CN206396574U - A kind of full landform retaining delay discharge floor tile and its floor brick paving - Google Patents

A kind of full landform retaining delay discharge floor tile and its floor brick paving Download PDF

Info

Publication number
CN206396574U
CN206396574U CN201621131415.3U CN201621131415U CN206396574U CN 206396574 U CN206396574 U CN 206396574U CN 201621131415 U CN201621131415 U CN 201621131415U CN 206396574 U CN206396574 U CN 206396574U
Authority
CN
China
Prior art keywords
floor tile
retaining
chamber
full landform
delay discharge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621131415.3U
Other languages
Chinese (zh)
Inventor
高恬芳
高进展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Te Ban Of Xiamen Guoan Industry Science And Technology Ltd
Original Assignee
Te Ban Of Xiamen Guoan Industry Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Te Ban Of Xiamen Guoan Industry Science And Technology Ltd filed Critical Te Ban Of Xiamen Guoan Industry Science And Technology Ltd
Priority to CN201621131415.3U priority Critical patent/CN206396574U/en
Application granted granted Critical
Publication of CN206396574U publication Critical patent/CN206396574U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of full landform retaining delay discharge floor tile and its floor brick paving, belongs to building floor tile technical field.It solves existing floor tile and dredges ponding ability to be easily caused the problem of flood causes disaster.This full landform retaining delay discharge floor tile, including floor tile body, there is retaining cavity in floor tile body, water on floor tile upper surface is entered by water guide structure in above-mentioned retaining cavity, retaining cavity one end has opening surface and is in communication with the outside by opening surface, the other end has sealing surface, there is the gap and the seepage mouth positioned at bottom positioned at upper end on the sealing surface, gap connects above-mentioned retaining cavity and the external world with seepage mouth, and the displacement of gap is bigger than seepage mouth.This full landform retaining delay discharge floor tile have the advantages that can water storage slowly draining, the water to discharge can collect recycling again.

