CN206396574U - A kind of full landform retaining delay discharge floor tile and its floor brick paving - Google Patents
A kind of full landform retaining delay discharge floor tile and its floor brick paving Download PDFInfo
- Publication number
- CN206396574U CN206396574U CN201621131415.3U CN201621131415U CN206396574U CN 206396574 U CN206396574 U CN 206396574U CN 201621131415 U CN201621131415 U CN 201621131415U CN 206396574 U CN206396574 U CN 206396574U
- Authority
- CN
- China
- Prior art keywords
- floor tile
- retaining
- chamber
- full landform
- delay discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a kind of full landform retaining delay discharge floor tile and its floor brick paving, belongs to building floor tile technical field.It solves existing floor tile and dredges ponding ability to be easily caused the problem of flood causes disaster.This full landform retaining delay discharge floor tile, including floor tile body, there is retaining cavity in floor tile body, water on floor tile upper surface is entered by water guide structure in above-mentioned retaining cavity, retaining cavity one end has opening surface and is in communication with the outside by opening surface, the other end has sealing surface, there is the gap and the seepage mouth positioned at bottom positioned at upper end on the sealing surface, gap connects above-mentioned retaining cavity and the external world with seepage mouth, and the displacement of gap is bigger than seepage mouth.This full landform retaining delay discharge floor tile have the advantages that can water storage slowly draining, the water to discharge can collect recycling again.
Description
Technical field
The utility model belongs to building floor tile technical field, is related to a kind of full landform retaining delay discharge and by rainwater
The floor tile and its floor brick paving of Collection utilization.
Background technology
General on town road, community's road and square road surface at present to lay floor tile, the floor tile is with granite, entity
Based on brick, cement tile etc., this kind of floor tile is mutually abutted in laying, causes to be tightly combined between floor tile, the mesh so laid
Be the smooth and intensity for ensureing road surface, but be due to that against close, impenetrably brick oozes rainwater when rainy between floor tile
Enter ground end, easily produce ponding.
Brick structure is improved later people over the ground, the structures such as priming hole is devised on floor tile, then in floor tile
The osculum that portion is designed between osculum, adjacent two floor tile is interconnected, and the rainwater on floor tile is incorporated into osculum by priming hole
In, then discharged it by osculum.But it there are problems that:Particularly on acclive road, than if any the gradient
Square, water is constantly discharged into physical features by osculum lower ground on brick, and in the flow of water positioned at physical features higher floor tile
Can promotion under, water flow velocity is very fast, and flow is also larger, thus physical features lower brick flooring due to can not be in time to discharging what is come
Water is dredged away and can frequently result in flood and cause disaster, and when especially running into torrential rain again, situation will be even worse.
The content of the invention
The purpose of this utility model is there is above mentioned problem for existing technology, it is proposed that one kind can water storage again can delay
Slow draining, the full landform retaining delay discharge floor tile for collecting recycling.
Another purpose of the present utility model proposes by controlling the drain discharge of every piece of floor tile to realize that anxious water delays
Row discharges floor brick paving so as to avoid the full landform retaining that the situation that flood causes disaster on the low floor tile face of physical features occurs from being delayed.
The purpose of this utility model can be realized by following technical proposal:A kind of full landform retaining delay discharge floor
In brick, including floor tile body, floor tile body there is the water on retaining cavity, floor tile upper surface to enter by water guide structure
Into above-mentioned retaining cavity, it is characterised in that:Described retaining cavity one end has opening surface and connected by opening surface with extraneous
Logical, the other end has the gap and the seepage mouth positioned at bottom having on sealing surface, the sealing surface positioned at upper end, institute
The gap stated connects above-mentioned retaining cavity and the external world with seepage mouth, and the displacement of described gap is bigger than seepage mouth.
In a kind of above-mentioned full landform retaining delay discharge floor tile, described water guide structure includes being opened in floor tile
The surface groove of body upper surface and the lead angle drainage trough being arranged on a floor tile body wherein corner, described surface groove
Turned on by the guiding gutter one and above-mentioned retaining cavity that are opened on floor tile body, described lead angle drainage trough passes through guiding gutter
Two turn on above-mentioned retaining cavity.
