CN209556935U - A kind of soft soil foundation rotary drilling rig job platform - Google Patents

A kind of soft soil foundation rotary drilling rig job platform Download PDF

Info

Publication number
CN209556935U
CN209556935U CN201822139789.5U CN201822139789U CN209556935U CN 209556935 U CN209556935 U CN 209556935U CN 201822139789 U CN201822139789 U CN 201822139789U CN 209556935 U CN209556935 U CN 209556935U
Authority
CN
China
Prior art keywords
base plate
road base
rigid road
concrete component
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822139789.5U
Other languages
Chinese (zh)
Inventor
陈巨峰
徐声亮
黎炜
王金龙
周勇
谢含军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Municipal Engineering Construction Group Co Ltd
Original Assignee
Ningbo Municipal Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Municipal Engineering Construction Group Co Ltd filed Critical Ningbo Municipal Engineering Construction Group Co Ltd
Priority to CN201822139789.5U priority Critical patent/CN209556935U/en
Application granted granted Critical
Publication of CN209556935U publication Critical patent/CN209556935U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of soft soil foundation rotary drilling rig job platforms.The platform includes that 3 parts such as bed course basis, clay embankment and rigid road base plate are constituted.Rigid road base plate uses precast splice type concrete component, is linked to be entirety using the double hinge fishplate bars of PBL keyed, built-in diversion pipe is buried in component, and angle steel reinforced is arranged to Member Lip.On the basis of rigid road base plate is as bed course, one of clay embankment is arranged in periphery, forms interim mud mud storage region with rigid road base plate.Rigid road base plate effectively shares the weight of rotary drilling rig to soft foundation equally, its bottom stress is made to meet the requirement for bearing capacity of soft stratum, while alleviating job platform bulk settling;The mud circulating system that built-in diversion pipe built in it and interim mud pit are constituted, can effectively deal with that spiral-digging pore technique mud is repeatedly excessive and reflux problem.The utility model is in the municipal works of soft clay area with the economy and social benefit of highly significant.

