CN206383282U - Precast T-Beam beam rib reinforcement skeleton tire film frame - Google Patents

Precast T-Beam beam rib reinforcement skeleton tire film frame Download PDF

Info

Publication number
CN206383282U
CN206383282U CN201720049075.8U CN201720049075U CN206383282U CN 206383282 U CN206383282 U CN 206383282U CN 201720049075 U CN201720049075 U CN 201720049075U CN 206383282 U CN206383282 U CN 206383282U
Authority
CN
China
Prior art keywords
beam rib
reinforcement
rib reinforcement
steel
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720049075.8U
Other languages
Chinese (zh)
Inventor
毋存粮
崔浩
贾晓锋
宋立新
吴靖江
褚志军
姚兵
贾维志
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201720049075.8U priority Critical patent/CN206383282U/en
Application granted granted Critical
Publication of CN206383282U publication Critical patent/CN206383282U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model provides a kind of Precast T-Beam beam rib reinforcement skeleton tire film frame, the problem of effectively solving uneven reinforcing bar transverse and longitudinal spacing, reinforcing bar poor location.Beam rib reinforcement skeleton molding bed rack described in the utility model includes beam rib steel-bar binding pedestal, the left side of the beam rib steel-bar binding pedestal is longitudinally spaced to be provided with multiple beam rib reinforcement support bars, the front side of the beam rib reinforcement support bar is vertically interval with multiple horizontal reinforcement abutment sleeves, horizontal reinforcement locating rod is equipped with the horizontal reinforcement abutment sleeve, the beam rib reinforcement support bar is provided with upper beam rib reinforcement locating groove towards the side upper end of beam rib steel-bar binding pedestal, beam rib steel-bar binding pedestal upper surface on the right side of the beam rib reinforcement support bar is longitudinally spaced provided with multiple lower beam rib reinforcement locating grooves corresponding with upper beam rib reinforcement locating groove.

Description

Precast T-Beam beam rib reinforcement skeleton tire film frame
Technical field
The utility model is related to Precast T-Beam, particularly a kind of Precast T-Beam beam rib reinforcement skeleton tire film frame.
Background technology
At present in Precast T-Beam colligation beam rib reinforcement, typically bar bender carries out colligation on Precast T-Beam pedestal, construction When, it is uneven to there is reinforcing bar transverse and longitudinal spacing, reinforcing bar poor location, while being had a certain impact to cover to reinforcement.
Utility model content
For above-mentioned situation, to overcome the defect of prior art, the utility model provides a kind of Precast T-Beam beam rib steel muscles and bones Frame tire film frame, the problem of effectively solving uneven reinforcing bar transverse and longitudinal spacing, reinforcing bar poor location.
Beam rib reinforcement skeleton molding bed rack described in the utility model includes beam rib steel-bar binding pedestal, the beam rib steel-bar binding The left side of pedestal is longitudinally spaced to be provided with multiple beam rib reinforcement support bars, and the front side of the beam rib reinforcement support bar is vertically interval with Horizontal reinforcement locating rod, the beam rib reinforcement are equipped with multiple horizontal reinforcement abutment sleeves, the horizontal reinforcement abutment sleeve Support bar is provided with upper beam rib reinforcement locating groove, the beam rib reinforcement support towards the side upper end of beam rib steel-bar binding pedestal Beam rib steel-bar binding pedestal upper surface on the right side of bar is longitudinally spaced provided with multiple corresponding with upper beam rib reinforcement locating groove Lower beam rib reinforcement locating groove.
Beneficial effect:Of the present utility model to use, one is to ensure that Precast T-Beam beam rib steel-bar binding specification, and two be to save steel Muscle work receives the time with colligation Precast T-Beam beam rib reinforcement, and three, which are easy for scene, carries out continuous productive process, improves production efficiency, four It is easy for quality control personnel to exercise supervision inspection, five be to substantially increase live standardized management level.
Brief description of the drawings
Fig. 1 is the utility model rib reinforcement skeleton molding bed rack front view structure figure.
Fig. 2 is the utility model rib reinforcement skeleton molding bed rack left view structure chart.
Embodiment
Embodiment of the present utility model is described in further detail below in conjunction with accompanying drawing.
Provided by Fig. 1 and Fig. 2, the technical solution of the utility model is that the beam rib reinforcement skeleton molding bed rack includes beam rib Reinforcing steel bar-binding bench seat 1, the left side of the beam rib steel-bar binding pedestal 1 is longitudinally spaced provided with multiple beam rib reinforcement support bars 2, described The front side of beam rib reinforcement support bar 2 is vertically interval with multiple horizontal reinforcement abutment sleeves 3, the horizontal reinforcement abutment sleeve 3 Horizontal reinforcement locating rod 4 is inside equipped with, the side upper end of beam rib reinforcement support bar 2 towards the beam rib steel-bar binding pedestal 1 is set There are upper beam rib reinforcement locating groove 5, the upper surface of beam rib steel-bar binding pedestal 1 longitudinal direction on the right side of beam rib reinforcement support bar 2 It is interval with multiple lower beam rib reinforcement locating grooves 6 corresponding with upper beam rib reinforcement locating groove 5.
The upper reinforcement locating groove 5 and lower rebar locating groove 6 are made by 5 bugle steel.
Upper reinforcement locating groove and lower rebar locating groove, corresponding up and down to be arranged vertically using 5 bugle steel, card Separation is identical with beam rib reinforcement spacing, it is ensured that beam rib reinforcement spacing and perpendicularity meet design and code requirement.
The utility model is in use, its beam rib reinforcement skeleton carries out colligation, horizontal reinforcement using its molding bed rack(Namely exist Transverse steel in Fig. 2)Successively up and down be erected on beam rib reinforcement support bar 2, the distance between beam rib reinforcement support bar 2 be through Cross the measuring and calculating of standard to determine, therefore ensure using beam rib reinforcement support bar 2 horizontal reinforcement positioning precision, beam rib bottom steel Muscle locating groove 6 and beam rib upper reinforcement locating groove 5 position the beam rib reinforcement on top and the beam rib reinforcement of bottom respectively.
Beneficial effect:Of the present utility model to use, one is to ensure that Precast T-Beam beam rib steel-bar binding specification, and two be to save steel Muscle work receives the time with colligation Precast T-Beam beam rib reinforcement, and three, which are easy for scene, carries out continuous productive process, improves production efficiency, four It is easy for quality control personnel to exercise supervision inspection, five be to substantially increase live standardized management level.

