CN206359990U CN201621462923.XU CN201621462923U CN206359990U CN 206359990 U CN206359990 U CN 206359990U CN 201621462923 U CN201621462923 U CN 201621462923U CN 206359990 U CN206359990 U CN 206359990U
Authority
CN
China
Prior art keywords
dam
dam body
poured
water level
retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621462923.XU
Other languages
Chinese (zh)
Inventor
汪振
周廷清
郎玲芳
汤暘
田建海
邵卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201621462923.XU priority Critical patent/CN206359990U/en
Application granted granted Critical
Publication of CN206359990U publication Critical patent/CN206359990U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is related to a kind of for reducing the structure of dam body water level during rock panel is poured to retaining.The purpose of this utility model be to provide it is a kind of be used for reduce the structure of dam body water level during rock panel is poured to retaining, can it is simpler, it is safe reduction dam body water level so that safer during concrete slab is poured to retaining.The technical solution of the utility model is:It is a kind of to be used to reduce the structure of dam body water level during rock panel is poured to retaining, dam body including rock, the concrete slab for being laid on upstream dam slope, the toe board for being arranged in panel bottom periphery, and it is arranged on the water stop at the dam slope toe of downstream, it is characterised in that:The dam slope of the water stop upstream side is provided with several draining shafts, and draining shaft has the immersible pump for being placed in shaft bottom and leads to the drainpipe in the outer downstream of well.CFRD of the utility model suitable for Hydraulic and Hydro-Power Engineering.

Description

Structure for reducing dam body water level during rock panel is poured to retaining
Technical field
The utility model is related to a kind of for reducing the structure of dam body water level during rock panel is poured to retaining. CFRD suitable for Hydraulic and Hydro-Power Engineering.
Background technology
CFRD is generally concrete slab, bedding material area, Transition Materials area, main enrockment from upstream to downstream Area and secondary rockfill area.In the panel concrete casting and constructing phase by external environment influence, dam body water level inside is raised, once water level mistake Reverse water pressure inside height, dam body can safely cause harm to concrete slab, generally require to reduce dam body using engineering measure Water level inside.
Dam body inside reverse water pressure during panel concrete is poured to retaining is eliminated at present, and conventional method is by toe Plate or panel reserve reverse drainage hole, and the later stage is blocked again, and rapid retaining, backfill ballast etc. are needed after closure;And these methods Very high is required to later stage plugging construction quality, construction organization, it is careless slightly to be all likely to result in potential safety hazard.Therefore, how more Simply, safe reduction dam body water level, is designer's urgent problem.
The content of the invention
The technical problems to be solved in the utility model is:It is used to reduce panel there is provided one kind for above-mentioned problem The structure of dam body water level during face-plate of rockfill dam is poured to retaining, simpler, safe can reduce dam body water level, so that coagulation Native panel is safer during pouring to retaining.
The technical scheme that the utility model is used is:One kind is used to reducing during rock panel poured to retaining The structure of dam body water level, including rock dam body, be laid on the concrete slab of upstream dam slope, be arranged in panel bottom The toe board on periphery, and it is arranged on the water stop at the dam slope toe of downstream, it is characterised in that:The dam slope of the water stop upstream side Several draining shafts are provided with, draining shaft has the immersible pump for being placed in shaft bottom and leads to the drainpipe in the outer downstream of well.
Draining shaft steel pipe pre-buried when being dam embankment is the hole being drilled with after the completion of dam embankment, directly Footpath is 400~1000mm.
The tube wall of the steel pipe is the floral tube pattern provided with water seepage hole.
The steel pipe surrounding and draining shaft shaft bottom set filter protection material.
The beneficial effects of the utility model are:The utility model is used sets draining to erect in rock downstream dam slope Well, and the normal operation input before concrete slab is poured, are seeped water using draining shaft pump drainage dam body, are reduced dam body water level, are kept away Exempt from dam body reverse water pressure to cause harm to concrete slab, processing method construction very simple, without in toe board or panel part The reserved osculum in position, to toe board, panel without damage, also without retaining or backfill ballast time requirement anxiety etc. before later stage closure, dam Problem, economic input is also less.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model CFRD.
Fig. 2 is draining shaft structural representation in the utility model.
Embodiment
As shown in Figure 1 and Figure 2, the present embodiment is poured to the retaining phase to be a kind of for reducing Face Slab of Concrete-faced Rockfill Between dam body water level structure, including rock dam body 1, be laid on the concrete slab 2 of upstream dam slope, be arranged in panel The toe board 3 of bottom periphery, and the water stop 7 at the dam slope toe of downstream is arranged on, the upstream side of water stop 7 sets several (roots Determined according to dam body infiltration flow) draining shaft 6, after draining shaft is formed, immersible pump 601 is placed in shaft bottom, and dam body is seeped water Using the pump drainage of drainpipe 602 to dam downstream, to reduce the water level of dam body 1, it is to avoid the reverse water pressure 8 in dam body 1 is to concrete slab 2 Cause harm, the pump drainage of draining shaft 6 work should before concrete slab 2 is poured normal operation input.
In the present embodiment, draining shaft 6 can be the steel pipe 605 pre-buried in dam embankment, or dam embankment complete Drilling is formed afterwards.The diameter of steel pipe 605 is preferably in 400mm~1000mm, and steel pipe 605 uses floral tube form, i.e. tube wall to set water seepage hole 604;The embedded surrounding of steel pipe 605 of draining shaft 6 should fill material according to dam body 1, it is determined whether need to set filter protection material Material 603;The bottom plate of draining shaft 6 typically places immersible pump 601, should also set anti-in shaft bottom for the dam foundation 5 for alluvial deposit foundation Filter protection materials 603.Draining shaft 6 pump drainage work should before concrete slab 2 is poured normal operation input, dam body 1 is oozed Water conservancy immersible pump 601, by the pump drainage of drainpipe 602 to the downstream of water stop 7, to reduce the water level of dam body 1, it is to avoid reverse water pressure 8 Concrete slab 2 is caused to produce destruction.Draining shaft 6 is after the normal retaining of dam is completed, and draining shaft 6 can be backfilled with rock ballast and sealed It is stifled, it can also retain.
Certainly, described above is not limitation of the utility model, and the utility model is also not limited to the example above, this skill The those of ordinary skill in art field, in the range of the utility model, the change made, changes addition or replaces, should belong to this The protection domain of utility model.

