CN206396898U - A kind of beam column of steel structure installs connector - Google Patents

A kind of beam column of steel structure installs connector Download PDF

Info

Publication number
CN206396898U
CN206396898U CN201621474006.3U CN201621474006U CN206396898U CN 206396898 U CN206396898 U CN 206396898U CN 201621474006 U CN201621474006 U CN 201621474006U CN 206396898 U CN206396898 U CN 206396898U
Authority
CN
China
Prior art keywords
beam column
steel structure
fixture
sides
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621474006.3U
Other languages
Chinese (zh)
Inventor
杨启荣
陈军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Masteel Engineering and Technology Group Co Ltd
Original Assignee
Anhui Masteel Engineering and Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Masteel Engineering and Technology Group Co Ltd filed Critical Anhui Masteel Engineering and Technology Group Co Ltd
Priority to CN201621474006.3U priority Critical patent/CN206396898U/en
Application granted granted Critical
Publication of CN206396898U publication Critical patent/CN206396898U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of beam column of steel structure installs connector, belong to steel building technical field of construction.Beam column of steel structure installs connector of the present utility model, including fixture and connecting plate;The fixture symmetrical expression clamps two beam column of steel structure of soldering opening both sides, and the fixture of soldering opening both sides is detachably fixed into connection by connecting plate.Fixed by clamp, the fixture of soldering opening both sides is positioned by formula by connecting plate again and is detachably fixed connection, reach that chucking position is relatively fixed, the width of soldering opening also can just be limited, if width is not setting numerical value, dynamics can be clamped by alignment jig, reached after setting numerical value, then fastened;Soldering opening width can be adjusted by reaching, the effect that can after welding dismantle and reuse again, production cost is greatly reduced.