Description

A kind of soft soil foundation rotary drilling rig job platform
Technical field
The utility model relates to Construction Technology field more particularly to a kind of soft soil foundation rotary drilling rig operation horizontals Platform.
Background technique
With the increasingly propulsion of Chinese Urbanization, size of urban population is steadily improved, and city expressway, which becomes, solves urban district The important means of traffic congestion.Domestic common city expressway is all made of " surface road+main line is overhead ", i.e., main line is overhead Cushion cap is located in the median strip of surface road.Under normal conditions, the construction scale of city expressway is big, cast-in-situ bored pile number It measures more and long in time limit.When being related to embedding rock stratum, gravel layer or boulder bed within the scope of pile foundation, spiral-digging pore technique has higher Economic advantages.
Rotary drilling rig weight required for spiral-digging pore technique is very big, and the rotary drilling rig being widely used in the market usually exists 100 tons~150 tons or so, crawler belt substrate mean stress is more than 100kPa, proposes high requirement to working space:
For the through street improvement project of existing road, rotary drilling rig can be using original path as job platform;
For the new construction in farmland region, it is contemplated that topsoil content of organic matter height in farmland is (with cumulosol, mud Based on matter silty clay), foundation bearing capacity is weak, and rotary drilling rig can not direct operation.
To meet job requirements of the rotary drilling rig on soft foundation, a kind of job platform is proposed.
Summary of the invention
The main purpose of the utility model is that providing a kind of soft soil foundation rotary drilling rig operation horizontal regarding to the issue above The scheme of platform and application method.
To achieve the above objectives, a kind of the technical solution adopted in the utility model are as follows: soft soil foundation rotary drilling rig operation Platform, including bed course basis, clay embankment and rigid road base plate, it is characterised in that: the bed course basis is located at lowest part, institute It states rigid road base plate and is placed in bed course basis top, three sides of the rigid road base plate are surrounded with clay embankment, described rigid Property base board the last one side and construction occasional passage be overlapped;The clay embankment and rigid road base plate of three sides Equipped with the mud storage region for storing mud, the rigid road base plate is spliced to form by concrete component, the concrete Component stitching portion is equipped with the double hinge fishplate bars of PBL keyed, and the concrete component stitching portion is equipped with rigid road base plate piece, described mixed It is equipped with drilling hole location on solidifying soil component, the concrete component is equipped with the built-in diversion pipe for being connected to drilling hole location.
Bilevel steel mesh is equipped in the concrete component, the longitudinal direction of the concrete component is equipped with two Built-in diversion pipe;The short side edge direction of the concrete component is equipped with diversion pipe built in single, and the built-in diversion pipe is located at upper Between the steel mesh of lower layer.
The double hinge fishplate bars of the PBL keyed are equipped with junction steel plate, and the junction steel plate is equipped with anchor hole and connecting hole, institute It states on the junction steel plate that anchor hole is set on the inside of concrete component, one is provided on the thickness direction of the concrete component Anchor hole, the connecting hole are set on the junction steel plate on the outside of concrete component, on the thickness direction of the concrete component There are two connecting holes for setting.
At least provided with three anchor holes, the length direction of the concrete component on the length direction of the concrete component On be provided with a connecting hole, the anchor bar being fixed on inside concrete component, the connecting hole are equipped in the anchor hole Equipped with the connection reinforcing bar being located in rigid road base plate piece.Connect part of the reinforcing bar as anti-shearing force.
Each pair of PBL keyed is double to be hinged plate spacing not less than 0.8m and is no more than 1.2m, this distance is anti-shearing The most suitable one end distance of the part of power can both not have to assemble the double hinge fishplate bars of too many PBL keyed, can guarantee connection steel yet The effect of the anti-shearing force of muscle;The spacing of the rigid road base plate piece is 10 to 20cm, this distance is for the ease of installation Reinforcing bar is connected, and for preventing rigid road base plate differential settlement obvious.
Pvc pipe is equipped in the built-in diversion pipe, described built-in diversion pipe one end is communicated to drilling hole location, the other end connects Mud storage region or rigid road base plate piece are led to, the built-in diversion pipe periphery is equipped with silent stirrup, and described is silent The diameter of stirrup is not less than 12mm.
The lower planes of the concrete component are equipped with top angle, and the length direction interval along the bound edge angle is arranged There are vertical strengthening ribs and cross reinforcing, the vertical strengthening ribs are arranged along the short transverse of concrete component, using half time Type construction, connects the top angle of upper and lower plane;The cross reinforcing is arranged along the in-plane of concrete component, using L Type construction, is welded with the upper and lower layer steel mesh in respective plane respectively.
The material of low-water-content, low void ratio is selected on the bed course basis, it is described state bed course basis with a thickness of 20 to 30cm。
The clay embankment selects the material of low permeability and is in earth dam shape, the height and rigidity of the clay embankment The height of base board is consistent, and the volume of the mud storage region is at least 1.5 times of mud spill-out peak value.
