CN206396645U - A kind of construction basis of cast-in-place high ferro box beam - Google Patents

A kind of construction basis of cast-in-place high ferro box beam Download PDF

Info

Publication number
CN206396645U
CN206396645U CN201621458799.XU CN201621458799U CN206396645U CN 206396645 U CN206396645 U CN 206396645U CN 201621458799 U CN201621458799 U CN 201621458799U CN 206396645 U CN206396645 U CN 206396645U
Authority
CN
China
Prior art keywords
steel
pipe column
steel pipe
clamping block
steady pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621458799.XU
Other languages
Chinese (zh)
Inventor
孙焕重
李强
高慧
霍光明
于江永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN201621458799.XU priority Critical patent/CN206396645U/en
Application granted granted Critical
Publication of CN206396645U publication Critical patent/CN206396645U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of construction basis of cast-in-place high ferro box beam, including subgrade case, steel pipe column, steel I-beam, Bailey beam and steady pin, the subgrade case is on ground, the steel pipe column is affixed with subgrade case by steady pin, the steel I-beam is connected by steady pin with steel pipe column, and the Bailey beam is fixedly supported on steel I-beam.Beneficial effect:The steel plate roadbed box of use is the instrument of recycling.The technical solution of the utility model only needs soil layer to go through reality, and steel plate roadbed box directly is hung into steel pipe column position directly below.On the other hand, the utility model is connected using assembled, and connection method is connected using bearing pin, connects quick and easy reliable, saving of work and time.

