CN206378395U CN201621312028.XU CN201621312028U CN206378395U CN 206378395 U CN206378395 U CN 206378395U CN 201621312028 U CN201621312028 U CN 201621312028U CN 206378395 U CN206378395 U CN 206378395U
Authority
CN
China
Prior art keywords
ring
double
outer ring
pads
inner ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621312028.XU
Other languages
Chinese (zh)
Inventor
纪磊
秦艳
焦巍
胡永宁
侯向阳
秦伟
郭利彪
武自念
张勇
崔云虹
徐凯然
刘青海
宋庆成
张海玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Grassland Research Institute of Chinese Academy of Agricultural Sciences
Original Assignee
Grassland Research Institute of Chinese Academy of Agricultural Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grassland Research Institute of Chinese Academy of Agricultural Sciences filed Critical Grassland Research Institute of Chinese Academy of Agricultural Sciences
Priority to CN201621312028.XU priority Critical patent/CN206378395U/en
Application granted granted Critical
Publication of CN206378395U publication Critical patent/CN206378395U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本实用新型提供的双环入渗仪以及防蒸发的双环入渗仪,属于地质探测工具领域。双环入渗仪包括内环和外环,内环的外侧壁和外环的内侧壁之间通过多个连接杆连接,外环和内环的同一端的端部间隔设置有多个切口,相邻两个切口之间形成一个插入齿。防蒸发的双环入渗仪,包括防蒸发盖和双环入渗仪,防蒸发盖与外环之间通过铰接件铰接且通过卡接件可拆卸连接。本技术方案通过在现有技术的基础上增设插入齿,使双环入渗仪能够更易砸入土壤中,减少对土地的破坏,进而保证水能够更加集中的渗入土壤,保证土壤渗透系数的测量值更加准确。防蒸发的双环入渗仪能够减少内环中的水份在温度较高的时间的蒸发量,进而保证测量值的准确性。

The utility model provides a double-ring infiltrator and an anti-evaporation double-ring infiltrator, which belong to the field of geological detection tools. The double-ring infiltration instrument includes an inner ring and an outer ring. The outer wall of the inner ring and the inner wall of the outer ring are connected by a plurality of connecting rods. The ends of the same end of the outer ring and the inner ring are provided with multiple cutouts at intervals. An insertion tooth is formed between the two cutouts. The anti-evaporation double-ring infiltration instrument includes an anti-evaporation cover and a double-ring infiltration instrument. The anti-evaporation cover and the outer ring are hinged by a hinge and detachably connected by a clip. This technical solution adds insertion teeth on the basis of the existing technology, so that the double-ring infiltrator can be smashed into the soil more easily, reducing the damage to the land, thereby ensuring that the water can infiltrate into the soil more concentratedly, and ensure the measured value of the soil permeability coefficient more precise. The anti-evaporation double-ring infiltration meter can reduce the evaporation of water in the inner ring when the temperature is higher, thereby ensuring the accuracy of the measured value.

Description

双环入渗仪以及防蒸发的双环入渗仪Double ring infiltrator and anti-evaporative double ring infiltrator

技术领域technical field

本实用新型涉及地质探测工具领域,具体而言,涉及双环入渗仪以及防蒸发的双环入渗仪。The utility model relates to the field of geological detection tools, in particular to a double-ring infiltrator and an anti-evaporation double-ring infiltrator.

背景技术Background technique

双环入渗仪是一种简单的设备,用来测量水渗入土壤的渗透速度,进而计算土壤的垂向渗透系数。渗透速率是指单位时间内单位表面积的水渗入量。是土力学科的常用实验设备。双环为两个同心圆环,内环控制实验面积,外环保证内环的溶液垂直下渗进而减少侧向渗流。由于内环中的水是垂直流动的,因而测量仅限于在内环中进行。要取得满意的测量结果,一定要考虑以下几个可能影响测量的因素:表面植被、土壤的紧压程度、土壤温度以及土壤分层。但是现有的双环入渗仪是先将双环放到试验地点,双手按压双环置入土壤或用铁锤敲击均匀进入土壤,常常会使土地遭到破坏,进而影响土壤的紧压程度,从而影响土壤的垂向渗透系数的测量值的准确性。A double-ring infiltration meter is a simple device used to measure the infiltration rate of water into the soil to calculate the vertical permeability coefficient of the soil. Infiltration rate refers to the amount of water infiltrated per unit surface area per unit time. It is a commonly used experimental equipment in soil mechanics. The double ring is two concentric rings, the inner ring controls the experimental area, and the outer ring ensures that the solution in the inner ring seeps down vertically to reduce lateral seepage. Since the water in the inner ring flows vertically, measurements are limited to the inner ring. To obtain satisfactory measurement results, the following factors that may affect the measurement must be considered: surface vegetation, soil compaction, soil temperature, and soil stratification. However, the existing double-ring infiltration instrument is to put the double ring on the test site first, press the double ring with both hands to put it into the soil or knock it into the soil evenly with a hammer, which often causes the land to be damaged, and then affects the degree of compaction of the soil, thereby Affects the accuracy of the measured value of the vertical permeability coefficient of the soil.

