CN107009510A - Prefabricated case beam steel bar overall binding mold and its application method - Google Patents

Prefabricated case beam steel bar overall binding mold and its application method Download PDF

Info

Publication number
CN107009510A
CN107009510A CN201710161315.8A CN201710161315A CN107009510A CN 107009510 A CN107009510 A CN 107009510A CN 201710161315 A CN201710161315 A CN 201710161315A CN 107009510 A CN107009510 A CN 107009510A
Authority
CN
China
Prior art keywords
plate
plate body
top plate
bar
horizontal bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710161315.8A
Other languages
Chinese (zh)
Inventor
何志军
郭万中
幸元野
史明胜
罗益俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
Original Assignee
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd filed Critical China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
Priority to CN201710161315.8A priority Critical patent/CN107009510A/en
Publication of CN107009510A publication Critical patent/CN107009510A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/043Wire anchoring or tensioning means for the reinforcements

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of prefabricated case beam steel bar overall binding mold and its application method, prefabricated case beam steel bar overall binding mold includes:Outer moulding bed, it includes two side forms and bed die, side form includes integrally formed upper side form and lower side form, polylith plate body one is arranged at intervals with upper side form along the longitudinal direction, at least one piece plate body two is provided with upper side form, it is arranged at intervals with from bottom to up on polylith plate body three, bed die on lower side form and is arranged at intervals with polylith plate body four along the longitudinal direction, the two ends on bed die in transverse direction is respectively arranged with least one piece plate body five;Interior moulding bed, it includes multiple row spaced roof steel bar colligation supporting sleeve, many top plates longitudinal direction sizing steel pipe support pipes, many top plates longitudinal direction sizing steel pipes in transverse direction.The prefabricated case beam steel bar overall binding mold that the present invention is provided put into when using small, cost it is low, adaptable, construct it is simple, quick, safe.

