CN206375778U - A kind of river channel ecology brick with purification function - Google Patents
A kind of river channel ecology brick with purification function Download PDFInfo
- Publication number
- CN206375778U CN206375778U CN201621164693.9U CN201621164693U CN206375778U CN 206375778 U CN206375778 U CN 206375778U CN 201621164693 U CN201621164693 U CN 201621164693U CN 206375778 U CN206375778 U CN 206375778U
- Authority
- CN
- China
- Prior art keywords
- brick
- ecological
- ecological brick
- steel plate
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of river channel ecology brick with purification function, river channel ecology brick includes steel plate, Ecological Wall and steel cable rope, Ecological Wall is formed by connecting by ecological brick, ecological brick includes the first ecological brick, second ecological brick and the 3rd ecological brick, first ecological brick, choked flow area is provided with second ecological brick and the 3rd ecological brick, sandstone settling zone, filtering area and degraded area, choked flow is provided with spoiler in area, stone is filled with sandstone settling zone, barrier and adsorption layer are provided with filtering area, degraded is provided with two filler bars and a diafiltration membrane in area, the utility model is simple in construction, it is practical, pass through choked flow area, sandstone settling zone, filtering area and the processing in degraded area, improve water quality, by contaminant filters such as the particles and organic matter in water, and the design for passing through steel plate, extend the service life of Ecological Wall, prevent corrosion of the current to ecological brick, improve the security performance of whole device, reduce energy consumption and cost, improve comprehensive utilization ratio.
Description
Technical field
The utility model is related to a kind of river channel ecology brick with purification function.
Background technology
In the last few years, with the high speed development of China's economic, pollution problem also becomes increasingly severe, wherein, river course is dirty
Dye is particularly acute.And with all the more attention of the people for problem of environmental pollution, river course decontamination processing becomes more and more important.
Present river course decontamination mode mainly has:1. handled by manually salvaging;2. pass through some big machinery equipment
Handle river sewage.But for the former, traditional artificial salvaging processing mode needs to consume substantial amounts of manpower, and it can only
The bulky refuse in some river courses is removed, can not but be played a role for those organic pollutants being dissolved in water etc..And
For the latter, not only need substantial amounts of financial support, and can not be permanently effective purify water, of short duration work can only be played
With, in addition it is also necessary to maintenance overhaul often is carried out to equipment, cost is larger.
Utility model content
The utility model purpose is the deficiency present in prior art and provides a kind of river with purification function
The technical scheme of road ecological brick, the river channel ecology brick can not only administer some organic impurities soluble in water etc., and can be with
Accomplish recycling, meet current Green Development main body, saved resource, reduced so that river water quality is become better and better, carried
High comprehensive utilization ratio.
In order to solve the above-mentioned technical problem, the utility model is adopted the following technical scheme that:
A kind of river channel ecology brick with purification function, river channel ecology brick includes steel plate, Ecological Wall and steel cable rope, Ecological Wall
It is formed by connecting by ecological brick, it is characterised in that:Steel plate includes the first steel plate and the second steel plate, and the first steel plate is located at a left side for Ecological Wall
On side, the second steel plate is located on the right flank of Ecological Wall, and the first steel plate is connected by clamp with the second steel plate, the first steel plate
Steel cable rope is wound with being provided with the second steel plate on steel cable rope limited post, steel cable rope limited post, ecological brick includes the first life
State brick, the second ecological brick and the 3rd ecological brick, the bottom of the first ecological brick, which is provided with the top of limited impression, the second ecological brick, to be set
Spacing block set is equipped with, the bottom of the 3rd ecological brick, which is provided with the top of limited impression, the 3rd ecological brick, is provided with spacing block set, limited
Position groove matches with spacing block set, on the front end face and rear end face of the first ecological brick, the second ecological brick and the 3rd ecological brick
It is provided with impurity filtering net, the right flank of the first ecological brick, the second ecological brick and the 3rd ecological brick and is embedded with observation door, sees
Cha Men is connected by hinge with ecological brick, be provided with the first ecological brick, the second ecological brick and the 3rd ecological brick choked flow area,
Sandstone settling zone, filtering area and degraded area, between choked flow area and sandstone settling zone, between sandstone settling zone and filtering area, filtering
It is provided between area and degraded area in filter screen, choked flow area and is provided with spoiler, stone, mistake is filled with sandstone settling zone
Filter is provided with barrier and adsorption layer in area, and barrier is connected by installing plate with the inwall of ecological brick, and degraded is set in area
There are two filler bars and a diafiltration membrane, two filler bars are connected by fixed block with the inwall of ecological brick, in diafiltration membrane
At least four diafiltration holes are provided with, diafiltration membrane is located at the right side of filler bar;The design of steel plate, passes through the first steel plate and the second steel plate
It can prevent that corrosive material causes to damage to ecological brick both sides in water, influences the service life of ecological brick, reduces maintenance cost
With having saved cost, and further fixation can be done to the Ecological Wall by steel plate so that Ecological Wall is more stablized,
The design of clamp, can make it that the contact between steel plate and Ecological Wall is even closer so that the stability of whole device is more preferable,
The security performance of whole device is improved, the design of steel cable rope limited post can both wind steel cable rope, pass through steel cable rope oblique pull
Mode steel plate is fixed, further strengthen whole device stability, can prevent steel cable rope from sliding again, improve behaviour
Make security performance, the design of limited impression and spacing block set can be conducive to the connection between ecological brick and ecological brick, Er Qiebian
Dismount and utilize in the repetition of ecological brick, it is to avoid the waste of resource, swallow-tailed design, can securely fix whole Ecological Wall,
Ecological brick can be dismantled and reused again, further increase the security performance of whole Ecological Wall so that the water quality after processing
Higher, the design of impurity filtering net filters the large granular impurity in water, it is to avoid it is blocked inside ecological brick, influences ecological brick
Detergent power, extend the service life of ecological brick, reduce the design that observation door is embedded with the right side of maintenance cost, ecological brick,
Both the inspection and maintenance that region inner body can have been purified in order to ecological brick so that operation is more simple and convenient, again can be so as to
Connection between ecological brick and ecological brick, prevents observation door to be directly installed on right flank so that ecological brick and ecological brick it
Between produce larger space, the quality after influence sewage disposal, the barrier effect that choked flow area passes through spoiler so that water velocity becomes
Slowly, in the larger impurity particle precipitation in water, sandstone settling zone, current are trickled by the space between sandstone so that in water
Impurity is further filtered, and further increases water quality, and filtering area is removed remaining impurity in water by the filtering of barrier
Remove, then by the suction-operated of adsorption layer, the small material in water adsorbed, the quality after sewage disposal is further increased,
Barrier is connected by installing version with ecological brick inwall, is easy to the installing/dismounting of barrier, is conducive to it to change, and makes it more
Firmly, degraded area is decomposed the impurity in water by filler bar, so that it becomes utility, and the resistance to overload shock of filler bar
Better performances, service life is longer, reduces cost, then by the percolation of diafiltration membrane, by impurity such as the organic matters in water
Filtering.
Further, clamp is connected by the second screw with the first steel plate and the second steel plate, because according to different ecology
The length of wall is needed to change suitable clamp, and so as to the connection of the first steel plate and the second steel plate, the installation for being more beneficial for clamp is torn open
Unload, be easy to the replacing of clamp so that simple operation.
Further, the shape of limited impression and spacing block set is dovetail shaped, swallow-tailed limited impression and spacing block set
Large carrying capacity, even if current are larger in river course, Ecological Wall also can be more stable, extends the service life of Ecological Wall.
It is preferred that after, the material of observation door is stainless steel, and the observation door that stainless steel makes, good corrosion resistance, chemical property is steady
Fixed, good manufacturability is easy to processing to cut out, and later maintenance is simple and convenient, and service life is longer, reduces cost.
Further, filter screen is connected by the first screw with ecological brick inwall, mode connects for screw cause filter screen with
It is more firm that ecological brick inwall is connected, and is easy to removing and installing for filter screen, is conducive to maintenance to change so that operation is more
Plus it is simple, improve the wastewater treatment efficiency of river channel ecology brick.
It is preferred that after, impurity filtering net is rhombus, and contaminant filter net materials are metal rubber material, and rhombus body is lighter
Just, it is sturdy and durable, and good appearance, also allow for cutting, the impurity filtering net that metal rubber material makes, filter effect compared with
Good, decay resistance is strong, and intensity is larger, and shock resistance preferably, extends the service life of impurity filtering net.
Further, be filled with activated carbon in adsorption layer, the absorption property of activated carbon preferably, can by the Impurity Absorption in water,
Improve the quality that river channel ecology brick purifies sewage, and activated carbon is cheap, and comprehensive cost performance is high, has saved cost.
Further, Biodegradable films are provided with filler bar, Biodegradable films can be by the fast prompt drop of harmful substance in water
Solution, is translated into utility, the water quality after raising processing.
The utility model is by adopting the above-described technical solution, have the advantages that:
1st, the design of steel plate, can prevent that corrosive material is to ecological brick two in water by the first steel plate and the second steel plate
Side causes to damage, and influences the service life of ecological brick, reduces maintenance cost, has saved cost, and can be by steel plate to this
Ecological Wall does further fixation so that Ecological Wall is more stablized;
2nd, the design of clamp, can make it that the contact between steel plate and Ecological Wall is even closer so that whole device it is steady
It is qualitative more preferably to improve the security performance of whole device;
3rd, the design of limited impression and spacing block set, can be conducive to the connection between ecological brick and ecological brick, Er Qiebian
Dismount and utilize in the repetition of ecological brick, it is to avoid the waste of resource, swallow-tailed design, can securely fix whole Ecological Wall,
Ecological brick can be dismantled and reused again, further increase the security performance of whole Ecological Wall so that the water quality after processing
It is higher, and the large carrying capacity of swallow-tailed limited impression and spacing block set, even if current are larger in river course, Ecological Wall also can
It is enough more stable;
4th, the design of observation door is embedded with the right side of ecological brick, the inspection that both can have purified region inner body in order to ecological brick
Look into and repair so that operation is more simple and convenient, can prevent from observing door in order to the connection between ecological brick and ecological brick again
It is directly installed on right flank so that larger space, the quality after influence sewage disposal are produced between ecological brick and ecological brick;
5th, filtering area is removed remaining impurity in water by the filtering of barrier, then by the suction-operated of adsorption layer,
By the small material absorption in water, the quality after sewage disposal is further increased, barrier is by installing in version and ecological brick
Wall is connected, and is easy to the installing/dismounting of barrier, is conducive to it to change, makes it more firm;
6th, degraded area is decomposed the impurity in water by filler bar, so that it becomes utility, and filler bar is resistance to negative
Preferably, service life is longer, reduces cost for lotus impact property, then by the percolation of diafiltration membrane, by the organic matter in water
Deng contaminant filter.
The utility model is simple in construction, practical, passes through the place in choked flow area, sandstone settling zone, filtering area and the area that degrades
Reason, improves water quality, by contaminant filters such as the particles and organic matter in water, and by the design of steel plate, extends Ecological Wall
Service life, prevent corrosion of the current to ecological brick, improve the security performance of whole device, reduce energy consumption and cost,
Improve comprehensive utilization ratio.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is a kind of structural representation of the river channel ecology brick with purification function of the utility model;
Fig. 2 is the structural representation of the 3rd ecological brick in the utility model;
Fig. 3 is the internal structure schematic diagram of the 3rd ecological brick in the utility model;
Fig. 4 is the connection diagram of ecological brick in the utility model.
In figure:1- Ecological Walls;The screws of 2- second;The steel plates of 3- first;The steel plates of 4- second;5- clamps;6- steel cable rope limited posts;
The ecological bricks of 7- first;The ecological bricks of 8- second;The ecological bricks of 9- the 3rd;10- limited impressions;11- spacing block sets;12- impurity filtering nets;
13- observes door;14- hinges;15- choked flows area;16- sandstones settling zone;17- filtering areas;18- degradeds area;19- filter screens;20-
Spoiler;21- stones;22- barriers;23- adsorption layers;24- installing plates;25- filler bars;26- diafiltration membranes;27- is percolated hole;
28- fixed blocks;The screws of 29- first.
Embodiment
As shown in Figures 1 to 4, it is a kind of river channel ecology brick with purification function of the utility model, river channel ecology brick bag
Steel plate, Ecological Wall 1 and steel cable rope are included, Ecological Wall 1 is formed by connecting by ecological brick, steel plate includes the first steel plate 3 and the second steel plate 4,
First steel plate 3 is located on the left surface of Ecological Wall 1, and the second steel plate 4 is located on the right flank of Ecological Wall 1, and the first steel plate 3 passes through card
Plate 5 is connected with the second steel plate 4, and steel cable rope limited post 6, steel cable rope limited post are provided with the first steel plate 3 and the second steel plate 4
Steel cable rope is wound with 6, the design of steel plate can prevent corrosive material pair in water by the first steel plate 3 and the second steel plate 4
Ecological brick both sides cause to damage, and influence the service life of ecological brick, reduce maintenance cost, have saved cost, and can pass through
Steel plate does further fixation to the Ecological Wall 1 so that Ecological Wall 1 is more stablized, and the design of clamp 5 can cause steel plate
Contact between Ecological Wall 1 is even closer so that the stability of whole device more preferably, improves the security of whole device
Can, clamp 5 is connected by the second screw 2 with the first steel plate 3 and the second steel plate 4, because according to the length of different Ecological Walls 1
Need to change suitable clamp 5, so as to the connection of the first steel plate 3 and the second steel plate 4, be more beneficial for the installing/dismounting of clamp 5, just
In the replacing of clamp 5 so that simple operation, the design of steel cable rope limited post 6 can both wind steel cable rope, pass through steel cable rope
Steel plate is fixed with the mode of oblique pull, further strengthens the stability of whole device, can prevent steel cable rope from sliding again, carry
High safe operation performance, ecological brick includes the first ecological brick 7, the second ecological brick 8 and the 3rd ecological brick 9, the first ecological brick 7,
The length of second ecological brick 8 and the 3rd ecological brick 9 is provided with two kinds of specifications, and the first scale lengths are 30mm, and the second specification is long
Spend for 60mm, two kinds of specifications, be easy to ecological brick lower-upper length being designed as different in size, this structure causes Ecological Wall about 1
More firm stable, the bottom of the first ecological brick 7 is provided with limited impression 10, and the top of the second ecological brick 8 sets limited location
Projection 11, the bottom of the 3rd ecological brick 9 is provided with limited impression 10, and the top of the 3rd ecological brick 9 is provided with spacing block set 11, limit
Position groove 10 matches with spacing block set 11, and the design of limited impression 10 and spacing block set 11 can be conducive to ecological brick and life
Connection between state brick, and be easy to the repetition of ecological brick to dismount to utilize, it is to avoid the waste of resource, swallow-tailed design can be with
Whole Ecological Wall 1 is securely fixed, ecological brick can be dismantled and reused again, further increase the peace of whole Ecological Wall 1
Full performance so that the water quality after processing is higher, the shape of limited impression 10 and spacing block set 11 is dovetail shaped, swallow-tailed limit
The large carrying capacity of position groove 10 and spacing block set 11, even if current are larger in river course, Ecological Wall 1 also can be more stable, prolongs
Grow on the service life of Ecological Wall 1, the front end face and rear end face of the first ecological brick 7, the second ecological brick 8 and the 3rd ecological brick 9
Impurity filtering net 12 is provided with, the design of impurity filtering net 12 filters the large granular impurity in water, it is to avoid it blocks ecological
Inside brick, the detergent power of ecological brick is influenceed, the service life of ecological brick is extended, maintenance cost is reduced, impurity filtering net 12 is
Rhombus, the material of impurity filtering net 12 is metal rubber material, and rhombus body is lighter, sturdy and durable, and good appearance,
It is easy to cut, the impurity filtering net 12 that metal rubber material makes, preferably, decay resistance is strong, and intensity is larger for filter effect, resists
Impact property preferably, extends the service life of impurity filtering net 12, the first ecological brick 7, the second ecological brick 8 and the 3rd ecological brick
Observation door 13 is embedded with 9 right flank, observation door 13 is connected by hinge 14 with ecological brick, and the right side of ecological brick is embedded
There is the design of observation door 13, the inspection and maintenance that both can have purified region inner body in order to ecological brick so that operation is more
It is simple and convenient, observation door 13 can be prevented to be directly installed on right flank again so that produced between ecological brick and ecological brick larger
Space, the quality after influence sewage disposal, the material of observation door 13 is stainless steel, the observation door 13 that stainless steel makes, corrosion-resistant
Good, the stable chemical performance of property, good manufacturability is easy to processing to cut out, and later maintenance is simple and convenient, and service life is longer, reduces
Be provided with cost, the first ecological brick 7, the second ecological brick 8 and the 3rd ecological brick 9 choked flow area 15, sandstone settling zone 16,
Filtering area 17 and degraded area 18, between choked flow area 15 and sandstone settling zone 16, between sandstone settling zone 16 and filtering area 17, filtering
Filter screen 19 is provided between area 17 and degraded area 18, filter screen 19 is connected by the first screw 29 with ecological brick inwall
Connect, mode connects for screw causes filter screen 19 is connected with ecological brick inwall more firm, and is easy to the dismounting of filter screen 19
Install, be conducive to maintenance to change so that operation is more simple, improves the wastewater treatment efficiency of river channel ecology brick, choked flow area
Spoiler 20, the barrier effect that choked flow area 15 passes through spoiler 20 so that larger in low water velocities, water are provided with 15
Impurity particle is precipitated, and is filled with sandstone settling zone 16 in stone 21, sandstone settling zone 16, current pass through the sky between stone 21
Clearance flow is dropped down so that the impurity in water is further filtered, and further increases and the He of barrier 22 is provided with water quality, filtering area 17
Adsorption layer 23, barrier 22 is connected by installing plate 24 with the inwall of ecological brick, filtering area 17 by the filtering of barrier 22,
Remaining impurity in water is removed, then by the suction-operated of adsorption layer 23, the small material in water adsorbed, is further improved
Quality after sewage disposal, barrier 22 is connected by installing version with ecological brick inwall, is easy to the installation of barrier 22 to tear open
Unload, be conducive to it to change, make it more firm, be filled with activated carbon in adsorption layer 23, the absorption property of activated carbon preferably, can be by
Impurity Absorption in water, improves the quality that river channel ecology brick purifies sewage, and activated carbon cheap, comprehensive cost performance
Height, has saved in cost, degraded area 18 and has been provided with two filler bars 25 and a diafiltration membrane 26, two filler bars 25 are by solid
Determine block 28 with ecological brick inwall to be connected, Biodegradable films are provided with filler bar 25, Biodegradable films can be by having in water
Evil material fast degradation, is translated into and is provided with least four in utility, the water quality after raising processing, diafiltration membrane 26 and oozes
Filter opening 27, diafiltration membrane 26 is located at the right side of filler bar 25, and degraded area 18 is decomposed the impurity in water by filler bar 25, becomes it
For utility, and the resistance to overload shock better performances of filler bar 25, service life is longer, reduces cost, then by oozing
The percolation of filter membrane 26, by contaminant filters such as the organic matters in water.
Specific embodiment of the utility model is these are only, but technical characteristic of the present utility model is not limited thereto.Appoint
How based on the utility model, to realize essentially identical technique effect, made ground simple change, equivalent substitution or repair
Decorations etc., are all covered by among protection domain of the present utility model.
Claims (8)
1. a kind of river channel ecology brick with purification function, the river channel ecology brick includes steel plate, Ecological Wall and steel cable rope, described
Ecological Wall is formed by connecting by ecological brick, it is characterised in that:The steel plate includes the first steel plate and the second steel plate, first steel plate
On the left surface of the Ecological Wall, second steel plate is located on the right flank of the Ecological Wall, and first steel plate leads to
Cross clamp with second steel plate to be connected, steel cable rope limited post be provided with first steel plate and second steel plate,
The steel cable rope is wound with the steel cable rope limited post, the ecological brick includes the first ecological brick, the second ecological brick and the 3rd
Ecological brick, the bottom of first ecological brick, which is provided with the top of limited impression, second ecological brick, is provided with spacing block set,
The bottom of 3rd ecological brick is provided with the top of the limited impression, the 3rd ecological brick and is provided with the limit convex
Block, the limited impression matches with the spacing block set, first ecological brick, second ecological brick and the three lives
Be provided with impurity filtering net on the front end face and rear end face of state brick, first ecological brick, second ecological brick with it is described
Observation door is embedded with the right flank of 3rd ecological brick, the observation door is connected by hinge with the ecological brick, described
Be provided with first ecological brick, second ecological brick and the 3rd ecological brick choked flow area, sandstone settling zone, filtering area and
Degrade area, between the choked flow area and the sandstone settling zone, between the sandstone settling zone and the filtering area, the filtering
It is provided between area and the degraded area in filter screen, the choked flow area and is provided with spoiler, in the sandstone settling zone
Filled with stone, barrier and adsorption layer are provided with the filtering area, the barrier passes through installing plate and the ecological brick
Inwall be connected, two filler bars and a diafiltration membrane are provided with the degraded area,
Two filler bars are connected by fixed block with the inwall of the ecological brick, are provided with least in the diafiltration membrane
Four diafiltration holes, the diafiltration membrane is located at the right side of the filler bar.