实用新型内容Utility model content

本实用新型的目的在于提供双环入渗仪,保证水能够更加集中的渗入土壤,保证土壤渗透系数的测量值更加准确。The purpose of the utility model is to provide a double-ring infiltration meter to ensure that water can infiltrate into the soil more concentratedly and to ensure that the measured value of the soil permeability coefficient is more accurate.

本实用新型的另一个目的在于提供防蒸发的双环入渗仪,以减少水量的蒸发量,保证土壤渗透系数的测量值更加准确。Another purpose of the utility model is to provide an anti-evaporation double-ring infiltration instrument to reduce water evaporation and ensure more accurate measurement of soil permeability coefficient.

本实用新型是这样实现的:The utility model is achieved in that:

本实用新型提供的双环入渗仪,包括内环和外环,内环设置于外环的内侧,内环的外侧壁和外环的内侧壁之间通过多个连接杆连接,外环和内环的同一端的端部间隔设置有多个切口,相邻两个切口之间形成一个插入齿。The double-ring infiltration instrument provided by the utility model includes an inner ring and an outer ring. The inner ring is arranged on the inner side of the outer ring. A plurality of slits are arranged at intervals at the same end of the ring, and an insertion tooth is formed between two adjacent slits.

双环入渗仪是一种简单的设备,用来测量水渗入土壤的渗透速度,进而计算土壤的垂向渗透系数。渗透速率是指单位时间内单位表面积的水渗入量。是土力学科的常用实验设备。双环为两个同心圆环,内环控制实验面积,外环保证内环的溶液垂直下渗进而减少侧向渗流。需要说明的是,在没有特殊说明的情况下,下文中的双环均指的是内环和外环。A double-ring infiltration meter is a simple device used to measure the infiltration rate of water into the soil to calculate the vertical permeability coefficient of the soil. Infiltration rate refers to the amount of water infiltrated per unit surface area per unit time. It is a commonly used experimental equipment in soil mechanics. The double ring is two concentric rings, the inner ring controls the experimental area, and the outer ring ensures that the solution in the inner ring seeps down vertically to reduce lateral seepage. It should be noted that, unless otherwise specified, the double rings hereinafter refer to inner rings and outer rings.

连接杆用于实现内环和外环之间的连接,连接杆的设置方向可以沿着双环的直径方向设置也可以与双环的直径方向形成一定的夹角。切口和插入齿之间间隔设置,实际操作的时候,将双环的设置有插入齿和切口的一端作为插入土壤的起始端,由于插入齿的横截面积小,因此能够减小双环插入土壤的阻力,减小对周围土体的破坏,保证内环中的水能够尽可能的垂直下渗,进而保证垂向渗透系数测量值的准确度。The connecting rod is used to realize the connection between the inner ring and the outer ring, and the connecting rod can be arranged along the diameter direction of the double ring or can form a certain angle with the diameter direction of the double ring. The incision and the insertion teeth are set at intervals. In actual operation, the end of the double ring with the insertion teeth and the incision is used as the starting point for inserting into the soil. Since the cross-sectional area of the insertion teeth is small, the resistance of the double ring to insert into the soil can be reduced. , reduce the damage to the surrounding soil, ensure that the water in the inner ring can infiltrate vertically as much as possible, and then ensure the accuracy of the measured value of the vertical permeability coefficient.

进一步地,内环和外环之间设置有加强固定杆,加强固定杆的一端与内环的外侧壁连接,加强固定杆的另一端贯穿外环的侧壁伸到外环的外部且呈圆锥状。Further, a reinforced fixing rod is arranged between the inner ring and the outer ring, one end of the reinforced fixing rod is connected to the outer wall of the inner ring, and the other end of the reinforced fixing rod extends through the side wall of the outer ring to the outside of the outer ring and is conical shape.

进一步地,外环的外侧壁环形分布有多个尖部凸起,多个尖部凸起位于靠近插入齿的一端。Further, the outer wall of the outer ring is annularly distributed with a plurality of pointed protrusions, and the plurality of pointed protrusions are located at one end close to the insertion teeth.

进一步地,双环入渗仪还包括十字连接架,十字连接架包括交叉设置的第一杆和第二杆,十字连接架设置于内环和外环的一端且远离插入齿。Further, the double-ring infiltration instrument also includes a cross connection frame, the cross connection frame includes a first rod and a second rod arranged crosswise, and the cross connection frame is arranged at one end of the inner ring and the outer ring and away from the insertion teeth.

进一步地,十字连接架设置有冲击垫盘,冲击垫盘嵌设于第一杆和第二杆的交叉处。Further, the cross connection frame is provided with an impact pad, and the impact pad is embedded in the intersection of the first rod and the second rod.

进一步地,内环的远离插入齿的一端设置有四个第一嵌设缺口,外环的远离插入齿的一端设置有四个第二嵌设缺口,第一嵌设缺口和第二嵌设缺口均横向设置有支撑垫板,每个支撑垫板的纵向截面均呈半弧形,第一杆和第二杆分别卡接于支撑垫板。Further, the end of the inner ring away from the insertion teeth is provided with four first embedding notches, and the end of the outer ring far away from the insertion teeth is provided with four second embedding notches, the first embedding notch and the second embedding notch Both support pads are arranged horizontally, the longitudinal section of each support pad is semi-arc, and the first rod and the second rod are clamped to the support pad respectively.