Description

A kind of beam column of steel structure installs connector
Technical field
The utility model is related to steel building technical field of construction, more particularly to a kind of beam column of steel structure installs connection Device.
Background technology
At present, steel building is widely used.Girder steel, steel column transport Assembling after being prefabricated in the factory, with Reinforced concrete structure building needs molding, pours, conserves and compare, and can effectively shorten the construction period.In addition, steel building can Situ wet operation is effectively reduced, environment protecting is obvious.
China is building about 3,000,000 tons of steel structure work amount, wherein about 10,000,000 tons of steel construction, current beam column of steel structure every year Connection is installed and uses the type of attachment of below figure 1, connection otic placode (4) beam column of steel structure both sides are welded on, then pass through connecting plate (7) After being fixedly connected, then by between two beam column of steel structure soldering opening weld.The welding of steel column connection otic placode (4) accounts for steel construction The 3% of beam column quantities, both about 3.6 ten thousand tons of total amount.Beam column of steel structure connection otic placode factory wants process and assemble manually to consume when manufacturing Connection otic placode (3) is cut off after Shi Yuezhan 5%, installation and causes to waste, weld seam is polished and spends the artificial time-consuming steel column that accounts for pacify Artificial 10% is filled, that is, causes the waste of material, causes man-hour to increase again, production cost is higher.
Through retrieval, Chinese patent application, publication number:CN204983173U, publication date:2016.01.20, one kind is disclosed Steel structure girder column connected node.It includes girder steel bracket, two pieces of junction steel plates and multiple bolts;Two pieces of junction steel plates are respectively perpendicular It is respectively formed with the side that one end of girder steel and steel column upper end are connected with girder steel, and on two pieces of junction steel plates many Individual corresponding bolt connecting hole;Girder steel bracket is arranged on the position being located on steel column on the downside of junction steel plate;Multiple bolt difference It is connected in two bolt connecting holes corresponding on two pieces of junction steel plates.The utility model is in steel building installation process In, using girder steel bracket support girder steel, the operating efficiency at steel girder erection scene can be effectively lifted, realizes and crane is used only In the case of multiple girder steels while install.Girder steel accidental falling in installation process can be prevented using U-shaped girder steel bracket, lifting is made Industry site safety.The auxiliary positioning during steel beam lifting can be realized using girder steel bracket locations, it is to avoid when directly lifting Exactitude position requirement, reduces installation difficulty.The utility model is positioned by girder steel bracket, after positioning completion is bolted, It is ineffective and cause unnecessary waste.
Utility model content
1. the utility model technical problem to be solved
For existing in the prior art in beam column of steel structure installation process, wasted with connection otic placode connecting material, man-hour increases Plus, the problem of production cost is higher, the utility model provides a kind of beam column of steel structure installs connector.It can realize steel knot After the welding of structure beam column, the detachable and purpose that can reuse, production cost is greatly reduced.
2. technical scheme
To reach above-mentioned purpose, the technical scheme that the utility model is provided is:
A kind of beam column of steel structure installs connector, including fixture and connecting plate;The fixture symmetrical expression clamps soldering opening two Two beam column of steel structure of side, and the fixture of soldering opening both sides is detachably fixed by connection by connecting plate.Pass through clamp Fix, then the fixture of soldering opening both sides positioned by formula by connecting plate and be detachably fixed connection, reach that chucking position is relatively fixed, The width of soldering opening also can just be limited, if width is not setting numerical value, can be clamped dynamics by alignment jig, be reached and set After fixed number value, then fastened;Soldering opening width can be adjusted by reaching, the effect that can after welding dismantle and reuse again Really, production cost is greatly reduced.
Further technical scheme, beam column of steel structure is H profile steel or box column, it is adaptable to which during both section bars, effect is more It is good.
Further technical scheme, the fixtures of the H profile steel both sides 2 relative Z-shaped plates are hinged by rotating shaft and Into, and complete in the middle part of Z-shaped plate to be hinged, form jaw, it is only necessary to which the mesh for clamping H profile steel can be reached by tightening the bolt at two ends , fixed and dismounting is more facilitated.
Further technical scheme, the fixture totally 8, soldering opening both sides are symmetrical arranged;Connecting plate is 4, H profile steel two Side is symmetrical arranged, and is fixedly connected by fixing bolt;Improve the friction dynamics clamped, it is to avoid the soldering opening of two sections of H profile steels is wide The unstable change of degree.
Further technical scheme, in addition to fixed plate, by the clamp pressing of H profile steel both sides below connecting plate;It is described Connecting plate, fixed plate from top to bottom will be fixedly connected by fixing bolt with fixture;Connecting plate and the orthogonal setting of fixed plate, even Fishplate bar and fixed plate are equipped with, and play synergy, prevent that soldering opening width is uneven.
Further technical scheme, fixing bolt is to use 3 in 24, each fixture, and at least triple fixations improve solid Determine effect, prevent the unstable change of soldering opening width.
Further technical scheme, the fixation that the fixtures of the box column both sides passes through 2 fixed plates and fixed plate both sides Bolt is formed by fixedly connecting through fixed bolt hole.Fixed plate fitted bolt fixes the box column clamped-in style of soldering opening both sides, And soldering opening width can be adjusted by adjusting clamping dynamics, for the welding of two section box columns, dismounting is gone back after welding It can reuse, production cost is greatly reduced.
Further technical scheme, the fixing bolt is fixedly connected on the inside of fixed plate and connecting plate, fixed bolt hole In fixed plate, also piercing has link bolt hole, and connecting bolt, which fixes the fixed plate of box column both sides through link bolt hole, to be connected Connect to form fixture.Connecting bolt and fixing bolt act in accordance with the division of their functions and duties, formula synergy, improve soldering opening width stability Effect.
Further technical scheme, left and right two parts of each fixed plate, which symmetrically pierce, 3 fixed bolt holes and 2 Link bolt hole.Triple fixations and double connection effect, further increase the stability of soldering opening width.
Further technical scheme, soldering opening width is not more than 25mm, it is necessary to improve clamping dynamics when wide, moreover, right Welding technique requires high;Less than 25mm, the stability of soldering opening width and the convenience of welding ensure that.
3. beneficial effect
The technical scheme provided using the utility model, compared with prior art, is had the advantages that:
(1) a kind of beam column of steel structure installs connector of the present utility model, is fixed, then pass through connecting plate by clamp The fixtures of soldering opening both sides positioning formula is detachably fixed connection, reaches that chucking position is relatively fixed, the width of soldering opening is also It can limit, if width is not setting numerical value, dynamics can be clamped by alignment jig, reached after setting numerical value, then carry out Fastening;Soldering opening width can be adjusted by reaching, the effect that can after welding dismantle and reuse again, and production cost is significantly Reduction;
(2) a kind of beam column of steel structure installs connector of the present utility model, it is adaptable to two kinds of section bars of H profile steel and box column When, facilitate positioning formula to be detachably fixedly clamped, effect is more preferable;
(3) a kind of beam column of steel structure installs connector of the present utility model, relative to Z-shaped plate shape into jaw, it is only necessary to The purpose for clamping H profile steel can be reached by tightening the bolt at two ends, fixed and dismounting is more facilitated;