In a kind of above-mentioned full landform retaining delay discharge floor tile, described water guide structure is also opened up including several
Drain gully on floor tile body and at above-mentioned sealing surface, the drain gully passes through above-mentioned gap and retaining inner chamber
Conducting.
It is delayed in a kind of above-mentioned full landform retaining in discharge floor tile, separates in described retaining cavity provided with two and add
Retaining cavity is separated into three inner chambers by rib one, two described separation ribbed stiffeners one, is from left to right followed successively by left chamber, lumen
And right chamber, above-mentioned surface groove turned on by guiding gutter one and lumen, and the lead angle drainage trough is led by guiding gutter two and right chamber
It is logical.
In a kind of above-mentioned full landform retaining delay discharge floor tile, described left chamber and the cross section of right chamber are short
The underlying inverted trapezoidal structure in side, described lumen cross section is short side trapezoid structure above.
It is delayed in a kind of above-mentioned full landform retaining in discharge floor tile, separates in described retaining cavity provided with one and add
Retaining cavity is separated into two inner chambers, respectively left inside chamber and right inner chamber, above-mentioned table by rib two, described separation ribbed stiffener two
Face groove is both turned on by guiding gutter one with left inside chamber and right inner chamber, and described lead angle drainage trough passes through guiding gutter two and right inner chamber
Conducting.
In a kind of above-mentioned full landform retaining delay discharge floor tile, described left inside chamber as right inner chamber size,
Its cross section is rectangle and four corner roundings.
A kind of full landform retaining delay discharge floor brick paving, it is characterised in that:Spliced in length and breadth by multiple above-mentioned floor tiles
Form, in same row, described sealing surface contacts connection with the opening surface of adjacent floor tile, the drain gully also with adjacent floor
The retaining cavity conducting of brick, floor tile between the column and the column is setting of mutually staggering.
Compared with prior art, this floor tile has following several advantages:
1st, quickly the water on floor tile is directed in retaining cavity in time by three kinds of conduit pipes, prevents rainwater mistake
Greatly can not diversion in time is into retaining cavity and surface gathered water is serious;
2nd, retaining and draining are carried out simultaneously, reach the effect of the slow row of anxious water, so as to preventing for acclive road surface or
The phenomenon that the road surface flood that the places such as square cause physical features low because draining is too fast causes disaster occurs.
Brief description of the drawings
Fig. 1 is the structural representation of this floor tile.
Fig. 2 is the cross-sectional structure figure in Fig. 1.
Fig. 3 is the floor brick paving of floor tile formation in Fig. 1.
Fig. 4 is another structural representation of this floor tile.
Fig. 5 is the cross-sectional structure figure in Fig. 4.
In figure, 1, floor tile body;2nd, left chamber;3rd, lumen;4th, right chamber;5th, ribbed stiffener one is separated;51st, limbers;6th, table
Face groove;7th, guiding gutter one;8th, lead angle drainage trough;9th, guiding gutter two;10th, drain gully;11st, sealing surface;12nd, seepage mouth;13rd, overflow
The mouth of a river;14th, ribbed stiffener two is separated;15th, left inside chamber;16th, right inner chamber.
Embodiment
The following is specific embodiment of the utility model and with reference to accompanying drawing, further is made to the technical solution of the utility model
Description, but the utility model is not limited to these embodiments.
Embodiment one
As shown in Figure 1,2 and 3, this full landform retaining delay discharge floor tile includes floor tile body 1, floor tile body 1
Interior to have retaining cavity, retaining cavity one end has opening surface and is in communication with the outside by opening surface, and the other end has sealing surface
11, there is on sealing surface 11 gap 13 and the seepage mouth 12 positioned at bottom positioned at upper end.