进一步地,内环的一端焊接有四个环形分布的第一敲击垫盘,外环的一端也焊接有四个环形分布的第二敲击垫盘,四个第一敲击垫盘和四个第二敲击垫盘均位于远离插入齿的一端;其中两个第一敲击垫盘和两个第二敲击垫盘沿外环的直径方向设置且通过第一撑杆连接,剩余的两个第一敲击垫盘和两个第二敲击垫盘也沿外环的直径方向设置且通过第二撑杆连接。Further, one end of the inner ring is welded with four circularly distributed first knocking pads, and one end of the outer ring is also welded with four circularly distributed second knocking pads, four first knocking pads and four The two second knock pads are located at one end away from the insertion teeth; the two first knock pads and the two second knock pads are arranged along the diameter direction of the outer ring and connected by the first struts, and the remaining Two first knocking pads and two second knocking pads are also arranged along the diameter direction of the outer ring and connected by second struts.

进一步地,内环的侧壁竖向嵌设有玻璃长条,玻璃长条设置有刻度。Further, the side wall of the inner ring is vertically embedded with glass strips, and the glass strips are provided with scales.

进一步地,外环的外侧壁对称设置有两个把手。Further, two handles are symmetrically provided on the outer wall of the outer ring.

一种防蒸发的双环入渗仪,包括防蒸发盖和双环入渗仪,防蒸发盖设置有铰接件和卡接件,防蒸发盖与外环之间通过铰接件铰接且通过卡接件可拆卸连接。An anti-evaporation double-ring infiltration instrument, comprising an anti-evaporation cover and a double-ring infiltration instrument, the anti-evaporation cover is provided with a hinge and a clip, the anti-evaporation cover and the outer ring are hinged through the hinge and Disconnect the connection.

本实用新型的有益效果:本技术方案通过在现有技术的基础上增设插入齿,使双环入渗仪能够更易砸入土壤中,减少对土地的破坏,进而保证水能够更加集中的渗入土壤,保证土壤渗透系数的测量值更加准确。Beneficial effects of the utility model: the technical scheme adds insertion teeth on the basis of the prior art, so that the double-ring infiltrator can be smashed into the soil more easily, reducing the damage to the land, and ensuring that the water can infiltrate into the soil more concentratedly. Ensure that the measured value of soil permeability coefficient is more accurate.

防蒸发的双环入渗仪能够减少内环中的水分在温度较高的时间的蒸发量,进而保证水能够尽可能的垂直渗入土壤,保证测量值的准确性。The anti-evaporation double-ring infiltration meter can reduce the evaporation of water in the inner ring when the temperature is higher, thereby ensuring that the water can infiltrate the soil vertically as much as possible and ensure the accuracy of the measured value.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following drawings will be briefly introduced in the embodiments. It should be understood that the following drawings only show some embodiments of the present invention. Therefore, it should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can also be obtained according to these drawings without creative work.

图1为本实用新型实施例提供的双环入渗仪的第一种结构示意图;Fig. 1 is the first structural representation of the double-ring infiltrator provided by the embodiment of the present invention;

图2为本实用新型实施例提供的双环入渗仪的第二种结构示意图;Fig. 2 is the second structural schematic diagram of the double-ring infiltration instrument provided by the embodiment of the present invention;

图3为本实用新型实施例提供的双环入渗仪的第三种结构示意图;Fig. 3 is the third structural representation of the double-ring infiltration instrument provided by the embodiment of the present invention;

图4为本实用新型实施例提供的双环入渗仪的第四种结构局部剖示意图;Fig. 4 is the partial cross-sectional view of the fourth structure of the double-ring infiltration instrument provided by the embodiment of the utility model;

图5为本实用新型实施例提供的双环入渗仪的第五种结构的俯视图;Fig. 5 is the top view of the fifth structure of the double-ring infiltrator provided by the embodiment of the present invention;

图6为本实用新型实施例提供的双环入渗仪的第六种结构的俯视图。Fig. 6 is a top view of the sixth structure of the double-ring infiltrator provided by the embodiment of the present invention.

图标:100-内环;110-切口;120-插入齿;130-支撑垫板;140-第一敲击垫盘;150-第一撑杆;160-第二撑杆;170-玻璃长条;200-外环;210-尖部凸起;220-第二敲击垫盘;300-连接杆;400-加强固定杆;500-十字连接架;510-冲击垫盘;600-把手。Icons: 100-inner ring; 110-cutout; 120-insert teeth; 130-support pad; 140-first knocking pad; 150-first strut; 160-second strut; 170-glass strip ;

具体实施方式detailed description

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本实用新型实施例的组件可以以各种不同的配置来布置和设计。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.

因此,以下对在附图中提供的本实用新型的实施例的详细描述并非旨在限制要求保护的本实用新型的范围,而是仅仅表示本实用新型的选定实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

在本实用新型的描述中,需要说明的是,术语“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the utility model, it should be noted that the orientation or positional relationship indicated by the terms "inside" and "outside" are based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship shown in the drawings, or the customary swing when the utility model product is used. The orientation or positional relationship is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be interpreted as a reference to the utility model. New types of restrictions. In addition, the terms "first", "second", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance.