(4) a kind of beam column of steel structure installs connector of the present utility model, by increasing fixture quantity, you can improve and clamp Friction dynamics, it is to avoid the unstable change of soldering opening width of two sections of H profile steels;
(5) a kind of beam column of steel structure installs connector of the present utility model, connecting plate and fixed plate are equipped with, and play association Same-action, prevents that soldering opening width is uneven;
(6) 3 fixing bolts are used in a kind of beam column of steel structure installs connector of the present utility model, each fixture, extremely Few triple fixations, improve fixed effect, prevent the unstable change of soldering opening width;
(7) a kind of beam column of steel structure installs connector of the present utility model, fixed plate fitted bolt is by soldering opening both sides Box column (2) clamped-in style is fixed, it is possible to adjust soldering opening width by adjusting clamping dynamics, for the weldering of two section box columns Fetch, dismounting can also be reused after welding, and production cost is greatly reduced;
(8) a kind of beam column of steel structure installs connector of the present utility model, connecting bolt and fixing bolt act in accordance with the division of their functions and duties, matched somebody with somebody Box-like synergy, improves the effect of soldering opening width stability;
(9) a kind of beam column of steel structure installs connector of the present utility model, 3 fixed bolt holes and 2 link bolt hole Setting, triple fixations and double connection effect further increase the stability of soldering opening width;
(10) application of a kind of beam column of steel structure installs connector of the present utility model, when soldering opening width is wide, it is necessary to Clamping dynamics is improved, moreover, requiring high to welding technique;Less than 25mm, stability and the welding of soldering opening width ensure that Convenience.
Brief description of the drawings
Fig. 1 is the beam column of steel structure installs connector structural representation of prior art;
Fig. 2 is the beam column of steel structure installs connector upward view of prior art;
A kind of beam column of steel structure installs connector upward view of Fig. 3 embodiments 2;
A kind of beam column of steel structure installs connector front view of Fig. 4 embodiments 2;
A kind of beam column of steel structure installs connector upward view of Fig. 5 embodiments 4;
A kind of beam column of steel structure installs connector front view of Fig. 6 embodiments 4.
Label declaration in schematic diagram:1st, H profile steel;2nd, box column;3rd, soldering opening;4th, connection otic placode;5th, fixture;6th, it is fixed Plate;7th, connecting plate;8th, fixing bolt;9th, connecting bolt;41st, otic placode bolt hole;51st, rotating shaft;52nd, Z-shaped plate;81st, fixed spiral shell Keyhole;91st, link bolt hole.
Embodiment
To further appreciate that content of the present utility model, the utility model is described in detail with reference to accompanying drawing.
The beam column of steel structure of prior art installs type of attachment of the connection using Fig. 1 and Fig. 2, and connection otic placode 4 is welded on Beam column of steel structure both sides, then be fixedly connected with beam column of steel structure by the cooperation of bolt through otic placode bolt hole 41 and connecting plate 7 Afterwards, then by the soldering opening between two beam column of steel structure weld, this connected mode cuts off connection otic placode 3 and causes wave after installation Take, polish weld seam and spend artificial time-consuming, that is, cause the waste of material, cause man-hour to increase again, production cost is higher.
Embodiment 1
The beam column of steel structure installs connector of the present embodiment, applied to H profile steel 1, including fixture 5 and connecting plate 7;The folder Have two beam column of steel structure that 5 symmetrical expressions clamp the both sides of soldering opening 3, and can by the fixture 5 of the both sides of soldering opening 3 by connecting plate 7 Dismounting is fixedly connected, and 2 relative Z-shaped plates 52 are hinged by the fixture 5 of the both sides of H profile steel 1 by rotating shaft 51 to be formed, and at " Z " The middle part of shape plate 52 is completed to be hinged, and forms jaw, it is only necessary to which the purpose for clamping H profile steel can be reached by tightening the bolt at two ends, is made solid Fixed and dismounting more facilitates.Be fixedly clamped by fixture 5, then the fixture 5 of the both sides of soldering opening 3 is positioned by formula by connecting plate 7 can Dismounting is fixedly connected, and reaches that the position of fixture 5 is relatively fixed, and the width of soldering opening 3 also can just be limited, if width is not setting Numerical value, can clamp dynamics by alignment jig 5, reach after setting numerical value, then fastened;Soldering opening can be adjusted by reaching 3 width, the effect that can after welding dismantle and reuse again, production cost is greatly reduced.
Embodiment 2
The beam column of steel structure installs connector of the present embodiment, basic structure be the same as Example 1 is different and the improvement is that: As shown in Figures 3 and 4, in addition to fixed plate 6, the fixture 5 of the both sides of H profile steel 1 is compressed below 7 in connecting plate;The fixing bolt 8 From top to bottom connecting plate 7, fixed plate 6 will be fixedly connected with fixture 5;Connecting plate 7 and the orthogonal setting of fixed plate 6, connection Plate 7 and fixed plate 6 are equipped with, and play synergy, prevent that the width of soldering opening 3 is uneven.Fixture 5 totally 8,3 liang of soldering opening Side is symmetrical arranged;Connecting plate 7 is 4, and the both sides of H profile steel 1 are symmetrical arranged, and are fixedly connected by fixing bolt 8;Improve what is clamped Friction dynamics, it is to avoid the unstable change of the width of soldering opening 3 of two sections of H profile steels 1.Fixing bolt 8 is 24, is used in each fixture 5 To 3, at least triple fixations improve fixed effect, prevent the unstable change of the width of soldering opening 3.
Embodiment 3
The beam column of steel structure installs connector of the present embodiment, the width of soldering opening 3 is not more than 25mm, applied to box column 2, bag Include fixture 5 and connecting plate 7;The symmetrical expression of fixture 5 clamps two beam column of steel structure of the both sides of soldering opening 3, and passes through connecting plate 7 The fixture 5 of the both sides of soldering opening 3 is detachably fixed connection, the fixture 5 of the both sides of box column 2 passes through 2 fixed plates 6 and fixation The fixing bolt 8 of the both sides of plate 6 is formed by fixedly connecting through fixed bolt hole 81.The fitted bolt of fixed plate 6 is by the both sides of soldering opening 3 The clamped-in style of box column 2 is fixed, it is possible to the width of soldering opening 3 is adjusted by adjusting clamping dynamics, for the weldering of two section box columns 2 Fetch, dismounting can also be reused after welding, and production cost is greatly reduced.
Embodiment 4
The beam column of steel structure installs connector of the present embodiment, basic structure be the same as Example 3 is different and the improvement is that: As shown in Figure 5,6, the fixing bolt 8 is fixedly connected with fixed plate 6 and connecting plate 7, the fixed plate 6 of the inner side of fixed bolt hole 81 On, also piercing has link bolt hole 91, and connecting bolt 9 passes through link bolt hole 91 by the company of fixation of fixed plate 6 of the both sides of box column 2 Connect to form fixture 5.Connecting bolt 9 and fixing bolt 8 act in accordance with the division of their functions and duties, formula synergy, improve the width of soldering opening 3 stable The effect of property.Left and right two parts of each fixed plate 6, which symmetrically pierce, 3 fixed bolt holes 81 and 2 link bolt hole 91, Triple fixations and double connection effect, further increase the stability of the width of soldering opening 3.
Schematically the utility model and embodiments thereof are described above, the description does not have restricted, accompanying drawing Shown in be also one of embodiment of the present utility model, actual structure is not limited thereto.So, if this area Those of ordinary skill enlightened by it, without departing from the spirit of the invention, without it is creative designing with should The similar frame mode of technical scheme and embodiment, all should belong to protection domain of the present utility model.

