CN206346081U - 1 point of CP installation aiding device in a kind of tunnel of utilization injected hole - Google Patents

1 point of CP installation aiding device in a kind of tunnel of utilization injected hole Download PDF

Info

Publication number
CN206346081U
CN206346081U CN201621425313.2U CN201621425313U CN206346081U CN 206346081 U CN206346081 U CN 206346081U CN 201621425313 U CN201621425313 U CN 201621425313U CN 206346081 U CN206346081 U CN 206346081U
Authority
CN
China
Prior art keywords
hole
screw
injected hole
mark post
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621425313.2U
Other languages
Chinese (zh)
Inventor
周理含
周金全
周良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Original Assignee
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Geotechnical Investigations and Design Institute Co Ltd filed Critical Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority to CN201621425313.2U priority Critical patent/CN206346081U/en
Application granted granted Critical
Publication of CN206346081U publication Critical patent/CN206346081U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses the installation aiding device of 1 point of CP in tunnel of utilization injected hole a kind of, including injected hole and the bolt base being arranged in the injected hole and the mark post being connected with the bolt base;The bolt base includes the end of thread positioned at bottom, the end of thread is used to be connected with injected hole, connection terminal is connected with the top of the end of thread, a screw and some holes are offered on the end face of the connection terminal, the screw is located at the shaft core position of connection terminal, and screw is used to connect mark post;Described hole is evenly distributed on the surrounding of screw, and hole is used to coordinate with special spanner;The connection screw thread for being used for being connected with hole is provided with the bottom of the mark post, the connection neck for being connected with prism is offered at the top of the mark post.

Description

1 point of CP installation aiding device in a kind of tunnel of utilization injected hole
Technical field
The utility model is related to constructing tunnel field, specifically, is related specifically in a kind of tunnel of utilization injected hole The installation aiding device that 1 point of CP.
Background technology
With the fast development of modern city subway, subway tunnel, which is laid a railway track, have also been introduced the skill at the control points of CP III in high ferro Art, 1 point of high ferro CP is general in 60 meters of pair of right and left, because the small curve of subway tunnel is more, between 1 spacing of CP is laid in tunnel It is smaller away from meeting, can only be 40 meters or so, so that 1 point of CP can lay more in tunnel.At present, the control points of CP III are in tunnel Interior laying mode mainly has following several:
1st, retainer instrument platform is buried using ring plate bolt hole, Embedment and installation instrument platform is time-consuming, take a lot of work, instrument platform installation site The shortcomings of being restricted, remove inconvenience after the completion of use.
2nd, fixed pole is directly installed on tunnel ring-shaped sheet to connect prism, but layouted when laying with electric hammer, it is easily broken Bad tunnel structure, the shortcomings of easily being touched by external force and be difficult to after destroying recover.
The above method is all difficult to be rapidly completed lays the control points of CP III in tunnel, and point position is not easy to long-term preservation, broken It is difficult to recover after bad.
Utility model content
The purpose of this utility model is, for deficiency of the prior art, to utilize (every piece of injected hole on tunnel ring-shaped sheet All at least a pair of injected holes on ring plate waist) a kind of quick installation aiding device is provided, the device is by using connection control point Base is connected with injected hole to be fixed in ring plate, and the mark post that connection prism is installed on base is quickly connected with prism realization.
The technical problem that the utility model is solved can be realized using following technical scheme:
1 point of CP installation aiding device in a kind of tunnel of utilization injected hole, including injected hole and it is arranged on the slip casting Bolt base in hole and the mark post being connected with the bolt base;
The bolt base includes the end of thread positioned at bottom, and the end of thread is used to be connected with injected hole, in institute State and connection terminal is connected with the top of the end of thread, if offering a screw and dry hole on the end face of the connection terminal Hole, the screw is located at the shaft core position of connection terminal, and screw is used to connect mark post;Described hole is evenly distributed on the four of screw Week, hole is used to coordinate with special spanner;
The connection screw thread for being used for being connected with hole is provided with the bottom of the mark post, is opened up at the top of the mark post There is the connection neck for being connected with prism.
Further, the special spanner is used to screw in the bolt base in injected hole, and special spanner includes spanner Main body, the circular groove coordinated with mark post is offered in one end of the wrench body, in the circular groove both sides A spanner terminal is respectively equipped with bottom surface, spanner terminal is used to coordinate with hole.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the quick fixation of plane/measurement of higher degree mark can be laid in subway tunnel ring plate, be easy to multiple repetition measurement to use, Cost is relatively low;
2nd, mark post and prism can be connected quickly, reduced the centering leveling time, improved operating efficiency;
3rd, due to being laid on the injected hole of tunnel ring-shaped sheet waist, and there is injected hole in every ring plate, be not required to punching, Destroy tunnel structure, the advantages of position is picked out at random, it is less that the live rod member of laying exposes works, contribute to autoprotection and Avoid the barrier on tunnel.
Brief description of the drawings
Fig. 1 is the structural representation of injected hole described in the utility model.
Fig. 2 is the structural representation of bolt base described in the utility model.
Fig. 3 is the structural representation of mark post described in the utility model.
Fig. 4 is the connection diagram of bolt base described in the utility model and mark post.
Fig. 5 is the structural representation of special spanner described in the utility model.
Fig. 6 is the use state schematic diagram of special spanner described in the utility model.
Label declaration in figure:Injected hole 1, bolt base 2, mark post 3, the end of thread 4, connection terminal 5, screw 6, hole 7, company Connect screw thread 8, connection neck 9, circular groove 10, spanner terminal 11.
Embodiment
To be easy to understand technological means, creation characteristic, reached purpose and effect of the utility model realization, below With reference to embodiment, the utility model is expanded on further.
Referring to Fig. 1-Fig. 6,1 point of CP installation aiding device in a kind of tunnel of utilization injected hole 1 described in the utility model, Including injected hole 1 and the bolt base 2 being arranged in the injected hole 1 and the mark post being connected with the bolt base 2 3;
The bolt base 2 includes the end of thread 4 positioned at bottom, and the end of thread 4 is used to be connected with injected hole 1, Connection terminal 5 is connected with the top of the end of thread 4, the He of a screw 6 is offered on the end face of the connection terminal 5 Some holes 7, the screw 6 is located at the shaft core position of connection terminal 5, and screw 6 is used to connect mark post 3;Described hole 7 uniformly divides Cloth screw 6 surrounding, hole 7 be used for and special spanner coordinate;
The connection screw thread 8 for being used for being connected with hole 7 is provided with the bottom of the mark post 3, at the top of the mark post 3 Offer the connection neck 9 for being connected with prism.
The special spanner is used to screw in the bolt base 2 in injected hole 1, and special spanner includes wrench body, One end of the wrench body offers the circular groove 10 coordinated with mark post 3, the bottom in the both sides of circular groove 10 A spanner terminal 11 is respectively equipped with face, spanner terminal 11 is used to coordinate with hole 7.
The installation process of the present invention is as follows:
1) injected hole 1 being first turned in ring plate is covered, and exposes injected hole 1;
2) and then mark post 3 and bolt base 2 it is assembled into one;
3) mark post 3 and bolt base 2 are screwed in using special spanner in injected hole 1 assembling;
4) finally prism is attached on mark post 3;Another prism is similarly loaded the corresponding position of this ring plate by above-mentioned steps, So far one group of control point of CP III is with regard to that can be quickly completed assembling.
General principle of the present utility model and principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (2)