Description

Prefabricated case beam steel bar overall binding mold and its application method
Technical field
The present invention relates to a kind of steel bar binding clamping fixture.It is more particularly related to which a kind of prefabricated case beam reinforcing bar is overall Binding clamping fixture and its application method.
Background technology
Large scale prefabricated box beam belongs to prestressed reinforced concrete component, and bar gauge model is more, and all kinds of reinforcing bars are handed in length and breadth Fork, bar spacing error is smaller, while longitudinal prestressing pipeline centralized arrangement is in web reinforcement skeleton, and prestress pipe Spatial positioning accuracy is higher, and difficulty is larger, in order to realize that prefabricated case beam tie with reinforcing bar is molded, typically takes following three kinds of sides Method.
One is direct colligation in template, and not on steel bar binding clamping fixture, colligation is molded, and is first tied up in the template on pedestal Bottom web reinforcement skeleton is tied, then internal model is installed, then the good roof steel bar skeleton of colligation in template, last colligation chamfering connection Reinforcing bar is integral.The method has the disadvantages that:1) framework of steel reinforcement is higher, scaffold need to be set up in external mold flat as operation Platform, will but be removed, work efficiency is extremely low when installing internal model.2) there is no positioner in template, all kinds of bar spacings are difficult to ensure, in advance should Hydraulic piping space orientation can not be precisely accomplished.3) the chamfering dowel colligation between bottom web reinforcement and roof steel bar is operated very Difficult (operating personnel need to climb fixes chamfering connection reinforcing bar in roof steel bar), framework of steel reinforcement globality poor, quality it is difficult to ensure that. 4) it can not realize that the rubbish produced in steel flxer sequence and template cleaning polishing synchronous construction, reinforcing bar process of binding is difficult to clean up Totally, not only work efficiency is low but also has a strong impact on the inherent quality of pre-manufactured product.
Two be colligation on split mold, web steel bar binding clamping fixture and the good bottom of roof steel bar binding clamping fixture difference the colligation bottom of at Web reinforcement skeleton and roof steel bar skeleton, first lift bottom web reinforcement skeleton in external mold, then install box girder inner formwork, internal model peace After in place, then row ceiling board framework of steel reinforcement, in internal model, then colligation chamfering connection reinforcing bar is integral on box girder formwork.This Method has the disadvantages that:1) fixed bottom web steel bar binding clamping fixture and roof steel bar binding clamping fixture are processed respectively, and it is counted Measure as 1:1.Relatively overall mold floor space is its 2 times, unfavorable to save land.2) processing bottom web reinforcement skeleton and roof steel bar bone Shaped steel amount used in frame is 2 times of overall steel bar binding clamping fixture, is unfavorable for saving material.3) during split colligation, per hole box beam reinforcing bar Frame need to be lifted 2 times, and during overall binding, need to only be lifted 1 time per hole steel bar framework of box beam, and framework of steel reinforcement split colligation work efficiency is same It is relatively low.4) with template direct colligation it is same, chamfering dowel colligation between bottom web reinforcement and roof steel bar operation is non- Often difficult (operating personnel need to climb fixes chamfering connection reinforcing bar in roof steel bar), framework of steel reinforcement globality poor, quality is difficult to protect Card.
Three be colligation on overall mold, on steel bar overall binding mold the good bottom web reinforcement of colligation and roof steel bar and fall Angle connects reinforcing bar, after skeleton is formed a whole, then integral hoisting framework of steel reinforcement is finally mounted directly internal model i.e. in external mold Can.
Technology in the prior art for reinforcing bar colligation on overall mold of prefabricated case beam is also immature, structure design and There are problems in manufacture, such as, using not enough facilitating, efficiency is low, and security is low.
The content of the invention
It is an object of the invention to solve at least the above, and provide the advantage that at least will be described later.
It is a still further object of the present invention to provide a kind of prefabricated case beam steel bar overall binding mold, its rational in infrastructure, manufacture Simply, efficiency high, safe.
In order to realize that there is provided a kind of prefabricated case beam steel bar overall binding according to object of the present invention and further advantage Mold, including:
Outer moulding bed, it includes two side forms and bed die, and described two side forms are arranged at intervals in transverse direction, and relative to institute State bed die to be symmetrical arranged, the side form includes integrally formed upper side form and lower side form, on the upper side form along the longitudinal direction between Every being provided with polylith plate body one, the plate body one is set in transverse direction, is arranged at intervals with transverse direction on the plate body one Multiple top plates are indulged and are provided with least one piece plate body two on muscle locating slot, the upper side form, and the plate body two is set along the longitudinal direction, When the block number of the plate body two is polylith, polylith plate body two is arranged at intervals in transverse direction, along longitudinal side on the plate body two It is located at the outside of plate body one to the plate body two being arranged at intervals with multiple top plate horizontal bar locating slots, a side form, the top plate is horizontal Between the height of the bottom of muscle locating slot is less than on the height that the top plate indulges the bottom of muscle locating slot, the lower side form from bottom to up Every being provided with polylith plate body three, the plate body three is set along the longitudinal direction, is arranged at intervals with along the longitudinal direction on the plate body three Polylith plate body four is arranged at intervals with multiple web horizontal bar locating slots, the bed die along the longitudinal direction, the plate body four is transversely Direction is set, and the two ends on the plate body four along the longitudinal direction are fixedly connected with described two side forms respectively, by bed die and side Mould connection is integral, is arranged at intervals with multiple bottom plates on the plate body four in transverse direction and indulges edge on muscle locating slot, the bed die The two ends of horizontal direction are respectively arranged with least one piece plate body five, and the plate body five is fixedly connected with the plate body four, and along vertical Set to direction, be arranged at intervals with multiple bottom plate horizontal bar locating slots on the plate body five along the longitudinal direction, the bottom plate horizontal bar is determined The height of the bottom of position groove indulges the height of the bottom of muscle locating slot less than the bottom plate, when the block number of the plate body five is at least three During block, at least three pieces plate bodys five are arranged at intervals in transverse direction;
Interior moulding bed, it includes multiple row, and spaced roof steel bar colligation supporting sleeve, many top plates are indulged in transverse direction To the longitudinal sizing steel pipes of sizing steel pipe support pipe, many top plates, multiple top plate steel in a row roof steel bar colligation supporting sleeve Muscle colligation supporting sleeve is arranged at intervals along the longitudinal direction, and a roof steel bar colligation supporting sleeve piece top plate of correspondence is longitudinally shaped Steel pipe support pipe and a top plate longitudinal direction sizing steel pipe, the roof steel bar colligation supporting sleeve is arranged vertically at described The lower section of bed die, longitudinally sizing steel pipe support pipe is vertically plugged in corresponding roof steel bar colligation support set to top plate Guan Zhong, top plate longitudinally sizing steel pipe set along the longitudinal direction, and with corresponding row top plate longitudinally sizing steel pipe support pipe In many top plates longitudinally sizing steel pipe support pipe is detachably connected respectively, when the columns of roof steel bar colligation supporting sleeve is extremely During few three row, the longitudinal sizing steel pipe support pipe and adjacent thereto and set along the longitudinal direction of the row top plate set along the longitudinal direction One row or two row top plates longitudinally sizing steel pipe support pipe it is detachably connected, set respectively positioned at outside and along the longitudinal direction Longitudinally sizing steel pipe support pipe is detachably connected two row top plates with described two side forms respectively.
Preferably, the plate body one, the plate body two, the plate body three, the plate body four and the plate body five are Angle steel, the plate body one, the plate body two, the plate body three, on five respective lamellar bodies of the plate body four and the plate body The top plate is accordingly arranged at intervals with along its length indulges muscle locating slot, the top plate horizontal bar locating slot, web horizontal stroke Muscle locating slot, the bottom plate indulge muscle locating slot and the bottom plate horizontal bar locating slot, and it is horizontal that the top plate indulges muscle locating slot, the top plate Muscle locating slot, the web horizontal bar locating slot, the bottom plate indulge muscle locating slot and the bottom plate horizontal bar locating slot respectively along described Plate body one, the plate body two, the plate body three, the plate body four and the plate body five thickness direction through the plate body one, The plate body two, the plate body three, the plate body four and the plate body five, and the top plate indulges muscle locating slot, top plate horizontal stroke Muscle locating slot, the web horizontal bar locating slot, the bottom plate indulge the equal court of opening of muscle locating slot and the bottom plate horizontal bar locating slot On.
Preferably, in top plate longitudinal direction sizing steel pipe and corresponding row top plate longitudinal direction sizing steel pipe support pipe Many top plates longitudinally the concrete mode that is detachably connected respectively of sizing steel pipe support pipe is:
A pair of top plates longitudinally sizing steel are symmetrically arranged with the top of the lateral wall of the top plate longitudinal direction sizing steel pipe support pipe Pipe block card, the top of a pair of top plates longitudinal direction sizing steel pipe block cards is located at the top of top plate longitudinal direction sizing steel pipe support pipe, one To top plate, longitudinally sizing steel pipe block card is in the shape of the letter V, and the top plate longitudinal direction sizing steel pipe is fastened on corresponding multipair top plate and indulged To between sizing steel pipe block card.
Preferably, it is provided with one piece of plate body two on the upper side form.
Preferably, the two ends on the bed die in transverse direction are respectively arranged with one piece of plate body five.
Preferably, the columns of the roof steel bar colligation supporting sleeve is three row.
