CN206377455U - A kind of double glazing constant pressure inflation system - Google Patents

A kind of double glazing constant pressure inflation system Download PDF

Info

Publication number
CN206377455U
CN206377455U CN201720054270.XU CN201720054270U CN206377455U CN 206377455 U CN206377455 U CN 206377455U CN 201720054270 U CN201720054270 U CN 201720054270U CN 206377455 U CN206377455 U CN 206377455U
Authority
CN
China
Prior art keywords
double glazing
inflation
branch pipe
valve
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720054270.XU
Other languages
Chinese (zh)
Inventor
任廷禄
魏鹏举
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tian Qiang Glass Co Ltd
Original Assignee
Sichuan Tian Qiang Glass Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Tian Qiang Glass Co Ltd filed Critical Sichuan Tian Qiang Glass Co Ltd
Priority to CN201720054270.XU priority Critical patent/CN206377455U/en
Application granted granted Critical
Publication of CN206377455U publication Critical patent/CN206377455U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Glass To Other Materials (AREA)
  • Securing Of Glass Panes Or The Like (AREA)

Abstract

The utility model discloses a kind of double glazing constant pressure inflation system, it is related to double glazing preparation field, it is located on gas-flow closure casing, it is connected with the double glazing of gas-flow closure box house, tracheae including air accumulator and connection air accumulator and double glazing, the tracheae is provided with intake valve, the tracheae is by supervisor and with being responsible for the air intake branch being connected, suction branch, pressure branch pipe and inflation branch pipe is constituted, the intake valve is located on air intake branch, the end of the suction branch is connected with vacuum machine, suction branch is provided with extraction valve, the pressure branch pipe and inflation branch pipe are extended respectively to inside hermetic seal box house and double glazing;By controlling intake valve and extraction valve, first the cavity of Pneumatic box body inside and double glazing is evacuated to after vacuum and is re-filled with corresponding gas, turbulent flow phenomenon will not be thus formed, so as to solve when the hollow glass of prior art is inflated the problem of charge-air mass is not high caused by turbulent flow phenomenon.