在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should also be noted that unless otherwise specified and limited, the term "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection ; It can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.

具体实施例,参照图1至图6。For specific embodiments, refer to FIG. 1 to FIG. 6 .

本实施例提供的双环入渗仪,如图1所示,包括内环100和外环200,内环100设置于外环200的内侧,内环100的外侧壁和外环200的内侧壁之间通过多个连接杆300连接,外环200和内环100的同一端的端部间隔设置有多个切口110,相邻两个切口110之间形成一个插入齿120。The double-ring infiltration instrument provided in this embodiment, as shown in Figure 1, includes an inner ring 100 and an outer ring 200, the inner ring 100 is arranged on the inner side of the outer ring 200, between the outer side wall of the inner ring 100 and the inner side wall of the outer ring 200 The outer ring 200 and the inner ring 100 are connected by a plurality of connecting rods 300 , and a plurality of notches 110 are arranged at intervals at the ends of the same end of the outer ring 200 and the inner ring 100 , and an insertion tooth 120 is formed between two adjacent notches 110 .

双环入渗仪是一种简单的设备,用来测量水渗入土壤的渗透速度,进而计算土壤的垂向渗透系数。渗透速率是指单位时间内单位表面积的水渗入量。是土力学科的常用实验设备。双环为两个同心圆环,内环100控制实验面积,外环200保证内环100的溶液垂直下渗进而减少侧向渗流。需要说明的是,在没有特殊说明的情况下,下文中的双环均指的是内环100和外环200。A double-ring infiltration meter is a simple device used to measure the infiltration rate of water into the soil to calculate the vertical permeability coefficient of the soil. Infiltration rate refers to the amount of water infiltrated per unit surface area per unit time. It is a commonly used experimental equipment in soil mechanics. The double rings are two concentric rings, the inner ring 100 controls the experimental area, and the outer ring 200 ensures that the solution in the inner ring 100 seeps down vertically to reduce lateral seepage. It should be noted that, unless otherwise specified, the double rings below refer to the inner ring 100 and the outer ring 200 .

连接杆300用于实现内环100和外环200之间的连接,连接杆300的设置方向可以沿着双环的直径方向设置也可以与双环的直径方向形成一定的夹角。切口110和插入齿120之间间隔设置,实际操作的时候,将双环的设置有插入齿120和切口110的一端作为插入土壤的起始端,由于插入齿120的横截面积小,因此能够减小双环插入土壤的阻力,减小对周围土体的破坏,保证内环100中的水能够尽可能的垂直下渗,进而保证垂向渗透系数测量值的准确度。插入齿120的形状可以是三角形、梯形或者其他的尖部状。The connecting rod 300 is used to realize the connection between the inner ring 100 and the outer ring 200, and the installation direction of the connecting rod 300 can be arranged along the diameter direction of the double ring or can form a certain angle with the diameter direction of the double ring. The notches 110 and the insertion teeth 120 are arranged at intervals. In actual operation, the end of the double ring provided with the insertion teeth 120 and the notches 110 is used as the starting point for inserting into the soil. Since the cross-sectional area of the insertion teeth 120 is small, it can be reduced. The resistance of the double rings inserted into the soil reduces damage to the surrounding soil and ensures that the water in the inner ring 100 can infiltrate vertically as much as possible, thereby ensuring the accuracy of the measured value of the vertical permeability coefficient. The shape of the insertion teeth 120 may be triangular, trapezoidal or other pointed shapes.

如图1所示,双环入渗仪还包括十字连接架500,十字连接架500包括交叉设置的第一杆和第二杆,十字连接架500设置于内环100和外环200的一端且远离插入齿120。As shown in Figure 1, the double-ring infiltration instrument also includes a cross connection frame 500, and the cross connection frame 500 includes a first bar and a second rod arranged crosswise, and the cross connection frame 500 is arranged at one end of the inner ring 100 and the outer ring 200 and is away from Insert tooth 120 .

设置十字连接架500能够增强内环100和外环200之间的连接强度,同时十字连接架500还能有效限定内环100和外环200之间的相对位置关系,并且十字连接架500还能便于搬运双环入渗仪以及为双环插入土壤的操作提供更多的便利。使双环的使用变得更加方便。Setting the cross connection frame 500 can enhance the connection strength between the inner ring 100 and the outer ring 200, and at the same time, the cross connection frame 500 can also effectively limit the relative positional relationship between the inner ring 100 and the outer ring 200, and the cross connection frame 500 can also It is convenient to carry the double-ring infiltrator and provide more convenience for the operation of double-ring insertion into the soil. Make the use of double ring more convenient.

如图1所示,内环100和外环200之间设置有加强固定杆400,加强固定杆400的一端与内环100的外侧壁连接,加强固定杆400的另一端贯穿外环200的侧壁伸到外环200的外部且呈圆锥状。加强固定杆400一方面能够增强内环100和外环200之间的连接强度。另一方面,加强固定杆400的穿过所述外环200的一端能够在外环200的外侧壁形成尖部状,使双环更易于砸入土壤中,减少对土体破坏。进一步提高垂向渗透系数测量值的准确度。加强固定杆400可以设置一根或者多根。加强固定杆400可以采用纵向截面不同的形状。As shown in Figure 1, a reinforced fixing rod 400 is arranged between the inner ring 100 and the outer ring 200, one end of the reinforced fixing rod 400 is connected to the outer wall of the inner ring 100, and the other end of the reinforced fixing rod 400 runs through the side of the outer ring 200 The wall extends outside the outer ring 200 and is conical. On the one hand, the reinforced fixing rod 400 can enhance the connection strength between the inner ring 100 and the outer ring 200 . On the other hand, the end of the reinforcing rod 400 passing through the outer ring 200 can form a pointed shape on the outer wall of the outer ring 200, making it easier for the double rings to be smashed into the soil and reduce damage to the soil. Further improve the accuracy of vertical permeability coefficient measurement. One or more reinforcing fixing rods 400 may be provided. The reinforcing fixing rod 400 may adopt different shapes in longitudinal section.

如图1所示,内环100的远离插入齿120的一端设置有四个第一嵌设缺口,外环200的远离插入齿120的一端设置有四个第二嵌设缺口,第一嵌设缺口和第二嵌设缺口均横向设置有支撑垫板130,每个支撑垫板130的纵向截面均呈半弧形,第一杆和第二杆分别卡接于支撑垫板130。设置支撑垫板130主要是为了增大第一杆与内环100、外环200的端部的接触面积以及第二杆与内环100、外环200的端部的接触面积,进而减小局部作用力,在利用机械工具外部施加作用力于冲击垫盘510的时候能够减小第一杆或者第二杆对内环100和外环200的冲击力,避免内环100和外环200端部由于受力过大导致变形,内环100和外环200形状变形易造成内环100内水的高度测量值出现误差,进而影响土壤渗透系数的测量值的准确度。As shown in FIG. 1 , the end of the inner ring 100 away from the insertion teeth 120 is provided with four first embedding notches, and the end of the outer ring 200 away from the insertion teeth 120 is provided with four second embedding notches. Both the notch and the second embedding notch are provided with supporting pads 130 transversely. The longitudinal section of each supporting pad 130 is in a semi-arc shape. The supporting pad 130 is provided mainly to increase the contact area between the first rod and the ends of the inner ring 100 and the outer ring 200 and the contact area between the second rod and the ends of the inner ring 100 and the outer ring 200, thereby reducing the local Active force, when the mechanical tool is used to apply external force to the impact pad 510, the impact force of the first rod or the second rod on the inner ring 100 and the outer ring 200 can be reduced, and the end of the inner ring 100 and the outer ring 200 can be avoided. Due to deformation due to excessive force, the shape deformation of the inner ring 100 and the outer ring 200 may easily cause errors in the measurement of the height of the water in the inner ring 100, thereby affecting the accuracy of the measurement of the soil permeability coefficient.

如图2所示,外环200的外侧壁对称设置有两个把手600。设置把手600,便于搬运,携带,以及对双环进行的其他操作。As shown in FIG. 2 , two handles 600 are symmetrically arranged on the outer wall of the outer ring 200 . A handle 600 is provided to facilitate handling, carrying, and other operations on the double ring.

如图3所示,外环200的外侧壁环形分布有多个尖部凸起210,多个尖部凸起210位于靠近插入齿120的一端。多个尖部凸起210可以采用规则或者不规则的方式排列在外环200的外侧壁。多个尖部凸起210的整体位于靠近外环200的设置插入齿120的一端,尖部凸起210能够增大外环200对土壤的挤压,使双环更易于砸入土壤中,减少对土体破坏。进一步提高垂向渗透系数测量值的准确度。多个尖部凸起210和插入齿120共同作用,双环砸入土壤中变得更加快捷迅速,有效提高垂向渗透系数测量值的准确度。As shown in FIG. 3 , a plurality of pointed protrusions 210 are distributed annularly on the outer wall of the outer ring 200 , and the plurality of pointed protrusions 210 are located at one end close to the insertion teeth 120 . A plurality of pointed protrusions 210 may be arranged on the outer wall of the outer ring 200 in a regular or irregular manner. A plurality of pointed protrusions 210 are located at one end of the insertion teeth 120 near the outer ring 200. The pointed protrusions 210 can increase the extrusion of the outer ring 200 to the soil, making it easier for the double ring to be smashed into the soil and reduce the impact on the soil. Soil damage. Further improve the accuracy of vertical permeability coefficient measurement. The plurality of pointed protrusions 210 and the insertion teeth 120 work together to make the double rings drop into the soil faster and faster, effectively improving the accuracy of the measured value of the vertical permeability coefficient.

如图4所示,内环100的侧壁竖向嵌设有玻璃长条170,玻璃长条170设置有刻度。设置带有刻度的玻璃长条170,便于直接读取内环100内的水的高度或者深度,简化土壤渗透系数的测量过程,水位高度可直接根据读取的数据带入相关公式即可。As shown in FIG. 4 , the side wall of the inner ring 100 is vertically embedded with glass strips 170 , and the glass strips 170 are provided with scales. A glass strip 170 with a scale is provided to facilitate direct reading of the height or depth of the water in the inner ring 100, simplifying the measurement process of the soil permeability coefficient, and the water level height can be directly brought into the relevant formula according to the read data.