Description

A kind of construction basis of cast-in-place high ferro box beam
Technical field
The present invention relates to the construction basis in high ferro box girder construction field, more particularly to a kind of cast-in-place high ferro box beam.
Background technology
Existing high ferro box girder construction method is:Forced position is supported in box-girder, row's bored concrete pile is made a call to, on bored concrete pile Pour welded still pipe post in strip footing, strip footing.I shaped steel girder steel is welded on steel pipe column, on i shaped steel girder steel Bailey beam, in Bailey beam upper berth flitch and template, the assembling reinforcement casting concrete in template are installed.As described above, existing Construction method is non-dismountable using welding manner steel pipe column and shaped steel girder steel and strip footing so that bored concrete pile and bar shaped base Plinth can not be reused, and building materials utilization rate is relatively low.And pour strip footing and need the time, many using equipment, the construction time is long.
If using being threadedly coupled between steel pipe column and shaped steel girder steel and strip footing, when reclaiming the building materials such as square tube, plate, Need seriatim to twist rotation screw, removal efficiency is low, operation is also inconvenient.
The content of the invention
The purpose of the present invention is to overcome the shortcomings of above-mentioned background technology there is provided a kind of construction of cast-in-place high ferro box beam basis, To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
The construction basis of the cast-in-place high ferro box beam includes subgrade case, steel pipe column, steel I-beam, Bailey beam and fixation Pin, the subgrade case is on ground, and the steel pipe column is affixed with subgrade case by steady pin, and the steel I-beam passes through fixation Pin is connected with steel pipe column, and the Bailey beam is fixedly supported on steel I-beam.
The further design on the construction basis of the cast-in-place high ferro box beam is that the steady pin includes the grafting of cylindricality Portion, rectangle clamping block and latch provided with conduit, one end of the plug division are provided with step, and the other end, which is provided with, to be used to store institute The groove of clamping block is stated, the latch is worn with the groove through the conduit and connect, realize being flexibly connected for clamping block and plug division, when When the length direction of clamping block is vertical with plug division axis, clamping block and the step parallel containment surfaces in a pair, this two Containment surfaces are realized mutual closer or far from length direction and plug division when clamping block with conduit relative to the motion of latch During diameter parallel, the clamping block is contained in the groove.
The further design on the construction basis of the cast-in-place high ferro box beam is that the conduit is inclined straight trough.
The further design on the construction basis of the cast-in-place high ferro box beam is that the steel pipe column corresponds to the one of subgrade case End, which is provided with least two first engaging lugs, the subgrade case, corresponds to first engaging lug provided with the second engaging lug, described Steady pin is connected to the first engaging lug and the second engaging lug and realizes opening to unload and being connected for steel pipe column and subgrade case.
Beneficial effects of the present invention are:
In the construction basis for the cast-in-place high ferro box beam that the present invention is provided, the steel plate roadbed box of use is the work of recycling Tool, and traditional bored concrete pile and strip footing is expendable consumed product.And traditional long construction period with bored concrete pile, it is necessary to be set Standby, pouring strip footing needs the time, many using equipment, and the construction time is long.Technical scheme only needs soil layer to go through reality, directly Steel plate roadbed box is hung to steel pipe column position directly below.On the other hand, steel I-beam and steel pipe in traditional construction method Between post, largely using being welded to connect or being threadedly coupled between steel pipe column and strip footing, installation effectiveness is low, not easy to operate, Connected in technical scheme using assembled, connection method is connected using bearing pin, connect quick and easy reliable, saving of labor It is time saving.
Brief description of the drawings
Fig. 1 is the basic structural representation of the construction of cast-in-place high ferro box beam.
Fig. 2 is the position relationship schematic diagram of steel I-beam, steel pipe column and subgrade case.
Fig. 3 is the CC direction views of the position relationship schematic diagram of steel I-beam, steel pipe column and subgrade case shown in Fig. 2.
Fig. 4 is the BB direction views of the position relationship schematic diagram of steel I-beam, steel pipe column and subgrade case shown in Fig. 2.
Fig. 5 is the present invention for the structural representation of the steady pin quickly connected between square tube and plate.
Fig. 6 is of the invention for the AA of the structural representation of steady pin quickly connected between square tube and plate shown in Fig. 1 Sectional view.
Fig. 7 is the structural representation of clamping block.
Fig. 8 is the structural representation of latch.
Fig. 9 is square tube of the invention and plate method for rapidly mounting step 1)Schematic diagram.
Figure 10 is square tube of the invention and plate method for rapidly mounting step 2)Schematic diagram.
Figure 11 is square tube of the invention and plate method for rapidly mounting step 3)Schematic diagram.
Embodiment
The application is described in further detail with reference to the accompanying drawings and detailed description.
The corresponding construction basis of the present embodiment, the construction foundation main will be by subgrade case 7, steel pipe column 8, steel I-beam 9, shellfish Thunder beam 10 and steady pin composition.Subgrade case 7 is on surface soil layer 13, and steel pipe column 8 is affixed by steady pin and subgrade case 7. Steel I-beam 9 is connected by steady pin with steel pipe column 8.Bailey beam 10 is fixedly supported on steel I-beam 9, referring to Fig. 1, Fig. 2.
Such as Fig. 5, Fig. 6, the steady pin of the present embodiment is mainly by the plug division 1 of cylindricality, the rectangle clamping block 2 provided with conduit 21 And latch 5 is constituted.One end of plug division 1 is provided with step 11, and the other end is provided with the groove 22 for being used for storing clamping block 2.Latch 5 is worn The conduit 21 of clamping block is crossed, and wears and connects with groove 22, being flexibly connected for clamping block 2 and plug division 1 is realized.When the length of clamping block 2 When direction is vertical with cylindricality plug division axis, a pair of parallel containment surfaces are made in the formation of clamping block 2 and step 11, two containment surfaces with Conduit is realized mutual closer or far from when 2 length directions and the axis of plug division 1 of clamping block relative to the motion of latch When parallel, clamping block 2 is contained in groove 22.