Description

A kind of double glazing constant pressure inflation system
Technical field
The utility model is related to double glazing preparation field, and in particular to a kind of double glazing constant pressure inflation system.
Background technology
With country about the policy of building energy conservation and the vigorously implementing of regulation, building energy conservation knowledge it is gradually general And, people's double glazing demand high to energy-conservation configuration is also being continuously increased, and the large-scale production of low radiation coated glass is brought The market growth relative raising, make it possible that the effective demand amount of high-performance hollow glass is continuously increased.Then occur Increasingly it is widely applied in terms of preparing low-emissivity coated hollow glass, it is in the ascendant.But the application of low emissivity glass brings me Before two problems never running into:(1) using offline low-emission coated making double glazing, the requirement to sealing life becomes Obtain and more protrude;(2) after use low emissivity glass solves the problems, such as heat radiation, the thermal convection current in reduction double glazing cavity just becomes Obtain very urgent.
Filling inert gas into hollow glass contributes to while improving sealing life and reduction thermal convection current, and inflate double glazing institute Necessary initial inflation process concentration and air-tightness, are the basic guarantees for solving the problems, such as these two aspects, in general, inflate double glazing Used inert gas be argon gas, with it is colourless, tasteless, nontoxic the characteristics of, its molecular weight weighs 38%, thermal conductivity factor compared with air It is smaller than air.
Air that prior art is inflated in air of the technology in by double glazing reaches by way of being replaced as argon gas The purpose of inflation, because the density ratio air of argon gas is big, therefore, when double glazing is inflated, it is necessary to set two holes, argon gas fills (entering) stomata goes out (row) stomata in upper end in lower end, air, to displace the air in double glazing, reaches required argon Gas concentration, this inflation, which is substantially, takes a breath and on-inflatable, and gas replenishment process is substantially that flowing gas is shifted from a kind of motion state To the process of another state, whether high charge-air mass is produces laminar flow (laminar) with gas or is turbulent flow (turbul Ence it is) relevant.
Inertia force and viscous force coefficient result when laminar flow and turbulent flow are motion of viscous.Motion of viscous with The main distinction of perfect fluid motion be the stress of micelle in addition to inertia force, also viscous force.According to the characteristics of both power, it Influence to fluid micellar motor behavior be different.According to definition, the effect of viscous force is to prevent fluid micellar from occurring phase To moving, and the effect contrast of the effect of inertia force and viscous force, therefore in viscous fluid flow, the behavior of flowing is determined The result acted on due to both power.Under action condition of the effect much larger than inertia force of viscous force, gas motion produces layer Stream, conversely, when the effect of inertia force is much larger than the effect of viscous force, gas motion produces turbulent flow.
Intuitively, as a kind of most simple image of fluid motion, laminar flow can regard adjacent to each other as and have The fluid layer of " determining material meaning ", or perhaps in the absence of " the fluid line element " of mutual vibration, the one kind for carrying out sliding motion is prolonged Stretch.Briefly, laminar flow is exactly the laminar flow of fluid.Now, fluid bears newtonian viscous stress in motion, between solid Revolting the mechanical mechanism for the motion that slips over one another does not have any essential difference.Turbulent flow basic characteristics be have whirlpool property, scrambling, with Machine, diffusivity and dissipativeness, be it is a kind of by differing in size, the spiral structure that frequency is different constitute, make its physical quantity to the time Change with space shows irregular randomness.
When inflating double glazing generation turbulent flow, the argon gas that the partial air in double glazing cavity can not be charged all the time is put Change, accordingly, there exist the requirement that the initial concentration of the inflation double glazing of turbulent flow is extremely difficult to prescribed by standard.In addition, inflation During produced by turbulent flow, air is still in the middle position of double glazing cavity.When double glazing turbulent flow occurs now As when, be vented the concentration detected by hole sensor in double glazing, in general, should be higher than that the central turbulent flow of double glazing cavity Air, and the complete diffusion of the inert gas of double glazing need 6~8 hours.If carrying out on-line checking using this method, Then measured concentration is apparently higher than the actual concentrations after diffusion.Therefore, we can not be using this detection method as in inflation The on-line checking means of empty glass.Otherwise, occur in inflation double glazing under the conditions of turbulent flow phenomenon, testing staff can be provided wrong Judgement by mistake.Such as there is the inflation double glazing of turbulent flow, the position for detecting double glazing using electrion process should be leaned on as far as possible Closely spaced bar position.Three measurement points advised according to producer, just avoid the turbulent gas of inflation double glazing, i.e. air Position, given concentration is the concentration of inert gas.Therefore, it is necessary to after inflation double glazing is placed 6~8 hours, obtain Go out correct concentration numeral.According to investigations, the inflation double glazing initial concentration of some producer's self-inspections is more than 90%, but through the 3rd Side's measurement actual concentrations are significantly lower than 90%, even less than 70% had.By close to the big inflatable glass of these concentration difference The outward appearance detection of envelope, we are difficult to find out any seal defect, therefore, it is concluded that one of the reason for this phenomenon occur, is Caused due to turbulent flow.
But, this detection method belongs to the detection afterwards of product quality.After inflating double glazing placement 6-8 hours, the Two road fluid sealants solidify substantially, if the concentration of inflation double glazing does not reach requirement, to returning for the double glazing inflated Work is a thing wasted time and energy.In addition with two kinds of possibility:(1) if not improving inflation method, we still without Method ensures that the carbonate concentration for the product done over again reaches requirement;(2) common inflation method is used, i.e., inflates and inflates naturally and be strong Degassing method processed, unavoidably occurs turbulent flow phenomenon, even the glass of random inspection detection reaches concentration requirement, unless we have Real-time monitoring numeral of the gas replenishment process per sheet glass, otherwise, we also can not definitely ensure the inflatable glass of whole batch It is qualified.