Claims (2)

1. Precast T-Beam beam rib reinforcement skeleton tire film frame, it is characterised in that including beam rib steel-bar binding pedestal(1), the beam rib steel Bar binding pedestal(1)Left side it is longitudinally spaced be provided with multiple beam rib reinforcement support bars(2), the beam rib reinforcement support bar(2)'s Front side is vertically interval with multiple horizontal reinforcement abutment sleeves(3), the horizontal reinforcement abutment sleeve(3)Inside it is equipped with horizontal steel Muscle locating rod(4), the beam rib reinforcement support bar(2)Towards beam rib steel-bar binding pedestal(1)Side upper end be provided with upper beam Rib reinforcement locating groove(5), the beam rib reinforcement support bar(2)The beam rib steel-bar binding pedestal on right side(1)Between the longitudinal direction of upper surface Every provided with multiple and upper beam rib reinforcement locating groove(5)Corresponding lower beam rib reinforcement locating groove(6).
2. Precast T-Beam beam rib reinforcement skeleton tire film frame according to claim 1, it is characterised in that the upper reinforcement is determined Position neck(5)With lower rebar locating groove(6)It is made by 5 bugle steel.
CN201720049075.8U 2017-01-17 2017-01-17 Precast T-Beam beam rib reinforcement skeleton tire film frame Expired - Fee Related CN206383282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720049075.8U CN206383282U (en) 2017-01-17 2017-01-17 Precast T-Beam beam rib reinforcement skeleton tire film frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720049075.8U CN206383282U (en) 2017-01-17 2017-01-17 Precast T-Beam beam rib reinforcement skeleton tire film frame

Publications (1)

Publication Number Publication Date
CN206383282U true CN206383282U (en) 2017-08-08

Family

ID=59492080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720049075.8U Expired - Fee Related CN206383282U (en) 2017-01-17 2017-01-17 Precast T-Beam beam rib reinforcement skeleton tire film frame

Country Status (1)

Country Link
CN (1) CN206383282U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108638323A (en) * 2018-06-15 2018-10-12 交通运输部科学研究院 A kind of beam prefabricated construction reinforced bar binding rack of T and binding method
CN109692927A (en) * 2018-12-27 2019-04-30 中建四局第六建筑工程有限公司 A kind of tire film frame assembly and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108638323A (en) * 2018-06-15 2018-10-12 交通运输部科学研究院 A kind of beam prefabricated construction reinforced bar binding rack of T and binding method
CN108638323B (en) * 2018-06-15 2023-06-20 交通运输部科学研究院 T-beam prefabrication construction steel bar binding rack and binding method
CN109692927A (en) * 2018-12-27 2019-04-30 中建四局第六建筑工程有限公司 A kind of tire film frame assembly and its construction method

Similar Documents

Publication Publication Date Title
CN206383282U (en) Precast T-Beam beam rib reinforcement skeleton tire film frame
CN205614823U (en) Well beam bridge face plate steel rib ligature mould
CN107009510A (en) Prefabricated case beam steel bar overall binding mold and its application method
CN206186089U (en) Case roof beam reinforcement bed -jig
CN204563409U (en) A kind of single pole, two bar, high-low rod integral type gymnastic training device
CN106738308A (en) Precast T-Beam reinforcing bar molding bed rack system
CN203640276U (en) Adjustable column mold device
CN103921347B (en) Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases
CN207210963U (en) Jig structure for T beam steel bar colligations
CN209552090U (en) A kind of prefabricated beam stirrup positioning tool
CN205224079U (en) Interior mandrel is used in foundation construction of contact net cup type
CN203755697U (en) Reinforcing bar mesh sample frame
CN202745393U (en) Device for controlling distance of stirrups
CN205291250U (en) Supplementary utensil in sunshade reinforcement location
CN208100725U (en) A kind of openable Precast T-Beam reinforcing bar moulding bed
CN206702444U (en) Street lamp basis steel reinforcement cage preparation rack
CN207521619U (en) A kind of mould bases for the binding of cored slab reinforcing bar
CN207143740U (en) A kind of bridge construction drilling platform
CN205330008U (en) Reinforcing steel bar support
CN202059866U (en) Special cage for evaluation of quail production performance
CN206153467U (en) Shield structure section of jurisdiction steel reinforcement cage rack for manufacturing
CN202227588U (en) Cast-insitu concrete slab hogging moment bar rebar horse chair
CN206034292U (en) Supporting structure of be used for bent cap steel bones RACK to assemble
CN110102677A (en) Steel reinforcement cage method for shaping and tooling
CN206636218U (en) It is overall to receive the demoulding and mark time stepped formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170808