Preferably, positioned at outside and the longitudinal sizing steel pipe support pipe difference of the two row top plates that set in transverse direction respectively It is detachably connected with described two side forms, and connected mode is identical, wherein, a line set positioned at outside and in transverse direction Longitudinally the sizing steel pipe support pipe concrete mode detachably connected with described two side forms is top plate:
Be provided with a lateral connection reinforcing bar between described two side forms, the two ends of lateral connection reinforcing bar respectively with two side forms Detachably connected, the middle part of lateral connection reinforcing bar is indulged with three top plates in a line top plate longitudinally sizing steel pipe support pipe respectively It is detachably connected to sizing steel pipe support pipe.
Preferably, the bottom of the side form is provided with support meanss, the outer moulding bed and is provided with operating platform.
Present invention also offers a kind of application method of the prefabricated case beam steel bar overall binding mold, including:
Step 1: each roof steel bar colligation supporting sleeve is inserted in ground, outer moulding bed is installed;
Step 2: many foundation plate lower floor horizontal bars are fastened in multiple bottom plate horizontal bar locating slots successively, and make bottom plate lower floor Curved surface of the horizontal bar along side form is upwardly extended and inserted in multiple web horizontal bar locating slots, afterwards by many foundation plate lower floors indulge muscle according to It is secondary to be fastened in the vertical muscle locating slot of multiple bottom plates, then the vertical muscle of many foundation plate lower floor horizontal bars on bed die and many foundation plate lower floors is tied up One is bundled into, bottom plate lower floor reinforcing bar is formed;
Step 3: welding the gate reinforcing bar one vertically set at each net node of bottom plate lower floor reinforcing bar, connect And many foundation plate upper strata horizontal bars set gradually according to the position of each foundation plate lower floor horizontal bar, and make the two ends of bottom plate upper strata horizontal bar to On extend to relative with two side forms, and do not contacted with each foundation plate lower floor horizontal bar in multiple web horizontal bar locating slots, then root The position of muscle is indulged according to each foundation plate lower floor, many foundation plate upper stratas is laid successively on each foundation plate upper strata horizontal bar and indulges muscle, and the bottom of by Each foundation plate upper strata horizontal bar and each foundation plate upper strata on mould indulge muscle in each intersection colligation, and in each friendship of its formation It is integrally welded with each gate reinforcing bar one at crunode;
Step 4: installing the other parts of interior moulding bed, Duo Gen top plates lower floor horizontal bar is fastened on multiple top plate horizontal bars successively In locating slot, and by each top plate longitudinal direction sizing steel pipe support Ge Gen top plates lower floor horizontal bar, indulge muscle in multiple top plates afterwards and determine Card sets Duo Gen top plates lower floor and indulges muscle successively in the groove of position, lays other top plate lower floors successively afterwards and indulges muscle, and is laying other top plates When lower floor indulges muscle, by the end of each foundation plate lower floor horizontal bar, and bottom plate upper strata horizontal bar end under corresponding top plate Layer horizontal bar and top plate lower floor indulge colligation at the net node of muscle formation, then indulge Ge Gen top plates lower floor's horizontal bar and Ge Gen top plates lower floor Muscle colligation is integral, forms top plate lower floor reinforcing bar;
Step 5: the gate reinforcing bar two vertically set is welded at each net node of layer reinforcing bar under the top plate, so Many top plate upper strata horizontal bars are set gradually according to the position of Ge Gen top plates lower floor horizontal bar afterwards, muscle is indulged further according to Ge Gen top plates lower floor Position, many top plate upper stratas are laid on each top plate upper strata horizontal bar and indulge muscle, afterwards push up each top plate upper strata horizontal bar and Ge Gen Muscle is indulged in intersection colligation in plate upper strata, and integrally welded in each intersection and each gate reinforcing bar two of its formation.
The present invention at least includes following beneficial effect:
1) small, cost is put into low, the bottom of the invention that the roof steel bar colligation supporting sleeve of interior moulding bed is arranged on to outer moulding bed Below mould, whole inner tube of a tyre frame is set inside moulding bed outside, i.e., increase roof steel bar in the space of bed die and two side form formation Support system, it is not necessary to be fabricated separately roof steel bar binding clamping fixture in addition, floor space reduces half, uses common steel tube generation For shaped steel, machining mould reduces half with material amount, and it is many that welding capacity reduces half.
2) adaptable, the longitudinal length of general box beam is 32.6m, such as needs the case that prefabricated longitudinal length is 24.6m Beam, also needs the roof steel bar binding clamping fixture of specially one 24.6m of processing beam unlike split binding clamping fixture.The present invention is only Need during the framework of steel reinforcement of colligation prefabricated case beam, by positioned at the bottom plate of box beam intermediate standard section part and the longitudinal direction of top plate Reinforcing bar shortens 8m, i.e., the longitudinally disposed reinforcing bar length of intermediate standard section part is reduced into 8m, and the 8m removed is longitudinally set Longitudinally sizing steel pipe removes the corresponding top plate of overall binding mold in region where the reinforcing bar put together, prefabricated case beam reinforcing bar On the longitudinally disposed reinforcing bar in the termination of skeleton and overall binding mold corresponding top plate longitudinally sizing steel pipe simultaneously to prefabricated The longitudinal midpoint movement 8m of the beam body of box beam, (support plate is real to the support plate of prefabricated case beam framework of steel reinforcement one end setting on the ground The aid used in the construction of border) position move 8m to longitudinal center, that is, obtained 24.6m prefabricated case beam frameworks of steel reinforcement, The conversion of different spans steel bar framework of box beam colligation is easily realized, it is adaptable.
3) construct simple, quick, operating personnel need to only stand framework of steel reinforcement inner chamber can smoothly the complete bottom web reinforcement of colligation, Roof steel bar, framework of steel reinforcement good integrity simple to operate, of the invention, quality easily ensures, need to only lift once, and construction is fast, Work efficiency is high.After framework of steel reinforcement overall binding is good, lifted by crane with special hanger, framework of steel reinforcement is due to elongated, interior sky of conducting oneself with dignity after lifting Become big, operating personnel easily take away the steel pipe and lateral connection reinforcing bar of roof steel bar support system very much, remove moulding bed in easy.
4) it is safe, relative to existing standing is in scaffold or climbs the progress colligation behaviour in roof steel bar Make, the present invention more perfect safety that ensure that operating personnel on the whole.
Further advantage, target and the feature of the present invention embodies part by following explanation, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is the structural representation of prefabricated case beam steel bar overall binding mold of the present invention;
Fig. 2 be step one of the present invention in install the structural representation after outer moulding bed;
Fig. 3 be step 2 of the present invention in install the structural representation after bottom plate lower floor horizontal bar;
Fig. 4 is the structural representation after welding gate reinforcing bar one in step 3 of the present invention;
Fig. 5 be step 4 of the present invention in obtain the structural representation after top plate lower floor reinforcing bar;
Fig. 6 is the structural representation after welding gate reinforcing bar two in step 5 of the present invention;
Fig. 7 is the structural representation of plate body one of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or many The presence or addition of individual other elements or its combination.In the description of the invention, term " transverse direction ", " longitudinal direction ", " axial direction ", " footpath To ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", the instruction such as " outer " side Position or position relationship are, based on orientation shown in the drawings or position relationship, to be for only for ease of the description present invention and simplify description, It is not instruction or implies that signified device or element there must be specific orientation, with specific azimuth configuration and operation, because This is not considered as limiting the invention.
As shown in figures 1 to 6, the invention provides a kind of prefabricated case beam steel bar overall binding mold, including:
Outer moulding bed, it includes two side forms 1 and bed die 2, and described two side forms 1 are arranged at intervals in transverse direction, and relatively It is symmetrical arranged in the bed die, the side form 1 is included on integrally formed upper side form 3 and lower side form 4, the upper side form 3 along vertical Polylith plate body 1 is arranged at intervals with to direction, and the plate body 1 sets that (left and right directions in Fig. 1 is transverse direction side in transverse direction It is longitudinal direction to, fore-and-aft direction, horizontal direction is row, and longitudinal direction is row), it is spaced in transverse direction on the plate body 1 It is provided with multiple top plates and indulges and at least one piece plate body 26 is provided with muscle locating slot 51, the upper side form 3, the plate body 26 is along vertical Set to direction, when the block number of the plate body 26 is polylith, polylith plate body 26 is arranged at intervals in transverse direction, the plate body The plate body 26 being arranged at intervals with along the longitudinal direction on 26 on multiple top plate horizontal bar locating slots, a side form 1 is located at plate body 1 Outside, the height of the bottom of the top plate horizontal bar locating slot indulges the height of the bottom of muscle locating slot 51 less than the top plate, so The vertical muscle of top plate lower floor reinforcing bar is located on horizontal bar, and polylith plate body 37 is arranged at intervals with from bottom to up on the lower side form 4, described Plate body 37 is set along the longitudinal direction, is arranged at intervals with multiple web horizontal bar locating slots, institute on the plate body 37 along the longitudinal direction State and be arranged at intervals with polylith plate body 48 on bed die 2 along the longitudinal direction, the plate body 48 is set in transverse direction, the plate body four Two ends on 8 along the longitudinal direction are fixedly connected with described two side forms 1 respectively, bed die 2 and side form 1 are connected into integral, institute State be arranged at intervals with transverse direction on plate body 48 multiple bottom plates indulge on muscle locating slot 81, the bed die 2 in transverse direction two End is respectively arranged with least one piece plate body 59, and the plate body 59 is fixedly connected with the plate body 48, and is set along the longitudinal direction Put, be arranged at intervals with multiple bottom plate horizontal bar locating slots, the bottom of the bottom plate horizontal bar locating slot on the plate body 59 along the longitudinal direction The height in portion indulges the height of the bottom of muscle locating slot 81 less than the bottom plate, and the vertical muscle of such bottom plate lower floor reinforcing bar is located at horizontal bar On, when the block number of the plate body 59 is at least three pieces, at least three pieces plate bodys 59 are arranged at intervals in transverse direction;