1. 1 point of CP installation aiding device in a kind of tunnel of utilization injected hole, it is characterised in that:Including injected hole and it is arranged on Bolt base in the injected hole and the mark post being connected with the bolt base;
The bolt base includes the end of thread positioned at bottom, and the end of thread is used to be connected with injected hole, in the spiral shell Line is connected with connection terminal at the top of end, and a screw and some holes, institute are offered on the end face of the connection terminal The shaft core position that screw is located at connection terminal is stated, screw is used to connect mark post;Described hole is evenly distributed on the surrounding of screw, hole Hole is used to coordinate with special spanner;
The connection screw thread for being used for being connected with hole is provided with the bottom of the mark post, use is offered at the top of the mark post In the connection neck being connected with prism.
2. 1 point of CP installation aiding device in the tunnel of utilization injected hole according to claim 1, it is characterised in that:It is described special It is used to screw in the bolt base in injected hole with spanner, special spanner includes wrench body, the one of the wrench body End offers the circular groove coordinated with mark post, and a spanner end is respectively equipped with the bottom surface of the circular groove both sides Son, spanner terminal is used to coordinate with hole.
CN201621425313.2U 2016-12-23 2016-12-23 1 point of CP installation aiding device in a kind of tunnel of utilization injected hole Expired - Fee Related CN206346081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621425313.2U CN206346081U (en) 2016-12-23 2016-12-23 1 point of CP installation aiding device in a kind of tunnel of utilization injected hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621425313.2U CN206346081U (en) 2016-12-23 2016-12-23 1 point of CP installation aiding device in a kind of tunnel of utilization injected hole

Publications (1)

Publication Number Publication Date
CN206346081U true CN206346081U (en) 2017-07-21

Family

ID=59321518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621425313.2U Expired - Fee Related CN206346081U (en) 2016-12-23 2016-12-23 1 point of CP installation aiding device in a kind of tunnel of utilization injected hole

Country Status (1)

Country Link
CN (1) CN206346081U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173270A (en) * 2019-06-28 2019-08-27 晏强 A kind of shield measurement total station hanging basket equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173270A (en) * 2019-06-28 2019-08-27 晏强 A kind of shield measurement total station hanging basket equipment

Similar Documents

Publication Publication Date Title
CN105839988A (en) Self-vertical positioning pole erecting device and construction method thereof
CN206346081U (en) 1 point of CP installation aiding device in a kind of tunnel of utilization injected hole
CN204703186U (en) A kind of pre-embedded bolt positioning installation apparatus
CN205591251U (en) Transformer basis
CN204727362U (en) Control setup draw-in box
CN104913166B (en) Sensor pole base
CN206000028U (en) A kind of combination built-in fitting of steel building
CN105239571B (en) Tree root shape electric pole lateral conductor fixator
CN204781961U (en) Accurate positioner of high -rise floor buried sleeve
CN106480898A (en) The telescopic base structure of mountain area small load
CN206476578U (en) A kind of wire releasing disk
CN206844685U (en) A kind of construction wire dispenser
CN203908538U (en) Combined measuring device for stratum deformation
CN204753642U (en) Municipal administration is with combination formula inspection shaft
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN207857540U (en) A kind of mounting structure of material-pulling device on manipulator
CN206971772U (en) Movably foot bolt locating rack
CN205862697U (en) Cable device for marking
CN204902834U (en) Underground works measures with laser centering device under point
CN206486186U (en) A kind of turning device of prefabricated piping lane
CN201868586U (en) Grounding pole for maintaining power supply circuit
CN205975992U (en) Pre -buried anchor of building infilled wall drawknot muscle is tied
CN203323756U (en) Drill hole monitoring point protection cap
CN206376885U (en) A kind of tunnel steel arch frame positioner
CN204267059U (en) A kind of with beating the crab-bolt device for casting of filling with template

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170721

CF01 Termination of patent right due to non-payment of annual fee