Description

A kind of full landform retaining delay discharge floor tile and its floor brick paving
Technical field
The utility model belongs to building floor tile technical field, is related to a kind of full landform retaining delay discharge and by rainwater The floor tile and its floor brick paving of Collection utilization.
Background technology
General on town road, community's road and square road surface at present to lay floor tile, the floor tile is with granite, entity Based on brick, cement tile etc., this kind of floor tile is mutually abutted in laying, causes to be tightly combined between floor tile, the mesh so laid Be the smooth and intensity for ensureing road surface, but be due to that against close, impenetrably brick oozes rainwater when rainy between floor tile Enter ground end, easily produce ponding.
Brick structure is improved later people over the ground, the structures such as priming hole is devised on floor tile, then in floor tile The osculum that portion is designed between osculum, adjacent two floor tile is interconnected, and the rainwater on floor tile is incorporated into osculum by priming hole In, then discharged it by osculum.But it there are problems that:Particularly on acclive road, than if any the gradient Square, water is constantly discharged into physical features by osculum lower ground on brick, and in the flow of water positioned at physical features higher floor tile Can promotion under, water flow velocity is very fast, and flow is also larger, thus physical features lower brick flooring due to can not be in time to discharging what is come Water is dredged away and can frequently result in flood and cause disaster, and when especially running into torrential rain again, situation will be even worse.
The content of the invention
The purpose of this utility model is there is above mentioned problem for existing technology, it is proposed that one kind can water storage again can delay Slow draining, the full landform retaining delay discharge floor tile for collecting recycling.
Another purpose of the present utility model proposes by controlling the drain discharge of every piece of floor tile to realize that anxious water delays Row discharges floor brick paving so as to avoid the full landform retaining that the situation that flood causes disaster on the low floor tile face of physical features occurs from being delayed.
The purpose of this utility model can be realized by following technical proposal:A kind of full landform retaining delay discharge floor In brick, including floor tile body, floor tile body there is the water on retaining cavity, floor tile upper surface to enter by water guide structure Into above-mentioned retaining cavity, it is characterised in that:Described retaining cavity one end has opening surface and connected by opening surface with extraneous Logical, the other end has the gap and the seepage mouth positioned at bottom having on sealing surface, the sealing surface positioned at upper end, institute The gap stated connects above-mentioned retaining cavity and the external world with seepage mouth, and the displacement of described gap is bigger than seepage mouth.
In a kind of above-mentioned full landform retaining delay discharge floor tile, described water guide structure includes being opened in floor tile The surface groove of body upper surface and the lead angle drainage trough being arranged on a floor tile body wherein corner, described surface groove Turned on by the guiding gutter one and above-mentioned retaining cavity that are opened on floor tile body, described lead angle drainage trough passes through guiding gutter Two turn on above-mentioned retaining cavity.
In a kind of above-mentioned full landform retaining delay discharge floor tile, described water guide structure is also opened up including several Drain gully on floor tile body and at above-mentioned sealing surface, the drain gully passes through above-mentioned gap and retaining inner chamber Conducting.
It is delayed in a kind of above-mentioned full landform retaining in discharge floor tile, separates in described retaining cavity provided with two and add Retaining cavity is separated into three inner chambers by rib one, two described separation ribbed stiffeners one, is from left to right followed successively by left chamber, lumen And right chamber, above-mentioned surface groove turned on by guiding gutter one and lumen, and the lead angle drainage trough is led by guiding gutter two and right chamber It is logical.
In a kind of above-mentioned full landform retaining delay discharge floor tile, described left chamber and the cross section of right chamber are short The underlying inverted trapezoidal structure in side, described lumen cross section is short side trapezoid structure above.
It is delayed in a kind of above-mentioned full landform retaining in discharge floor tile, separates in described retaining cavity provided with one and add Retaining cavity is separated into two inner chambers, respectively left inside chamber and right inner chamber, above-mentioned table by rib two, described separation ribbed stiffener two Face groove is both turned on by guiding gutter one with left inside chamber and right inner chamber, and described lead angle drainage trough passes through guiding gutter two and right inner chamber Conducting.
In a kind of above-mentioned full landform retaining delay discharge floor tile, described left inside chamber as right inner chamber size, Its cross section is rectangle and four corner roundings.
A kind of full landform retaining delay discharge floor brick paving, it is characterised in that:Spliced in length and breadth by multiple above-mentioned floor tiles Form, in same row, described sealing surface contacts connection with the opening surface of adjacent floor tile, the drain gully also with adjacent floor The retaining cavity conducting of brick, floor tile between the column and the column is setting of mutually staggering.
Compared with prior art, this floor tile has following several advantages:
1st, quickly the water on floor tile is directed in retaining cavity in time by three kinds of conduit pipes, prevents rainwater mistake Greatly can not diversion in time is into retaining cavity and surface gathered water is serious;
2nd, retaining and draining are carried out simultaneously, reach the effect of the slow row of anxious water, so as to preventing for acclive road surface or The phenomenon that the road surface flood that the places such as square cause physical features low because draining is too fast causes disaster occurs.
Brief description of the drawings
Fig. 1 is the structural representation of this floor tile.
Fig. 2 is the cross-sectional structure figure in Fig. 1.
Fig. 3 is the floor brick paving of floor tile formation in Fig. 1.
Fig. 4 is another structural representation of this floor tile.
Fig. 5 is the cross-sectional structure figure in Fig. 4.
In figure, 1, floor tile body;2nd, left chamber;3rd, lumen;4th, right chamber;5th, ribbed stiffener one is separated;51st, limbers;6th, table Face groove;7th, guiding gutter one;8th, lead angle drainage trough;9th, guiding gutter two;10th, drain gully;11st, sealing surface;12nd, seepage mouth;13rd, overflow The mouth of a river;14th, ribbed stiffener two is separated;15th, left inside chamber;16th, right inner chamber.
Embodiment
