CN204117695U - A kind of enamelling machine carrying out classification cooling - Google Patents

A kind of enamelling machine carrying out classification cooling Download PDF

Info

Publication number
CN204117695U
CN204117695U CN201420514411.8U CN201420514411U CN204117695U CN 204117695 U CN204117695 U CN 204117695U CN 201420514411 U CN201420514411 U CN 201420514411U CN 204117695 U CN204117695 U CN 204117695U
Authority
CN
China
Prior art keywords
bosh
burner hearth
cold air
cooling
air chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420514411.8U
Other languages
Chinese (zh)
Inventor
席斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGJIANG HUASHI MOTOR WIRE FACTORY
Original Assignee
QINGJIANG HUASHI MOTOR WIRE FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGJIANG HUASHI MOTOR WIRE FACTORY filed Critical QINGJIANG HUASHI MOTOR WIRE FACTORY
Priority to CN201420514411.8U priority Critical patent/CN204117695U/en
Application granted granted Critical
Publication of CN204117695U publication Critical patent/CN204117695U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)

Abstract

The utility model relates to a kind of enamelling machine carrying out classification cooling, and it includes burner hearth pipeline, and burner hearth pipe interior is provided with multiple line channel for wire transmission; Heating chamber is provided with in described burner hearth pipeline; Describedly carry out in the enamelling machine of classification cooling, burner hearth pipeline distal portion is provided with aspirating air pipe, and aspirating air pipe inside is provided with air compressor; Described burner hearth pipeline is communicated to cooling device, and cooling device is by cold air chamber, and one-level bosh and secondary bosh are formed, and is provided with chuck in the inwall of described one-level bosh; Described aspirating air pipe includes the first arm be communicated in cold air chamber, and is communicated to the second arm in the chuck of one-level bosh; Adopt the enamelling machine of the classification carried out cooling of technique scheme, it, by by wire imports and its temperature fits coolant, avoids wire to cause the insulating barrier on its surface to rupture because of chilling.