As can be seen here, unless the charger that we use can be effectively prevented from turbulent flow and occur or remain to fill The laminar flow of the stabilization of gas process, otherwise, we cannot exclude the true and false of the concentration of on-line checking.Furtherly, in this condition Under, we ensure that the correct method of the concentration of inflation double glazing, can only be that the production process for inflating double glazing is controlled System, rather than product quality control.
At present, the charge-air mass of China's double glazing is not high, is largely produced in gas replenishment process disorderly Caused by stream.It is assumed that the sensor of charger only recognizes the concentration for the inert gas being collected at double glazing steam vent, And the laminar flow and the inert gas concentration that finally provides of turbulent flow of inflation double glazing also correspond to standard requirement, people are with the naked eye again It cannot be distinguished from the concentration trend of the inert gas of any piece double glazing after the diffusion.If using electrion process to this kind of inflation The initial concentration of double glazing carries out on-line checking, and the concentration drawn will be higher by the actual concentrations after diffusion.As a result have two Kind:If 1) product that producer there will be turbulent flow is judged as client good for delivery or is sent to test in laboratory, the reality after diffusion Concentration will be lower than starting the concentration of test.2) the inflation double glazing of this concentration significant change can puzzle manufacturer, because Sealing and zero defect for product, and the simply initial concentration of product test.
Utility model content
The utility model provides a kind of double glazing constant pressure inflation system, when being inflated with solving the hollow glass of prior art The problem of charge-air mass is not high caused by turbulent flow phenomenon.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is summarized as follows:
A kind of double glazing constant pressure inflation system, is located on gas-flow closure casing, hollow with gas-flow closure box house Glass is connected, and includes the tracheae of air accumulator and connection air accumulator and double glazing, and the tracheae is provided with intake valve, the gas Pipe is constituted by supervisor and with being responsible for the air intake branch being connected, suction branch, pressure branch pipe and inflation branch pipe, and the intake valve is set On air intake branch, the end of the suction branch is connected with vacuum machine, and suction branch is provided with extraction valve, the pressure branch pipe and Inflation branch pipe is extended respectively to inside hermetic seal box house and double glazing;Inside hermetic seal box house and double glazing Pumping and gas replenishment process are synchronously carried out, it is ensured that the inside and outside differential pressure of double glazing is minimum, even if the cavity of double glazing is in vacuum State, double glazing will not also be destroyed by the inside and outside differential pressure of double glazing, by controlling intake valve and extraction valve, first will inflation The cavity of box house and double glazing, which is evacuated to after vacuum, is re-filled with corresponding gas, will not thus form turbulent flow phenomenon, So as to solve when the hollow glass of prior art is inflated the problem of charge-air mass is not high caused by turbulent flow phenomenon.
More excellent, it is equipped with pressure test device, the inflation branch pipe and also sets on the pressure branch pipe and inflation branch pipe There is ventilating control valve, inflation branch pipe is connected with valve, and the valve is communicated with the cavity of double glazing, presses branch pipe and inflation branch pipe On the pressure test device that is respectively provided be easy to whether the cavity air pressure for detecting double glazing is equal to the air pressure inside Pneumatic box body, fill Gas control valve is used to adjust the draught head inside the cavity and Pneumatic box body of double glazing, it is ensured that double glazing will not be by hollow The inside and outside differential pressure of glass destroys and influences air-tightness, and after inflation terminates, closes ventilating control valve, reduces inside double glazing Gas and extraneous gas exchanges, improve charge-air mass.
More excellent, the end of the pressure branch pipe and inflation branch pipe is connected with the pressure connection through gas-flow closure casing respectively Pipe and inflation connecting tube, the pressure connecting tube, inflation connecting tube are mutually fixed with gas-flow closure casing;The valve connects with inflation Adapter is connected, easy to connect, it is easy to mount and dismount, and easily realizes.
More excellent, connected, be easy in valve insertion by spiral elasticity connecting tube between the valve and inflation connecting tube In the air-filled pore of empty glass, different size, the demand of the double glazing of position in gas-flow closure casing are adapted to.
More excellent, connected between the valve and inflation connecting tube by elastic hose, be easy to valve to insert double glazing Air-filled pore in, adapt to gas-flow closure casing in different size, the demand of the double glazing of position.
More excellent, the inflation branch pipe is at least provided with one group, it is ensured that inflation can at least fill more than one piece of hollow glass every time Glass, can meet multiple pieces of glass while the demand inflated.
Relative to prior art, the beneficial effect produced by the utility model:
1st, the utility model device is by controlling intake valve and extraction valve, first by inside Pneumatic box body and double glazing Cavity is evacuated to after vacuum, is re-filled with corresponding gas, will not thus form turbulent flow phenomenon, so that it is hollow to solve prior art During glass inflation the problem of charge-air mass is not high caused by turbulent flow phenomenon;
2nd, isobaric pumping and charge operation are realized to the cavity of Pneumatic box body inside and double glazing, it is ensured that hollow glass The inside and outside differential pressure of glass is minimum, even if the cavity of double glazing is in vacuum state, double glazing also will not be by double glazing External differential destroys and influences air-tightness;