Such as Fig. 7, conduit 21 is inclined straight trough.Likewise, the conduit may be alternatively configured shaped groove, such as deep-slotted chip breaker(In figure It is not shown).
It is respectively provided with plug division and wears the hole for patching pin.Accordingly, it is respectively equipped with corresponding aperture in the both ends of the surface of latch Chamfering, referring to Fig. 8.
In order to improve the reliability and precision of steady pin in the present embodiment, the width of groove 22 has more than the width of clamping block 0.2-0.3mm.The present embodiment uses preferred value 0.25mm.The width of conduit 21 has more 0.5-1.5mm than latch.The present embodiment is adopted Use preferred value 1mm.
Steel pipe column 8 in the present embodiment corresponds to one end of subgrade case 7 provided with four the first engaging lugs 81, four first companies Lug 81 is distributed in the periphery of the same axial location of steel pipe column 8.Correspond to the first engaging lug 81 on subgrade case 7 provided with the second connection Ear 82.Steady pin is connected to the first engaging lug 81 and the second engaging lug 82 and realizes opening to unload and being connected for steel pipe column and subgrade case, joins See Fig. 3.
Such as Fig. 4, the other end of steel pipe column 8 is provided with installing plate, and the corner of the installing plate is respectively equipped with a pin-and-hole.Steady pin point Not Chuan Guo above-mentioned pin-and-hole mounting hole corresponding with steel I-beam 9 realize that steel I-beam 9 and steel pipe column 8 are detachably connected.
The steady pin of the present embodiment is just in use, only needing to move clamping block just can realize the step and clamping of plug division one end The regulation of block spacing, i.e., by the relative displacement in conduit of latch, make latch produce conflict effect to conduit inwall, and then to steel The contact surface of tubing string 8 and subgrade case 7 or steel pipe column 8 and steel I-beam 9 generates constraint, so as to realize the quick of square tube and plate Locking and unblock so that the installation of steel pipe column 8 and subgrade case 7 or steel pipe column 8 and steel I-beam 9, unlock efficiency and greatly increase, It is easily operated.
The construction method of cast-in-place high ferro box beam corresponding with above-mentioned construction method, comprises the following steps:
Step 1)Soil layer 13 under box beam 12 is tamped.
Step 2)Subgrade case 7 is equipped with according to upper load.
Step 3)Steel pipe column 8 is installed on subgrade case.
Step 4)Steel I-beam 9 is installed on steel pipe column.
Step 5)Bailey beam 10 is installed on steel I-beam.
Step 6)Spread flitch and template successively from the bottom to top in Bailey beam 10(Not shown in figure), and the colligation in template Reinforcing bar after-pouring concrete formation box beam 12, completes construction.
Step 1)In, it is contemplated that the security of construction and the reliability on construction basis, the earth bearing strength of soil layer, which need to reach, often puts down Square 8 tons of rice.
The step 3 and step 4)Realized between middle steel pipe column and steel I-beam by the way of pin connection quick, removable The installation unloaded.
In the present embodiment, step 3 and step 4)Middle use steady pin realizes pin connection, mainly by the plug division 1 of cylindricality, set It is made up of the rectangle clamping block 2 and latch 5 of conduit 21.One end of plug division 1 is provided with step 11, and the other end, which is provided with, to be used to store The groove 22 of clamping block 2.Latch 5 passes through the conduit 21 of clamping block, and wears and connect with groove 22, realizes the activity of clamping block 2 and plug division 1 Connection.When the length direction of clamping block 2 is vertical with cylindricality plug division axis, clamping block 2 makees a pair of parallel with the formation of step 11 Containment surfaces, two containment surfaces with conduit realized relative to the motion of latch it is mutual closer or far from, when clamping block 2 length When spending the diameter parallel in direction and plug division 1, clamping block 2 is contained in groove 22.
The Fast Installation of the steady pin comprises the following steps:
a)Rotating clamping block 2 makes clamping block 2 be accommodated in the groove 22 of plug division 1, and steady pin is connected into steel pipe column 8 and road In the mounting hole of base case 7 or steel pipe column 8 and steel I-beam 9, referring to Fig. 8.
b)Clamping is pulled to after extreme position for 2 pieces along the axis direction of plug division 1, rotating clamping block 2 makes the side of clamping block 2 Face is vertical with the axis of plug division 1, referring to Fig. 9.
c)Clamping block 2 is moved to the mutually close corresponding direction of two containment surfaces, until the side of latch and conduit inwall During interference fit, Fast Installation is completed.The movement of clamping block can be according to using hand or instrument the need for actual close-fitting degree in the step Realize, instrument can be using T-shaped hammer etc., referring to Figure 10.
The method for dismounting corresponding with above-mentioned installation method only need with hand or instrument movement clamping block i.e. can be achieved square tube with The dismounting of plate, compares the operation with twisting rotation screw, very simply, it is easy to operate.
Further, such as Fig. 7, conduit 21 is inclined straight trough.Likewise, the conduit may be alternatively configured shaped groove, such as arc Shape groove(Not shown in figure).
In the construction basis for the cast-in-place high ferro box beam that the present embodiment is provided, the steel plate roadbed box of use is the work of recycling Tool, and traditional bored concrete pile and strip footing is expendable consumed product.And traditional long construction period with bored concrete pile, it is necessary to be set Standby, pouring strip footing needs the time, many using equipment, and the construction time is long.Technical scheme only needs soil layer to go through reality, directly Steel plate roadbed box is hung to steel pipe column position directly below.On the other hand, steel I-beam and steel pipe in traditional construction method Between post, largely using being welded to connect or being threadedly coupled between steel pipe column and strip footing, installation effectiveness is low, not easy to operate, Connected in technical scheme using assembled, connection method is connected using bearing pin, connect quick and easy reliable, saving of labor It is time saving.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, the change or replacement that can be readily occurred in, It should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with scope of the claims It is defined.

