CN206386130U - Tunnel concrete pours the outer tamping equipment of tunneling boring - Google Patents

Tunnel concrete pours the outer tamping equipment of tunneling boring Download PDF

Info

Publication number
CN206386130U
CN206386130U CN201621484974.2U CN201621484974U CN206386130U CN 206386130 U CN206386130 U CN 206386130U CN 201621484974 U CN201621484974 U CN 201621484974U CN 206386130 U CN206386130 U CN 206386130U
Authority
CN
China
Prior art keywords
template
attached vibrator
attached
row
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621484974.2U
Other languages
Chinese (zh)
Inventor
李晓真
任庆成
郑军伟
刘宗伟
罗志威
李婧源
邹翊伟
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621484974.2U priority Critical patent/CN206386130U/en
Application granted granted Critical
Publication of CN206386130U publication Critical patent/CN206386130U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tunnel concrete and pours the outer tamping equipment of tunneling boring, and it includes template system, and template system includes bow member and both sides wall form, and the outer surface of vault template proximate bow member is laid;Some row's attached vibrator groups are vertically installed in vault template, both sides wall form inwall, each row's attached vibrator group is made up of several along the equally distributed attached vibrator in side wall template horizontal direction lateral separation, and adjacent two rows attached vibrator group arranges cross-shaped in small formwork group according to odevity;The power control line of several attached vibrators in each row's attached vibrator group is connected with parallel way by aviation socket with the controller that vibrates, and control system controls some row's attached vibrator groups to run respectively by several controllers that vibrate.The utility model realizes whole-process automatic control vibrating time, it is ensured that quality of vibrating, and starching is uninterrupted, greatly reduces labor intensity, improves efficiency of construction.