Interior moulding bed, it includes multiple row spaced roof steel bar colligation supporting sleeve 10, many top plates in transverse direction It is many in longitudinal direction sizing steel pipe support pipe 11, many top plates longitudinal direction sizing steel pipes 12, a row roof steel bar colligation supporting sleeve 10 Individual roof steel bar colligation supporting sleeve 10 is arranged at intervals along the longitudinal direction, a correspondence of roof steel bar colligation supporting sleeve 10 one Top plate longitudinal direction sizing steel pipe support pipe 11 and a top plate longitudinal direction sizing steel pipe 12, the edge of roof steel bar colligation supporting sleeve 10 Vertical direction is arranged on the lower section of the bed die 2, and it is right therewith that top plate longitudinal direction sizing steel pipe support pipe 11 is vertically plugged in In the roof steel bar colligation supporting sleeve 10 answered, top plate longitudinally sizing steel pipe 12 set along the longitudinal direction, and with it is corresponding Longitudinally sizing steel pipe support pipe 11 is detachably connected many top plates in one row top plate longitudinal direction sizing steel pipe support pipe 11 respectively, when When the columns of roof steel bar colligation supporting sleeve 10 is at least three row, the row top plate longitudinal direction sizing steel pipe set along the longitudinal direction Longitudinally sizing steel pipe support pipe 11 is detachable for support tube 11 and adjacent thereto and the row set along the longitudinal direction or two row top plates Ground is connected, if a row top plate is longitudinally shaped, the right and left of steel pipe support pipe 11 is each provided with a row top plate longitudinally sizing steel pipe branch Stay tube 11, the then longitudinal longitudinal sizing steel pipe support pipe 11 of sizing steel pipe support pipe 11 and two row top plates adjacent thereto of a row top plate Detachably connected, if a row top plate is longitudinally shaped, the left side or the right of steel pipe support pipe 11 are provided with a row top plate and longitudinally determined Shape steel tube support tube 11, the then longitudinal longitudinal sizing steel pipe of sizing steel pipe support pipe 11 and a row top plate adjacent thereto of a row top plate Support tube 11 is detachably connected, so can by each row top plate, longitudinally sizing steel pipe support pipe 11 be linked to be entirety, positioned at outside and The two row top plates set along the longitudinal direction respectively are longitudinally shaped, and (i.e. leftmost one arranges and rightmost steel pipe support pipe 11 in Fig. 1 The longitudinal sizing steel pipe support pipe 11 of a row top plate) be detachably connected respectively with described two side forms.So can be by each row top plate Longitudinal direction sizing steel pipe support pipe 11 is linked to be after entirety to be attached with two side forms 1.
The height of the bottom of the locating slot of top plate horizontal bar described in this programme indulges the bottom of muscle locating slot 51 less than the top plate Height, the height of the bottom of the bottom plate horizontal bar locating slot indulges the height of the bottom of muscle locating slot 81 less than the bottom plate, It is first to lay transverse steel when laying each layer of reinforcing bar, then lays on transverse steel longitudinal reinforcement, it is therefore desirable to will be all kinds of It is relatively lower that the height of the bottom of horizontal bar locating slot is set, and puts all horizontal bar locating slots to see clearly in accompanying drawing Greatly, actual relative altitude is not represented.
Using this programme can colligation go out the framework of steel reinforcement of prefabricated case beam, carried out essentially according to following steps:
Each roof steel bar colligation supporting sleeve 10 is inserted in ground, outer moulding bed is installed;
Many foundation plate lower floor horizontal bars are fastened in multiple bottom plate horizontal bar locating slots successively, i.e., it is each foundation plate lower floor is horizontal Muscle is put into transverse direction, and in realizing that card is set at least two bottom plate horizontal bar locating slots of rods arranged in horizontal line, and makes each Curved surface of the bottom plate lower floor horizontal bar along side form is upwardly extended and inserted in multiple web horizontal bar locating slots, forms web outer reinforcement Many foundation plate lower floors are indulged muscle afterwards and are fastened on successively in the vertical muscle locating slot 81 of multiple bottom plates by horizontal bar, i.e., each foundation plate lower floor Vertical muscle is put into along the longitudinal direction, and is indulged in muscle locating slot 81 at least two bottom plates of rods arranged in horizontal line and realized that card is set, then the bottom of by Many foundation plate lower floor horizontal bars and many foundation plate lower floors on mould 2 indulge muscle colligation integrally, form bottom plate lower floor reinforcing bar;And colligation abdomen Plate outer reinforcement indulges muscle, and binding method is any one of the prior art, after the completion of colligation, forms web outer reinforcement.Cause The horizontal bar of web outer reinforcement is a reinforcing bar, then web outer reinforcement and bottom plate lower floor reinforcing bar with the horizontal bar of bottom plate lower floor reinforcing bar Entirety is connected into.
(i.e. the point of intersection of bottom plate lower floor horizontal bar and vertical muscle) is welded along vertical at each net node of bottom plate lower floor reinforcing bar The gate reinforcing bar one that direction is set, with support baseboard top bars, sets successively then according to the position of each foundation plate lower floor horizontal bar Put many foundation plate upper strata horizontal bars, the top of a foundation plate lower floor horizontal bar sets a foundation plate upper strata horizontal bar, bottom plate lower floor horizontal bar and The bottom plate upper strata horizontal bar being positioned above is parallel to each other, and vertical projection is overlapped, and bottom plate top bars is similar to pass through bottom plate lower floor Reinforcing bar is vertically translated up and obtained, and make bottom plate upper strata horizontal bar two ends extend upwardly to it is relative with two side forms, and Do not contacted with each foundation plate lower floor horizontal bar in multiple web horizontal bar locating slots, so form web internal layer horizontal bar, web internal layer Horizontal bar is relative one by one and separated by a distance with web outer layer horizontal bar, so that web outer reinforcement and internal layer reinforcing bar are separated by necessarily Distance, now the top of web internal layer reinforcing bar is hanging, and the position of muscle is indulged further according to each foundation plate lower floor, horizontal on each foundation plate upper strata Many foundation plate upper stratas are laid on muscle successively and indulge muscle, to form bottom plate top bars, the top that a foundation plate lower floor indulges muscle sets one Muscle is indulged on foundation plate upper strata, and bottom plate lower floor indulges muscle and the bottom plate upper strata being positioned above is indulged muscle and is parallel to each other, and vertical projection is overlapped, And the vertical muscle of web internal layer reinforcing bar is laid, each foundation plate upper strata horizontal bar on bed die 2 and each foundation plate upper strata then are indulged into muscle exists Each intersection colligation, and indulge on each foundation plate upper strata horizontal bar and each foundation plate upper strata each intersection of muscle formation with it is each Individual gate reinforcing bar one is integrally welded;With this support baseboard top bars.The vertical muscle set-up mode of web internal layer reinforcing bar is existing Technology, after the completion of the vertical muscle colligation of web internal layer reinforcing bar, forms web internal layer reinforcing bar.
The other parts of moulding bed, multiple top plate horizontal bar locating slots are fastened on by Duo Gen top plates lower floor horizontal bar successively in installing In, i.e., each top plate lower floor horizontal bar is put into transverse direction, and muscle positioning is indulged at least two top plates of rods arranged in horizontal line Realize that card is set in groove 51, and longitudinally sizing steel pipe 12 supports Ge Gen top plates lower floor horizontal bar by each top plate, afterwards on multiple tops Plate, which is indulged successively to block in muscle locating slot 51, sets the vertical muscle of Duo Gen top plates lower floor, i.e., each top plate lower floor is indulged into muscle is put into along longitudinal side To, and in realizing that card is set in the vertical muscle locating slot 51 of at least two top plates of rods arranged in horizontal line, lay successively under other top plates afterwards The vertical muscle of layer, i.e. top plate lower floor between two boards body 1 indulge muscle, and other top plate lower floors indulge muscle and are welded in place according to conventional arrangement mode , top plate indulges muscle locating slot and top plate horizontal bar locating slot is intended merely to position the left and right ends of top plate lower floor reinforcing bar, works as left and right After two ends are fixed, you can fixed top plate lower floor reinforcing bar, and when other top plate lower floors of laying indulge muscle, by each foundation plate lower floor horizontal bar End, and the end of each foundation plate upper strata horizontal bar indulges muscle formation in corresponding top plate lower floor horizontal bar and top plate lower floor Colligation at net node, i.e., distinguish colligation under the top plate on layer reinforcing bar, then by each by web outer layer horizontal bar, web internal layer horizontal bar Top plate lower floor horizontal bar and Ge Gen top plates lower floor indulge muscle colligation integrally, form top plate lower floor reinforcing bar;