Claims (10)

1. a kind of beam column of steel structure installs connector, including fixture (5), it is characterised in that also including connecting plate (7);The folder Have two beam column of steel structure that (5) symmetrical expression clamps soldering opening (3) both sides, and by connecting plate (7) by soldering opening (3) both sides Fixture (5) is detachably fixed connection.
2. a kind of beam column of steel structure installs connector according to claim 1, it is characterised in that:The beam column of steel structure is H profile steel (1) or box column (2).
3. a kind of beam column of steel structure installs connector according to claim 2, it is characterised in that:H profile steel (1) both sides Fixture (5) 2 relative Z-shaped plates (52) be hinged by rotating shaft (51) formed, and complete in the middle part of Z-shaped plate (52) hinge Connect.
4. a kind of beam column of steel structure installs connector according to claim 3, it is characterised in that:The fixture (5) totally 8 Individual, soldering opening (3) both sides are symmetrical arranged;Connecting plate (7) is 4, and H profile steel (1) both sides are symmetrical arranged, and pass through fixing bolt (8) it is fixedly connected.
5. a kind of beam column of steel structure installs connector according to claim 4, it is characterised in that:Also include fixed plate (6), The fixture (5) of H profile steel (1) both sides is compressed below in connecting plate (7);The fixing bolt (8) will be from top to bottom by connecting plate (7), fixed plate (6) is fixedly connected with fixture (5);Connecting plate (7) and the orthogonal setting of fixed plate (6).
6. a kind of beam column of steel structure installs connector according to claim 4, it is characterised in that:The fixing bolt (8) For 24,3 are used in each fixture (5).
7. a kind of beam column of steel structure installs connector according to claim 5, it is characterised in that:The box column (2) two The fixture (5) of side is fixed through fixed bolt hole (81) by the fixing bolt (8) of 2 fixed plates (6) and fixed plate (6) both sides It is formed by connecting.
8. a kind of beam column of steel structure installs connector according to claim 7, it is characterised in that:The fixing bolt (8) It is fixedly connected in the fixed plate (6) on the inside of fixed plate (6) and connecting plate (7), fixed bolt hole (81), also piercing has connecting bolt The fixed plate (6) of box column (2) both sides is fixedly connected to form folder by hole (91), connecting bolt (9) through link bolt hole (91) Have (5).
9. a kind of beam column of steel structure installs connector according to claim 8, it is characterised in that:Each fixed plate (6) Left and right two parts, which symmetrically pierce, 3 fixed bolt holes (81) and 2 link bolt hole (91).
10. according to a kind of any described beam column of steel structure installs connector of claim 1 to 9, it is characterised in that:The welding Mouth (3) width is not more than 25mm.
CN201621474006.3U 2016-12-30 2016-12-30 A kind of beam column of steel structure installs connector Expired - Fee Related CN206396898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621474006.3U CN206396898U (en) 2016-12-30 2016-12-30 A kind of beam column of steel structure installs connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621474006.3U CN206396898U (en) 2016-12-30 2016-12-30 A kind of beam column of steel structure installs connector