Description

Tunnel concrete pours the outer tamping equipment of tunneling boring
Technical field
The utility model is related to the construction equipment for compacting of being vibrated after concreting, more particularly, to a kind of tunnel concrete Pour the outer tamping equipment of tunneling boring.
Background technology
At present, when carrying out concreting in Tunnel Engineering particularly small space, operation of vibrating generally is carried out by artificial, The problem of existing be:1st, manipulator's labor intensity is big:One manipulator has to longitudinal 4 meters distance of vibrating, and gets rid of make firm by ramming back and forth Rod and mobile tamper main frame, manipulator are easily tired;2nd, working environment is severe:Manipulator must be by upper half body from working window Working space is reached, hand-held rod of making firm by ramming is dragged back and forth, up and down, and rather dark in working space, air quality is very poor, and space is narrow It is small, it is big to manipulator's physical impairment;3rd, tamping quality is unstable:Artifical influence factor is big, and the vibrating time of single setting is long It is short to differ, workmen operation level it is uneven, often occur leakage smash, cross smash, slip up and cause forming surface founding, stomata, Even seminess, directly contributes concrete formation planar defect;4th, the manipulator personnel needed are more:Often constructing one section needs to be equipped with 6~8 manipulators;5th, equipment loss is larger:Because tamper is moved back and forth, make the frequent whipping of rod firm by ramming, cause tamper easy Damage, frequently repair or more exchange device causes construction cost to improve.
The content of the invention
To solve the above problems, the purpose of this utility model, which is to provide a kind of tunnel concrete, pours the dress that vibrated outside tunneling boring Put, which reduce artificial disturbance factor, realization is vibrated automatically, improves concrete construction quality.
For achieving the above object, the utility model is adopted the following technical scheme that:
A kind of tunnel concrete pours the outer tamping equipment of tunneling boring, and it includes template system, template system include bow member with Both sides wall form, bottom and the both sides wall form top of bow member are fastenedly connected, the outer surface laying of vault template proximate bow member, Horizontal support members are installed between the interior space of above-mentioned both sides wall form formation, vault template and both sides wall form are by some Individual small formwork is combined;Some row's adhesion types are vertically installed in vault template, both sides wall form inwall to shake Smash device group, each row's attached vibrator group is by several along the equally distributed adhesion type in side wall template horizontal direction lateral separation Vibrator is constituted, and adjacent two rows attached vibrator group arranges cross-shaped in small formwork group according to odevity;Each row The power control line of several attached vibrators in attached vibrator group passes through aviation socket and one with parallel way The controller that vibrates is connected, and control system controls some row's attached vibrator groups to run respectively by several controllers that vibrate.
Described tunnel concrete pours the outer tamping equipment of tunneling boring, and its horizontal support members is by regulation screw mandrel and level branch Strut is constituted, and one of them in the wall form of both sides is connected between horizontal support bar by adjusting screw mandrel.
Described tunnel concrete pours horizontal, vertical between the outer tamping equipment of tunneling boring, its adjacent attached vibrator Determined to vibrating radins of the spacing according to attached vibrator.
Due to using technical scheme as described above, the utility model has following superiority:
The tunnel concrete pours the outer tamping equipment of tunneling boring, and it uses attached vibrator in tunneling boring, solves nothing Backbreak exempt from backfill construction present in vault difficulty make firm by ramming, the problem of quality is difficult to ensure card;Using intelligent controller, whole process is realized certainly Dynamic control vibrating time, solves and leakage smashes, crosses the problems such as smashing, it is ensured that quality of vibrating;Vibrating time is worked by live new mixed concrete Property be determined and input control system, realization automatically controls vibrating time;The concreting time is fast, with traditional side of vibrating Formula is compared, and is saved the time more than 60%, and scope of operation personnel reduce 70%, realizes whole-course automation, and starching is uninterrupted, greatly reduces Labor intensity, improves efficiency of construction.
Brief description of the drawings
Fig. 1 is the structural front view that the utility model tunnel concrete pours the outer tamping equipment of tunneling boring;
Fig. 2 is Fig. 1 structural side view;
In figure:1- vault templates;2- bow members;3- horizontal support members;4(a、b)- side wall template;5- adhesion types shake Smash device;6- cables;7- control systems;8- concreting windows;9- aviation sockets;The small formworks of 10-.
Embodiment
The technical solution of the utility model is described in further detail with reference to the accompanying drawings and examples.
As shown in Figure 1, 2, the tunnel concrete pours the outer tamping equipment of tunneling boring, and it includes template system, template system Including bow member 2 and side wall template 4a, side wall template 4b, bottom and the both sides wall form top of bow member are fastenedly connected, vault template 1 It is close to the outer surface laying of bow member 2, horizontal support members 3 is installed between the interior space of above-mentioned both sides wall form formation, encircleed Top template and both sides wall form are combined by several small formworks 10, several intervals are additionally provided with side wall template uniform Concreting window 8;Some row's adhesion types are vertically installed in vault template, both sides wall form inwall to vibrate Device group, each row's attached vibrator group is shaken by several along the equally distributed adhesion type in side wall template horizontal direction lateral separation Device 5 is smash to constitute, adjacent two rows attached vibrator group small formwork group respectively on according to odd number, even number arrangement it is cross-shaped; The power control line of several attached vibrators in each row's attached vibrator group passes through cable 6, boat with parallel way Dummy receptacle 9 is connected with the controller that vibrates, and the controller that vibrated by one control operation, control system 7 is vibrated by several Controller controls some row's attached vibrator groups to run respectively.
Described tunnel concrete pours the outer tamping equipment of tunneling boring, and its horizontal support members is by regulation screw mandrel and level branch Strut is constituted, and one of them in the wall form of both sides is connected between horizontal support bar by adjusting screw mandrel.
Described tunnel concrete pours horizontal, vertical between the outer tamping equipment of tunneling boring, its adjacent attached vibrator Determined to vibrating radins of the spacing according to attached vibrator.
Control system is made up of switch board, rectifier transformer, remote control and time controller.
Each row's attached vibrator group is controlled with starching progress successively controlled system, full when realizing concreting Section outer purpose of vibrating automatically.
Starching is highly controlled within 500mm;Vibrating time is determined and inputted by live new mixed concrete workability Control system, realization automatically controls vibrating time.General vibrating time is 50~60s, is not sunk significantly with concrete surface, is pushed up Face has been shakeout, and there is no bubble effusion, surface glows a thin layer of cement mortar and is defined.
Control system can be controlled to each row's attached vibrator group, while individually can also adhere to each Formula vibrator is controlled.
Preferred embodiment of the present utility model is the foregoing is only, rather than to limitation of the present utility model, is not departing from this In the case of the spirit and scope of utility model, all equivalent changes and modifications made according to present utility model application the scope of the claims, It should all belong within scope of patent protection of the present utility model.