(i.e. the point of intersection of top plate lower floor horizontal bar and vertical muscle) is welded along vertical at each net node of layer reinforcing bar under the top plate The gate reinforcing bar two that direction is set, then sets gradually many top plate upper strata horizontal bars according to the position of Ge Gen top plates lower floor horizontal bar, The top of a piece top plate lower floor horizontal bar sets a top plate upper strata horizontal bar, top plate lower floor horizontal bar and the top plate upper strata being positioned above Horizontal bar is parallel to each other, and vertical projection is overlapped, and top plate top bars is similar vertically to be put down upwards by top plate lower floor reinforcing bar Shifting is obtained, and the position of muscle is indulged further according to Ge Gen top plates lower floor, and many top plate upper stratas are laid on each top plate upper strata horizontal bar and indulge muscle, The top that a piece top plate lower floor indulges muscle sets a top plate upper strata to indulge muscle, and top plate lower floor indulges muscle and the top plate upper strata being positioned above Vertical muscle, is parallel to each other, and vertical projection is overlapped, and each top plate upper strata horizontal bar and Ge Gen top plates upper strata are indulged into muscle in crosspoint afterwards Locate colligation, and each intersection and each gate reinforcing bar of muscle formation are indulged in each top plate upper strata horizontal bar and Ge Gen top plates upper strata Two is integrally welded.With this roof supporting top bars.
Further, since being provided with top plate on two upper side forms 3 indulges muscle locating slot 51, the central region of top plate lower floor reinforcing bar Each longitudinal reinforcement (other top plate lower floors indulge muscle) be arranged at intervals in transverse direction, to strengthen the firm of top plate lower floor reinforcing bar Property, the set-up mode of top plate top bars is identical with the set-up mode of bottom plate top bars.The top that top plate lower floor indulges muscle is set Have one it is in parallel, and vertical projection overlap top plate upper strata indulge muscle, this is prior art, be will not be repeated here.The bottom of due to Plate upper strata horizontal bar and bottom plate lower floor horizontal bar are respectively a whole piece reinforcing bar, in laying, form one pair respectively at two side forms 1 Depending on the web reinforcement of layer, the shape of the shape of the web reinforcement according to side form 1 and the web for needing prefabricated box beam, the web The horizontal bar of outer reinforcement and the horizontal bar of web internal layer reinforcing bar are respectively same steel with bottom plate lower floor horizontal bar and bottom plate upper strata horizontal bar Muscle, multiple rows of longitudinal reinforcement is set on each layer of horizontal bar of the web reinforcement, overall with the framework of steel reinforcement for strengthening prefabricated case beam Steadiness.Meanwhile, the prestress pipe with rubber pulling rod rod is set up between web outer reinforcement and web internal layer reinforcing bar fixed Position mesh sheet, and other desired finished product or semi-finished product.This is prior art, be will not be repeated here.
Thus, the framework of steel reinforcement overall binding of prefabricated case beam is completed.
The roof steel bar colligation supporting sleeve 10 of interior moulding bed is arranged on the lower section of bed die 2 of outer moulding bed by this programme, whole interior Moulding bed is arranged on inside outer moulding bed, i.e., increase the support system of roof steel bar in the space of bed die 2 and two formation of side form 1, Roof steel bar binding clamping fixture need not be fabricated separately in addition, floor space reduces half, shaped steel is replaced with common steel tube, processes Mold reduces half with material amount, and welding capacity reduction half is more, while putting into, small, cost is low, adaptable, construction is simple, fast It is prompt, safe.
In another technical scheme, the plate body 1, the plate body 26, the plate body 37, the plate body 48 and institute It is angle steel (as shown in Figure 7), the plate body 1, the plate body 26, the plate body 37, the plate body 48 to state plate body 59 Muscle locating slot is indulged with the top plate is accordingly arranged at intervals with described 59 respective lamellar bodies of plate body along its length 51st, the top plate horizontal bar locating slot, the web horizontal bar locating slot, the bottom plate indulge muscle locating slot 81 and the bottom plate horizontal bar is fixed Position groove, the top plate indulges muscle locating slot 51, the top plate horizontal bar locating slot, the web horizontal bar locating slot, the bottom plate and indulges muscle Locating slot 81 and the bottom plate horizontal bar locating slot are respectively along the plate body 1, the plate body 26, the plate body 37, the plate The thickness direction of body 48 and the plate body 59 runs through the plate body 1, the plate body 26, the plate body 37, the plate body 48 and the plate body 59, and the top plate indulges muscle locating slot 51, the top plate horizontal bar locating slot, web horizontal bar positioning The opening of the vertical muscle locating slot 81 of groove, the bottom plate and the bottom plate horizontal bar locating slot is upward.As shown in fig. 7, on a lamellar body Groove be that top plate indulges muscle locating slot or top plate horizontal bar locating slot or web horizontal bar locating slot or bottom plate indulges muscle locating slot or bottom plate Horizontal bar locating slot, by taking the setting of bottom plate lower floor horizontal bar as an example, bottom plate lower floor horizontal bar need to be fastened on the positioning of at least two bottom plate horizontal bars In groove, these bottom plate horizontal bar locating slots point-blank, and are located on different plate bodys 1.The set-up mode of other reinforcing bars It is identical with the set-up mode of bottom plate lower floor horizontal bar, that is, need at least two locating slot cards to set a reinforcing bar, card sets reinforcing bar Locating slot is point-blank.The plate body 1, plate body 26, plate body 37, plate body 48 and plate body 59 of this programme are using having The angle steel of two lamellar bodies sets corresponding reinforcing bar locating slot, simple and convenient, by taking plate body 1 as an example, when in use, plate body 1 One lamellar body is weldingly fixed on side form 3, sets top plate to indulge muscle locating slot 51 on another lamellar body, top plate is set to position and block Lower floor indulges muscle, plate body 26, plate body 37, plate body 48 and plate body 59 setting principle it is identical with plate body 1.Can using this programme Colligation goes out the framework of steel reinforcement of prefabricated case beam, and remaining step is as hereinbefore.
In another technical scheme, top plate longitudinal direction sizing steel pipe 12 and corresponding row top plate longitudinal direction sizing steel Many top plates in pipe support tube 11 concrete mode that longitudinally sizing steel pipe support pipe 11 is detachably connected respectively is:
A pair of top plates are symmetrically arranged with the top of the lateral wall of the top plate longitudinal direction sizing steel pipe support pipe 11 longitudinally to shape Steel pipe block card 13, the top of a pair of top plates longitudinal direction sizing steel pipe block cards 13 is located at top plate longitudinal direction sizing steel pipe support pipe 11 Top, longitudinally sizing steel pipe block card 13 is in the shape of the letter V a pair of top plates, and the top plate longitudinal direction sizing steel pipe 12 is fastened on corresponding Multipair top plate is longitudinally between sizing steel pipe block card 13.
Using top plate, longitudinally the card of sizing steel pipe block card 13 sets top plate longitudinally sizing steel pipe 12 to this programme, and this is simple in construction, real Apply conveniently.A pair of top plates longitudinally sizing steel pipe gear is symmetrically welded at the top of the top plate longitudinally lateral wall of sizing steel pipe support pipe 11 Card 13, then by top plate, longitudinally sizing steel pipe support pipe 11 is inserted in roof steel bar colligation supporting sleeve 10.Can using the present invention Colligation goes out the framework of steel reinforcement of prefabricated case beam, and remaining step is as hereinbefore.
In another technical scheme, one piece of plate body 26 is provided with the upper side form 3.
This programme sets one piece of plate body 26 on one on side form 3, top plate horizontal bar locating slot is set on plate body 26, i.e., Fix a top plate lower floor horizontal bar by two top plate horizontal bar locating slots, can realize completely the positioning to top plate lower floor horizontal bar and Card is set, and simplifies the structure of mold, cost-effective.Using this programme can colligation go out the framework of steel reinforcement of prefabricated case beam, remaining step with It is same as before.
In another technical scheme, the two ends on the bed die 2 in transverse direction are respectively arranged with one piece of plate body 59.
This programme sets one piece of plate body 59, sets bottom plate horizontal bar locating slot at the two ends of plate body 59, that is, passes through two bottoms Plate horizontal bar locating slot fixes a foundation plate lower floor horizontal bar, can realize that the positioning to bottom plate lower floor horizontal bar and card are set completely, simplifies The structure of mold, it is cost-effective.Using this programme can colligation go out the framework of steel reinforcement of prefabricated case beam, remaining step is as hereinbefore.
In another technical scheme, the columns of the roof steel bar colligation supporting sleeve 10 is three row.
The present invention sets three row roof steel bar colligation supporting sleeves 10, correspondingly there is three row top plates longitudinally sizing steel pipe support Two layers of reinforcing bar above and below pipe 11, three top plates longitudinal direction sizing steel pipes, enough roof supportings, reduces unnecessary cost payout.Utilize This programme can colligation go out the framework of steel reinforcement of prefabricated case beam, remaining step is as hereinbefore.
In another technical scheme, the two row top plates longitudinal direction sizing steel pipe branch set respectively positioned at outside and in transverse direction Stay tube 11 is detachably connected with described two side forms 1 respectively, and connected mode is identical, wherein, it is positioned at outside and transversely square To a line top plate of setting, longitudinally the concrete mode detachably connected with described two side forms 1 of sizing steel pipe support pipe 11 is:
It is provided with a lateral connection reinforcing bar 14 between described two side forms 1, the two ends of lateral connection reinforcing bar 14 are respectively with two Individual side form 1 is detachably connected, the middle part of lateral connection reinforcing bar 14 respectively with a line top plate longitudinally sizing steel pipe support pipe 11 Three top plates longitudinally sizing steel pipe support pipe 11 it is detachably connected.Herein, due to three row roof steel bar colligation supporting sleeves 10, correspondingly there is three row top plates longitudinally sizing steel pipe support pipe 11, longitudinally sizing steel pipe support pipe 11 is transversely square for a line top plate To being in not necessarily rods arranged in horizontal line, mutually it can also stagger a bit, but approximate trend is to be arranged at intervals in transverse direction.This programme exists After top plate longitudinal direction sizing steel pipe support pipe 11 is installed, a lateral connection reinforcing bar 14 is set in transverse direction, and respectively Longitudinally sizing steel pipe support pipe 11 is connected with two side forms 1 and a line top plate, and which is simple, operation is easy.Utilize the present invention Can colligation go out the framework of steel reinforcement of prefabricated case beam, remaining step is as hereinbefore.Because of a top plate, longitudinally sizing steel pipe and a row are pushed up Longitudinally sizing steel pipe support pipe is linked to be entirety to plate, thus only needs in Fig. 1, and two ends along the longitudinal direction respectively set a transverse direction and connected Connect reinforcing bar 14, you can longitudinally sizing steel pipe support pipe is linked to be entirety by each row top plate.