Description

A kind of enamelling machine carrying out classification cooling
Technical field
The utility model relates to a kind of process equipment, especially a kind of enamelling machine carrying out classification cooling.
Background technology
Enamelling machine is a kind of plant equipment wire being processed into enamelled wire.Enamelling machine of the prior art, it all needs to cool it after completing the production process of enamelled wire, but, existing cooling way is for directly to put into coolant by enamelled wire, because enamelled wire needs at high temperature to dry in process of production, when it completes processing rear surface, still there is quite high temperature, so it is directly immersing the breakage very easily producing surface in coolant, thus make the insulating barrier outside wire break and cause the damage of product quality.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of enamelling machine, it can be avoided because of chilling to occur surface fracture phenomenon in its cooling procedure after enamelled wire machines.
For solving the problems of the technologies described above, the utility model relates to a kind of enamelling machine carrying out classification cooling, and it includes burner hearth pipeline, and burner hearth pipe interior is provided with multiple line channel for wire transmission, and it prolongs burner hearth pipeline Axis Extension; Be provided with heating chamber in described burner hearth pipeline, the conducting each other of heating chamber and line channel, heating chamber is provided with heating wire; Described line channel end is communicated to bosh; Describedly carry out in the enamelling machine of classification cooling, burner hearth pipeline distal portion is provided with aspirating air pipe, and aspirating air pipe inside is provided with air compressor; Described burner hearth pipeline is communicated to cooling device, and cooling device is by cold air chamber, and one-level bosh and secondary bosh are formed, and it communicates with each other, and are provided with air-cooler in described cold air chamber, is provided with chuck in the inwall of described one-level bosh; Described aspirating air pipe includes the first arm be communicated in cold air chamber, and is communicated to the second arm in the chuck of one-level bosh.
Improve as one of the present utility model, the position that crosses of described aspirating air pipe and burner hearth pipeline is provided with multiple suction port, and it includes the top suction port being connected to burner hearth pipeline upper surface, and is connected to the sidepiece suction port of burner hearth pipeline side end face; The diameter of described top suction port is at least 1/3 of burner hearth pipeline radial width.Adopt above-mentioned design, it is by multiple suction port more efficiently absorption burner hearth pipeline, the waste gas that wire machining produces, thus the mach waste gas of enamel-cover is discharged more thoroughly, and provides more sufficient source of the gas for follow-up cooling.
Improve as one of the present utility model, between first arm of described aspirating air pipe and cold air chamber, multiple air outlet is set, wherein include, be arranged on the opposing end surface of cold air chamber and the first bosh, and to multiple first air outlet that its opposing end surface extends, and be arranged on cold air chamber upper surface, and multiple second air outlet extended to its lower surface.Adopt above-mentioned design, its waste gas formed in cold air chamber in the first arm by the first air outlet and the second air outlet enters in cold air chamber by multiple directions, thus waste gas can be mixed more uniformly with the cold air in cold air chamber, thus the gas temperature in cooling chamber is more fitted conductor temperature.
Improve as one of the present utility model, in described cold air chamber, multiple first air outlet is all uniformly distributed in the radial direction of cold air chamber, and the distance between each first air outlet and wire place plane is at most 5 centimetres, and its axis equal guiding line place plane extends; In described cold air chamber, directly over each root wire, be provided with at least three the second air outlet.Adopt above-mentioned design, the setting of its air outlet extended by multiple guiding line direction, moved in its gas guiding line direction that can promote in cold air chamber, and then its cold air effect and efficiency are all promoted.
Improve as one of the present utility model, in described first bosh, the distance between chuck and the first bosh inwall is at most 3 centimetres; In described first bosh, non-lead location is provided with the many auxiliary cooling pipes prolonging it and axially extend with radial direction, and it is all communicated to chuck inside.Adopt above-mentioned design, it, by the waste gas in the auxiliary cooling pipe that extends in all directions, avoids the water temperature of the first bosh cross cold and cause the insulating barrier of wire outside to break.
The above-mentioned enamelling machine carrying out classification cooling, it can make wire enter cold air chamber, the first bosh and the second bosh successively and cool after burner hearth pipeline is derived; Simultaneously, the waste gas sucking-off that burner hearth pipeline inside conductor machining produces by the aspirating air pipe being arranged on burner hearth pipe end, import in the chuck of cold air chamber and the first bosh, gas in cold air chamber is mixed with waste gas, formation temperature is close to the mist of conductor temperature, and making cooling water in the first bosh by the exhaust gases in chuck, water temperature is close to gas temperature in cold air chamber; Such scheme makes cold air chamber, the first bosh become the multistage cooling device of Gradient Descent with the second bosh formation temperature, and then makes in wire cooling procedure, and the coolant temperature of its every one-phase all fits with wire.
Adopt the enamelling machine of the classification the carried out cooling of technique scheme, it is by importing in the coolant that fits with its temperature by wire, avoid wire to cause because of chilling the insulating barrier on its surface to rupture, to such an extent as to affect the quality even loss of product of enamelled wire; Simultaneously, coolant in cold air chamber and the first cooling device is all heated it by the waste gas produced in the enamelling machine course of processing, namely avoid additionally arranging the energy cost that thermal source produces, also can make the recycling to waste gas in enamelling machine, make the more environmental protection of its production process.
Accompanying drawing explanation
Fig. 1 is the utility model schematic diagram;
Fig. 2 is aspirating air pipe and burner hearth pipeline connection diagram in the utility model;
Fig. 3 is cold air chamber's private side view schematic diagram in the utility model;
Fig. 4 is cold air chamber's inside top figure in the utility model;