The application method includes service stage and transition splicing stage;
The service stage the following steps are included:
Using job platform pore-forming, when the drill bit of drilling machine is put into drilling hole location, because drilling bucket and drilling rod occupy-place, mud pass through In the excessive mud storage region between clay embankment and rigid road base plate of built-in diversion pipe;When drill bit is promoted, because of drilling It is taken outside the earthwork of part and drilling bucket, drilling rod occupy-place is withdrawn from, mud liquid level decline in the hole location that drills, at this point, interim mud storage region Interior mud is supplemented to drilling hole location by built-in diversion pipe, according to law of connected vessels, maintain in drilling hole location mud liquid level with State similar in mud storage region liquid level;
To make the rigid road base plate entirety uniform settlement, rotary drilling rig pore-forming sequence need in accordance with symmetrical operation principle, and It drills by the sequence of angle point behind first edge rear center, first midpoint;
The transition splicing stage the following steps are included:
The bed course basis that a layer thickness is 20~30cm is filled on new job platform;By the rigid road base of a upper cushion cap The double hinge fishplate bar removals of the PBL keyed of plate, when the double hinge fishplate bar locks of PBL keyed caused by differential settlement occurs in rigid road base plate When tight, taken out after being cut off the reinforcing bar of the double hinge fishplate bars of PBL keyed using acetylene torch;To i.e. by the rigid road base plate before transition Concrete component numbered, on the basis of the double hinge fishplate bars of PBL keyed, give identical number with a pair of of connecting plate;Using Each block concrete component is transferred to another cushion cap region by 70T autocrane in order;It is connected using reinforcing bar and is connected with a pair of Fishplate bar, wherein each connecting hole is both needed to setting shear reinforcement locking on every piece of connecting plate;Clay is set outside rigid road base plate Embankment, after be again introduced into service stage.
Compared with the prior art, the advantages of the utility model are:
Rigid road base plate effectively shares the weight of rotary drilling rig to soft foundation equally, meets its bottom stress flabbily The requirement for bearing capacity of layer, while alleviating job platform bulk settling;The mud that diversion pipe and interim mud pit built in it are constituted Circulating system is starched, if mud supplement is not in time, aperture mud liquid level sharply declines, and the casing bottom cubic metre of earth of initiation collapses (hole bottom Unstability is swelled, as shown).Hole top retaining wall collapse by cause original ground sink, along with original ground foundation bearing capacity sharply under Sliding, the operation stabilized platform of rotary drilling rig is lost, and drilling machine faces the risk toppled, this job platform can effectively avoid the danger Danger, while can effectively deal with that spiral-digging pore technique mud is repeatedly excessive and reflux problem, keep the clean and tidy of construction environment.PBL key Use, do not use bolt, effective solution rigid road base plate stuck problem of connector in uneven subsidence equally makes The case where with 70T autocrane, selects manufacture work of the less mixed mud component of cost as splice and mixed mud component Skill is simpler, therefore, the utility model and economy and society's effect in the municipal works of soft clay area with highly significant Benefit.
Detailed description of the invention
Fig. 1 is a kind of plan view of soft soil foundation rotary drilling rig job platform;
Fig. 2 is that a kind of soft soil foundation rotary drilling rig job platform faces view;
Fig. 3 is a kind of job order figure of the digging stake drilling machine of soft soil foundation rotary drilling rig job platform;
Fig. 4 is the sectional view along A-A of Fig. 1;
Fig. 5 is the B-B direction cross-sectional view of Fig. 1;
Fig. 6 is the Local C direction view of Fig. 3;
Fig. 7 is the D-D of Fig. 1 to cross-sectional view;
Fig. 8 is the enlarged view of the local E of Fig. 1;
Fig. 9 is the simple principle figure that the earthwork of casing bottom collapses;
Figure 10 is that mud liquid level flows to schematic diagram when drilling machine moves down;
Figure 11 is that mud liquid level flows to schematic diagram when drilling machine moves down.
The corresponding title of each appended drawing reference is: bed course basis 1;Clay embankment 2;Mud storage region 21;Rigid road Substrate 3;Concrete component 31;Rigid road base plate piece 32;The double hinge fishplate bars 33 of PBL keyed;Junction steel plate 330;Anchor hole 331;Connecting hole 332;Anchor bar 333;Connect reinforcing bar 334;Drill hole location 34;Built-in diversion pipe 35;Steel mesh 4;Silent hoop Muscle 43;Construction occasional passage 5;Top angle 6;Cross reinforcing 61;Vertical strengthening ribs 62;Bottom surface absolute altitude a;Normal head b;It mentions Head c after drill bit out;Casing d;Water penetration and the trend f of the earthwork;Drill tip moving direction 8;Mud moving direction 9.
Specific embodiment
Be described below for disclose the utility model particular content so that those skilled in the art to can be realized this practical new Type.Preferred embodiment in being described below is only used as illustrating, it may occur to persons skilled in the art that other obvious modifications.
The embodiments of the present invention are a kind of soft soil foundation rotary drilling rig job platform, to achieve the above objectives, this Product mainly includes bed course basis 1, clay embankment 2 and rigid road base plate 3.
1, rigid road base plate
1.1.1, using concrete structure