Claims (3)

1. a kind of tunnel concrete pours the outer tamping equipment of tunneling boring, it is characterized in that:It includes template system, and template system includes Bow member and both sides wall form, bottom and the both sides wall form top of bow member are fastenedly connected, the outer surface of vault template proximate bow member Laying, horizontal support members, vault template and both sides wall form are provided between the interior space of above-mentioned both sides wall form formation Combined by several small formworks;Some rows are vertically installed in vault template, both sides wall form inwall Attached vibrator group, each row's attached vibrator group is uniformly distributed by several along side wall template horizontal direction lateral separation Attached vibrator composition, adjacent two rows attached vibrator group in small formwork group according to odevity arrangement in staggeredly Shape;The power control line of several attached vibrators in each row's attached vibrator group is inserted with parallel way by aviation Seat is connected with the controller that vibrates, and control system controls some row's attached vibrators respectively by several controllers that vibrate Group operation.
2. tunnel concrete according to claim 1 pours the outer tamping equipment of tunneling boring, it is characterized in that:Its horizontal support group Part is made up of regulation screw mandrel and horizontal support bar, and one of them in the wall form of both sides passes through regulation between horizontal support bar Screw mandrel is connected.
3. tunnel concrete according to claim 1 pours the outer tamping equipment of tunneling boring, it is characterized in that:Its adjacent adhesion type Transverse direction, longitudinal pitch between vibrator are determined according to the vibrating radins of attached vibrator.
CN201621484974.2U 2016-12-31 2016-12-31 Tunnel concrete pours the outer tamping equipment of tunneling boring Expired - Fee Related CN206386130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621484974.2U CN206386130U (en) 2016-12-31 2016-12-31 Tunnel concrete pours the outer tamping equipment of tunneling boring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621484974.2U CN206386130U (en) 2016-12-31 2016-12-31 Tunnel concrete pours the outer tamping equipment of tunneling boring

Publications (1)

Publication Number Publication Date
CN206386130U true CN206386130U (en) 2017-08-08

Family

ID=59491496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621484974.2U Expired - Fee Related CN206386130U (en) 2016-12-31 2016-12-31 Tunnel concrete pours the outer tamping equipment of tunneling boring

Country Status (1)