Provided with two separation ribbed stiffeners 1 in retaining cavity, two separate ribbed stiffener 1 and retaining cavity are separated into three
Inner chamber, is from left to right followed successively by left chamber 2, lumen 3 and right chamber 4, and support can be had to floor tile body 1 by separating ribbed stiffener 1
Increase the effect of intensity, so that floor tile body 1 is firmer.Seepage mouth 12 is one, is turned on lumen 3;Gap 13
For two, turn on respectively positioned at the top of the left and right sides of seepage mouth 12 and with left chamber 2 and right chamber 4 respectively, in left chamber 2 and right chamber 4
Turned on by a limbers 51 and lumen 3, a limbers 51 is all provided with every separation ribbed stiffener 1.
The cross section of left chamber 2 and right chamber 4 is the underlying inverted trapezoidal structure of short side, and the cross section of lumen 3 is short side position
Trapezoid structure in top.
Water on floor tile upper surface is to be introduced in by water guide structure in retaining cavity, and this water guide structure includes
Three water guide channels, first water guide channel includes the surface groove 6 and conductive surface for being opened in the upper surface of floor tile body 1
The guiding gutter 1 of groove 6 and lumen 3.Surface groove 6 is located at the surface of lumen 3 and through the upper table of whole floor tile body 1
Face, guiding gutter 1 is located at opening surface, and the water of floor tile upper surface, which is collected, to be converged in surface groove 6, then passes through water guide
Groove 1 is introduced in lumen 3, and the water in lumen 3 is slowly discharged into the lumen 3 of next floor tile by seepage mouth 12,
Then slowly it is discharged into next but one floor tile, is so discharged successively by seepage mouth 12 thereon again.
Article 2 water guide channel includes the lead angle drainage trough 8 being arranged on the wherein corner of floor tile body 1 and conducting
Lead angle drainage trough 8 and the guiding gutter of right chamber 429, have cut a part on one jiao of floor tile body 1, form a breach
Namely lead angle drainage trough 8, after so adjacent floor tile body 1 splices, its junction of floor tile body 1 just forms water guide and led to
Road, then the water part on floor tile is introduced in right chamber 4 by lead angle drainage trough 8, guiding gutter 29 is stored in right chamber
In 4, lumen 3 and then slow discharge are entered by limbers 51 after the water in right chamber 4 is accumulated to a certain extent.
Article 3 water guide channel includes two drain gullies being opened on floor tile body 1 and at sealing surface 11
10, two drain gullies 10 correspond to two gaps 13 respectively, and pass through each self-corresponding gap 13 and right chamber 4 and left chamber respectively
2 connections, the two drain gullies 10 be close to after road surfacing well with the opening surface of adjacent floor tile body 1 and with storage thereon
Water cavity is turned on.During the water being introduced into from this water guide channel enters directly into the retaining cavity of adjacent floor tile body 1, Ran Houhuan
Slow draining.
Full landform retaining delay discharge floor brick paving is spliced in length and breadth by multiple floor tiles, in same row, sealing surface
11 contact connection with the opening surface of adjacent floor tile, and drain gully 10 is also turned on the retaining cavity of adjacent floor tile, in same row
Floor tile body 1 it is adjacent between retaining cavity turned on by seepage mouth 12 and gap 13, floor tile between the column and the column
For setting of mutually staggering.A water part enters lumen 3 by first water guide channel on road surface, in the retaining of lumen 3, delays simultaneously
Slowly it is discharged into by seepage mouth 12 next;Some water is introduced in right chamber 4 by Article 2 water guide channel and stored up
Deposit, when be stored into certain altitude by limbers 51 enter lumen 3 then by seepage mouth 12 slowly discharge;Remaining one
Divide water to be introduced in right chamber 4 and left chamber 2 by Article 3 water guide channel to store, limbers 51 is passed through when being stored into certain altitude
Enter lumen 3 and then slowly discharged by seepage mouth 12, play the effect discharged in storage.When running into precipitation than larger
Heavy rain etc. when, the water level that its seepage mouth 12 has little time in discharge, lumen 3 is quickly raised, and reservoir storage is excessive, when water level is higher than overflowing
During the mouth of a river 13, the assisted drainage of gap 13, the water in lumen 3 discharge the storage of next floor tile body 1 by gap 13
In water cavity, because the discharge of the water-carrying capacity of gap 13 is more much larger than seepage mouth 12, assisted drainage effect is played, retaining is empty
Chamber will not generally be completely filled with water so that the water on road surface can not be incorporated into retaining cavity.Its retaining cavity volume
It is larger, relatively large number of water can be stored, while seepage mouth 12 and gap 13 are used for discharging water, its openings of sizes controls to arrange
Size high-volume, so as to play the effect of the slow row of anxious water, the low ground of its physical features will not discharge water because of the floor tile of high-land
Amount is excessive and flood causes disaster.