3rd, the utility model is simple to operate, and structure is uncomplicated to be easily achieved, compared to high accuracy inflation of the prior art Device, the utility model is with low cost, it is adaptable to the production of little Zhong enterprises.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is connection diagram of the present utility model;
Label is respectively in figure:1st, air accumulator;11st, air intake branch;12nd, intake valve;2nd, vacuum machine;21st, suction branch; 22nd, extraction valve;3rd, tracheae;4th, branch pipe is pressed;41st, connecting tube is pressed;5th, branch pipe is inflated;51st, ventilating control valve;52nd, inflation connects Adapter;53rd, spiral elasticity connecting tube;54th, valve;6th, pressure test device.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.Reality of the present utility model Apply mode including but not limited to the following example.
Embodiment 1
As shown in figure 1, a kind of double glazing constant pressure inflation system, is located on gas-flow closure casing, with gas-flow closure casing Internal double glazing is connected, and includes setting on the tracheae 3 of air accumulator 1 and connection air accumulator 1 and double glazing, the tracheae 3 There is an intake valve 12, the tracheae 3 is by supervisor and with being responsible for the air intake branch 11 being connected, suction branch 21, pressing branch pipe 4 and fill Gas branch pipe 5 is constituted, and the intake valve 12 is located on air intake branch 11, and the end of the suction branch 21 is connected with vacuum machine 2, pumping Branch pipe 21 is provided with extraction valve 22, and the pressure branch pipe 4 and inflation branch pipe 5 extend respectively to hermetic seal box house and hollow glass Inside glass.
In this implementation, double glazing is arranged in device and installed after device, close intake valve 12, open extraction valve 22, the synchronic gas of the cavity of double glazing and gas-flow closure box house is extracted out so that the cavity air pressure of double glazing begins It is equal to the air pressure of gas-flow closure box house eventually, treats that the cavity of double glazing is exhausted with the gas of gas-flow closure box house Afterwards, extraction valve 22 is closed, intake valve 12 is opened, the inflation synchronous with gas-flow closure box house of the cavity to double glazing so that The cavity air pressure of double glazing is consistently equal to the air pressure of gas-flow closure box house, until the cavity air pressure of double glazing and inflation Air pressure inside seal case stops inflation when being equal to normal pressure, closes intake valve 12, double glazing is taken out, operation letter It is single.
, can be with repeatedly pumping, inflation more than 2 times in order to ensure charge-air mass in the present embodiment.
The present embodiment device realizes isobaric pumping and charge operation to the cavity of Pneumatic box body inside and double glazing, Ensure that the inside and outside differential pressure of double glazing is minimum, even if the cavity of double glazing is in vacuum state, double glazing also will not be by The inside and outside differential pressure destruction of empty glass, it is possible to by controlling intake valve 12 and extraction valve 22, first by inside Pneumatic box body and in The cavity of empty glass is evacuated to after vacuum, is re-filled with corresponding gas, will not thus form turbulent flow phenomenon, so as to solve existing During the inflation of technology double glazing the problem of charge-air mass is not high caused by turbulent flow phenomenon.
Embodiment 2
Further optimize on the basis of a kind of double glazing constant pressure inflation system described in embodiment 1, the pressure branch It is equipped with pipe 4 and inflation branch pipe 5 on pressure test device 6, the inflation branch pipe 5 and is additionally provided with ventilating control valve 51, inflation branch Pipe 5 is connected with valve 54, and the valve 54 is communicated with the cavity of double glazing;In the present embodiment, in pressure branch pipe 4 and inflation branch pipe The pressure test device 6 that is respectively provided with 5 be easy to detect the cavity air pressure of double glazing all the time whether gas-flow closure box house Air pressure, and then by controlling ventilating control valve 51 to ensure that double glazing will not be destroyed by its inside and outside differential pressure and influence air-tightness, The present embodiment is by ventilating control valve 51 and two pressure test devices 6 to gas-flow closure box house and double glazing Cavity realizes isobaric pumping and charge operation, and precision is high, it is easy to control, while the setting of two pressure test devices 6 is also just In detecting whether to realize evacuation, charge-air mass is improved.
Embodiment 3
Further optimize on the basis of a kind of double glazing constant pressure inflation system described in embodiment 2, the pressure branch The end of pipe 4 and inflation branch pipe 5 is connected with pressure connecting tube 41 and inflation connecting tube 52 through gas-flow closure casing respectively, described Pressure connecting tube 41, inflation connecting tube 52 are mutually fixed with gas-flow closure casing;The valve 54 is connected with inflation connecting tube 52, this The setting of embodiment facilitates the installation of pressure branch pipe 4 and inflation branch pipe 5.
Embodiment 4
Further optimize on the basis of a kind of double glazing constant pressure inflation system described in embodiment 3, the valve 54 It is connected between inflation connecting tube 52 by spiral elasticity connecting tube 53, the setting of the present embodiment is easy to valve 54 to insert hollow glass In the air-filled pore of glass, different size, the demand of the double glazing of position in gas-flow closure casing are adapted to.
Embodiment 5
Further optimize on the basis of a kind of double glazing constant pressure inflation system described in embodiment 3, the valve 54 It is connected between inflation connecting tube 52 by elastic hose, the inflation of the insertion double glazing of valve 54 is easy in the setting of the present embodiment Kong Zhong, adapts to different size, the demand of the double glazing of position in gas-flow closure casing.
Embodiment 6
Further optimize on the basis of a kind of any one of double glazing constant pressure inflation systems of embodiment 1-5, The inflation branch pipe 5 can once fill 3 blocks of double glazings at least provided with 3 groups in the present embodiment.
It is embodiment of the present utility model as described above.The utility model is not limited to above-mentioned embodiment, anyone The structure change made under enlightenment of the present utility model should be learnt, it is every that there is same or like skill with the utility model Art scheme, each falls within protection domain of the present utility model.