Fig. 5 is one-level bosh schematic diagram in the utility model;
Reference numerals list:
1-burner hearth pipeline, 2-wire, 3-line channel, 4-heating chamber, 5-heating wire, 6-aspirating air pipe, 7-air compressor, 8-cold air chamber, 9-one-level bosh, 10-secondary bosh, 11-air-cooler, 12-chuck, the 13-the first arm, the 14-the second arm, 15-top suction port, 16-sidepiece suction port, the 17-the first air outlet, the 18-the second air outlet, 19-auxiliary cooling pipe.
Embodiment
Below in conjunction with the drawings and specific embodiments, illustrate the utility model further, following embodiment should be understood and be only not used in restriction scope of the present utility model for illustration of the utility model.It should be noted that, the word "front", "rear" of use is described below, "left", "right", "up" and "down" refer to direction in accompanying drawing, word " interior " and " outward " refer to the direction towards or away from particular elements geometric center respectively.
Embodiment 1
A kind of enamelling machine carrying out classification cooling as shown in Figure 1, it includes burner hearth pipeline 1, and burner hearth pipeline 1 inside is provided with multiple line channel 3 transmitted for wire 2, and it prolongs burner hearth pipeline 1 Axis Extension; Be provided with heating chamber 4 in described burner hearth pipeline 1, heating chamber 4 and line channel 2 conducting each other, heating chamber 4 inside is provided with heating wire 5; Described line channel 2 end is communicated to bosh; Describedly carry out in the enamelling machine of classification cooling, burner hearth pipeline 1 distal portion is provided with aspirating air pipe 6, and aspirating air pipe 6 inside is provided with air compressor 7; Described burner hearth pipeline 1 is communicated to cooling device, and cooling device is by cold air chamber 8, and one-level bosh 9 and secondary bosh 10 are formed, and it communicates with each other, and is provided with air-cooler 11 in described cold air chamber 8, is provided with chuck 12 in the inwall of described one-level bosh 9; Described aspirating air pipe 6 includes the first arm 13 be communicated in cold air chamber 8, and is communicated to the second arm 14 in the chuck 12 of one-level bosh.
Improve as one of the present utility model, as shown in Figure 2, the position that crosses of described aspirating air pipe and burner hearth pipeline 1 is provided with multiple suction port, and it includes the top suction port 15 being connected to burner hearth pipeline upper surface, and is connected to the sidepiece suction port 16 of burner hearth pipeline side end face; The diameter of described top suction port 15 is 1/3 of burner hearth pipeline radial width.Adopt above-mentioned design, it is by multiple suction port more efficiently absorption burner hearth pipeline, the waste gas that wire machining produces, thus the mach waste gas of enamel-cover is discharged more thoroughly, and provides more sufficient source of the gas for follow-up cooling.
Embodiment 2
Improve as one of the present utility model, as shown in Figure 3 and Figure 4, between first arm 13 of described aspirating air pipe and cold air chamber 8, multiple air outlet is set, wherein include, be arranged on the opposing end surface of cold air chamber 8 and the first bosh 9, and to four the first air outlet 17 that its opposing end surface extends, and be arranged on cold air chamber 8 upper surface, and multiple second air outlet 18 extended to its lower surface.Adopt above-mentioned design, its waste gas formed in cold air chamber in the first arm by the first air outlet and the second air outlet enters in cold air chamber by multiple directions, thus waste gas can be mixed more uniformly with the cold air in cold air chamber, thus the gas temperature in cooling chamber is more fitted conductor temperature.
Improve as one of the present utility model, in described cold air chamber 8, four the first air outlet 17 are all uniformly distributed in the radial direction of cold air chamber 8, and the distance between each first air outlet 17 and wire 3 place plane is 5 centimetres, and its axis equal guiding line 3 place plane extends; In described cold air chamber 8, directly over each root wire, be provided with three the second air outlet 18.Adopt above-mentioned design, the setting of its air outlet extended by multiple guiding line direction, moved in its gas guiding line direction that can promote in cold air chamber, and then its cold air effect and efficiency are all promoted.
All the other feature & benefits of the present embodiment are all identical with embodiment 1.
Embodiment 3
Improve as one of the present utility model, as shown in Figure 5, in described first bosh 9, the distance between chuck 12 and the first bosh 9 inwall is 3 centimetres; In described first bosh 9, non-lead location is provided with four and prolongs the auxiliary cooling pipe 19 that it axially extends and four are prolonged its radial direction and extend, and it is inner that it is all communicated to chuck 12.Adopt above-mentioned design, it, by the waste gas in the auxiliary cooling pipe that extends in all directions, avoids the water temperature of the first bosh cross cold and cause the insulating barrier of wire outside to break.
The above-mentioned enamelling machine carrying out classification cooling, it can make wire enter cold air chamber, the first bosh and the second bosh successively and cool after burner hearth pipeline is derived; Simultaneously, the waste gas sucking-off that burner hearth pipeline inside conductor machining produces by the aspirating air pipe being arranged on burner hearth pipe end, import in the chuck of cold air chamber and the first bosh, gas in cold air chamber is mixed with waste gas, formation temperature is close to the mist of conductor temperature, and making cooling water in the first bosh by the exhaust gases in chuck, water temperature is close to gas temperature in cold air chamber; Such scheme makes cold air chamber, the first bosh become the multistage cooling device of Gradient Descent with the second bosh formation temperature, and then makes in wire cooling procedure, and the coolant temperature of its every one-phase all fits with wire.
Adopt the enamelling machine of the classification the carried out cooling of technique scheme, it is by importing in the coolant that fits with its temperature by wire, avoid wire to cause because of chilling the insulating barrier on its surface to rupture, to such an extent as to affect the quality even loss of product of enamelled wire; Simultaneously, coolant in cold air chamber and the first cooling device is all heated it by the waste gas produced in the enamelling machine course of processing, namely avoid additionally arranging the energy cost that thermal source produces, also can make the recycling to waste gas in enamelling machine, make the more environmental protection of its production process.
All the other feature & benefits of the present embodiment are all identical with embodiment 2.