Rotary drilling rig rigid road base plate 3 need to have certain thickness on soft soil foundation, to adapt to the requirement of soft foundation, Thickness is preferably 30cm ± 5cm.On the one hand, thickness is too small, is not enough to expand the rotary drilling rig crawler belt base stress of 100kPa or more It is dissipated to soft foundation (otherwise base board itself will undertake biggish internal force, and material consumption is significantly increased);On the other hand, thickness mistake Greatly, 3 own wt of rigid road base plate greatly improves, and manufacturing cost and use cost rise sharply, and reduces rigid road base plate scheme Competitive advantage constrains the popularization of rigid road base plate.
The structure type of rigid road base plate 1 can be divided mainly into 3 kinds: 1. pure steel structure;2. steel-concrete combined structure;③ Concrete structure.
For pure steel structure scheme, for the load and fatigue effect effect for adapting to rotary drilling rig track surface, steel plate Thickness is not preferably less than 20mm, and rigid road base plate entirety steel using amount is about 600kg/m2.It is with 9 pile framings that municipal works are common Example, about 64.8 tons of monomer weight;
For steel concrete composite structure scheme, upper and lower layer uses concrete slab, and centre uses type steel skeleton layer, uses Steel amount can be reduced to 400kg/m2, and about 71.3 tons of the weight of 9 pile framings;
For concrete structure scheme, using two-way steel mesh, steel bar arrangement preferably uses " minor diameter, low tone away from " (diameter Preferably select 12@120mm of φ) mode execute.The ratio of reinforcement of single layer one-way reinforcement is not less than 0.3%, to meet code requirement.It is mixed The steel using amount of Xtah Crude Clay structure scheme about 200kg/m2, always weighs about 84.2 tons.
In addition, needing setting shear connector, manufacturing cost in steel-concrete combined structure scheme, between concrete slab and type steel skeleton It is high;Steel construction cutting and welding workload are big, and manufacture difficulty is not also small;Concrete structure solution process is conventional, manufacture difficulty It is small.
Use aspect, less (it is concrete that pure steel structure scheme lifts gross weight to the weight differential of 3 schemes of 9 pile framings The 77% of structure), it is both needed to be handled using special measure.
In conclusion job platform uses concrete structure.
1.1.2, using precast splice type component
The rigid road base plate monomer weight of precast concrete 31 is larger, and the requirement to live hoisting machinery is high.Construction The common autocrane specification in scene is 25T and 70T.Wherein, specified in operating radius 12m of 70T autocrane hangs Filling weight is 12 tons, therefore the rigid road base plate of precast concrete 31 need to use prefabricated member, the maximum weight of monolithic elements Amount is no more than 12 tons.
1.1.3, using the double hinge fishplate bars of PBL keyed
It is connected between the plate of precast concrete 31 using the double hinge fishplate bars 33 of PBL keyed, each pair of PBL keyed is double to be hinged Fishplate bar 33 includes two junction steel plates 330, anchor bar 333, four connecting holes 332 and the companies of being interspersed in anchor hole 331 Two connection reinforcing bars 334 for being used for anti-shearing force in hole are connect, have following feature:
1) it is divided to anchor hole 331 and 332 liang of classes of connecting hole, anchor hole on the junction steel plate 330 of the double hinge fishplate bars 33 of PBL keyed 331 are set on the junction steel plate 330 of 31 inside of concrete component, and the thickness direction along concrete component 31 is arranged 1;Connection Hole 332 is set on the junction steel plate 330 in 31 outside of concrete component, and the thickness direction along concrete component 31 is arranged 2;
2) anchor hole 331 is typical case's PBL key construction, is interspersed in anchor hole 331 and is fixed on 31 inside of concrete component Anchor bar 333, diameter, spacing and interior bar diameter of wearing need to meet national regulation requirement, and single hole shear-carrying capacity is not small In 20 tons, the length direction quantity along concrete component 31 is no less than 3;
3) connecting hole 332 is typical double hinge constructions, i.e., 2 holes is arranged along the thickness direction of concrete component 31, inside wears It connects reinforcing bar 334 and is used as lateral member in shear memory.The construction can both undertake the moment of flexure in vertical shear, axial drawing/pressure and plane Effect.332 diameter of connecting hole and spacing need to meet " Code for design of steel structures " requirement, and diameter is not more than 30mm;
4) the two pieces of prefabricated concrete components 31 that are connected keep a fixed spacing (suitable 10~20cm), centre use diameter for The connection of connection reinforcing bar 334 (diameter is less than 30mm) of 20mm, not preferably less than 15 tons of single hole shear-carrying capacity;If concrete structure 31 spacing of part it is too small in addition close to when, the interim installation error in scene easily leads to the dislocation of connecting hole 332, at this time connects reinforcing bar 334 There can be the inclination of certain angle to be inserted into, be inserted into connecting hole 332 convenient for connection reinforcing bar 334;If be connected by screw bolts: working as connection In offset error, the diameter of bolt specification that side can only be used to wear connecting hole 332 is reduced, and then lowers holding for connector in hole 332 Carry power;And when there is the locking of connector caused by differential settlement in the concrete component 31 on rigid road base plate 3, even if using Acetylene torch is also not easily taken out the bolt that reinforcing bar cuts off rear thread junction and screw thread can also damage, therefore is not suitable between connecting plate It is connected by screw bolts;
5) it connects rigid 330 thickness of plate and is no less than 2cm, to ensure its bearing capacity and rigidity requirement;