In another technical scheme, the bottom of the side form, which is provided with support meanss, the outer moulding bed, is provided with operation Platform 11.
This programme sets side form support meanss to prop up after each roof steel bar colligation supporting sleeve 10 is inserted in ground Side form 1 is supportted, set-up mode is prior art, increase the steadiness of side form 1, two outsides after side form 1 is set transversely are pacified Operating platform 11 is filled, to facilitate operating personnel to operate.Using this programme can colligation go out the framework of steel reinforcement of prefabricated case beam, remaining step As hereinbefore.
In addition, the side when vertical and horizontal occurred in the title of each locating slot of the present invention are its actual setting To.
A kind of application method of the prefabricated case beam steel bar overall binding mold, including:
Step 1: each roof steel bar colligation supporting sleeve is inserted in ground, outer moulding bed is installed;
Step 2: many foundation plate lower floor horizontal bars 15 are fastened in multiple bottom plate horizontal bar locating slots 16 successively, and make bottom plate Curved surface of the lower floor's horizontal bar 15 along side form is upwardly extended and inserted in multiple web horizontal bar locating slots 23, afterwards by under many foundation plates The vertical muscle of layer is fastened on multiple bottom plates and indulged in muscle locating slot successively, then by many foundation plate lower floor horizontal bars 15 and many foundation on bed die 2 Plate lower floor indulges muscle colligation integrally, forms bottom plate lower floor reinforcing bar;
Step 3: the gate reinforcing bar 1 vertically set is welded at each net node of bottom plate lower floor reinforcing bar, Many foundation plate upper strata horizontal bars 18 are set gradually then according to the position of each foundation plate lower floor horizontal bar 15, and make bottom plate upper strata horizontal bar 18 Two ends extend upwardly to it is relative with two side forms 1, and with each foundation plate lower floor horizontal bar in multiple web horizontal bar locating slots 23 15 are not contacted, and the position of muscle is indulged further according to each foundation plate lower floor, many foundation plates are laid successively on each foundation plate upper strata horizontal bar 18 Muscle is indulged on upper strata, and each foundation plate upper strata horizontal bar 18 on bed die 2 and each foundation plate upper strata are indulged into muscle in each intersection colligation, And it is integrally welded in each intersection and each gate reinforcing bar 1 of its formation;
Step 4: installing the other parts of interior moulding bed, it is horizontal that Duo Gen top plates lower floor horizontal bar 19 is fastened on into multiple top plates successively In muscle locating slot 20, and by each top plate longitudinal direction sizing steel pipe support Ge Gen top plates lower floor horizontal bar 19, afterwards in multiple top plates Card sets Duo Gen top plates lower floor and indulges muscle successively in vertical muscle locating slot, lays other top plate lower floors successively afterwards and indulges muscle, and is laying it When his top plate lower floor indulges muscle, by the end of each foundation plate lower floor horizontal bar 15, and bottom plate upper strata horizontal bar 18 end right with it The top plate lower floor horizontal bar 19 answered and top plate lower floor indulge colligation at the net node of muscle formation, then by the He of Ge Gen top plates lower floor horizontal bar 19 Ge Gen top plates lower floor indulges muscle colligation integrally, forms top plate lower floor reinforcing bar;
Step 5: the gate reinforcing bar 2 21 vertically set is welded at each net node of layer reinforcing bar under the top plate, Then many top plate upper strata horizontal bars 22 are set gradually according to the position of Ge Gen top plates lower floor horizontal bar 19, further according to Ge Gen top plates lower floor The position of vertical muscle, many top plate upper stratas are laid on each top plate upper strata horizontal bar 22 and indulge muscle, afterwards by each top plate upper strata horizontal bar Muscle is indulged in intersection colligation in 22 and Ge Gen top plates upper strata, and in each intersection and each gate reinforcing bar 2 21 of its formation It is integrally welded.
The present invention is in specific implementation in use, there are as below methods:
1st, mold is ejected with the line of ink marker according to prefabricated case beam steel bar overall binding matrix design figure setting-out on smooth ground Marginal position and in length and breadth axis.
2nd, A points (OA=2.704m), B points are symmetrically measured as starting point, successively using mold direction end socket edge line midpoint O points (AB=3.36m), 6 positions of C points (BC=0.8m), are respectively adopted the line of ink marker by AA, BB, CC point at two ends and connect, obtain 6 Bar longitudinal direction lines.On 6 vertical lines, using termination as starting point, measure successively spacing be respectively 1.1m, 1.65m, 2.0m, 2.0m, 2.0m, 2.0m, 2.0m, 2.0m, 2.0m, 2.0m, 2.0m, 2.0m, 2.0m, 2.0m, 1.65m, 1.1m point, above-mentioned position according to 6 holes of Φ 10 of secondary brill.200*200*10mm steel plates are anchored on terrace using 6 Φ 10 expansion bolt, it is whole as reinforcing bar Body binding clamping fixture and the attachment point on ground.
3rd, by their entirety binding clamping fixture design drawing dimensioned its constitute component, such as:Reinforcing bar guardrail, operating platform, top plate are indulged Muscle locating slot, top plate horizontal bar locating slot, top plate longitudinal direction sizing steel pipe block card, top plate longitudinal direction sizing steel pipe, lateral connection reinforcing bar, branch Longitudinally sizing steel pipe support pipe, bottom plate indulge muscle locating slot, bottom plate horizontal bar locating slot, web horizontal bar locating slot, top for support arrangement, top plate The components such as slab muscle colligation supporting sleeve, and the welding fabrication successively on terrace, support plate and girder falling built-in fitting position foundation Position is constructed in design drawing.
4th, after the completion of steel bar overall binding mold processing and fabricating, each size construction error is inspected for acceptance, checks and accepts and closes Lattice, and fill in i.e. usable after record of acceptance.
5th, bottom plate lower floor transverse steel is sequentially placed into bottom plate horizontal bar locating slot.Then by bottom plate lower floor longitudinal reinforcement according to The secondary bottom plate that is put into is indulged in muscle locating slot and in web horizontal bar locating slot, and the reinforcing bar colligation of bottom plate lower floor is completed.
6th, the prestress pipe on web (is completed into) (the machined examination in scene of positioning mesh sheet by rubber pulling rod rod pore-forming Qualified semi-finished product) it is sequentially arranged at according to design drawing position in web double layer bar, while bottom plate spilled water hole, web are led to The spiral bar of air holes position is installed in place.
7th, the cableway (i.e. gate reinforcing bar one) of bottom plate top bars is welded in bottom plate lower floor bar-mat reinforcement node location.Door After the completion of steel bar one is welded, by sequence number 5 successively colligation bottom plate upper strata vertically and horizontally reinforcing bar.Bottom plate upper strata transverse and longitudinal reinforcing bar is positioned According to lower floor, vertically and horizontally muscle is completed, up and down two layers vertically and horizontally reinforcement location vertical direction it is coplanar.
8th, the insertion top plate longitudinal direction sizing steel pipe in the roof steel bar colligation support pipe-in-pipe being fixed on below mold bottom plate Support tube.Lateral connection bar connecting is used between three row's top plates longitudinal direction sizing steel pipe support pipe, in top plate longitudinal direction sizing steel pipe support Place top plate longitudinally sizing steel pipe in tube top end.
9th, three firm row's top plates longitudinally sizing steel pipe and indulge muscle locating slot with top plate and constitute roof supporting framework of steel reinforcement Platform, indulges muscle locating slot side with top plate and is provided with top plate horizontal bar locating slot.
10th, it is put into top plate lower floor transverse steel in the top plate horizontal bar locating slot at two ends.Laid again on lower floor's horizontal bar vertical To reinforcing bar, longitudinal reinforcement positioning is the positioning tied silk by two ends transverse steel to complete.The vertically and horizontally reinforcing bar colligation of top plate lower floor After shaping, the spiral bar of the position such as top plate spilled water hole and hole for hoist is installed.
11st, cableway (the i.e. gate steel of layer vertically and horizontally bar-mat reinforcement node location welding top plate top bars under the top plate Muscle two).After cableway is welded, the horizontal and vertical reinforcing bar in upper strata is installed successively.The positioning of top plate upper strata transverse and longitudinal reinforcing bar be according to Vertically and horizontally muscle is completed for lower floor, up and down two layers vertically and horizontally reinforcement location vertical direction it is coplanar.
12nd, after bottom plate and roof steel bar colligation are molded, standing will connection web and top plate, abdomen on baseplate reinforcing bar The chamfering reinforcing bar of plate and bottom plate is welded in place successively according to design drawing home position and size.Again by bottom plate and top plate it is pre-buried and Integrated ground reinforcing bar is welded in place as requested.
13rd, withdrawing rod is penetrated in the vestibule of positioning mesh sheet formation with strand pulling machine, so far framework of steel reinforcement overall binding is completed.
14th, the suspension hook (making of gaily decorated basket screw rod) on framework of steel reinforcement special hanger is hung over into top plate, bottom plate vertically and horizontally steel successively Muscle crosspoint.2 50t machines liftings, because reinforcing bar deadweight framework of steel reinforcement is vertically elongated, the cavity between top plate and bottom plate becomes big, Top plate longitudinally forms space between sizing steel pipe top ends and roof steel bar, and operating personnel easily extract top plate longitudinally sizing steel out this moment Guan Hou, then lateral connection reinforcing bar and top plate longitudinally sizing steel pipe support pipe are extracted, so far whole roof steel bar support platform is released, Framework of steel reinforcement integral hoisting is put into template by 2 door machines.
15th, a hole prefabricated case beam framework of steel reinforcement overall binding lifting is completed.
Although embodiment of the present invention is disclosed as above, it is not restricted in specification and embodiment listed With it can be applied to various suitable the field of the invention completely, can be easily for those skilled in the art Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, the present invention is not limited In specific details and shown here as the legend with description.