2. a kind of river channel ecology brick with purification function according to claim 1, it is characterised in that:The clamp passes through
Second screw is connected with first steel plate and second steel plate.
3. a kind of river channel ecology brick with purification function according to claim 1, it is characterised in that:The limited impression
Shape with the spacing block set is dovetail shaped.
4. a kind of river channel ecology brick with purification function according to claim 1, it is characterised in that:The observation door
Material is stainless steel.
5. a kind of river channel ecology brick with purification function according to claim 1, it is characterised in that:The filter screen
It is connected by the first screw with the ecological brick inwall.
6. a kind of river channel ecology brick with purification function according to claim 1, it is characterised in that:The contaminant filter
Net is rhombus, and the contaminant filter net materials are metal rubber material.
7. a kind of river channel ecology brick with purification function according to claim 1, it is characterised in that:In the adsorption layer
Filled with activated carbon.
8. a kind of river channel ecology brick with purification function according to claim 1, it is characterised in that:On the filler bar
It is provided with Biodegradable films.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621164693.9U CN206375778U (en) | 2016-11-01 | 2016-11-01 | A kind of river channel ecology brick with purification function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621164693.9U CN206375778U (en) | 2016-11-01 | 2016-11-01 | A kind of river channel ecology brick with purification function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206375778U true CN206375778U (en) | 2017-08-04 |
Family
ID=59402530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621164693.9U Expired - Fee Related CN206375778U (en) | 2016-11-01 | 2016-11-01 | A kind of river channel ecology brick with purification function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206375778U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024479A (en) * | 2018-07-24 | 2018-12-18 | 上海海洋大学 | Structure, manufacture craft and the seashore wetland landforms of Wetland ecological brick regulate and control method |
-
2016
- 2016-11-01 CN CN201621164693.9U patent/CN206375778U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024479A (en) * | 2018-07-24 | 2018-12-18 | 上海海洋大学 | Structure, manufacture craft and the seashore wetland landforms of Wetland ecological brick regulate and control method |
CN109024479B (en) * | 2018-07-24 | 2020-08-18 | 上海海洋大学 | Manufacturing process of wetland ecological brick and coastal wetland landform regulation and control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211435304U (en) | Sewer filter equipment for environmental protection | |
CN206375778U (en) | A kind of river channel ecology brick with purification function | |
CN209835838U (en) | Efficient wastewater treatment and recovery device for corrugated paper production | |
CN107724357A (en) | The method for salvaging treatment tank scum silica frost | |
CN111718036A (en) | Domestic sewage environmental protection purifies preliminary treatment pond | |
CN111732215A (en) | Environment-friendly sewage separation processing apparatus | |
CN207553064U (en) | A kind of rapid cleaning device for river surface rubbish | |
CN215480219U (en) | Underground water circulating well system with repair equipment | |
CN214693574U (en) | Urban sewage treatment filter device with anti-blocking function | |
CN205087963U (en) | Purifier of phosphate radical in modified vermiculite absorption sewage | |
CN210825870U (en) | A purify protective screen for river regulation | |
CN213994939U (en) | Environment-friendly sewage filtration equipment | |
CN213407846U (en) | Domestic sewage filter equipment for boats and ships | |
CN210127143U (en) | A multistage adsorption purification device for river course waste water | |
CN206736030U (en) | The cleaning system in restoration of the ecosystem river course | |
CN217580361U (en) | Hydraulic engineering desilting device | |
CN213032037U (en) | Preliminary filtering mechanism for sewage treatment | |
CN220811997U (en) | Sewage treatment recovery unit | |
CN219440816U (en) | Domestic sewage quick purification device | |
CN216837469U (en) | Domestic sewage denitrification treatment device | |
CN203729431U (en) | Flotage and sediment separation and filtration integrated machine for rainwater pipe network | |
CN210766990U (en) | Rainwater collecting and purifying device | |
CN215250171U (en) | Ecological rural sewage treatment plant | |
CN214167515U (en) | Sewage recovery processor | |
CN213803439U (en) | Septic tank for preventing water outlet from being blocked |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170804 Termination date: 20181101 |
|
CF01 | Termination of patent right due to non-payment of annual fee |