6) spacing of the double hinge fishplate bars 33 of adjacent 2 PBL keyed is no more than not less than 0.8m (scene disseminate reinforcing bar needs) 1.2m (concrete component entirety stress needs);
7) gap about 10 to 20cm of prefabricated concrete component 31, the connection reinforcing bar if gap is too small, between connecting plate 334 interspersed insufficient spaces;Gap is excessive, and the globality of rigid road base plate 3 reduces, and differential settlement is significant.
1.1.4, parting and built-in diversion pipe
Mud capacity in the cast-in-situ bored pile of spiral-digging pore is in " zigzag growth ": when 1. drilling rod sinks, by drill bit The occupy-place of (considering that mud has little time to fill when sinking) and drilling rod (drilling rod is hollow unit, can accommodate mud), mud are excessive;② After drilling rod is promoted, reflux mud not only needs to supplement the occupy-place amount V1 of former drill bit and drilling rod, also needs to supplement this drilling depth earth excavation Volume V2.
Spiral digging machine drill pipe diameter 508mm, inside are nested 4~5 inner tubes, inner tube minimum diameter about 300mm, average wall thickness 2.5cm, for drilling depth based on 60m, volume needed for drilling rod itself is 1.885m3;Bit diameter 1.0m, highly about 1.5m, it is required Volume is 1.18m3.Therefore the excessive total amount V1 about 3.065m of mud3.Based on 0.8m, 1.0m cast-in-situ bored pile needs footage per bit The mud regurgitant volume V2 of supplement is 3.7m3
If mud supplements not in time, aperture mud liquid level sharply declines, and the casing bottom cubic metre of earth of initiation collapses (bottom heave Unstability, as shown in figure 9, a indicates bottom surface absolute altitude in figure;B indicates normal head;C indicates head after proposition drill bit;D indicates shield Cylinder;F indicates the trend of water penetration and the earthwork).Hole top retaining wall, which collapses, will cause original ground sinking, hold along with original ground ground The sharply downslide of power being carried, the operation stabilized platform of rotary drilling rig is lost, and drilling machine faces the risk toppled --- cast-in-situ bored pile is straight Diameter is smaller, and fluid change caused by same volume mud lacks is more significant.
Therefore, to accommodate excessive mud when spiral-digging pore, and slurry level in drilling is replenished in time, by law of connected vessels Mud equilibrium system is set:
1) interim mud storage region 21 is set on job platform periphery, and mud storage region 21 uses clay (antiseepage) It fills, top mark is tall and big in rotary digging stake job platform top mark 0.1m~0.2m, and the capacity of mud storage region 21 is not less than 1.5 times Peak value mud regurgitant volume V2;
2) buried depth for increasing steel pile casting, for 1.0m cast-in-situ bored pile, casing length (presses slurry liquid not less than 5.0m Sinking 1.5m in face considers);Area is opened up at the top of steel pile casting not less than 0.06m2Overflow hole, overflow hole top mark height is in rotary digging stake 0.2~0.4m of job platform.
Setting diversion pipe is both needed to for mud excessive and reflux in hole, each borehole circumference during ensuring pore-forming.Diversion pipe Scheme complements each other with 32 scheme of rigid road base plate piece:
When selecting external diversion trench, diversion trench is located at drill center line, therefore concrete component is divided along drill-pouring Pile center's line point;
When selecting built-in diversion trench, diversion trench is still located at drill center line, at this point, concrete component piece needs to be arranged The line of centres removes between Pile.
When the greatest problem that external diversion trench faces, concrete component is connected in external diversion trench region without effective, soft On soil base, in 100 tons or more rotary drilling rig operations, Yi Fasheng differential settlement, to the overall stability structure of job platform At adverse effect.Therefore built-in diversion pipe 33 is buried in the utility model use, built-in 33 arrangement form of diversion pipe has following four Feature:
1) built in built-in type diversion pipe 33 use unidirectional arrangement principle, i.e., when along bridge to setting circulation duct after, direction across bridge Diversion pipe 33 built in no setting is required;
2) diversion pipe 33 built in built-in type uses linear serial system, if penetrating through the direction after unidirectionally passing through dry hole Entire plate can two-way plasma discharge or benefit slurry for one borehole;It is spelled when the center of drilling hole location 34 is in rigid road base plate When stitching 32, then no setting is required in the direction parallel with rigid road base plate piece 32 built-in diversion pipe 33, rigid road base plate piece 32 is risen The effect of built-in diversion pipe 33
3) consider that plate thickness and flow restriction, built-in diversion pipe 33 select 2 diameters not on concrete component 31 Pvc pipe less than 150mm~200mm, pvc pipe center spacing are not less than 400mm;
4) pvc pipe (built-in diversion pipe 33) periphery setting diameter is not less than the silent stirrup of 100mm not less than 12mm, spacing 43 reinforce.
1.1.5, protected using angle steel bound edge
To ensure that job platform periphery concrete component 31 is not removed by rotary drilling rig crawler belt, along 31 straight line of concrete component The top angle that specification is no more than L50 type is arranged in side, and top angle has following requirement:
1) plate upper and lower faces are respectively provided with top angle;
2) along angle steel length direction at interval of 1 connection reinforcing bar of 40cm setting.Connection reinforcing bar is divided into vertical strengthening ribs and cross To reinforcing rib, wherein vertical strengthening ribs are arranged along short transverse, using [construction, connects upper and lower twice top angle;Another Cross reinforcing is arranged along in-plane, is constructed using L-type, passes through welding with the upper and lower layer steel mesh of mixed concrete component 31 Connection.