Claims (9)

1. a kind of prefabricated case beam steel bar overall binding mold, it is characterised in that including:
Outer moulding bed, it includes two side forms and bed die, and described two side forms are arranged at intervals in transverse direction, and relative to the bottom Mould is symmetrical arranged, and the side form, which includes being spaced along the longitudinal direction on integrally formed upper side form and lower side form, the upper side form, to be set Polylith plate body one is equipped with, the plate body one is set in transverse direction, is arranged at intervals with transverse direction on the plate body one multiple Top plate is indulged and is provided with least one piece plate body two on muscle locating slot, the upper side form, and the plate body two is set along the longitudinal direction, works as institute State plate body two block number be polylith when, polylith plate body two is arranged at intervals in transverse direction, on the plate body two along the longitudinal direction between It is located at the outside of plate body one every the plate body two being provided with multiple top plate horizontal bar locating slots, a side form, the top plate horizontal bar is determined The height of the bottom of position groove is indulged to be spaced from bottom to up on the height of the bottom of muscle locating slot, the lower side form less than the top plate and set Polylith plate body three is equipped with, the plate body three is set along the longitudinal direction, is arranged at intervals with along the longitudinal direction on the plate body three multiple Polylith plate body four is arranged at intervals with web horizontal bar locating slot, the bed die along the longitudinal direction, the plate body four is in transverse direction Set, the two ends on the plate body four along the longitudinal direction are fixedly connected with described two side forms respectively, bed die and side form are connected It is connected on entirety, the plate body four and is arranged at intervals with transverse direction on the vertical muscle locating slot of multiple bottom plates, the bed die transversely The two ends in direction are respectively arranged with least one piece plate body five, and the plate body five is fixedly connected with the plate body four, and along longitudinal side To setting, multiple bottom plate horizontal bar locating slots, the bottom plate horizontal bar locating slot are arranged at intervals with the plate body five along the longitudinal direction Bottom height indulged less than the bottom plate muscle locating slot bottom height, when the block number of the plate body five is at least three pieces When, at least three pieces plate bodys five are arranged at intervals in transverse direction;
Interior moulding bed, it includes multiple row, and spaced roof steel bar colligation supporting sleeve, many top plates are longitudinally fixed in transverse direction Multiple roof steel bars in shape steel tube support tube, many top plates longitudinal direction sizing steel pipes, a row roof steel bar colligation supporting sleeve are tied up Prick supporting sleeve to be arranged at intervals along the longitudinal direction, piece top plate longitudinal direction sizing steel pipe of a roof steel bar colligation supporting sleeve correspondence Support tube and a top plate longitudinal direction sizing steel pipe, the roof steel bar colligation supporting sleeve are arranged vertically at the bed die Lower section, top plate longitudinally sizing steel pipe support pipe be vertically plugged in corresponding roof steel bar colligation supporting sleeve In, top plate longitudinally sizing steel pipe set along the longitudinal direction, and with corresponding row top plate longitudinally sizing steel pipe support pipe in Many top plates longitudinally sizing steel pipe support pipe be detachably connected respectively, when the columns of roof steel bar colligation supporting sleeve is at least During three row, the longitudinal sizing steel pipe support pipe and adjacent thereto and set along the longitudinal direction of the row top plate that sets along the longitudinal direction Longitudinally sizing steel pipe support pipe is detachably connected for one row or two row top plates, two set respectively positioned at outside and along the longitudinal direction Longitudinally sizing steel pipe support pipe is detachably connected row top plate with described two side forms respectively.
2. prefabricated case beam steel bar overall binding mold as claimed in claim 1, it is characterised in that the plate body one, the plate Body two, the plate body three, the plate body four and the plate body five are angle steel, the plate body one, the plate body two, the plate body 3rd, the top plate is accordingly arranged at intervals with along its length on described five respective lamellar bodies of plate body four and the plate body Vertical muscle locating slot, the top plate horizontal bar locating slot, the web horizontal bar locating slot, the bottom plate indulge muscle locating slot and the bottom plate Horizontal bar locating slot, the top plate indulges muscle locating slot, the top plate horizontal bar locating slot, the web horizontal bar locating slot, the bottom plate Vertical muscle locating slot and the bottom plate horizontal bar locating slot are respectively along the plate body one, the plate body two, the plate body three, the plate body Four and the plate body five thickness direction through the plate body one, the plate body two, the plate body three, the plate body four and described Plate body five, and the vertical muscle locating slot of the top plate, the top plate horizontal bar locating slot, the web horizontal bar locating slot, the bottom plate are vertical The opening of muscle locating slot and the bottom plate horizontal bar locating slot is upward.
3. prefabricated case beam steel bar overall binding mold as claimed in claim 1, it is characterised in that the top plate longitudinal direction sizing steel Longitudinally sizing steel pipe support pipe respectively can for many top plates in pipe and corresponding row top plate longitudinal direction sizing steel pipe support pipe Dismantling the concrete mode connected is:
A pair of top plates longitudinally sizing steel pipes gear is symmetrically arranged with the top of the lateral wall of the top plate longitudinal direction sizing steel pipe support pipe Card, the top of the longitudinal sizing steel pipe block cards of a pair of top plates is located at the top of the longitudinal sizing steel pipe support pipe of the top plate, a pair of tops Longitudinally sizing steel pipe block card is in the shape of the letter V plate, and it is longitudinally fixed that the top plate longitudinal direction sizing steel pipe is fastened on corresponding multipair top plate Between shape steel tube block card.
4. prefabricated case beam steel bar overall binding mold as claimed in claim 1, it is characterised in that be provided with the upper side form One piece of plate body two.
5. prefabricated case beam steel bar overall binding mold as claimed in claim 1, it is characterised in that transversely square on the bed die To two ends be respectively arranged with one piece of plate body five.
6. prefabricated case beam steel bar overall binding mold as claimed in claim 1, it is characterised in that the roof steel bar colligation branch The columns of support set pipe is three row.
7. prefabricated case beam steel bar overall binding mold as claimed in claim 6, it is characterised in that positioned at outside and respectively along horizontal stroke Longitudinally sizing steel pipe support pipe is detachably connected with described two side forms respectively for the two row top plates set to direction, and connection side Formula is identical, wherein, a line top plate longitudinal direction sizing steel pipe support pipe and the described two sides set positioned at outside and in transverse direction The detachably connected concrete mode of mould is:
A lateral connection reinforcing bar is provided between described two side forms, the two ends of lateral connection reinforcing bar are removable with two side forms respectively Connect with unloading, the middle part of lateral connection reinforcing bar is longitudinally determined with three top plates in a line top plate longitudinally sizing steel pipe support pipe respectively Shape steel tube support tube is detachably connected.
8. prefabricated case beam steel bar overall binding mold as claimed in claim 1, it is characterised in that the bottom of the side form is set Have and be provided with operating platform on support meanss, the outer moulding bed.
9. a kind of application method of prefabricated case beam steel bar overall binding mold as claimed in claim 1, it is characterised in that bag Include:
Step 1: each roof steel bar colligation supporting sleeve is inserted in ground, outer moulding bed is installed;
Step 2: many foundation plate lower floor horizontal bars are fastened in multiple bottom plate horizontal bar locating slots successively, and make bottom plate lower floor horizontal bar Upwardly extend and insert in multiple web horizontal bar locating slots along the curved surface of side form, many foundation plate lower floors are indulged into muscle afterwards and blocked successively Multiple bottom plates are located to indulge in muscle locating slot, then by many foundation plate lower floor horizontal bars on bed die and many foundation plate lower floors indulge muscle colligation into One, forms bottom plate lower floor reinforcing bar;
Step 3: weld the gate reinforcing bar one that vertically sets at each net node of bottom plate lower floor reinforcing bar, then root Many foundation plate upper strata horizontal bars are set gradually according to the position of each foundation plate lower floor horizontal bar, and the two ends of bottom plate upper strata horizontal bar is prolonged upwards Extend relative with two side forms, and do not contacted with each foundation plate lower floor horizontal bar in multiple web horizontal bar locating slots, further according to each Foundation plate lower floor indulges the position of muscle, lays many foundation plate upper stratas successively on each foundation plate upper strata horizontal bar and indulges muscle, and by bed die Each foundation plate upper strata horizontal bar and each foundation plate upper strata indulge muscle in each intersection colligation, and its formation each crosspoint Place is integrally welded with each gate reinforcing bar one;
Step 4: installing the other parts of interior moulding bed, Duo Gen top plates lower floor horizontal bar is fastened on into multiple top plate horizontal bars successively positions In groove, and by each top plate longitudinal direction sizing steel pipe support Ge Gen top plates lower floor horizontal bar, indulge muscle locating slot in multiple top plates afterwards In successively card set Duo Gen top plates lower floor indulge muscle, lay successively afterwards other top plate lower floors indulge muscle, and lay other top plate lower floors It is during vertical muscle, the end of each foundation plate lower floor horizontal bar, and the end of bottom plate upper strata horizontal bar is horizontal in corresponding top plate lower floor Muscle and top plate lower floor indulge colligation at the net node of muscle formation, and Ge Gen top plates lower floor's horizontal bar and Ge Gen top plates lower floor then are indulged into muscle and tied up One is bundled into, top plate lower floor reinforcing bar is formed;
Step 5: the gate reinforcing bar two vertically set, Ran Hougen are welded at each net node of layer reinforcing bar under the top plate Many top plate upper strata horizontal bars are set gradually according to the position of Ge Gen top plates lower floor horizontal bar, the position of muscle is indulged further according to Ge Gen top plates lower floor Put, many top plate upper stratas are laid on each top plate upper strata horizontal bar and indulge muscle, afterwards by each top plate upper strata horizontal bar and Ge Gen top plates Muscle is indulged in intersection colligation in upper strata, and integrally welded in each intersection and each gate reinforcing bar two of its formation.
CN201710161315.8A 2017-03-17 2017-03-17 Prefabricated case beam steel bar overall binding mold and its application method Pending CN107009510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710161315.8A CN107009510A (en) 2017-03-17 2017-03-17 Prefabricated case beam steel bar overall binding mold and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710161315.8A CN107009510A (en) 2017-03-17 2017-03-17 Prefabricated case beam steel bar overall binding mold and its application method