Claims (4)

1. a kind of be used to reduce the structure of dam body water level during rock panel is poured to retaining, including rock Dam body (1), the concrete slab (2) for being laid on upstream dam slope, the toe board (3) of panel bottom periphery is arranged in, and be arranged on Water stop (7) at the dam slope toe of downstream, it is characterised in that:The dam slope of water stop (7) upstream side is arranged provided with several Water vertical shaft (6), draining shaft has the immersible pump (601) for being placed in shaft bottom and leads to the drainpipe (602) in the outer downstream of well.
2. it is according to claim 1 a kind of for reducing the knot of dam body water level during rock panel is poured to retaining Structure, it is characterised in that:The draining shaft (6) steel pipe (605) pre-buried when being dam embankment or after the completion of being dam embankment The hole being drilled with, a diameter of 400~1000mm.
3. it is according to claim 2 a kind of for reducing the knot of dam body water level during rock panel is poured to retaining Structure, it is characterised in that:The tube wall of the steel pipe (605) is the floral tube pattern provided with water seepage hole (604).
4. it is according to claim 2 a kind of for reducing the knot of dam body water level during rock panel is poured to retaining Structure, it is characterised in that:Steel pipe (605) surrounding and draining shaft (6) shaft bottom set filter protection material (603).
CN201621462923.XU 2016-12-29 2016-12-29 Structure for reducing dam body water level during rock panel is poured to retaining Active CN206359990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621462923.XU CN206359990U (en) 2016-12-29 2016-12-29 Structure for reducing dam body water level during rock panel is poured to retaining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621462923.XU CN206359990U (en) 2016-12-29 2016-12-29 Structure for reducing dam body water level during rock panel is poured to retaining

Publications (1)

Publication Number Publication Date
CN206359990U true CN206359990U (en) 2017-07-28

Family

ID=59377480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621462923.XU Active CN206359990U (en) 2016-12-29 2016-12-29 Structure for reducing dam body water level during rock panel is poured to retaining

Country Status (1)

Country Link
CN (1) CN206359990U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295576A (en) * 2019-07-22 2019-10-01 长江勘测规划设计研究有限责任公司 Improve the concrete face rockfill dam of stress and deformations of concrete face slab state

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295576A (en) * 2019-07-22 2019-10-01 长江勘测规划设计研究有限责任公司 Improve the concrete face rockfill dam of stress and deformations of concrete face slab state
CN110295576B (en) * 2019-07-22 2024-04-12 长江勘测规划设计研究有限责任公司 Concrete face rockfill dam for improving face stress deformation state

Similar Documents

Publication Publication Date Title
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN103343543B (en) Foundation pit dewatering well pressure-reduction-type plugging method
CN101200895B (en) Method for repairing damage of underwater concrete panel slope protector
CN101245886B (en) Processing method for deep building pit piping
CN107761753A (en) A kind of foundation ditch water burst rapid rescue slip casting method for blocking
CN202809665U (en) Blocking device for relief well of micro artesian water in foundation pit
CN202194148U (en) Waterproof curtain
CN104895118A (en) Underground diaphragm wall internal corner position piping plug structure and grouting processing method thereof
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN204491646U (en) A kind of high water level area fender body device for plugging
CN107217683A (en) A kind of drainage pipeline basis filling anti-collapse structure of antiseepage and its construction method
CN103643690A (en) Deep foundation pit exploration hole water burst treatment method
CN105569062A (en) Dewatering method implemented through permeation, weakening and emission reduction
CN109930614B (en) Nondestructive construction method for deep foundation pit tube well operation closed bottom plate structure
CN104452664B (en) Reduction by Drainage kill-job renovation technique
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN206359990U (en) Structure for reducing dam body water level during rock panel is poured to retaining
CN103343534A (en) Closed precipitation method for foundation pit construction
CN206784415U (en) Piping in foundation pit fast plugging device
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN206220101U (en) A kind of support reinforcement structure of deep basal pit
CN105201009B (en) Tower foundation negative-pressure construction method for river channel
CN204252148U (en) High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure
CN103174154A (en) Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device
CN110258660A (en) The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant