer (7) are connected as a body;
During use, more being changed trains by railroad sleeper to move to needs to change the operation interval of sleeper, start excavator (2), operating hydraulically operated oil cylinder (6) makes drooping section (4) be in tiling position, handle quartering hammer (7) and impact the sleeper scrapped, make the sleeper scrapped be broken into the specification of roadbed rock ballast on the spot; Handle excavator (2) left and right to walk or swing quartering hammer (7) along slideway (3), move left and right after making the drill steel of quartering hammer (7) (10) insert rock ballast, empty roadbed rock ballast, screw and reinforcing bar with the side of drill steel (10) movement; The quartering hammer (7) handling excavator (2) raises the top of sleeper buttress (9) rotated to chassis (1), sling new displacement of sleepers on roadbed with gib head (8), after putting into new sleeper location, the rock ballast emptying out is backfilling into original position tamping.
CN201310669630.3A 2013-12-05 2013-12-05 The manufacture method that railroad sleeper is more changed trains Withdrawn - After Issue CN103669134B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310669630.3A CN103669134B (en) 2013-12-05 2013-12-05 The manufacture method that railroad sleeper is more changed trains

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310669630.3A CN103669134B (en) 2013-12-05 2013-12-05 The manufacture method that railroad sleeper is more changed trains

Publications (2)

Publication Number Publication Date
CN103669134A CN103669134A (en) 2014-03-26
CN103669134B true CN103669134B (en) 2015-11-25

Family

ID=50307851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310669630.3A Withdrawn - After Issue CN103669134B (en) 2013-12-05 2013-12-05 The manufacture method that railroad sleeper is more changed trains

Country Status (1)

Country Link
CN (1) CN103669134B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012718A (en) * 2016-06-23 2016-10-12 冯世英 Manufacture and application methods for railroad sleeper replacement vehicle with improved design

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE59403646D1 (en) * 1993-09-16 1997-09-11 Matisa Materiel Ind Sa TRACK CONSTRUCTION MACHINE FOR RENEWING TRACKS
AT4857U3 (en) * 2001-09-21 2002-06-25 Plasser Bahnbaumasch Franz MACHINE FOR REMOVING SILLS OF A TRACK
AT7113U3 (en) * 2004-06-07 2005-07-25 Plasser Bahnbaumasch Franz METHOD FOR REPLACING DAMAGED THREADS OF A TRACK AND MACHINE
CH700126B1 (en) * 2008-12-16 2013-01-31 Matisa Materiel Ind Sa Machine and method for renewing a track.
AT510423B1 (en) * 2011-01-11 2012-04-15 Franz Plasser Bahnbaumaschinen-Industriegesellscha METHOD AND VEHICLE FOR THE SECTIONAL REPLACEMENT OF ALTERNATIVE WAVES OF A TRACK THROUGH NEW WAVES

Also Published As

Publication number Publication date
CN103669134A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103696335B (en) Railway sleeper replacement vehicle
US8464972B2 (en) Concrete pulverizer
CN202610866U (en) Hydraulic transverse shaft milling head
US3967396A (en) Undercutter with rotary trencher
JPS6332001A (en) Self-propelling machine performing continuous replacement of track
CN102433853A (en) Trailer type sand elimination machine for railway
CN116043935A (en) A wheel-track integrated double-working device multi-purpose engineering vehicle
CN201106149Y (en) Wide broad milling and shaving machine for sheet pavement
CN208362827U (en) A kind of railway tunnel bridge railway ballast cleaning vehicle of double acting power drive two-shipper
CN208668182U (en) A kind of screen scarifier being suitble to narrow work surface
CN103669134B (en) The manufacture method that railroad sleeper is more changed trains
US1732568A (en) Tie removing and replacing machine
CN201321595Y (en) Road base course spreader
JP2019035300A (en) Roadbed excavator
US1595420A (en) Railroad tamping
US6481507B1 (en) Doweling hole drilling machine
JP2020112000A (en) Railroad backhoe
CN105442398A (en) Railway ballast processor suitable for narrow operation face
CN203625732U (en) Railway sleeper replacing cart
FI92621C (en) Device for removing the track support layer without dismantling the track
CN204000502U (en) A kind of railway ballast processor that is applicable to the narrow scope of operation
JP2014051859A (en) Device and method for drilling
RU13783U1 (en) TRAVELING MACHINE
CN205934615U (en) Machines are changed to sleeper
CN205975733U (en) Land leveling machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191111

Address after: 221300, Fumin Road, Pizhou hi tech Industrial Development Zone, Xuzhou, Jiangsu, 13

Patentee after: Pizhou hi tech Zone City Mineral Research Institute Co.,Ltd.

Address before: 235000 room 1, unit 34, 202 Li Yuan Xin Cun, Anhui, Huaibei

Patentee before: Feng Zheng

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231218

Address after: 221300 No.56, paoche street, Pizhou City, Xuzhou City, Jiangsu Province

Patentee after: Pizhou Jingpeng Venture Capital Co.,Ltd.

Address before: 221300 13 Fu Min Road, hi tech Industrial Development Zone, Pizhou, Xuzhou, Jiangsu

Patentee before: Pizhou hi tech Zone City Mineral Research Institute Co.,Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20151125

Effective date of abandoning: 20250826

AV01 Patent right actively abandoned

Granted publication date: 20151125

Effective date of abandoning: 20250826