Publications (1)

Publication Number Publication Date
CN107009510A true CN107009510A (en) 2017-08-04

Family

ID=59439592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710161315.8A Pending CN107009510A (en) 2017-03-17 2017-03-17 Prefabricated case beam steel bar overall binding mold and its application method

Country Status (1)

Country Link
CN (1) CN107009510A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574762A (en) * 2017-08-24 2018-01-12 中铁三局集团有限公司 A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities
CN108179701A (en) * 2018-01-22 2018-06-19 广西路桥工程集团有限公司 A kind of bridge-collision-avoidance wall embedded bar overall binding locating rack
CN109129847A (en) * 2018-10-18 2019-01-04 江苏燕宁工程科技集团有限公司 T beam integral mold plate
CN110587809A (en) * 2019-08-13 2019-12-20 中铁十六局集团第一工程有限公司 Integral binding system for embedded part and reinforcing steel bar at bottom of precast box girder and construction method
CN112847773A (en) * 2021-01-09 2021-05-28 江阴天孚新型墙体材料有限公司 Steel bar prefabricating device for die frame of aerated concrete plate

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201511439U (en) * 2009-09-21 2010-06-23 中铁大桥局集团第四工程有限公司 System for integrally binding and hoisting box girder steel reinforcement framework
CN201933417U (en) * 2011-01-30 2011-08-17 中交三航局第三工程有限公司 Integral steel reinforcement binding jig suitable for high-speed railway prefabricated box girder
CN204663011U (en) * 2015-02-06 2015-09-23 中建一局钢结构工程有限公司 Long span variable cross-section triangle steel tubular truss adjustable moulding bed
CN205223864U (en) * 2015-12-04 2016-05-11 中交二公局第三工程有限公司 Reinforcement mould for moving die carrier

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201511439U (en) * 2009-09-21 2010-06-23 中铁大桥局集团第四工程有限公司 System for integrally binding and hoisting box girder steel reinforcement framework
CN201933417U (en) * 2011-01-30 2011-08-17 中交三航局第三工程有限公司 Integral steel reinforcement binding jig suitable for high-speed railway prefabricated box girder
CN204663011U (en) * 2015-02-06 2015-09-23 中建一局钢结构工程有限公司 Long span variable cross-section triangle steel tubular truss adjustable moulding bed
CN205223864U (en) * 2015-12-04 2016-05-11 中交二公局第三工程有限公司 Reinforcement mould for moving die carrier

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574762A (en) * 2017-08-24 2018-01-12 中铁三局集团有限公司 A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities
CN108179701A (en) * 2018-01-22 2018-06-19 广西路桥工程集团有限公司 A kind of bridge-collision-avoidance wall embedded bar overall binding locating rack
CN109129847A (en) * 2018-10-18 2019-01-04 江苏燕宁工程科技集团有限公司 T beam integral mold plate
CN110587809A (en) * 2019-08-13 2019-12-20 中铁十六局集团第一工程有限公司 Integral binding system for embedded part and reinforcing steel bar at bottom of precast box girder and construction method
CN112847773A (en) * 2021-01-09 2021-05-28 江阴天孚新型墙体材料有限公司 Steel bar prefabricating device for die frame of aerated concrete plate

Similar Documents

Publication Publication Date Title
CN107009510A (en) Prefabricated case beam steel bar overall binding mold and its application method
CN103790265B (en) A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall
CN102418385B (en) Novel reinforced concrete prefabricated whole-poured building structure system and construction method thereof
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN106088337A (en) Large cantilever steel-frame structure with pull bar and construction method thereof
CN104175398B (en) Make the mold and method of prefabricated case beam framework of steel reinforcement
CN109457951B (en) Formwork system for collecting and dividing shear wall and construction method thereof
CN106854941B (en) A kind of construction method of big section Stand Inclined Beams and batter post
CN106351376B (en) Shed deckhead construction method
CN105649330A (en) External formwork system utilizing steel reinforcement cage as framework
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
CN104929295A (en) Seamless steel tube construction method for double-curvature arc-shaped roof
CN206733300U (en) Prefabricated case beam steel bar overall binding mold
CN109024685B (en) Large-volume concrete bottom plate steel bar supporting system and construction method thereof
CN204552774U (en) A kind of monolithic inverted arch mould bases of locating longitudinal waterstop
CN203701549U (en) High-altitude large-span cantilever formwork
CN103015704B (en) Flat-plate shearwall structure based on prefabricated reinforced concrete hollow template building and method of construction
CN102720360B (en) Combination device of secondary high building supported lifted and poured cement formwork and building material lifting and lifting box
CN103821360A (en) Construction method for high-altitude long-span cantilever formwork
CN202925887U (en) A slab-column shear wall structure building based on prefabricated reinforced concrete hollow formworks
CN209066488U (en) A kind of mass concrete invert reinforcing steel support system
CN207633773U (en) A kind of glomeration building prefabricated construction reinforcing bar guiding tube dismounting system
CN112195802A (en) Variable-section U-shaped hollow thin-wall pier steel bar partition prefabricated jig frame and partition installation method
CN204898718U (en) Assemble integral reinforced concrete utility tunnel and production mould thereof
CN114278019B (en) Assembled roof frame and preparation process and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804