Publications (1)

Publication Number Publication Date
CN206396898U true CN206396898U (en) 2017-08-11

Family

ID=59516164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621474006.3U Expired - Fee Related CN206396898U (en) 2016-12-30 2016-12-30 A kind of beam column of steel structure installs connector

Country Status (1)

Country Link
CN (1) CN206396898U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643561A (en) * 2018-07-24 2018-10-12 浙江中益建材科技有限公司 A kind of floor support plate oblique pull support construction
CN112376691A (en) * 2020-10-30 2021-02-19 中冶(上海)钢结构科技有限公司 Construction method for H-shaped steel beam bolt joint
CN112411877A (en) * 2020-11-04 2021-02-26 上海市建筑科学研究院有限公司 Steel-concrete combined structure shear connector, construction method and shear combined structure
CN113944229A (en) * 2020-07-17 2022-01-18 桃源县平安机械设备制造有限公司 Steel structure connecting node

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643561A (en) * 2018-07-24 2018-10-12 浙江中益建材科技有限公司 A kind of floor support plate oblique pull support construction
CN113944229A (en) * 2020-07-17 2022-01-18 桃源县平安机械设备制造有限公司 Steel structure connecting node
CN112376691A (en) * 2020-10-30 2021-02-19 中冶(上海)钢结构科技有限公司 Construction method for H-shaped steel beam bolt joint
CN112411877A (en) * 2020-11-04 2021-02-26 上海市建筑科学研究院有限公司 Steel-concrete combined structure shear connector, construction method and shear combined structure

Similar Documents

Publication Publication Date Title
CN206396898U (en) A kind of beam column of steel structure installs connector
CN110451401B (en) Clamp for hoisting and mounting kerbstone and using method thereof
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN108842915A (en) A kind of rigid connection node and its processing installation method of steel construction rectangle rod piece
CN209353708U (en) Upper anti-bank template reinforcing device
CN210767266U (en) Prefabricated assembled type stiffening concrete column member node connecting structure
CN207079948U (en) A kind of life rope fixed mount
KR101360287B1 (en) Assembled gang form
CN210597877U (en) Partially-filled combined column assembly type installation tool
KR102294174B1 (en) Temporary structure and construction method for formwork
KR20080004007A (en) Arrangement structure, vertical joint structure and vertical joint method of the unified form-prefabrication steel bar
CN208884716U (en) A kind of rigid connection node of steel construction rectangle rod piece
KR100685440B1 (en) Support for concrete form
CN201932850U (en) Integral balance arm of tower crane
CN215331468U (en) Brickwork corner constructional column template design reinforcing apparatus
CN212453064U (en) Building steel structure easy to assemble
CN212866984U (en) Fixing clamp for reinforcing construction of steel beam with enlarged cross section
CN221031423U (en) Stiffening column template reinforcing apparatus
CN220768435U (en) Connecting node mechanism of assembled apartment sandwich structure
CN221029558U (en) Combined steel box girder
CN217232740U (en) Stair concrete placement fixing device
CN217000140U (en) Formwork device with adjustable crane beam and post junction
CN214090085U (en) Novel loader moves annex for material device
CN220599209U (en) Reinforcing device for side wall template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170811