The following is specific embodiment of the utility model and with reference to accompanying drawing, further is made to the technical solution of the utility model Description, but the utility model is not limited to these embodiments.
Embodiment one
As shown in Figure 1,2 and 3, this full landform retaining delay discharge floor tile includes floor tile body 1, floor tile body 1 Interior to have retaining cavity, retaining cavity one end has opening surface and is in communication with the outside by opening surface, and the other end has sealing surface 11, there is on sealing surface 11 gap 13 and the seepage mouth 12 positioned at bottom positioned at upper end.
Provided with two separation ribbed stiffeners 1 in retaining cavity, two separate ribbed stiffener 1 and retaining cavity are separated into three Inner chamber, is from left to right followed successively by left chamber 2, lumen 3 and right chamber 4, and support can be had to floor tile body 1 by separating ribbed stiffener 1 Increase the effect of intensity, so that floor tile body 1 is firmer.Seepage mouth 12 is one, is turned on lumen 3;Gap 13 For two, turn on respectively positioned at the top of the left and right sides of seepage mouth 12 and with left chamber 2 and right chamber 4 respectively, in left chamber 2 and right chamber 4 Turned on by a limbers 51 and lumen 3, a limbers 51 is all provided with every separation ribbed stiffener 1.
The cross section of left chamber 2 and right chamber 4 is the underlying inverted trapezoidal structure of short side, and the cross section of lumen 3 is short side position Trapezoid structure in top.
Water on floor tile upper surface is to be introduced in by water guide structure in retaining cavity, and this water guide structure includes Three water guide channels, first water guide channel includes the surface groove 6 and conductive surface for being opened in the upper surface of floor tile body 1 The guiding gutter 1 of groove 6 and lumen 3.Surface groove 6 is located at the surface of lumen 3 and through the upper table of whole floor tile body 1 Face, guiding gutter 1 is located at opening surface, and the water of floor tile upper surface, which is collected, to be converged in surface groove 6, then passes through water guide Groove 1 is introduced in lumen 3, and the water in lumen 3 is slowly discharged into the lumen 3 of next floor tile by seepage mouth 12, Then slowly it is discharged into next but one floor tile, is so discharged successively by seepage mouth 12 thereon again.
Article 2 water guide channel includes the lead angle drainage trough 8 being arranged on the wherein corner of floor tile body 1 and conducting Lead angle drainage trough 8 and the guiding gutter of right chamber 429, have cut a part on one jiao of floor tile body 1, form a breach Namely lead angle drainage trough 8, after so adjacent floor tile body 1 splices, its junction of floor tile body 1 just forms water guide and led to Road, then the water part on floor tile is introduced in right chamber 4 by lead angle drainage trough 8, guiding gutter 29 is stored in right chamber In 4, lumen 3 and then slow discharge are entered by limbers 51 after the water in right chamber 4 is accumulated to a certain extent.
Article 3 water guide channel includes two drain gullies being opened on floor tile body 1 and at sealing surface 11 10, two drain gullies 10 correspond to two gaps 13 respectively, and pass through each self-corresponding gap 13 and right chamber 4 and left chamber respectively 2 connections, the two drain gullies 10 be close to after road surfacing well with the opening surface of adjacent floor tile body 1 and with storage thereon Water cavity is turned on.During the water being introduced into from this water guide channel enters directly into the retaining cavity of adjacent floor tile body 1, Ran Houhuan Slow draining.
Full landform retaining delay discharge floor brick paving is spliced in length and breadth by multiple floor tiles, in same row, sealing surface 11 contact connection with the opening surface of adjacent floor tile, and drain gully 10 is also turned on the retaining cavity of adjacent floor tile, in same row Floor tile body 1 it is adjacent between retaining cavity turned on by seepage mouth 12 and gap 13, floor tile between the column and the column For setting of mutually staggering.A water part enters lumen 3 by first water guide channel on road surface, in the retaining of lumen 3, delays simultaneously Slowly it is discharged into by seepage mouth 12 next;Some water is introduced in right chamber 4 by Article 2 water guide channel and stored up Deposit, when be stored into certain altitude by limbers 51 enter lumen 3 then by seepage mouth 12 slowly discharge;Remaining one Divide water to be introduced in right chamber 4 and left chamber 2 by Article 3 water guide channel to store, limbers 51 is passed through when being stored into certain altitude Enter lumen 3 and then slowly discharged by seepage mouth 12, play the effect discharged in storage.When running into precipitation than larger Heavy rain etc. when, the water level that its seepage mouth 12 has little time in discharge, lumen 3 is quickly raised, and reservoir storage is excessive, when water level is higher than overflowing During the mouth of a river 13, the assisted drainage of gap 13, the water in lumen 3 discharge the storage of next floor tile body 1 by gap 13 In water cavity, because the discharge of the water-carrying capacity of gap 13 is more much larger than seepage mouth 12, assisted drainage effect is played, retaining is empty Chamber will not generally be completely filled with water so that the water on road surface can not be incorporated into retaining cavity.Its retaining cavity volume It is larger, relatively large number of water can be stored, while seepage mouth 12 and gap 13 are used for discharging water, its openings of sizes controls to arrange Size high-volume, so as to play the effect of the slow row of anxious water, the low ground of its physical features will not discharge water because of the floor tile of high-land Amount is excessive and flood causes disaster.
Embodiment two
As shown in Figures 4 and 5, the present embodiment and the difference of embodiment one are:Provided with a separation in retaining cavity Ribbed stiffener 2 14, separates ribbed stiffener 2 14 and retaining cavity is separated into two inner chambers, respectively left inside chamber 15 and right inner chamber 16, table Face groove is both turned on by guiding gutter one with left inside chamber 15 and right inner chamber 16, and lead angle drainage trough passes through guiding gutter two and right inner chamber 16 Conducting.Seepage mouth is two, is turned on respectively with left inside chamber 15 and right inner chamber 16, and gap is two, directly over seepage mouth, And turned on respectively with left inside chamber 15 and right inner chamber 16.Drain gully is two, at sealing surface, is led respectively with two gaps It is logical.Left inside chamber 15 is as the right size of inner chamber 16, and its cross section is rectangle and four corner roundings.Other structures and principle are equal It is identical with embodiment one, it will not be repeated here.
Specific embodiment described herein is only to the utility model spirit explanation for example.The utility model institute Category those skilled in the art can make various modifications or supplement or using similar to described specific embodiment Mode substitute, but without departing from spirit of the present utility model or surmount scope defined in appended claims.