Claims (6)

1. a kind of double glazing constant pressure inflation system, is located on gas-flow closure casing, the hollow glass with gas-flow closure box house Glass be connected, include air accumulator (1) and connection air accumulator (1) and double glazing tracheae (3), the tracheae (3) be provided with into Air valve (12), it is characterised in that:The tracheae (3) is by supervisor and with being responsible for the air intake branch (11), the suction branch that are connected (21), pressure branch pipe (4) and inflation branch pipe (5) is constituted, and the intake valve (12) is located on air intake branch (11), the pumping branch The end of pipe (21) is connected with vacuum machine (2), and suction branch (21) is provided with extraction valve (22), the pressure branch pipe (4) and inflation Branch pipe (5) is extended respectively to inside hermetic seal box house and double glazing.
2. a kind of double glazing constant pressure inflation system as claimed in claim 1, it is characterised in that:It is described pressure branch pipe (4) and It is equipped with inflation branch pipe (5) on pressure test device (6), the inflation branch pipe (5) and is additionally provided with ventilating control valve (51), is inflated Branch pipe (5) is connected with valve (54), and the valve (54) communicates with the cavity of double glazing.
3. a kind of double glazing constant pressure inflation system as claimed in claim 2, it is characterised in that:It is described pressure branch pipe (4) and The end of inflation branch pipe (5) is connected with pressure connecting tube (41) and inflation connecting tube (52) through gas-flow closure casing, institute respectively Pressure connecting tube (41), inflation connecting tube (52) is stated mutually to fix with gas-flow closure casing;The valve (54) and inflation connecting tube (52) it is connected.
4. a kind of double glazing constant pressure inflation system as claimed in claim 3, it is characterised in that:The valve (54) and inflation Connected between connecting tube (52) by spiral elasticity connecting tube (53).
5. a kind of double glazing constant pressure inflation system as claimed in claim 3, it is characterised in that:The valve (54) and inflation Connecting tube is connected between (52) by elastic hose.
6. a kind of double glazing constant pressure inflation system as described in claim 1-4 any one, it is characterised in that:The inflation Branch pipe (5) is at least provided with one group.
CN201720054270.XU 2017-01-16 2017-01-16 A kind of double glazing constant pressure inflation system Expired - Fee Related CN206377455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720054270.XU CN206377455U (en) 2017-01-16 2017-01-16 A kind of double glazing constant pressure inflation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720054270.XU CN206377455U (en) 2017-01-16 2017-01-16 A kind of double glazing constant pressure inflation system

Publications (1)

Publication Number Publication Date
CN206377455U true CN206377455U (en) 2017-08-04

Family

ID=59400088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720054270.XU Expired - Fee Related CN206377455U (en) 2017-01-16 2017-01-16 A kind of double glazing constant pressure inflation system

Country Status (1)

Country Link
CN (1) CN206377455U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109404726A (en) * 2018-12-14 2019-03-01 中交第二航务工程勘察设计院有限公司 A kind of cryogenic liquid pot type container is released collection device
CN110841825A (en) * 2019-11-22 2020-02-28 国网河北省电力有限公司电力科学研究院 Helium quantitative injection device for helium vacuum leak detector
CN111416288A (en) * 2019-01-05 2020-07-14 吴长兰 Be suitable for explosion-proof cubical switchboard

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109404726A (en) * 2018-12-14 2019-03-01 中交第二航务工程勘察设计院有限公司 A kind of cryogenic liquid pot type container is released collection device
CN111416288A (en) * 2019-01-05 2020-07-14 吴长兰 Be suitable for explosion-proof cubical switchboard
CN110841825A (en) * 2019-11-22 2020-02-28 国网河北省电力有限公司电力科学研究院 Helium quantitative injection device for helium vacuum leak detector

Similar Documents

Publication Publication Date Title
CN206377455U (en) A kind of double glazing constant pressure inflation system
CN107036769B (en) It is a kind of for calibrating the system and method for different probe gas vacuum leak leak rates
CN102269641A (en) Detection device and method of tightness of flexible package products
CN105300869A (en) Device and method for measuring gas permeability of material by virtue of differential vacuum gauge
CN108872847A (en) The detection system of sulfur hexafluoride density relay
CN206377454U (en) A kind of constant pressure air charging device for hollow glass
CN206448721U (en) A kind of double glazing
CN207515983U (en) A kind of air tightness detection system
CN209542027U (en) A kind of battery pack air-tightness detection device
CN112556774A (en) Gradient inflatable SF based on weighing method6Method for measuring volume of gas chamber
CN116294086A (en) Refrigerant filling amount and vacuum degree detection method and device and air conditioner
CN106594971B (en) The minimum air quantity control method of mechanical ventilation system in grottoes
CN213422550U (en) Device for detecting air tightness of battery pack
CN114061868B (en) Medical sterile glove detection equipment for operation
CN206384802U (en) A kind of follow-on semi-automatic ink filling equipment
CN109297648B (en) Engine production detects and uses gas tightness measuring instrument convenient to observe
CN115389126A (en) Modularized contrast type automatic detection method and equipment for gas meter sealing performance
CN209470827U (en) A kind of device for detecting leak rate for low temperature multilead connector
CN104819812B (en) Glass fiber reinforced plastic septic tank airtightness detection method
CN206377453U (en) A kind of double glazing inflating nozzle
CN112414504A (en) SF (sulfur hexafluoride)6Constant volume air charging and discharging measuring device for air chamber
CN210464838U (en) Airtight detection device of product of single chip microcomputer control
CN108709703B (en) Calibrating device for building outer glass curtain wall testing machine
CN104422570B (en) Inspection device and inspection method for oil return hole of steam and liquid separator
CN215804113U (en) Automatic inflation and deflation airtight door for clean room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804

Termination date: 20210116

CF01 Termination of patent right due to non-payment of annual fee