CN206375963U - Cooling device after stainless steel wire heat treatment - Google Patents

Cooling device after stainless steel wire heat treatment Download PDF

Info

Publication number
CN206375963U
CN206375963U CN201621478313.9U CN201621478313U CN206375963U CN 206375963 U CN206375963 U CN 206375963U CN 201621478313 U CN201621478313 U CN 201621478313U CN 206375963 U CN206375963 U CN 206375963U
Authority
CN
China
Prior art keywords
stainless steel
wire
steel wire
tube
heat treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621478313.9U
Other languages
Chinese (zh)
Inventor
马建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaze Metal Industry Co., Ltd.
Original Assignee
Taizhou Special Steel Wire Co Fars
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Special Steel Wire Co Fars filed Critical Taizhou Special Steel Wire Co Fars
Priority to CN201621478313.9U priority Critical patent/CN206375963U/en
Application granted granted Critical
Publication of CN206375963U publication Critical patent/CN206375963U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Strip Materials And Filament Materials (AREA)

Abstract

The utility model discloses the cooling device after a kind of heat treatment of stainless steel wire, including support, many wire-passing tubes have been arranged side by side on support, flexible support is filled with every wire-passing tube, air inlet is provided with one end of every wire-passing tube, each air inlet is connected to blowning installation by connecting tube.Cooling device after stainless steel wire heat treatment of the present utility model; the stainless steel wire in wire-passing tube is cooled down using blowning installation; and flexible support is set in wire-passing tube; stainless steel wire is not contacted by wire-passing tube with crossing the madial wall of line, stainless steel wire is protected well while quick cooling.