Claims (8)

1. there is retaining in a kind of full landform retaining delay discharge floor tile, including floor tile body (1), floor tile body (1) Water on cavity, floor tile upper surface is entered by water guide structure in above-mentioned retaining cavity, it is characterised in that:The retaining Cavity one end has opening surface and is in communication with the outside by opening surface, and the other end has sealing surface (11), the sealing surface (11) Upper gap (13) and the seepage mouth (12) positioned at bottom, described gap (13) and seepage mouth with positioned at upper end (12) the above-mentioned retaining cavity of connection and the external world, the displacement of described gap (13) are bigger than seepage mouth (12).
2. a kind of full landform retaining delay discharge floor tile according to claim 1, it is characterised in that described water guide knot Structure includes being opened in the surface groove (6) of floor tile body (1) upper surface and being arranged on floor tile body (1) wherein corner Lead angle drainage trough (8), described surface groove (6) by be opened in the guiding gutter one (7) on floor tile body (1) with it is above-mentioned Retaining cavity is turned on, and described lead angle drainage trough (8) is turned on by guiding gutter two (9) and above-mentioned retaining cavity.
3. a kind of full landform retaining delay discharge floor tile according to claim 2, it is characterised in that described water guide knot Structure also includes several and is opened on floor tile body (1) and positioned at the drain gully (10) at above-mentioned sealing surface (11) place, it is described fall The mouth of a river (10) is turned on by above-mentioned gap (13) and retaining cavity.
4. a kind of full landform retaining delay discharge floor tile according to claim 3, it is characterised in that described retaining is empty Intracavitary separates ribbed stiffener one (5) provided with two, and retaining cavity is separated into three by two described separation ribbed stiffeners one (5) Chamber, is from left to right followed successively by left chamber (2), lumen (3) and right chamber (4), above-mentioned surface groove (6) is by guiding gutter one (7) with Chamber (3) is turned on, and the lead angle drainage trough (8) is turned on by guiding gutter two (9) and right chamber (4).
5. a kind of full landform retaining delay discharge floor tile according to claim 4, it is characterised in that described left chamber (2) and the cross section of right chamber (4) is the underlying inverted trapezoidal structure of short side, described lumen (3) cross section is short side position Trapezoid structure in top.
6. a kind of full landform retaining delay discharge floor tile according to claim 3, it is characterised in that described retaining is empty Intracavitary separates ribbed stiffener two (14) provided with one, and retaining cavity is separated into two inner chambers by described separation ribbed stiffener two (14), Respectively left inside chamber (15) and right inner chamber (16), above-mentioned surface groove pass through guiding gutter one and left inside chamber (15) and right inner chamber (16) It is both turned on, described lead angle drainage trough is turned on by guiding gutter two and right inner chamber (16).
7. a kind of full landform retaining delay discharge floor tile according to claim 6, it is characterised in that described left inside chamber (15) as right inner chamber (16) size, its cross section is rectangle and four corner roundings.
8. a kind of full landform retaining delay discharge floor brick paving, it is characterised in that:Appoint in multiple the claims 3~7 Floor tile is spliced in length and breadth described in one, in same row, and described sealing surface (11) contacts company with the opening surface of adjacent floor tile Connect, the drain gully (10) also turns on the retaining cavity of adjacent floor tile, and floor tile between the column and the column sets mutually to stagger Put.
CN201621131415.3U 2016-10-18 2016-10-18 A kind of full landform retaining delay discharge floor tile and its floor brick paving Expired - Fee Related CN206396574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621131415.3U CN206396574U (en) 2016-10-18 2016-10-18 A kind of full landform retaining delay discharge floor tile and its floor brick paving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621131415.3U CN206396574U (en) 2016-10-18 2016-10-18 A kind of full landform retaining delay discharge floor tile and its floor brick paving