如图5所示,十字连接架500设置有冲击垫盘510,冲击垫盘510嵌设于第一杆和第二杆的交叉处。设置冲击垫盘510,实际操作的时候,可以借助外部机械工具施加作用力于冲击垫盘510,由于冲击垫盘510位于十字连接架500的中心,因此施加作用力于冲击垫盘510能够保证双环均匀插入土壤。使双环插入土壤更加容易,也更加易于操作,简化实验进程。As shown in FIG. 5 , the cross connection frame 500 is provided with an impact pad 510 , and the impact pad 510 is embedded at the intersection of the first rod and the second rod. The impact pad 510 is set. During actual operation, an external mechanical tool can be used to apply force to the impact pad 510. Since the impact pad 510 is located in the center of the cross connector 500, applying force to the impact pad 510 can ensure the double ring Insert evenly into the soil. It makes it easier to insert the double ring into the soil, and it is also easier to operate, simplifying the experimental process.

如图5所示,内环100的一端焊接有四个环形分布的第一敲击垫盘140,外环200的一端也焊接有四个环形分布的第二敲击垫盘220,四个第一敲击垫盘140和四个第二敲击垫盘220均位于远离插入齿120的一端;其中两个第一敲击垫盘140和两个第二敲击垫盘220沿外环200的直径方向设置且通过第一撑杆150连接,剩余的两个第一敲击垫盘140和两个第二敲击垫盘220也沿外环200的直径方向设置且通过第二撑杆160连接。As shown in Figure 5, one end of the inner ring 100 is welded with four first knock pads 140 which are distributed annularly, and one end of the outer ring 200 is also welded with four second knock pads 220 which are distributed annularly. A knock pad 140 and four second knock pads 220 are all located at one end away from the insertion teeth 120; two first knock pads 140 and two second knock pads 220 are along the Diametrically arranged and connected by the first strut 150 , the remaining two first knocking pads 140 and two second knocking pads 220 are also set along the diameter of the outer ring 200 and connected by the second strut 160 .

设置第一敲击垫盘140和第二敲击垫盘220主要是为了便于将双环砸入土壤中,加快地质检测的过程。针对该种结构,可以单独设置外部施加作用力得机械工作,比如机械施力工具包括与第一敲击垫盘140对应的第一垫板,以及与第二敲击垫盘220对应的第二垫板,第一垫板和第二垫板包括多个,多个第一垫板的位置分别与第一敲击垫盘140对应,多个第二垫板的位置分别与第二敲击垫盘220对应,多个第一垫板和第二垫板之间通过连接件连接,实际操作的时候,通过施加作用力于连接件,进而压紧第一垫板和第二垫板,从而实现对第一敲击垫盘140和第二敲击垫盘220的同时施加作用来,保证对双环所施加的作用力更加的均匀,保证双环均匀插入土壤。The purpose of setting up the first knocking pad 140 and the second knocking pad 220 is mainly to smash the double rings into the soil and speed up the process of geological detection. For this kind of structure, the mechanical work of externally applied force can be set separately. For example, the mechanical force tool includes a first pad corresponding to the first knocking pad 140, and a second pad corresponding to the second knocking pad 220. Backing plate, the first backing plate and the second backing plate comprise a plurality of, the positions of multiple first backing plates correspond to the first knocking pad 140 respectively, and the positions of multiple second backing plates correspond to the second knocking pad respectively. Corresponding to the plate 220, a plurality of first backing plates and second backing plates are connected through connecting pieces. In actual operation, by applying force to the connecting pieces, the first backing plate and the second backing plate are compressed, so as to realize Simultaneously acting on the first knocking pad 140 and the second knocking pad 220 ensures that the applied force to the double rings is more uniform and ensures that the double rings are evenly inserted into the soil.

在上述实施例的基础上,再提供一种防蒸发的双环入渗仪,包括防蒸发盖和双环入渗仪,防蒸发盖设置有铰接件和卡接件,防蒸发盖与外环200之间通过铰接件铰接且通过卡接件可拆卸连接。铰接件和卡接件可以采用现有技术。该防蒸发的双环入渗仪可以在外界环境温度较高时,通过防蒸发盖来减小内环100内的水分的蒸发量,保证内环100内的水位高度的正确测量值,进而保证土壤渗透系数测量值的准确度。On the basis of the above embodiments, an anti-evaporation double-ring infiltration instrument is provided, including an anti-evaporation cover and a double-ring infiltration instrument. The spaces are hinged by hinges and detachably connected by clips. The hinges and clips can use prior art. The anti-evaporation double-ring infiltration instrument can reduce the evaporation of water in the inner ring 100 through the anti-evaporation cover when the external environment temperature is high, so as to ensure the correct measurement value of the water level in the inner ring 100, and then ensure the soil Accuracy of permeability coefficient measurements.