Claims (5)

1. can carry out an enamelling machine for classification cooling, it includes burner hearth pipeline, and burner hearth pipe interior is provided with multiple line channel for wire transmission, and it prolongs burner hearth pipeline Axis Extension; Be provided with heating chamber in described burner hearth pipeline, the conducting each other of heating chamber and line channel, heating chamber is provided with heating wire; Described line channel end is communicated to bosh; It is characterized in that, describedly carry out in the enamelling machine of classification cooling, burner hearth pipeline distal portion is provided with aspirating air pipe, and aspirating air pipe inside is provided with air compressor; Described burner hearth pipeline is communicated to cooling device, and cooling device is by cold air chamber, and one-level bosh and secondary bosh are formed, and it communicates with each other, and are provided with air-cooler in described cold air chamber, is provided with chuck in the inwall of described one-level bosh; Described aspirating air pipe includes the first arm be communicated in cold air chamber, and is communicated to the second arm in the chuck of one-level bosh.
2. according to the enamelling machine carrying out classification cooling according to claim 1, it is characterized in that, the position that crosses of described aspirating air pipe and burner hearth pipeline is provided with multiple suction port, it includes the top suction port being connected to burner hearth pipeline upper surface, and is connected to the sidepiece suction port of burner hearth pipeline side end face; The diameter of described top suction port is at least 1/3 of burner hearth pipeline radial width.
3. according to the enamelling machine of the classification the carried out cooling described in claim 1 or 2, it is characterized in that, between first arm of described aspirating air pipe and cold air chamber, multiple air outlet is set, wherein include, be arranged on the opposing end surface of cold air chamber and the first bosh, and to multiple first air outlet that its opposing end surface extends, and be arranged on cold air chamber upper surface, and multiple second air outlet extended to its lower surface.
4. according to the enamelling machine carrying out classification cooling according to claim 3, it is characterized in that, in described cold air chamber, multiple first air outlet is all uniformly distributed in the radial direction of cold air chamber, distance between each first air outlet and wire place plane is at most 5 centimetres, and its axis equal guiding line place plane extends; In described cold air chamber, directly over each root wire, be provided with at least three the second air outlet.
5. according to the enamelling machine carrying out classification cooling according to claim 4, it is characterized in that, in described first bosh, the distance between chuck and the first bosh inwall is at most 3 centimetres; In described first bosh, non-lead location is provided with the many auxiliary cooling pipes prolonging it and axially extend with radial direction, and it is all communicated to chuck inside.
CN201420514411.8U 2014-09-09 2014-09-09 A kind of enamelling machine carrying out classification cooling Expired - Fee Related CN204117695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420514411.8U CN204117695U (en) 2014-09-09 2014-09-09 A kind of enamelling machine carrying out classification cooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420514411.8U CN204117695U (en) 2014-09-09 2014-09-09 A kind of enamelling machine carrying out classification cooling

Publications (1)

Publication Number Publication Date
CN204117695U true CN204117695U (en) 2015-01-21

Family

ID=52334985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420514411.8U Expired - Fee Related CN204117695U (en) 2014-09-09 2014-09-09 A kind of enamelling machine carrying out classification cooling

Country Status (1)

Country Link
CN (1) CN204117695U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104240847A (en) * 2014-09-09 2014-12-24 靖江市华氏电机电磁线厂 Enamelling machine capable of conducting classified cooling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104240847A (en) * 2014-09-09 2014-12-24 靖江市华氏电机电磁线厂 Enamelling machine capable of conducting classified cooling

Similar Documents

Publication Publication Date Title
CN203333714U (en) Cooling system for aluminum profile quenching
CN204117695U (en) A kind of enamelling machine carrying out classification cooling
CN203960269U (en) The how excellent process furnace of middle heating-type
CN104240847A (en) Enamelling machine capable of conducting classified cooling
CN203501800U (en) Device for quickly cooling heating chamber of box-type heat treatment furnace
CN206146164U (en) Refrigeration dryer heat abstractor
CN204276523U (en) There is the hot-rolling mill of waste heat recycling function
CN203876109U (en) Annularly-lateral blowing device for cooling halogen-free crosslinking cable
CN102382972A (en) Single-tubular gas protection fiber thermal treatment device
CN202954938U (en) Waste heat recovery device of air-cooled air compressor
CN205472639U (en) Two tower hydrogen purification devices
CN204366071U (en) A kind of protective device with air cooling
CN204117712U (en) A kind of enamelling machine improving heating effect
CN205223002U (en) Practice thrift cooling device of fiber drawing helium use amount
CN205074190U (en) Hot -blast waste gas recovery recycles device
CN204648196U (en) industrial vapour generator
CN202265597U (en) Single-pipe type gas-shielded fiber heat treatment device
CN202643788U (en) Copper wire surface blow-drying device
CN205874505U (en) A cold wind exhaust system that is used for continuous high temperature annealing of tunnel type orientation silicon steel
CN202942797U (en) Hot air-moisture separating device
CN202747858U (en) Temperature rising/falling device for materials
CN201841246U (en) Graphite crystallizer
CN203928756U (en) A kind of heat shield of heat-treatment furnace
CN202304410U (en) Kiln and energy utilization system thereof
CN203878249U (en) A godet box of a cooling plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150121

Termination date: 20150909

EXPY Termination of patent right or utility model