Publications (1)

Publication Number Publication Date
CN206396574U true CN206396574U (en) 2017-08-11

Family

ID=59507764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621131415.3U Expired - Fee Related CN206396574U (en) 2016-10-18 2016-10-18 A kind of full landform retaining delay discharge floor tile and its floor brick paving

Country Status (1)

Country Link
CN (1) CN206396574U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436519A (en) * 2016-10-18 2017-02-22 厦门国安特板业科技有限公司 All-terrain water-storage and delayed-discharge floor tile and floor tile pavement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436519A (en) * 2016-10-18 2017-02-22 厦门国安特板业科技有限公司 All-terrain water-storage and delayed-discharge floor tile and floor tile pavement

Similar Documents

Publication Publication Date Title
CN101067313B (en) Draining method and draining and irrigating tube thereof
CN112982835B (en) Planting roofing siphon drainage collecting system
CN209941698U (en) Side slope drainage structure capable of being recycled
CN204875442U (en) Pavement ceramic tile and pavement
CN217053410U (en) Water seepage and drainage structure for green belt at edge of urban road
CN106087648B (en) A kind of special Quick drainage of urban road and irrigation system
CN206396574U (en) A kind of full landform retaining delay discharge floor tile and its floor brick paving
CN102322094A (en) Road surface combined drainage system
CN106436519A (en) All-terrain water-storage and delayed-discharge floor tile and floor tile pavement
JP2006132320A (en) Boundary block
CN210507029U (en) Road drainage structure
CN209652959U (en) Connected vessels type foundation pit drop and drainage structure
JP2006132320A5 (en)
CN103993578A (en) Overlapped type double-channel irrigation and drainage ridge
CN210315121U (en) Road surface drainage system
CN210151514U (en) Drainage floor tile
CN202202393U (en) Comprehensive road surface drainage system
CN213114153U (en) Road surface water permeable brick
CN108179677A (en) Sponge urban water-through pavement
CN110206048B (en) Highway side slope greening system
CN109610265B (en) Bury municipal square rainwater collection system
CN213389558U (en) Municipal administration permeable pavement structure
CN206561028U (en) refuse landfill
CN115419088B (en) Drainage structure of open cut tunnel
CN216130307U (en) Slope drainage ditch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170811

Termination date: 20211018

CF01 Termination of patent right due to non-payment of annual fee