Embodiment two
As shown in Figures 4 and 5, the present embodiment and the difference of embodiment one are:Provided with a separation in retaining cavity
Ribbed stiffener 2 14, separates ribbed stiffener 2 14 and retaining cavity is separated into two inner chambers, respectively left inside chamber 15 and right inner chamber 16, table
Face groove is both turned on by guiding gutter one with left inside chamber 15 and right inner chamber 16, and lead angle drainage trough passes through guiding gutter two and right inner chamber 16
Conducting.Seepage mouth is two, is turned on respectively with left inside chamber 15 and right inner chamber 16, and gap is two, directly over seepage mouth,
And turned on respectively with left inside chamber 15 and right inner chamber 16.Drain gully is two, at sealing surface, is led respectively with two gaps
It is logical.Left inside chamber 15 is as the right size of inner chamber 16, and its cross section is rectangle and four corner roundings.Other structures and principle are equal
It is identical with embodiment one, it will not be repeated here.
Specific embodiment described herein is only to the utility model spirit explanation for example.The utility model institute
Category those skilled in the art can make various modifications or supplement or using similar to described specific embodiment
Mode substitute, but without departing from spirit of the present utility model or surmount scope defined in appended claims.
Claims (8)
1. there is retaining in a kind of full landform retaining delay discharge floor tile, including floor tile body (1), floor tile body (1)
Water on cavity, floor tile upper surface is entered by water guide structure in above-mentioned retaining cavity, it is characterised in that:The retaining
Cavity one end has opening surface and is in communication with the outside by opening surface, and the other end has sealing surface (11), the sealing surface (11)
Upper gap (13) and the seepage mouth (12) positioned at bottom, described gap (13) and seepage mouth with positioned at upper end
(12) the above-mentioned retaining cavity of connection and the external world, the displacement of described gap (13) are bigger than seepage mouth (12).
2. a kind of full landform retaining delay discharge floor tile according to claim 1, it is characterised in that described water guide knot
Structure includes being opened in the surface groove (6) of floor tile body (1) upper surface and being arranged on floor tile body (1) wherein corner
Lead angle drainage trough (8), described surface groove (6) by be opened in the guiding gutter one (7) on floor tile body (1) with it is above-mentioned
Retaining cavity is turned on, and described lead angle drainage trough (8) is turned on by guiding gutter two (9) and above-mentioned retaining cavity.
3. a kind of full landform retaining delay discharge floor tile according to claim 2, it is characterised in that described water guide knot
Structure also includes several and is opened on floor tile body (1) and positioned at the drain gully (10) at above-mentioned sealing surface (11) place, it is described fall
The mouth of a river (10) is turned on by above-mentioned gap (13) and retaining cavity.
4. a kind of full landform retaining delay discharge floor tile according to claim 3, it is characterised in that described retaining is empty
Intracavitary separates ribbed stiffener one (5) provided with two, and retaining cavity is separated into three by two described separation ribbed stiffeners one (5)
Chamber, is from left to right followed successively by left chamber (2), lumen (3) and right chamber (4), above-mentioned surface groove (6) is by guiding gutter one (7) with
Chamber (3) is turned on, and the lead angle drainage trough (8) is turned on by guiding gutter two (9) and right chamber (4).
5. a kind of full landform retaining delay discharge floor tile according to claim 4, it is characterised in that described left chamber
(2) and the cross section of right chamber (4) is the underlying inverted trapezoidal structure of short side, described lumen (3) cross section is short side position
Trapezoid structure in top.