Claims (4)

1. the construction basis of a kind of cast-in-place high ferro box beam, it is characterised in that including subgrade case, steel pipe column, steel I-beam, Bailey beam And steady pin, the subgrade case is on ground, and the steel pipe column is affixed with subgrade case by steady pin, the steel I-beam It is connected by steady pin with steel pipe column, the Bailey beam is fixedly supported on steel I-beam.
2. the construction basis of cast-in-place high ferro box beam according to claim 1, it is characterised in that the steady pin includes cylindricality Plug division, rectangle clamping block and latch provided with conduit, one end of the plug division is provided with step, and the other end is provided with being used for The groove of the clamping block is stored, the latch is worn with the groove through the conduit and connect, and realizes the activity of clamping block and plug division Connection, when the length direction of clamping block is vertical with plug division axis, the parallel constraint in a pair of clamping block and the step Face, two containment surfaces are realized mutual closer or far from when the length direction of clamping block with conduit relative to the motion of latch During with plug division diameter parallel, the clamping block is contained in the groove.
3. the construction basis of cast-in-place high ferro box beam according to claim 2, it is characterised in that the conduit is inclined straight Groove.
4. the construction basis of cast-in-place high ferro box beam according to claim 3, it is characterised in that the steel pipe column corresponds to road One end of base case, which is provided with least two first engaging lugs, the subgrade case, corresponds to first engaging lug provided with the second connection Ear, the steady pin is connected to the first engaging lug and the second engaging lug and realizes opening to unload and being connected for steel pipe column and subgrade case.
CN201621458799.XU 2016-12-28 2016-12-28 A kind of construction basis of cast-in-place high ferro box beam Expired - Fee Related CN206396645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621458799.XU CN206396645U (en) 2016-12-28 2016-12-28 A kind of construction basis of cast-in-place high ferro box beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621458799.XU CN206396645U (en) 2016-12-28 2016-12-28 A kind of construction basis of cast-in-place high ferro box beam

Publications (1)

Publication Number Publication Date
CN206396645U true CN206396645U (en) 2017-08-11

Family

ID=59516995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621458799.XU Expired - Fee Related CN206396645U (en) 2016-12-28 2016-12-28 A kind of construction basis of cast-in-place high ferro box beam

Country Status (1)

Country Link
CN (1) CN206396645U (en)

Similar Documents

Publication Publication Date Title
CN106703028B (en) Large-diameter Manual Excavation Pile precast splice type steel retaining wall and its construction technology
CN110295669B (en) Reinforced concrete structure and reinforcing method
CN202117341U (en) Template for embedding foundation bolts of steel structures of buildings
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN202401398U (en) Construction steel pipe bailey beam support in soft foundation
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN209556935U (en) A kind of soft soil foundation rotary drilling rig job platform
CN206396645U (en) A kind of construction basis of cast-in-place high ferro box beam
CN207700746U (en) The upper buttress of existing building base isolation reinforcement constructs
CN204533812U (en) A kind of slurry-water balance type jacking construction system
CN102304919A (en) Device and anchor rod capable of being arranged on anchor rod anchoring section or/ and free-section rod body
CN103790176A (en) Embedded short strut structure and construction method thereof
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN106522109A (en) Construction method and foundation of cast-in-situ high-speed rail box girder
CN204825945U (en) A fixture for fixing buried bolt in advance
CN207863185U (en) A kind of Novel steel pipe concrete pole splicing apparatus of band edge sleeve-board cylinder
CN206346193U (en) Large-diameter Manual Excavation Pile precast splice type steel retaining wall
CN210562265U (en) Ground anchor reinforcing structure of communication tower
CN207143901U (en) River course bored concrete pile job platform
CN209211443U (en) A kind of device for inserting and placing improving long steel pile casting verticality
CN207776814U (en) Circle round drilling machine and its stabilising arrangement
CN208038979U (en) A kind of cement stabilized macadam base road device
CN207776790U (en) Circle round drilling machine and its drill bit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170811

Termination date: 20191228

CF01 Termination of patent right due to non-payment of annual fee