Country Link
CN (1) CN206386130U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005683A (en) * 2017-11-01 2018-05-08 中铁隧道局集团有限公司 A kind of vault vibrating method of tunnel-liner
CN108166750A (en) * 2018-02-01 2018-06-15 齐齐哈尔大学 A kind of manpower-free's vibrated concrete wall construction template and implementing process
CN109057821A (en) * 2018-09-28 2018-12-21 浙江八达隧道工程股份有限公司 Highway soft rock tunnel bilayer arch supporting construction system and its construction method
CN109736573A (en) * 2018-12-14 2019-05-10 东南大学 A kind of built-in tamping equipment based on sleeve post grouting construction
CN110486055A (en) * 2019-09-11 2019-11-22 刘怀福 A kind of tunnel double-lining concreting anti-come to nothing tamping control device and method
CN111963236A (en) * 2020-08-12 2020-11-20 平顶山天安煤业股份有限公司 Grouting, filling and supporting device for gob-side entry retaining of coal face
CN113815090A (en) * 2021-09-08 2021-12-21 中国建筑土木建设有限公司 Automatic highway box girder intelligent vibrating system for girder yard and operation method thereof
CN114197704A (en) * 2021-12-23 2022-03-18 江苏精享裕建工有限公司 Converter station firewall construction process
CN115126249A (en) * 2022-07-28 2022-09-30 上海宝冶集团有限公司 Concrete vibrating method for high and large wallboard in narrow environment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005683A (en) * 2017-11-01 2018-05-08 中铁隧道局集团有限公司 A kind of vault vibrating method of tunnel-liner
CN108166750A (en) * 2018-02-01 2018-06-15 齐齐哈尔大学 A kind of manpower-free's vibrated concrete wall construction template and implementing process
CN108166750B (en) * 2018-02-01 2024-02-02 齐齐哈尔大学 Template for construction of concrete wall without manual vibration and implementation process
CN109057821A (en) * 2018-09-28 2018-12-21 浙江八达隧道工程股份有限公司 Highway soft rock tunnel bilayer arch supporting construction system and its construction method
CN109736573A (en) * 2018-12-14 2019-05-10 东南大学 A kind of built-in tamping equipment based on sleeve post grouting construction
CN110486055A (en) * 2019-09-11 2019-11-22 刘怀福 A kind of tunnel double-lining concreting anti-come to nothing tamping control device and method
CN111963236A (en) * 2020-08-12 2020-11-20 平顶山天安煤业股份有限公司 Grouting, filling and supporting device for gob-side entry retaining of coal face
CN113815090A (en) * 2021-09-08 2021-12-21 中国建筑土木建设有限公司 Automatic highway box girder intelligent vibrating system for girder yard and operation method thereof
CN114197704A (en) * 2021-12-23 2022-03-18 江苏精享裕建工有限公司 Converter station firewall construction process
CN115126249A (en) * 2022-07-28 2022-09-30 上海宝冶集团有限公司 Concrete vibrating method for high and large wallboard in narrow environment

Similar Documents

Publication Publication Date Title
CN206386130U (en) Tunnel concrete pours the outer tamping equipment of tunneling boring
CN103469939B (en) A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof
CN104100092B (en) The track-type facilities of a kind of pitched roof pouring construction and method
CN103821364B (en) The construction method of reinforced concrete water pond
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN104405123B (en) Cast-in-situ reinforced concrete thin-wall rectangular small bore open tubular column template assembly and construction method thereof
CN103290967B (en) A kind of multi-ribbed hollow composite floor slab and manufacture method
CN106320706A (en) Masonry-wall line-pipe, line-groove and line-box burying construction method
CN110777983A (en) Synchronous construction structure and method for concrete filled wall and cast-in-place structure
CN207959612U (en) A kind of frame, shear wall cast-in-place structural fill wall with assembled light
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN107059920A (en) Loess formation piping lane construction technology
CN103388402B (en) Waffle beam hollow floor slab construction method
CN102383628A (en) Construction device and construction method for post construction of depressing cone of silo structure
CN108582466A (en) A kind of steel reinforcement cage of prefabricated box girder mould
CN106284789B (en) Construction technology for controlling cast-in-situ floor Forming Quality
CN103696439A (en) Immersed tube pouring method
CN103061509B (en) Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system
CN110485218A (en) It is a kind of to help wide construction method for railway bed
CN204299179U (en) Cast-in-situ reinforced concrete thin-wall rectangular small bore open tubular column template assembly
CN104746521B (en) The application of oversized cross-section slope cushion layer constructing structure
CN204081064U (en) A kind of basement sandwich
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN206941968U (en) Reinforcing bar limiting card with the upper oblique bayonet socket being parallel to each other
CN212506975U (en) Prestressed concrete hollow floor slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170808

Termination date: 20171231