6. a kind of full landform retaining delay discharge floor tile according to claim 3, it is characterised in that described retaining is empty
Intracavitary separates ribbed stiffener two (14) provided with one, and retaining cavity is separated into two inner chambers by described separation ribbed stiffener two (14),
Respectively left inside chamber (15) and right inner chamber (16), above-mentioned surface groove pass through guiding gutter one and left inside chamber (15) and right inner chamber (16)
It is both turned on, described lead angle drainage trough is turned on by guiding gutter two and right inner chamber (16).
7. a kind of full landform retaining delay discharge floor tile according to claim 6, it is characterised in that described left inside chamber
(15) as right inner chamber (16) size, its cross section is rectangle and four corner roundings.
8. a kind of full landform retaining delay discharge floor brick paving, it is characterised in that:Appoint in multiple the claims 3~7
Floor tile is spliced in length and breadth described in one, in same row, and described sealing surface (11) contacts company with the opening surface of adjacent floor tile
Connect, the drain gully (10) also turns on the retaining cavity of adjacent floor tile, and floor tile between the column and the column sets mutually to stagger
Put.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621131415.3U CN206396574U (en) | 2016-10-18 | 2016-10-18 | A kind of full landform retaining delay discharge floor tile and its floor brick paving |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621131415.3U CN206396574U (en) | 2016-10-18 | 2016-10-18 | A kind of full landform retaining delay discharge floor tile and its floor brick paving |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206396574U true CN206396574U (en) | 2017-08-11 |
Family
ID=59507764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621131415.3U Expired - Fee Related CN206396574U (en) | 2016-10-18 | 2016-10-18 | A kind of full landform retaining delay discharge floor tile and its floor brick paving |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206396574U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436519A (en) * | 2016-10-18 | 2017-02-22 | 厦门国安特板业科技有限公司 | All-terrain water-storage and delayed-discharge floor tile and floor tile pavement |
-
2016
- 2016-10-18 CN CN201621131415.3U patent/CN206396574U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436519A (en) * | 2016-10-18 | 2017-02-22 | 厦门国安特板业科技有限公司 | All-terrain water-storage and delayed-discharge floor tile and floor tile pavement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101067313B (en) | Draining method and draining and irrigating tube thereof | |
CN112982835B (en) | Planting roofing siphon drainage collecting system | |
CN209941698U (en) | Side slope drainage structure capable of being recycled | |
CN204875442U (en) | Pavement ceramic tile and pavement | |
CN217053410U (en) | Water seepage and drainage structure for green belt at edge of urban road | |
CN106087648B (en) | A kind of special Quick drainage of urban road and irrigation system | |
CN206396574U (en) | A kind of full landform retaining delay discharge floor tile and its floor brick paving | |
CN102322094A (en) | Road surface combined drainage system | |
CN106436519A (en) | All-terrain water-storage and delayed-discharge floor tile and floor tile pavement | |
JP2006132320A (en) | Boundary block | |
CN210507029U (en) | Road drainage structure | |
CN209652959U (en) | Connected vessels type foundation pit drop and drainage structure | |
JP2006132320A5 (en) | ||
CN103993578A (en) | Overlapped type double-channel irrigation and drainage ridge | |
CN210315121U (en) | Road surface drainage system | |
CN210151514U (en) | Drainage floor tile | |
CN202202393U (en) | Comprehensive road surface drainage system | |
CN213114153U (en) | Road surface water permeable brick | |
CN108179677A (en) | Sponge urban water-through pavement | |
CN110206048B (en) | Highway side slope greening system | |
CN109610265B (en) | Bury municipal square rainwater collection system | |
CN213389558U (en) | Municipal administration permeable pavement structure | |
CN206561028U (en) | refuse landfill | |
CN115419088B (en) | Drainage structure of open cut tunnel | |
CN216130307U (en) | Slope drainage ditch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170811 Termination date: 20211018 |
|
CF01 | Termination of patent right due to non-payment of annual fee |