以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (10)

1.一种双环入渗仪,其特征在于,包括内环和外环,所述内环设置于所述外环的内侧,所述内环的外侧壁和所述外环的内侧壁之间通过多个连接杆连接,所述外环和所述内环的同一端的端部间隔设置有多个切口,相邻两个所述切口之间形成一个插入齿。1. A double-ring infiltration instrument, characterized in that, comprises an inner ring and an outer ring, the inner ring is arranged on the inside of the outer ring, between the outer side wall of the inner ring and the inner side wall of the outer ring Connected by a plurality of connecting rods, the ends of the same end of the outer ring and the inner ring are provided with a plurality of slits at intervals, and an insertion tooth is formed between two adjacent slits. 2.根据权利要求1所述的双环入渗仪,其特征在于,所述内环和所述外环之间设置有加强固定杆,所述加强固定杆的一端与所述内环的外侧壁连接,所述加强固定杆的另一端贯穿所述外环的侧壁伸到所述外环的外部且呈圆锥状。2. The double-ring infiltrator according to claim 1, characterized in that, a reinforcing fixing rod is arranged between the inner ring and the outer ring, and one end of the reinforcing fixing rod is connected to the outer wall of the inner ring. connected, the other end of the reinforcing fixing rod extends through the side wall of the outer ring to the outside of the outer ring and is conical. 3.根据权利要求1所述的双环入渗仪,其特征在于,所述外环的外侧壁环形分布有多个尖部凸起,多个所述尖部凸起位于靠近所述插入齿的一端。3. The double-ring infiltration instrument according to claim 1, characterized in that, the outer wall of the outer ring is annularly distributed with a plurality of pointed protrusions, and the plurality of pointed protrusions are located near the insertion teeth. one end. 4.根据权利要求1所述的双环入渗仪,其特征在于,双环入渗仪还包括十字连接架,所述十字连接架包括交叉设置的第一杆和第二杆,所述十字连接架设置于所述内环和所述外环的一端且远离所述插入齿。4. The double-ring infiltration instrument according to claim 1, characterized in that, the double-ring infiltration instrument also includes a cross connection frame, and the cross connection frame includes a first bar and a second bar arranged crosswise, and the cross connection frame It is arranged at one end of the inner ring and the outer ring and away from the insertion teeth. 5.根据权利要求4所述的双环入渗仪,其特征在于,所述十字连接架设置有冲击垫盘,所述冲击垫盘嵌设于所述第一杆和所述第二杆的交叉处。5. The double-ring infiltration instrument according to claim 4, characterized in that, the cross connector is provided with an impact pad, and the impact pad is embedded in the intersection of the first rod and the second rod. place. 6.根据权利要求4所述的双环入渗仪,其特征在于,所述内环的远离所述插入齿的一端设置有四个第一嵌设缺口,所述外环的远离所述插入齿的一端设置有四个第二嵌设缺口,所述第一嵌设缺口和所述第二嵌设缺口均横向设置有支撑垫板,每个所述支撑垫板的纵向截面均呈半弧形,所述第一杆和所述第二杆分别卡接于所述支撑垫板。6. The double-ring infiltration instrument according to claim 4, characterized in that, the end of the inner ring far away from the insertion teeth is provided with four first embedding notches, and the end of the outer ring far away from the insertion teeth One end of one end is provided with four second embedding notches, and the first embedding notch and the second embedding notch are both provided with supporting pads transversely, and the longitudinal section of each of the supporting pads is semi-arc , the first rod and the second rod are snapped to the support pad respectively. 7.根据权利要求1所述的双环入渗仪,其特征在于,所述内环的一端焊接有四个环形分布的第一敲击垫盘,所述外环的一端也焊接有四个环形分布的第二敲击垫盘,四个所述第一敲击垫盘和四个所述第二敲击垫盘均位于远离所述插入齿的一端;其中两个所述第一敲击垫盘和两个所述第二敲击垫盘沿所述外环的直径方向设置且通过第一撑杆连接,剩余的两个所述第一敲击垫盘和两个所述第二敲击垫盘也沿所述外环的直径方向设置且通过第二撑杆连接。7. The double-ring infiltrator according to claim 1, characterized in that, one end of the inner ring is welded with four ring-shaped first knock pads, and one end of the outer ring is also welded with four ring-shaped pads. Distributed second knocking pads, four of the first knocking pads and four of the second knocking pads are all located at one end away from the insertion teeth; two of the first knocking pads The disk and the two second knocking pads are arranged along the diameter direction of the outer ring and are connected by a first strut, and the remaining two first knocking pads and the two second knocking pads Backing plates are also arranged along the diameter of the outer ring and connected by second struts. 8.根据权利要求1所述的双环入渗仪,其特征在于,所述内环的侧壁竖向嵌设有玻璃长条,所述玻璃长条设置有刻度。8 . The double-ring infiltration instrument according to claim 1 , wherein a glass strip is vertically embedded in the side wall of the inner ring, and the glass strip is provided with a scale. 9.根据权利要求1所述的双环入渗仪,其特征在于,所述外环的外侧壁对称设置有两个把手。9. The double-ring infiltration instrument according to claim 1, characterized in that two handles are symmetrically arranged on the outer wall of the outer ring. 10.一种防蒸发的双环入渗仪,其特征在于,包括防蒸发盖和权利要求1至9中任意一项所述的双环入渗仪,所述防蒸发盖设置有铰接件和卡接件,所述防蒸发盖与所述外环之间通过所述铰接件铰接且通过所述卡接件可拆卸连接。10. An anti-evaporation double-ring infiltration instrument, characterized in that it comprises an anti-evaporation cover and the double-ring infiltration instrument according to any one of claims 1 to 9, the anti-evaporation cover is provided with a hinge and a clip The anti-evaporation cover and the outer ring are hinged by the hinge and detachably connected by the clip.
CN201621312028.XU 2016-12-01 2016-12-01 The double-ring infiltration instrument of double-ring infiltration instrument and vaporization prevention Expired - Fee Related CN206378395U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621312028.XU CN206378395U (en) 2016-12-01 2016-12-01 The double-ring infiltration instrument of double-ring infiltration instrument and vaporization prevention

