CN206351261U - Borehole drill construction and rig - Google Patents

Borehole drill construction and rig Download PDF

Info

Publication number
CN206351261U
CN206351261U CN201621367156.4U CN201621367156U CN206351261U CN 206351261 U CN206351261 U CN 206351261U CN 201621367156 U CN201621367156 U CN 201621367156U CN 206351261 U CN206351261 U CN 206351261U
Authority
CN
China
Prior art keywords
drill
workpiece
machined
borehole
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621367156.4U
Other languages
Chinese (zh)
Inventor
冯明
张应江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Science And Technology Co Ltd
Original Assignee
Chengdu Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Science And Technology Co Ltd filed Critical Chengdu Science And Technology Co Ltd
Priority to CN201621367156.4U priority Critical patent/CN206351261U/en
Application granted granted Critical
Publication of CN206351261U publication Critical patent/CN206351261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model provides a kind of borehole drill construction and rig, is related to the technical field of mould processing.A kind of borehole drill construction, for processing hole respectively on multiple faces of workpiece to be machined, the borehole drill construction includes clamp body and multiple drills;The clamp body is to clamp workpiece to be machined;The each face for processing hole is needed at least to correspond to a drill on the workpiece to be machined, the drill is used to process hole on the corresponding face.During processing hole respectively on multiple faces of workpiece to be machined, workpiece to be machined is fixed in clamp body all the time, without being taken down, and turn-over is processed again, so that when having reached batch machining workpiece, the consistent effect in hole on workpiece.

Description

Borehole drill construction and rig
Technical field
The utility model is related to mold machining technology field, more particularly, to a kind of borehole drill construction and rig.
Background technology
Rig refers to the main device for processing hole on workpiece with cutter.Usual cutter rotates to be main motion, cutter shaft To mobile for feed motion.Rig is simple in construction, and machining accuracy is relatively low, can holes drilled through, blind hole, the special knife of replacing Tool, can expand, spot-facing, fraising or carry out the processing such as tapping.
During being processed using rig to workpiece, workpiece is motionless, allows cutter to move, by center cutter alignment hole Center, and rotate cutter.The characteristics of rig is that workpiece is fixed, and cutter rotates, and enters along major axes orientation Give, the operation to cutter can be manual or motor-driven.
Existing workpiece is frequently necessary to process the angle for having 90 degree between multiple holes, such as two holes, due to existing Rig is relatively simple for structure, can there is problems with process:On the one hand, a hole, work can only be processed every time Make efficiency bottom, production cost is high;On the other hand, first retaining element, processes behind a hole, removes workpiece and fix again, then adds Another hole of work, repeatedly fixes and would become hard to what the position for ensureing hole on each part was just as, so as to cause after batch production Workpiece uniformity it is poor.
Utility model content
The purpose of this utility model is to provide a kind of hole structure and rig, made with solving existing rig During, a hole can only be processed every time, and operating efficiency bottom, production cost is high;Wanting another hole of processing needs to remove work Part is fixed again, is repeatedly fixed and be would become hard to what the position for ensureing hole on each part was just as, so as to cause after batch production Workpiece uniformity difference technical problem.
The borehole drill construction that the utility model is provided, for processing hole, the brill respectively on multiple faces of workpiece to be machined Holes mechanism includes clamp body and multiple drills;The clamp body is to clamp workpiece to be machined;
The each face for processing hole is needed at least to correspond to a drill on the workpiece to be machined, the drill is used for Hole is processed on the corresponding face.
Further, the drill includes drill bit and motor, and the motor is used to drive the drill bit to rotate.
Further, the quantity of the motor is one, and the quantity of the drill bit is multiple, and the drill also includes Main shaft, the main shaft is connected with multiple drill bits by gear assembly, so that the motor drives the multiple drill bit by main shaft Rotate.
Further, the quantity for needing to process the corresponding drill in each face in hole on workpiece to be machined is multiple.
Further, the number of the drill is two, and described two drill angles are 90 degree.
Further, the workpiece to be machined includes multiple clamping faces, and the clamp body includes multiple fixture blocks, the clamping The quantity of face and fixture block is corresponded, and the multiple fixture block clamps the clamping face, for fixing the workpiece to be machined.
Further, the fixture block covers and is provided with drilling on the clamping face, the fixture block, so that the drill Drill bit is punched after passing through the drilling to workpiece to be machined.
Further, it is provided with drill bushing in the drilling.
Further, the drill also includes drive device, and the drive device is used to drive the drill to quilt Process workpiece motion s.
The rig that the utility model is provided, including above-mentioned borehole drill construction.
The borehole drill construction that the utility model is provided, for processing hole, the brill respectively on multiple faces of workpiece to be machined Holes mechanism includes needing each face for processing hole at least to correspond to one on clamp body and multiple drills, and the workpiece to be machined Drill, the drill is used to process hole on the corresponding face.In workpiece process, clamp body is to press from both sides Tight workpiece to be machined, so that workpiece to be processed is fixed in clamp body.Each drill on the workpiece to be machined with needing The face correspondence of processing, after drill starts, can be punched on its corresponding face to be punctured, so as to reach whole In drill process, user only needs to fix a workpiece to be processed, it is possible to the technology punched thereon on multiple faces Effect, not only increases the efficiency of work pieces process, and improves the uniformity of batch production workpiece.
The rig that the utility model is provided, including above-mentioned borehole drill construction, in multiple faces of workpiece to be machined Process respectively in hole, whole drill process, user only needs to fix a workpiece to be processed, it is possible on multiple faces thereon The technique effect punched, not only increases the efficiency of work pieces process, and improves the uniformity of batch production workpiece.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
The schematic diagram for the borehole drill construction that Fig. 1 provides for the utility model embodiment;
Front view on the borehole drill construction that Fig. 2 provides for the utility model embodiment at bit location;
The schematic diagram for the borehole drill construction upper fixture body that Fig. 3 provides for the utility model embodiment;
The sectional view of first fixture block on the borehole drill construction that Fig. 4 provides for the utility model embodiment.
Icon:100- clamp bodies;The fixture blocks of 101- first;The fixture blocks of 102- second;The fixture blocks of 103- the 3rd;200- drills; 201- drill bits;300- drill bushings.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described Embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on the embodiment in the utility model, sheet The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation or position relationship of the instruction such as " level ", " interior ", " outer " are, based on orientation shown in the drawings or position relationship, to be only Described for the ease of description the utility model and simplifying, rather than to indicate or imply that signified device or element must have specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in the utility model.
The schematic diagram for the borehole drill construction that Fig. 1 provides for the utility model embodiment;Fig. 2 provides for the utility model embodiment Borehole drill construction on front view at bit location, as shown in Fig. 1 and Fig. 2, the borehole drill construction that the utility model is provided is used for Process hole respectively on multiple faces of workpiece to be machined, the borehole drill construction includes clamp body 100 and multiple drills 200, institute Stating needs each face for processing hole at least to correspond to a drill 200 on workpiece to be machined.In workpiece process, clamp body 100 to clamp workpiece to be machined, so that workpiece to be processed is fixed in clamp body 100.Each drill 200 and the quilt The face correspondence of processing is needed on processing workpiece, after drill 200 starts, can be beaten on its corresponding face to be punctured Hole, so as to reach in whole drill process, user only needs to fix a workpiece to be processed, it is possible in multiple faces thereon The upper technique effect punched, not only increases the efficiency of work pieces process, and improves the uniformity of batch production workpiece.
The drill 200 includes drill bit 201 and motor, and the motor is used to drive the drill bit 201 to rotate.In drilling During mechanism is drilled, workpiece to be machined is fixed in clamp body 100, face to be processed and the drilling of workpiece to be machined Device 200 is corresponding, starts after motor, drives drill bit 201 to rotate after motor work, so as to complete to treat the drillman of machined surface Make.
Preferably, the quantity of motor is one, and the quantity of the drill bit 201 is multiple.According to the actual requirements, what is had is added Work workpiece needs to process multiple holes on a face to be processed simultaneously, and this is accomplished by a drill 200 including multiple drill bits 201, at this moment the quantity of motor can be one.Drill 200 also includes main shaft, and the main shaft passes through tooth with multiple drill bits 201 Wheel connection, so that the rotary electric machine drives the multiple drill bit 201 to rotate by main shaft, so as to reach each drill Multiple drill bits 201 on 200 carry out boring work under the drive of same motor, and the harmony of drill 200 is good, and accurate Degree is high.
The quantity of drill bit 201 and motor is multiple.According to the actual requirements, some workpieces to be machined need to treat at one simultaneously Multiple holes are processed on machined surface, this is accomplished by a drill 200 including multiple drill bits 201, and at this moment the quantity of motor can be with To be multiple, and corresponded with the quantity of drill bit 201.Each drill bit 201 with a relatively independent motor connection.Namely Say, in a drill 200, each motor drives corresponding drill bit 201 to be punched, although the brill on the drill 200 First 201 be all that boring work is carried out to a face to be processed, but because each drill bit 201 is respectively by different motor controls System, so that the depth portalled of processing or angle relative to face to be processed can be different, has reached the borehole drill construction It is adapted to the effect of more workpieces to be machined.
The drill bit 201 can be fluted drill, and fluted drill is to be relatively fixed the rotary cutting of axis by it with drilling work The instrument of the circular hole of part.Fluted drill includes helicla flute, and the helicla flute can be 2 grooves, 3 grooves or more groove.The material of drill bit 201 can Think high-speed tool steel or hard alloy.
The drill 200 also include drive device, the drive device be used for drive the drill 200 to be processed Workpiece motion s.During borehole drill construction is drilled, workpiece to be machined is fixed in clamp body 100, workpiece to be machined Face to be processed it is corresponding with drill 200.First, start motor, drive drill bit 201 to rotate after motor work;Then, drive Device starts, and drive device drives corresponding drill 200 to be moved along a straight line to face to be processed, so as to complete to treat machined surface Boring work.The whole process of work pieces process does not need the manually operated drill 200 of user, fully automatic working, Ke Yiji Big raising operating efficiency, and workpiece uniformity is higher compared to manual processing.
The drive device includes travel switch, and the travel switch is used for the depth for limiting the drilling of drill 200.Specifically Ground, when being drilled to workpiece to be machined, it is sometimes desirable to which workpiece is punched, but can not damage other structures again, this when Waiting needs to adjust the limited length for forming switch, so that the depth that drill 200 is punched is exactly equal to the thickness of workpiece.Work as brill When hole device 200 just punches workpiece to be machined, travel switch starts, and drill 200 no longer travels forward, but counter motion, From just by out, this completes once punch in punched hole.
The drive device can be cylinder, and the cylinder is used to drive the drill 200 to move to workpiece to be machined, So as to complete boring work.The principle of cylinder is simple, it is easy to installs and safeguards, for the less demanding of user;While cylinder High power output, is adapted to variety classes hardness workpiece to be machined;The strong adaptability of cylinder, can be in high temperature and low temperature environment Normal work and with dust-proof, waterproof ability, is suitable for various rugged environments.
Specifically, the number of the drill 200 is two, and the angle of described two drills 200 is 90 degree.In mould In process, situation about being punched on two faces mutually in 90 degree of mould is frequently encountered.For example, Fig. 2 is to be processed straight Gusset schematic diagram, as shown in Fig. 2 two faces of L-square need to be connected with other workpiece by screw, is so accomplished by this The hole in 90 degree is processed on two faces.So the position of two drills 200 is set into 90 degree of angles, drilled in mould During, firstly, it is necessary to which L-square is fixed on clamp body 100, then start drill 200, drill 200 is transported forward It is dynamic, drilled respectively on two faces of L-square, complete the processing of mould, whole process, user only needs to put workpiece Enter clamp body 100, then avoid the need for have adjusted doing others, wait work pieces process to finish, other work is carried out after removing Part is processed.User is simple to operate, and batch production is quick, and mould processing uniformity is high.
Multiple institutes of drill 200 are angled to be not limited to 90 degree, and the face institute angulation drilled can be needed according to workpiece to be machined Degree setting.In workpiece process, it is only necessary to which each drill 200 is with needing a face of processing on the workpiece to be machined Correspondence just can be with, after drill 200 starts, can be punched on its corresponding face to be punctured, so as to reach entirely In drill process, user only needs to fix a workpiece to be processed, it is possible to the technology punched thereon on multiple faces Effect, not only increases the efficiency of work pieces process, and improves the uniformity of batch production workpiece.
Workpiece to be machined includes multiple clamping faces, and the clamp body 100 includes multiple fixture blocks, the clamping face and fixture block Quantity is corresponded, and when needing to be processed workpiece, workpiece to be machined is placed between multiple fixture blocks, adjusts multiple fixture blocks Position, fixture block can be made to clamp the clamping face, so as to reach the purpose of fixed workpiece to be machined.
Preferably, the fixture block covers the clamping face, that is to say, that fixture block clamping face corresponding with workpiece to be machined is tight The area in the face of patch, which is more than or equal on the surface area in corresponding clamping face, the fixture block, is provided with drilling, so that the drill 200 drill bit 201 is punched after passing through the drilling to workpiece to be machined.Workpiece to be machined, and fixture block are clamped by fixture block The clamping face of covering, can make workpiece in process, will not occur because of the drilling action of drill 200 along drill 200 The deformation of direction of advance.In mold pressing process, workpiece to be machined is placed in clamp body 100 and clamped, on fixture block Corresponding drilling with the default processing hole of workpiece to be machined point-blank so that the drill bit 201 of drill 200 passes through institute Drilling is stated, position corresponding in workpiece to be machined is beaten, the processing of mould is completed.
Specifically, the schematic diagram for the borehole drill construction upper fixture body that Fig. 3 provides for the utility model embodiment, as shown in figure 3, Clamp body 100 includes the first fixture block 101, the second fixture block 102 and the 3rd fixture block 103, and the first fixture block 101 and the second fixture block 102 are in 90 degree of settings, and are provided with drilling, the one end of the 3rd fixture block 103 is provided with cylinder, when workpiece to be machined is placed on first When between fixture block 101, the second fixture block 102 and the 3rd fixture block 103, the 3rd fixture block 103 is for linear motion in the presence of cylinder, Workpiece to be machined is promoted to the first fixture block 101 and the direction of the second fixture block 102, until being fixed in clamp body 100.
The sectional view of the first fixture block is as shown in figure 4, the brill on the borehole drill construction that Fig. 4 provides for the utility model embodiment Drill bushing 300 is provided with hole.The main function of drill bushing 300 is the feeding direction of the position dimension and guiding cutter that control cutter, Meeting its processing hole has the technical requirements drilled on higher form and position tolerance and inclined-plane, curved surface.When processing workpiece on borehole drill construction When the positioning precision of clamp body 100 is undesirable, it can deliberately change the offset of main shaft by drill bushing 300 to reach processing hole site The technical requirements of degree.In addition, drill bushing 300, which can also play the mistake proofing checking of diameter tool, i.e. production line operation work, is replacing drill bit 201 or reamer cutter before, new cutter is inserted toward inside the hole of drill bushing 300, verifies whether it can pass through, makes tool diameter overproof Risk controlled.
In summary, the borehole drill construction that the utility model is provided, for being processed respectively on multiple faces of workpiece to be machined Hole, the borehole drill construction includes clamp body 100 and multiple drills 200.Clamp body 100 can cover workpiece to be machined completely Lid, so as to ensure in process, workpiece is not allowed to be also easy to produce deformation.In workpiece process, clamp body 100 is to clamp quilt Workpiece is processed, so that workpiece to be processed is fixed in clamp body 100.Each drill 200 on the workpiece to be machined with needing The face to be processed correspondence, after drill 200 starts, can be punched, so as to reach on its corresponding face to be punctured In whole drill process, user only needs to fix a workpiece to be processed, it is possible to punched thereon on multiple faces Technique effect, not only increase the efficiency of work pieces process, and improve batch production workpiece uniformity.
The utility model additionally provides a kind of rig, including above-mentioned borehole drill construction.For in many of workpiece to be machined Hole is processed respectively on individual face.
Rig also includes fuselage, and the fuselage is processed using thicker quality steel plate, provided for whole equipment Preferable rigidity and shock resistance, reduce the risk that whole system becomes unstable because of deformation.
The fuselage surface sets matcoveredn, and the material of the protective layer is crome metal, can play the effect of antirust.
The rig includes reduction box, and reduction box uses synchronous pulley and toothed belt transmission, and noise is small, generates heat low, It is difficult to lose step, skidding, improves the stability of dynamical system, different drillings can be adapted to by adjusting synchronous pulley and are turned Speed.
The rig includes control unit, and the time control unit is connected with hole structure, described for controlling Borehole drill construction is turned on or off.Specifically, for example, being provided with two drills 200 on the rig, two bench drill holes Device 200 is connected with control unit, when the rig works, by regulation unit, can make two drills 200 are punched to workpiece to be machined direction simultaneously.Or, one in two drills 200 is first drilled, after another Drilled.User according to the actual conditions of workpiece to be machined, can select the running status of two drills 200.
The rig includes air nozzle, and the air nozzle is fixed on fuselage, after the air nozzle is opened, Compressed air can be blown away towards the direction of the workpiece to be machined on clamp body 100.Because the process drilled using drilling machine In can produce substantial amounts of metal fragment, if this part chip is gathered on clamp body 100, can under the influence of a workpiece positioning And clamping.So, it is required for starting air nozzle after every time drilling to workpiece, chip is blown away from clamp body 100, So as to ensure the cleannes of fuselage.
Finally it should be noted that:Various embodiments above is only limited to illustrate the technical solution of the utility model, rather than to it System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, or to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type.

Claims (10)

1. a kind of borehole drill construction, for processing hole respectively on multiple faces of workpiece to be machined, it is characterised in that the drilling machine Structure includes clamp body and multiple drills;The clamp body is to clamp workpiece to be machined;
Needed on the workpiece to be machined process hole each face at least correspond to a drill, the drill be used for its Hole is processed on the corresponding face.
2. borehole drill construction according to claim 1, it is characterised in that the drill includes drill bit and motor, the electricity Machine is used to drive the drill bit to rotate.
3. borehole drill construction according to claim 2, it is characterised in that the quantity of the motor is one, the drill bit Quantity is multiple, and the drill also includes main shaft, and the main shaft is connected with multiple drill bits by gear assembly, so that described Motor drives the multiple drill bit to rotate by main shaft.
4. borehole drill construction according to claim 2, it is characterised in that need to process each facing for hole on workpiece to be machined The quantity for the drill answered is multiple.
5. borehole drill construction according to claim 2, it is characterised in that the number of the drill is two, and described two Individual drill angle is 90 degree.
6. borehole drill construction according to claim 3, it is characterised in that the workpiece to be machined includes multiple clamping faces, institute Clamp body is stated including multiple fixture blocks, the quantity of the clamping face and fixture block is corresponded, the multiple fixture block is by the clamping face Clamp, for fixing the workpiece to be machined.
7. borehole drill construction according to claim 6, it is characterised in that the fixture block covers the clamping face, the fixture block On be provided with drilling so that the drill bit of the drill pass through the drilling after workpiece to be machined is punched.
8. borehole drill construction according to claim 7, it is characterised in that be provided with drill bushing in the drilling.
9. borehole drill construction according to claim 1, it is characterised in that the drill also includes drive device, the drive Dynamic device is used to drive the drill to move to workpiece to be machined.
10. a kind of rig, it is characterised in that including:Any one of the claim 1-9 borehole drill constructions.
CN201621367156.4U 2016-12-13 2016-12-13 Borehole drill construction and rig Expired - Fee Related CN206351261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621367156.4U CN206351261U (en) 2016-12-13 2016-12-13 Borehole drill construction and rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621367156.4U CN206351261U (en) 2016-12-13 2016-12-13 Borehole drill construction and rig

Publications (1)

Publication Number Publication Date
CN206351261U true CN206351261U (en) 2017-07-25

Family

ID=59348083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621367156.4U Expired - Fee Related CN206351261U (en) 2016-12-13 2016-12-13 Borehole drill construction and rig

Country Status (1)

Country Link
CN (1) CN206351261U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107695377A (en) * 2017-10-26 2018-02-16 绍兴市雅克汽配有限公司 A kind of high pressure distributes sleeve special plane
CN108422232A (en) * 2018-06-08 2018-08-21 新兴移山(天津)重工有限公司 A kind of fixing device for plate punching

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107695377A (en) * 2017-10-26 2018-02-16 绍兴市雅克汽配有限公司 A kind of high pressure distributes sleeve special plane
CN108422232A (en) * 2018-06-08 2018-08-21 新兴移山(天津)重工有限公司 A kind of fixing device for plate punching

Similar Documents

Publication Publication Date Title
CN201095006Y (en) Intermittent micro-feed tiny pore drilling machine
CN202952047U (en) Drilling and tapping integrated machine
CN201223974Y (en) Automatic broacher
CN206351261U (en) Borehole drill construction and rig
CN209110543U (en) A kind of system window is bored with simple corner brace and attacks cutting all-in-one machine
CN206351262U (en) Rig and equipments machining die
CN202963555U (en) Drill jig of synchronizing sliding sleeve plunger chip
KR101023150B1 (en) Processing head for automatic deburring machine
CN218656913U (en) Ultrasonic drilling device suitable for machining ectopic holes of turbocharger shell
CN105108496B (en) Micro- brill automatic processing center
CN106475587A (en) Rig and equipments machining die
CN208132066U (en) A kind of milling machine adjustable type cutterhead
CN203380391U (en) Automatic drilling machine
CN105798615A (en) Drilling system of multifunctional automatic machining all-in-one machine
CN215146620U (en) Tapping device for producing prestressed anchorage device
CN109746681A (en) A kind of electric vehicle hub porous tapping machine
CN107876813A (en) A kind of double drilling machine
CN208409131U (en) A kind of multi-axis numerical control drilling and tapping machine tool
CN207747166U (en) A kind of milling of cutting of the mounting of calligraphy and painting the thick end of the scroll earth's axis bores three and uses integrally forming machine
CN218109399U (en) Adjustable multi-spindle drilling machine of efficient multistation
CN212652713U (en) Novel drilling equipment
CN202963519U (en) Machine tool with adjustable depth of drilling hole
CN211332138U (en) Special machine for drilling spark plug at counter sinking air inlet
CN211889894U (en) Conveniently adjusted workbench for drilling, milling and tapping machine tool
CN218362484U (en) Positive and negative chamfering PCD drilling reamer and auxiliary device for drilling processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170725

Termination date: 20171213

CF01 Termination of patent right due to non-payment of annual fee