CN206385461U - Bridge rapid construction bottom bracket mobile device - Google Patents
Bridge rapid construction bottom bracket mobile device Download PDFInfo
- Publication number
- CN206385461U CN206385461U CN201621266984.9U CN201621266984U CN206385461U CN 206385461 U CN206385461 U CN 206385461U CN 201621266984 U CN201621266984 U CN 201621266984U CN 206385461 U CN206385461 U CN 206385461U
- Authority
- CN
- China
- Prior art keywords
- double
- fixed
- plate
- support plate
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Bridge rapid construction bottom bracket mobile device, the platform back of the body is fixed on the ground, and the base of hydraulic jack is fixed on platform back, and the piston of hydraulic jack is connected with traveling platform, and traveling platform is arranged on slide rail, and slide rail is fixed on the ground;Double-deck support plate is installed, arranged for interval constitutes supportive body successively for main stay tube, secondary support tube, and supportive body is arranged on double-deck support plate, and the bottom of main stay tube is welded on the upper strata of double-deck support plate on traveling platform;The bottom of secondary support tube is arranged on the lower floor of double-deck support plate by bolt;Fixed plate, anti-dumping cladding plate are separately fixed at the both sides of supportive body.Main stay tube is the overall agent structure of the present apparatus, the bolt regulation for the lower floor that length of the secondary support tube along longitudinal direction passes through double-deck support plate;Bridge rapid construction bottom bracket mobile device is adjusted by hydraulic jack, and position adjustment flexibly, is adapted to make technological knowledge popular for small bridge.
Description
Technical field
The utility model is related to a kind of bottom bracket mobile device that rapid construction is carried out for small bridge, belongs to bridge
Construction technology technical field.
Background technology
For the construction of large bridge, generally require to call the plant equipment of many;For small-sized bridge, generally require
Too much artificial is constructed, and automaticity is low.
Utility model content
The purpose of this utility model is to devise a kind of bridge rapid construction bottom bracket mobile device, passes through the device
Construction control effectively can be carried out to bridge bottom, with lifting construction quality.
To achieve the above object, the technical solution adopted in the utility model is that bridge rapid construction bottom bracket moves dress
Put, the device include the platform back of the body 1, hydraulic jack 2, slide rail 3, traveling platform 4, double-deck support plate 5, main stay tube 6, secondary support tube 7,
Fixed plate 8, anti-dumping cladding plate 9, the platform back of the body 1 are fixed on the ground, and the base of hydraulic jack 2 is fixed on the platform back of the body 1, hydraulic jack
2 piston is connected with traveling platform 4, and traveling platform 4 is arranged on slide rail 3, and slide rail 3 is fixed on the ground;Pacify on traveling platform 4
Equipped with double-deck support plate 5, arranged for interval constitutes supportive body successively for main stay tube 6, secondary support tube 7, and supportive body is arranged on bilayer
On support plate 5, the bottom of main stay tube 6 is welded on the upper strata of double-deck support plate 5;The bottom of secondary support tube 7 is arranged on double by bolt
The lower floor of layer support plate 5;Fixed plate 8, anti-dumping cladding plate 9 are separately fixed at the both sides of supportive body.
Bridge plate 10 is laid on the top of supportive body.
The piston stroke of hydraulic jack 2 is equal to stroke of the traveling platform 4 along slide rail 3.
The radius of main stay tube 6 is more than the radius 3mm-6mm of time support tube 7.
Compared with prior art, the utility model has the advantages that.
1st, main stay tube is the overall agent structure of the present apparatus, and its length along longitudinal direction passes through main stay tube and bridge plate
Regulating bolt is adjusted;The bolt regulation for the lower floor that length of the secondary support tube along longitudinal direction passes through double-deck support plate.Main stay tube and
Secondary support tube is engaged completion and bridge plate formwork for placing amount of deflection is adjusted.
2nd, the position of traveling platform can freely be adjusted in the horizontal direction, level of the realization body structure to bridge Board position
Adjustment.
3rd, bridge rapid construction bottom bracket mobile device is adjusted by hydraulic jack, and position adjustment flexibly, is adapted to pin
Small bridge is made technological knowledge popular.
Brief description of the drawings
Fig. 1 is structure chart of the present utility model.
Embodiment
As shown in figure 1, bridge rapid construction bottom bracket mobile device, the device includes the platform back of the body 1, hydraulic jack 2, slided
Rail 3, traveling platform 4, double-deck support plate 5, main stay tube 6, secondary support tube 7, fixed plate 8, anti-dumping cladding plate 9, the platform back of the body 1 are fixed on ground
On, the base of hydraulic jack 2 is fixed on the platform back of the body 1, and the piston of hydraulic jack 2 is connected with traveling platform 4, traveling platform 4
On slide rail 3, slide rail 3 is fixed on the ground;Double-deck support plate 5, main stay tube 6, secondary support tube are installed on traveling platform 4
7 arranged for interval composition supportive bodies successively, supportive body is arranged on double-deck support plate 5, and the bottom of main stay tube 6 is welded on bilayer
The upper strata of support plate 5;The bottom of secondary support tube 7 is arranged on the lower floor of double-deck support plate 5 by bolt;9 points of fixed plate 8, anti-dumping cladding plate
The both sides of supportive body are not fixed on.
Bridge plate 10 is laid on the top of supportive body.
The piston stroke of hydraulic jack 2 is equal to stroke of the traveling platform 4 along slide rail 3.
The radius of main stay tube 6 is more than the radius 3mm-6mm of time support tube 7.
Main stay tube is the overall agent structure of the present apparatus, and it passes through main stay tube and the tune of bridge plate along longitudinal length
Section bolt is adjusted;The bolt regulation for the lower floor that length of the secondary support tube along longitudinal direction passes through double-deck support plate.Main stay tube and time
Support tube is engaged completion and bridge plate formwork for placing amount of deflection is adjusted.
The position of traveling platform can freely be adjusted in the horizontal direction, and realization body structure is adjusted to the level of bridge Board position
It is whole.
Bridge rapid construction bottom bracket mobile device is adjusted by hydraulic jack, and position adjustment flexibly, is adapted to be directed to
Small bridge makes technological knowledge popular.
Claims (4)
1. bridge rapid construction bottom bracket mobile device, it is characterised in that:The device includes the platform back of the body (1), hydraulic jack
(2), slide rail (3), traveling platform (4), double-deck support plate (5), main stay tube (6), secondary support tube (7), fixed plate (8), overturn-preventing
Plate (9), the platform back of the body (1) is fixed on the ground, and the base of hydraulic jack (2) is fixed on the platform back of the body (1), hydraulic jack (2)
Piston is connected with traveling platform (4), and traveling platform (4) is arranged on slide rail (3), and slide rail (3) is fixed on the ground;Traveling platform
(4) double-deck support plate (5) is installed, arranged for interval constitutes supportive body, support master successively for main stay tube (6), secondary support tube (7) on
Body is arranged on double-deck support plate (5), and the bottom of main stay tube (6) is welded on the upper strata of double-deck support plate (5);Secondary support tube (7)
Bottom is arranged on the lower floor of double-deck support plate (5) by bolt;Fixed plate (8), anti-dumping cladding plate (9) are separately fixed at supportive body
Both sides.
2. bridge rapid construction bottom bracket mobile device according to claim 1, it is characterised in that:Bridge plate (10) is spread
It is located at the top of supportive body.
3. bridge rapid construction bottom bracket mobile device according to claim 1, it is characterised in that:Hydraulic jack
(2) piston stroke is equal to stroke of the traveling platform (4) along slide rail (3).
4. bridge rapid construction bottom bracket mobile device according to claim 1, it is characterised in that:Main stay tube (6)
Radius be more than the radius 3mm-6mm of time support tube (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621266984.9U CN206385461U (en) | 2016-11-24 | 2016-11-24 | Bridge rapid construction bottom bracket mobile device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621266984.9U CN206385461U (en) | 2016-11-24 | 2016-11-24 | Bridge rapid construction bottom bracket mobile device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206385461U true CN206385461U (en) | 2017-08-08 |
Family
ID=59486734
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621266984.9U Expired - Fee Related CN206385461U (en) | 2016-11-24 | 2016-11-24 | Bridge rapid construction bottom bracket mobile device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206385461U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086165A (en) * | 2018-01-12 | 2018-05-29 | 九冶建设有限公司 | For the removable support of urban steel bridges beam installation |
CN113481820A (en) * | 2021-07-09 | 2021-10-08 | 武汉均楚创金技术咨询有限公司 | Bidirectional balance type lifting bridge |
-
2016
- 2016-11-24 CN CN201621266984.9U patent/CN206385461U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086165A (en) * | 2018-01-12 | 2018-05-29 | 九冶建设有限公司 | For the removable support of urban steel bridges beam installation |
CN113481820A (en) * | 2021-07-09 | 2021-10-08 | 武汉均楚创金技术咨询有限公司 | Bidirectional balance type lifting bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205314504U (en) | Building platform for outdoor building and indoor decoration | |
CN206447282U (en) | A kind of transfer robot of bar | |
CN206385461U (en) | Bridge rapid construction bottom bracket mobile device | |
CN203793390U (en) | Mobile car for mounting guide rail rack | |
CN206205894U (en) | Monoblock type automatic telescopic Mobile reinforcement stand | |
CN206385565U (en) | A kind of piping lane gate-type is from traveling hydraulic pressure exterior sheathing system and device | |
CN206690277U (en) | Fully automatic hydraulic box girder formwork | |
CN103195450A (en) | Hydraulic tunnel inverted arch operation trolley and inverted arch construction method | |
CN208380591U (en) | Send rail tunnel hydraulic two linings trolley automatically | |
CN201530666U (en) | Track slab general hanger | |
CN206484700U (en) | T beam hydraulic ejections mechanism | |
CN205576749U (en) | Pontic roof beam structure promotes and rackwork | |
CN205100119U (en) | Steel form device in self -propelled | |
CN105649636A (en) | Synchronous inverted-arch concrete paving device and method of large-diameter shield tunneling machine | |
CN205184745U (en) | Operation platform for airplane assembling | |
CN202064281U (en) | Slip form frame | |
CN106150525A (en) | A kind of rock anchorage beam construction trolley and construction method thereof | |
CN203603928U (en) | Rubber-tyred walking full-hydraulic lining trolley | |
CN204823299U (en) | Every single move mechanism of formula of lying prone trailer | |
CN204536018U (en) | Hydraulic support column, lifting jack testing table | |
CN109356618A (en) | A kind of simple integral movable type square type tunnel frame and its construction method | |
CN207610630U (en) | A kind of gunnery training target drone of automatic lifting and translation | |
CN206858061U (en) | A kind of adjustable two level lifting body | |
CN207316393U (en) | A kind of easy to operate wave-height gauge stent | |
CN201565573U (en) | Sand box transferring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd. Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170808 Termination date: 20211124 |