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621312028.XU CN206378395U (en) 2016-12-01 2016-12-01 The double-ring infiltration instrument of double-ring infiltration instrument and vaporization prevention

Publications (1)

Publication Number Publication Date
CN206378395U true CN206378395U (en) 2017-08-04

Family

ID=59406046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621312028.XU Expired - Fee Related CN206378395U (en) 2016-12-01 2016-12-01 The double-ring infiltration instrument of double-ring infiltration instrument and vaporization prevention

Country Status (1)

Country Link
CN (1) CN206378395U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108982322A (en) * 2018-07-20 2018-12-11 天津绿茵景观生态建设股份有限公司 A kind of soil infiltration capability measurement device
CN109444016A (en) * 2018-11-05 2019-03-08 北京市水科学技术研究院 A kind of Simple soil infiltration rate measurement device and measuring method
CN110702572A (en) * 2019-09-29 2020-01-17 张雪玲 Automatic water replenishing and measuring device for soil infiltration
CN112730189A (en) * 2020-12-10 2021-04-30 湖南大学 Sponge city facility water penetration and storage characteristic double-ring synchronous permeameter and detection method
CN112798495A (en) * 2021-02-02 2021-05-14 南昌工程学院 Multi-ring water infiltration test system and method
CN114659938A (en) * 2022-04-08 2022-06-24 四川农业大学 Full-automatic measuring instrument for soil priority flow experiment
CN117890274A (en) * 2023-12-19 2024-04-16 广东省科学院广州地理研究所 A portable soil infiltration detection device and method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108982322A (en) * 2018-07-20 2018-12-11 天津绿茵景观生态建设股份有限公司 A kind of soil infiltration capability measurement device
CN109444016A (en) * 2018-11-05 2019-03-08 北京市水科学技术研究院 A kind of Simple soil infiltration rate measurement device and measuring method
CN109444016B (en) * 2018-11-05 2024-05-31 北京市水科学技术研究院 Simple soil infiltration rate measuring device and measuring method
CN110702572A (en) * 2019-09-29 2020-01-17 张雪玲 Automatic water replenishing and measuring device for soil infiltration
CN110702572B (en) * 2019-09-29 2022-09-02 郑琼 Automatic water replenishing and measuring device for soil infiltration
CN112730189A (en) * 2020-12-10 2021-04-30 湖南大学 Sponge city facility water penetration and storage characteristic double-ring synchronous permeameter and detection method
CN112798495A (en) * 2021-02-02 2021-05-14 南昌工程学院 Multi-ring water infiltration test system and method
CN114659938A (en) * 2022-04-08 2022-06-24 四川农业大学 Full-automatic measuring instrument for soil priority flow experiment
CN117890274A (en) * 2023-12-19 2024-04-16 广东省科学院广州地理研究所 A portable soil infiltration detection device and method

Similar Documents

Publication Publication Date Title
CN206378395U (en) The double-ring infiltration instrument of double-ring infiltration instrument and vaporization prevention
CN203981507U (en) A New Plane Strain Consolidation Test Device
CN206056573U (en) A kind of slope of highway survey tool
CN206223561U (en) Flexible roof bolt pull-out test device
CN104482845A (en) Roadway section measuring instrument and measuring method
CN203687823U (en) Mining telescopic measuring rod
CN205981293U (en) Humiture measurement instrument
CN207365865U (en) A kind of side slope crack width observation device
CN203811297U (en) Large-size concrete temperature measuring device
CN110715592A (en) Measuring tool for hot asphalt virtual paving thickness
CN202329621U (en) Equipment for measuring crown settlement of tunnel
CN211602232U (en) A mass concrete temperature measuring device
CN203464881U (en) tapered electric pole buried depth measuring tape
CN104596477A (en) Transformer substation foundation settlement monitoring method
CN201555580U (en) A slope measuring instrument
CN204240896U (en) A kind of general bend pipe gauge
CN110579160A (en) A device for measuring the depth and width of tension cracks and its application
CN206328662U (en) A kind of novel asphalt paves detection probe
CN105004400B (en) A kind of simple underground water level measuring arrangement and measurement method
CN205909781U (en) Fan -shaped milliken conductor's multifunctional measuring fixture block
CN207114614U (en) Grounded screen place surface potential gradiometry servicing unit
CN206037977U (en) Fracture width changes dynamic monitoring device based on response of meeting an emergency
CN103090850A (en) Angle self-adaptive gradient measurement instrument
CN205209404U (en) Cast in situ concrete thickness measurement device
CN202577375U (en) Pile soil differential settlement measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804

Termination date: 20171201