Description

Cooling device after stainless steel wire heat treatment
Technical field
The utility model is related to stainless steel wire processing technique field, the cooling after more particularly to a kind of stainless steel wire heat treatment Device.
Background technology
Stainless steel wire needs to be cooled down after heat treatment step by annealing etc., is carrying out wire-drawing process, cooling less than Position the quality of stainless steel wire can be influenceed with regard to take-up, and if cooling procedure is more time-consuming only according to natural cooling, then how Fast and effectively cooling be need solve the problem of, and cooling during stainless steel wire also need to be protected well, Avoid deformation.
Utility model content
The purpose of this utility model be to provide it is a kind of be fast and effectively stainless steel wire heat treatment after cooling device, cold But the stainless steel wire in cooling procedure can also be protected while well.
To achieve the above object, the utility model provides the cooling device after a kind of stainless steel wire is heat-treated, including branch Frame, has been arranged side by side many wire-passing tubes on support, and flexible support is filled with every wire-passing tube, in every wire-passing tube One end is provided with air inlet, and each air inlet is connected to blowning installation by connecting tube.Stainless steel wire heat of the present utility model Cooling device after processing, is cooled down using blowning installation to the stainless steel wire in wire-passing tube, and is set in wire-passing tube Flexible support so that stainless steel wire can not contacted by wire-passing tube with crossing the madial wall of line, while quick cooling Stainless steel wire is protected well.
Further improvement is that, the wire-passing tube is set to double-deck, the open-ended closing between two layers of tube wall, wherein Outside tube wall one end sets air inlet, and the air inlet connects blowning installation by connecting tube, is provided with inside tube wall many Individual air admission hole.Wherein wire-passing tube is set to bilayer, and the gas that double-deck interlayer intermediate storage is blowed is uniform in the side of inside tube Multiple air admission holes are set, can cause air inlet uniformity, the various pieces of stainless steel wire can simultaneously and be multi-angle progress Blow and cool down, improve cooling effect and efficiency.
Further, the medial end of inside tube wall is provided with pressure sensor, the information transfer of pressure sensor To blowning installation, the power adjusting of blowning installation is controlled, temperature detection is additionally provided with the exit end of wire-passing tube stainless steel wire Device;Controlled valve is provided with each connecting tube.The information of pressure sensor and temperature detector is used to fill to blowing The regulation put, to ensure cooling effect, is provided with controlled valve, for no wire-passing tube in each connecting tube in addition Valve can just be closed, energy-saving and emission-reduction.
Cooling device after stainless steel wire heat treatment of the present utility model, it is rational in infrastructure, blow uniform, can be quickly effective Stainless steel wire is cooled down, and effectively protect stainless steel wire.Can also be not after stainless steel wire comes out from wire-passing tube Become rusty a steel wire side setting temperature detector, and whether the stainless steel wire after detection cooling meets the requirements, and can examine temperature The result for surveying device is transferred to blowning installation, in order to which blowning installation makes corresponding regulation.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Wherein, 1- supports, 2- wire-passing tubes, 3- air inlets, 4- blowning installations, 5- connecting tubes, 6- air admission holes, 7- pressure sensings Device, 8- controlled valves.
Embodiment
Describe optimal technical scheme of the present utility model in detail below in conjunction with the accompanying drawings.
As illustrated, the cooling device after stainless steel wire heat treatment of the present utility model, including support 1, on support 1 simultaneously Row is provided with many wire-passing tubes 2, and flexible support is filled with every wire-passing tube 2, is provided with one end of every wire-passing tube 2 Air inlet 3, each air inlet 3 is connected to blowning installation 4 by connecting tube 5.
Further, the wire-passing tube 2 is set to bilayer, the open-ended closing between two layers of tube wall, wherein outside Tube wall one end sets air inlet 3, and the air inlet 3 connects blowning installation 4 by connecting tube 5, is provided with inside tube wall many Individual air admission hole 6.
Further, the medial end of inside tube wall is provided with pressure sensor 7, the information of pressure sensor 7 is passed It is defeated to arrive blowning installation 4, the power adjusting of blowning installation 4 is controlled, temperature is additionally provided with the exit end of the stainless steel wire of wire-passing tube 2 Detector;Controlled valve 8 is provided with each connecting tube 5.
Cooling device after stainless steel wire heat treatment of the present utility model, using blowning installation to the stainless steel in wire-passing tube Line is cooled down, and sets in wire-passing tube flexible support so that stainless steel wire can be by wire-passing tube not with crossing line Madial wall contact, protect stainless steel wire well while quick cooling.
Wherein wire-passing tube is set to bilayer, and the gas that double-deck interlayer intermediate storage is blowed is uniform in the side of inside tube Multiple air admission holes are set, can cause air inlet uniformity, the various pieces of stainless steel wire can simultaneously and be multi-angle progress Blow and cool down, improve cooling effect and efficiency.
The information of pressure sensor and temperature detector is used for the regulation to blowning installation, to ensure cooling effect, in addition Controlled valve is provided with each connecting tube, valve can just be closed for no wire-passing tube, energy-saving and emission-reduction.
Cooling device after stainless steel wire heat treatment of the present utility model, it is rational in infrastructure, blow uniform, can be quickly effective Stainless steel wire is cooled down, and effectively protect stainless steel wire.Can also be not after stainless steel wire comes out from wire-passing tube Become rusty a steel wire side setting temperature detector, and whether the stainless steel wire after detection cooling meets the requirements, and can examine temperature The result for surveying device is transferred to blowning installation, in order to which blowning installation makes corresponding regulation.

Claims (4)

1. the cooling device after a kind of stainless steel wire heat treatment, it is characterised in that:Including support, it has been arranged side by side on support many Root wire-passing tube, flexible support is filled with every wire-passing tube, one end of every wire-passing tube is provided with air inlet, Mei Gejin Gas port is connected to blowning installation by connecting tube.
2. the cooling device after stainless steel wire heat treatment as claimed in claim 1, it is characterised in that:The wire-passing tube is set to Double-deck, the open-ended closing between two layers of tube wall, wherein outside tube wall one end sets air inlet, the air inlet passes through even Adapter connection blowning installation, is provided with multiple air admission holes on inside tube wall.
3. the cooling device after stainless steel wire heat treatment as claimed in claim 2, it is characterised in that:In the inner side of inside tube wall End is provided with pressure sensor, and the information transfer of pressure sensor controls the power adjusting of blowning installation to blowning installation, The exit end of wire-passing tube stainless steel wire is additionally provided with temperature detector.
4. the cooling device after stainless steel wire heat treatment as described in claim 1 or 2 or 3, it is characterised in that:In each company Controlled valve is provided with adapter.
CN201621478313.9U 2016-12-30 2016-12-30 Cooling device after stainless steel wire heat treatment Expired - Fee Related CN206375963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621478313.9U CN206375963U (en) 2016-12-30 2016-12-30 Cooling device after stainless steel wire heat treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621478313.9U CN206375963U (en) 2016-12-30 2016-12-30 Cooling device after stainless steel wire heat treatment

Publications (1)

Publication Number Publication Date
CN206375963U true CN206375963U (en) 2017-08-04

Family

ID=59408761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621478313.9U Expired - Fee Related CN206375963U (en) 2016-12-30 2016-12-30 Cooling device after stainless steel wire heat treatment

Country Status (1)

Country Link
CN (1) CN206375963U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109722526A (en) * 2019-01-15 2019-05-07 重庆市霆驰新材料科技有限公司 It is a kind of prevent bonding gold wire anneal after generate adhesion phenomenon cooling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109722526A (en) * 2019-01-15 2019-05-07 重庆市霆驰新材料科技有限公司 It is a kind of prevent bonding gold wire anneal after generate adhesion phenomenon cooling device

Similar Documents

Publication Publication Date Title
CN206375963U (en) Cooling device after stainless steel wire heat treatment
CN202675931U (en) Cooling tower
CN208033312U (en) A kind of closed copper wire wire drawing and annealing device
JP2016513593A (en) Base material heating duct for blow molding machines
CN205403462U (en) A cooling device and system for soft magnetic ferrite sintering high -temperature gas
CN203855414U (en) Tubular graphitization furnace
CN205710847U (en) A kind of finer wire heat treatment lead bath
CN218879739U (en) Low-cost optical fiber cooling device
CN209243145U (en) Cooling device is used in a kind of production of galvanized wire
CN205300272U (en) Industry is heat transfer device for vacuum furnace
CN205747928U (en) Well formula nitriding furnace
CN204417327U (en) A kind of cooling system of glass tempering unit
CN205188428U (en) Cooling device in magnetic control direct current sputtering system
CN205888043U (en) Special conveyor of high temperature aluminium ingot
CN213327748U (en) RTF high-temperature radiometer cooling device of hot galvanizing continuous annealing furnace
CN114346175A (en) Mould shell cooling device after wax mould dewaxing
CN201032405Y (en) Air condenser
CN105316453A (en) Rapid cooling device
CN207985376U (en) A kind of tunnel type heat shrink wrapping machine
CN205929411U (en) Plastics product cooling basin
CN207409315U (en) A kind of cable cooling device with blow-dry function
CN203794942U (en) Novel control cooling device for silicon-steel strip heat treatment production line
CN211552255U (en) Chill heat preservation machine is used in impeller production
CN104368269A (en) Cooling device for plaster mixing machine
CN204117695U (en) A kind of enamelling machine carrying out classification cooling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180326

Address after: 225721 No. 1, Chen Industrial District, Zhenjiang, Xinghua City, Zhenjiang City, Jiangsu

Patentee after: Huaze Metal Industry Co., Ltd.

Address before: 210000 Zhenjiang City, Jiangsu Province, Xinghua City, Zhendong Chen Industrial District

Patentee before: Taizhou special steel wire Co., Fars

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804

Termination date: 20201230

CF01 Termination of patent right due to non-payment of annual fee