It is worth noting that the clear spacing of top angle short transverse is preferably greater than the double width for being hinged steel plate of PBL keyed, When clear distance deficiency, notch need to be reserved at the junction steel plate of top angle.
1.2, bed course basis
Setting bed course basis 1 is needed between rigid road base plate 3 and original state ground.Bed course basis 1 need to have following two feature:
1) basigamy preferably (is directed to sandy soil) or low-water-content, low void ratio (being directed to cohesive soil), convenient for compacting, it is ensured that just Property 1 bottom surface of base board is smooth;
2) filling-up thickness is about 20~30cm, i.e., in soft soil foundation, 1.5 times of the estimated sedimentation value of rigid road base plate 1.
1.3, clay embankment
On original-pack ground, around rigid road base plate 3 build three sides clay embankment 2, with rigid road base plate 1 it Between the region that surrounds, the remaining side of rigid road base plate 3 connect with construction occasional passage 5, faces as during spiral-digging pore operation When mud storage region 21.It goes along with sb. to guard him construction and has following feature:
1) it is filled using lesser materials of water penetrations such as clays, is in earth dam shape;
2) it is close with rigid road base plate making height to go along with sb. to guard him top mark height;
3) it goes along with sb. to guard him inner distance rigid road base plate Edge Distance preferably to control in 60cm or so, spacing is too small, mud amount of storage Deficiency causes mud to outflow;Spacing is excessive, and circulating mud amount increases, and is unfavorable for cost control and field management.
A kind of application method of soft soil foundation rotary drilling rig job platform of the utility model is specific as follows:
2, application method
The utility model is used including 3 parts such as manufacture, use and transition assembly.
2.1, it makes
In stake position cushion cap region, the bed course basis 1 that a layer thickness is no more than 30cm is filled, and pours a layer thickness and is no more than The plain concrete screed-coat of 5cm after intensity reaches requirement, is laid with counterdie of the oilcloth as rigid road base plate 3.
Top angle skeleton is made, is connected between upper and lower layer top angle using reinforcing bar, the dermoskeleton as rigid road base plate 3 Frame;
Rigid road base plate bottom layer of the reinforcing steel is bound, its protective layer thickness is determined using precast concrete cushion block;
Junction steel plate and pvc pipe are installed, are fixed temporarily between junction steel plate and top angle using spotweld, pvc pipe is (built-in Diversion pipe 35) both ends are closed using plastic foil, line clogging when avoiding concreting;
Using plank sheathing as rigid road base plate exterior sheathing, using foams as inner template --- i.e. concrete component 31 Between 10cm gap and reserved bore position filled using cystosepiment, and interrupted at the double hinge fishplate bars 33 of PBL keyed;
During concreting, ballast is given to foam formwork using stone, foam is avoided to float;
The concrete curing time is not less than 72 hours, during which needs sprinkling maintenance, can be used directly after intensity reaches 70%.
2.2, service stage
In the pore-forming stage, when drill bit is transferred, drill tip moving direction 8 is moved down at this time, and because of drilling bucket and drilling rod occupy-place, mud is moved Dynamic direction 9 is the movement of mud storage region 21 outward, excessive to clay embankment 2 and rigid by built-in diversion pipe 35 In interim mud storage region 21 between base board 3;When drill bit is promoted, drill tip moving direction 8 is moved up at this time, because of drilling It is taken outside the earthwork of part and drilling bucket, drilling rod occupy-place is withdrawn from, the mud liquid level decline in the hole location 34 that drills, at this point, mud moving direction 9 To be moved from the mud storage region 21 in outside into drilling, the mud in interim mud storage region 21 passes through built-in water conservancy diversion Pipe 33 is supplemented in drilling, according to law of connected vessels, maintains to drill similar in interior mud liquid level and 33 liquid level of mud storage region State.
In addition, to make rigid road base plate entirety uniform settlement, rotary drilling rig pore-forming sequence need in accordance with " symmetrical operation " principle, And by the sequence of angle point behind first edge rear center, first midpoint, by taking 9 common pile framings of municipal works as an example, sequence of specifically drilling As shown in Figure 3.
2.3, transition is assembled
After a upper cushion cap cast-in-situ bored pile completes construction, by the concrete component of precast concrete rigid road base plate 1 31 give transition one by one, and sequence is as follows:
1) the bed course basis that a layer thickness is 20~30cm is filled on new job platform;
2) by the connection reinforcing bar removal between the rigid road base plate of a upper cushion cap;When unevenly sinking occurs in rigid road base plate 1 When the locking of reinforcing bar caused by dropping, taken out after being cut off reinforcing bar using acetylene torch;
3) to the concrete component 31 of the rigid road base plate 1 before transition numbered respectively;
4) each block concrete component is transferred to by another cushion cap region using 70T autocrane in order;
5) using reinforcing bar connection with a pair of of connecting plate, wherein each connecting hole is both needed to setting shearing resistance on every piece of connecting plate Reinforcing bar locking;
6) outside rigid road base plate be arranged clay embankment 2, after enter service stage.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only the principles of the present invention, the utility model also has respectively on the premise of not departing from the spirit and scope of the utility model Kind changes and improvements, these changes and improvements are both fallen in the range of claimed invention.The requires of the utility model Protection scope defined by appended claims and its equivalent.

Claims (9)

1. a kind of soft soil foundation rotary drilling rig job platform, including bed course basic (1), clay embankment (2) and rigid road base Plate (3), it is characterised in that: the bed course basic (1) is located at lowest part, and the rigid road base plate (3) is placed on bed course basic (1) Side, three sides of the rigid road base plate (3) are surrounded with clay embankment (2), the rigid road base plate (3) the last one Side and construction occasional passage (5) are overlapped;The clay embankment (2) of three sides and rigid road base plate (3), which are equipped with, to be used for The mud storage region (21) of mud is stored, the rigid road base plate (3) is spliced to form by concrete component (31), the coagulation Native component (31) stitching portion is equipped with the double hinge fishplate bars (33) of PBL keyed, and concrete component (31) stitching portion is equipped with rigid road Substrate piece (32), drilling hole location (34) is equipped on the concrete component (31), and the concrete component (31) is equipped with It is connected to the built-in diversion pipe (35) of drilling hole location (34), is equipped with pvc pipe in the built-in diversion pipe (35), it is described built-in to lead Flow tube (35) one end is communicated to drilling hole location (34), the other end is communicated to mud storage region (21) or rigid road base plate piece (32), built-in diversion pipe (35) periphery is equipped with silent stirrup (43).
2. a kind of soft soil foundation rotary drilling rig job platform according to claim 1, it is characterised in that: the concrete Bilevel steel mesh (4) are equipped in component (31), the longitudinal direction of the concrete component (31) is equipped with built in two and leads Flow tube (35);The short side edge direction of the concrete component (31) is equipped with diversion pipe (35) built in single, the built-in diversion pipe (35) between the steel mesh (4) of upper and lower level.
3. a kind of soft soil foundation rotary drilling rig job platform according to claim 1, it is characterised in that: the PBL key The double hinge fishplate bars (33) of formula are equipped with junction steel plate (330), and the junction steel plate (330) is equipped with anchor hole (331) and connecting hole (332), the anchor hole (331) is set on the junction steel plate (330) on the inside of concrete component (31), the concrete component (31) anchor hole (331) is provided on thickness direction, the connecting hole (332) is set on the outside of concrete component (31) Junction steel plate (330) on, setting is there are two connecting hole (332) on the thickness direction of the concrete component (31).
4. a kind of soft soil foundation rotary drilling rig job platform according to claim 1, it is characterised in that: the concrete At least provided with three anchor holes (331) on the length direction of component (31), set on the length direction of the concrete component (31) It is equipped with a connecting hole (332), is equipped in the anchor hole (331) and is fixed on the internal anchor bar of concrete component (31) (333), the connecting hole (332) is equipped with the connection reinforcing bar (334) being located in rigid road base plate piece (32).
5. a kind of soft soil foundation rotary drilling rig job platform according to claim 1, it is characterised in that: each pair of described Double hinge fishplate bar (33) spacing of PBL keyed are not less than 0.8m and are no more than 1.2m, the spacing of the rigid road base plate piece (32) It is 10 to 20cm.
6. a kind of soft soil foundation rotary drilling rig job platform according to claim 2, it is characterised in that: described is silent The diameter of stirrup (43) is not less than 12mm.
7. a kind of soft soil foundation rotary drilling rig job platform according to claim 1, it is characterised in that: the concrete The lower planes of component (31) are equipped with top angle (6), and the length direction along the top angle (6) is arranged at intervals with vertically Reinforcing rib (62) and cross reinforcing (61), the vertical strengthening ribs (62) set along the short transverse of concrete component (31) It sets, is constructed using half hollow, connect the top angle (6) of upper and lower plane;The cross reinforcing (61) is along concrete component (31) in-plane setting, is constructed using L-type, is welded respectively with the upper and lower layer steel mesh (4) in respective plane.
8. a kind of soft soil foundation rotary drilling rig job platform according to claim 1, it is characterised in that: the bed course base Plinth (1) selects the material of low-water-content, low void ratio, it is described state bed course basic (1) with a thickness of 20 to 30cm.
9. a kind of soft soil foundation rotary drilling rig job platform according to claim 1, it is characterised in that: the clay is anti- Bank protection (2) selects the material of low permeability and is in earth dam shape, height and rigid road base plate (3) of the clay embankment (2) Height is consistent, and the volume of the mud storage region (21) is at least 1.5 times of mud spill-out peak value.
CN201822139789.5U 2018-12-19 2018-12-19 A kind of soft soil foundation rotary drilling rig job platform Active CN209556935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822139789.5U CN209556935U (en) 2018-12-19 2018-12-19 A kind of soft soil foundation rotary drilling rig job platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822139789.5U CN209556935U (en) 2018-12-19 2018-12-19 A kind of soft soil foundation rotary drilling rig job platform

Publications (1)

Publication Number Publication Date
CN209556935U true CN209556935U (en) 2019-10-29

Family

ID=68302971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822139789.5U Active CN209556935U (en) 2018-12-19 2018-12-19 A kind of soft soil foundation rotary drilling rig job platform

Country Status (1)

Country Link
CN (1) CN209556935U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356530A (en) * 2018-12-19 2019-02-19 宁波市政工程建设集团股份有限公司 A kind of soft soil foundation rotary drilling rig job platform and application method
CN113006706A (en) * 2020-12-16 2021-06-22 宁波市政工程建设集团股份有限公司 Steel-mixed rotary drilling rig operation platform and construction method thereof
CN113550309A (en) * 2021-08-26 2021-10-26 上海城建市政工程(集团)有限公司 Construction method of multi-pile-hole combined steel platform capable of preventing slurry from overflowing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356530A (en) * 2018-12-19 2019-02-19 宁波市政工程建设集团股份有限公司 A kind of soft soil foundation rotary drilling rig job platform and application method
CN113006706A (en) * 2020-12-16 2021-06-22 宁波市政工程建设集团股份有限公司 Steel-mixed rotary drilling rig operation platform and construction method thereof
CN113550309A (en) * 2021-08-26 2021-10-26 上海城建市政工程(集团)有限公司 Construction method of multi-pile-hole combined steel platform capable of preventing slurry from overflowing

Similar Documents

Publication Publication Date Title
CN108035335B (en) Method for constructing shaft type underground parking garage by freezing method
CN112554177B (en) Construction method of ultra-long small-diameter cast-in-situ bored pile
CN209556935U (en) A kind of soft soil foundation rotary drilling rig job platform
CN107524142A (en) A kind of holing with slurry wall protection cast-in-place pile construction method
Godavarthi et al. Contiguous pile wall as a deep excavation supporting system
CN109371763B (en) Construction method of high-groundwater-level low-filling shallow-excavation expansive soil subgrade
CN108547641A (en) The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel
CN107794942A (en) Riverbed comprehensive pipe gallery structure and its construction method are worn under one kind
CN111705786A (en) Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile
CN104164881A (en) Piling wall overlapping cantilever foundation pit support construction method and structure
CN109356530A (en) A kind of soft soil foundation rotary drilling rig job platform and application method
CN115653000A (en) Gravity pipe gallery in-situ protection structure system in foundation pit range and construction method
CN106884431A (en) One kind building pit foundation construction safety supporting construction
CN102493485B (en) Method for building slope protection retaining wall during filling
CN113737780A (en) Underwater rock-socketed concrete pile and construction method thereof
CN112832690B (en) Rotary drilling rig operation platform for stratum with upper soft layer and lower hard layer and construction method thereof
CN212200402U (en) One shot forming PHC tubular pile prevents frostbite and expands drilling equipment
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN210105867U (en) Shield tunnel end frozen soil wall and ground are wall jointly reinforced structure
CN209353284U (en) Two bors d's oeuveres channel steel upright post formula water-break well and assembling type steel structure water-break system
CN113006706A (en) Steel-mixed rotary drilling rig operation platform and construction method thereof
CN110424488A (en) A kind of construction method of diaphram wall
CN218757568U (en) Transverse pipeline left groove and then closed open caisson
CN215165764U (en) Double-raft system operation platform suitable for rotary drilling rig operation in upper soft and lower hard strata
CN114753231B (en) Frame beam lattice bridge structure crossing underground pipeline and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant