CN206971772U - Movably foot bolt locating rack - Google Patents
Movably foot bolt locating rack Download PDFInfo
- Publication number
- CN206971772U CN206971772U CN201720579165.8U CN201720579165U CN206971772U CN 206971772 U CN206971772 U CN 206971772U CN 201720579165 U CN201720579165 U CN 201720579165U CN 206971772 U CN206971772 U CN 206971772U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- locating rack
- positive
- movable telescopic
- prism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Movably foot bolt locating rack, including foundation bolt supported hole (1), positive eight prism (3), fixed claw (4), movable telescopic steel pipe (6);Described foundation bolt supported hole (1) and fixed claw (4) is arranged on the end of movable telescopic steel pipe (6), and is arranged on by what movable telescopic steel pipe (6) was spaced on positive eight prism (3) seamed edge face;Foundation bolt supported hole (1) and fixed claw (4) point centered on the center of gravity of positive eight prism (3), each orthogonal is in " ten " font.Movably simple, production is low with use cost, stock is taken up an area less, can be with the obvious technical characterstic such as fast positioning and positioning precision height with making for foot bolt locating rack for this.
Description
Technical field
The utility model belongs to power industry relevant device installation auxiliary device, more particularly to a kind of movably foot bolt
Locating rack.
Background technology
This technology is movably foot bolt locating rack, mainly for power industry relevant device support embedding anchor bolts
Position work.Following defect be present in the Work tools such as traditional foundation bolt positioning framework, template:
1. due to specific aim processing can only be carried out according to field apparatus key dimension, various sizes of equipment can not be common to
Basis, so the scope of application is small, to meet construction demand, cause processing quantity huge.
2. for convenience of processing, so most use wooden template, so easily mouldy strain cracking, is unfavorable for preserving for a long time
And Reusability, so poor durability, substantially disposable product, each engineering must process a collection of, can not reduce into
This.
3. because specific aim processing must be carried out according to field apparatus key dimension, it is therefore can not completes to advance in Equipment Foundations
Row preprocessing, so being difficult to simplify construction procedure during construction, cause operating efficiency low.
4. traditional foundation bolt positioning Work tool there is no the fixed structure being fixed on for it in Equipment Foundations,
Therefore necessary two people coordinate when constructing, a people helps positioning Work tool to prevent its displacement, and another people slowly adjusts foundation bolt position
Put, therefore personnel's man-hour can not be reduced.
To expand the scope of application that traditional foundation bolt positions Work tool, durability is improved, reduces cost, simplifies construction
Step, operating efficiency is improved, reduce personnel's man-hour, therefore research and develop this movably foot bolt locating rack.Through overtesting, this locating rack
Fully meet need of work.
Utility model content
The utility model is directed to above prior art problem, there is provided one kind makes simple, production, stock low with use cost
Take up an area less, can be with fast positioning and the high movably foot bolt locating rack of positioning precision.
What the technical solution of the utility model was realized in:
Movably foot bolt locating rack, including foundation bolt supported hole, positive eight prism, fixed claw, movable telescopic
Steel pipe;Described foundation bolt supported hole and fixed claw are arranged on the end of movable telescopic steel pipe, and pass through movable telescopic
Steel pipe interval is arranged on positive eight prisms seamed edge face;Foundation bolt supported hole and fixed claw using the center of gravity of positive eight prism as
Central point, each orthogonal is in " ten " font.
As the further improvement of technical scheme, above-described movably foot bolt locating rack, described is movable
Telescopic steel pipe is provided with the Telescopic Fixed screw of steel pipe.
As the further improvement of technical scheme, above-described movably foot bolt locating rack, described positive eight rib
Positive eight prisms reinforcer is provided with the outside of cylinder, described movable telescopic steel pipe is fixed on just afterwards through positive eight prisms reinforcer
On eight prisms.
As the further improvement of technical scheme, above-described movably foot bolt locating rack, described is movable
Telescopic steel pipe is to cover more than small two sections and two sections isometric steel pipes greatly.
As the further improvement of technical scheme, above-described movably foot bolt locating rack, described fixed claw
For the triangle made by steel plate, the end of movable telescopic steel pipe minimum steel pipe is arranged on.
As the further improvement of technical scheme, above-described movably foot bolt locating rack, described lower margin spiral shell
Bolt supported hole is the annulus that high-strength zinc-coated flat steel sheet is rolled into, and is arranged on the end of movable telescopic steel pipe minimum steel pipe.
As the further improvement of technical scheme, further improvement of the above as technical scheme, above-described activity
Formula foundation bolt locating rack, described triangle are isosceles right triangle, and right-angle side is vertically downward.
As the further improvement of technical scheme, above-described movably foot bolt locating rack, described positive eight rib
Cylinder and positive eight prisms reinforcer are made using high-strength zinc-coated flat steel sheet, and this movably foot bolt is formed with movable telescopic steel pipe
The general frame of locating rack.
This movably foot bolt locating rack operation principle:
Equipment Foundations size is estimated first, and four on this locating rack positioning movable telescopic steel pipes with fixed claw are stretched
It is placed in after to suitable size in Equipment Foundations, tightens up positioning movable telescopic steel pipe, fixed claw is stuck in base side edge, fixed claw
Tip alignment base center line, then the Telescopic Fixed screw of the steel pipe on screwed in place movable telescopic steel pipe, completes this positioning
The fixed work in place of frame.Unclamp the Telescopic Fixed spiral shell of steel pipe on the movable telescopic steel pipe of other four foundation bolts support
Silk, the foundation bolt supported hole of the movable telescopic steel pipe end is pulled to directly over embedding anchor bolts hole.Foundation bolt is worn
The embedded hole crossed after the foundation bolt supported hole of this locating rack on the basis of being put into, the band upper cap nut on foundation bolt allow nut card
On positioning hole, foundation bolt is set to be suspended in embedded hole, the position that foundation bolt is then measured with steel tape and horizon rule is inclined
Difference, the position deviation of foundation bolt is adjusted by adjusting length and the angle of movable telescopic steel pipe, is tightened after adjustment
The Telescopic Fixed screw of steel pipe on movable telescopic steel pipe, foundation bolt positioning work are completed.
The utility model has the advantages that:
1. movably foot bolt locating rack, compared with traditional foundation bolt positioning Work tool, have and be applicable model
Enclose wide, durability is high, advantage of lower cost, is simplified construction procedure, improves operating efficiency, the characteristics of reducing personnel's man-hour.
2. traditional foundation bolt positions Work tool at positioning stone bolt position, because foundation bolt does not have fixation
Motion track, the mobile distance of control and direction are not easy to, causes positioning precision not high.But this locating rack is due to there is fixed activity
Track, in order to the direction of distance when controlling the foundation bolt to move, improve positioning precision.
3. a locating rack makes simply, production is low with use cost, and stock is taken up an area less, can be with fast positioning.
4. through practical operation experimental evaluation, the engineering time of this locating rack is reach traditional approach 25%, constructing operation
Personnel are also reduced to 1 people by original more than 2 and can directly operated, and greatly save city pump and improve operating efficiency.
Brief description of the drawings
Accompanying drawing 1 is this movably foot bolt locating rack structural representation.
In figure:
1- foundation bolt supported holes;The Telescopic Fixed screw of 2- steel pipes;Positive eight prisms of 3-;4- fixed claws;Positive eight prisms of 5-
Reinforcer;6- movable telescopic steel pipes.
Embodiment
The utility model is described in detail with specific embodiment (referring to Fig. 1) below in conjunction with the accompanying drawings.
Embodiment 1
Movably foot bolt locating rack, including foundation bolt supported hole (1), positive eight prism (3), fixed claw (4) are living
Dynamic formula telescopic steel pipe (6);Described foundation bolt supported hole (1) and fixed claw (4) is arranged on the end of movable telescopic steel pipe (6)
End, and be arranged on by what movable telescopic steel pipe (6) was spaced on positive eight prism (3) seamed edge face;Foundation bolt supported hole (1)
With fixed claw (4) centered on the center of gravity of positive eight prism (3) point, each it is orthogonal is in " ten " font.
Embodiment 2
The places different from embodiment 1 are:Described movable telescopic steel pipe (6) is provided with the Telescopic Fixed screw of steel pipe
(2)。
Embodiment 3
The places different from embodiment 1 or 2 are:Positive eight prisms reinforcer is provided with the outside of described positive eight prism (3)
(5), described movable telescopic steel pipe (6) is fixed on positive eight prism (3) afterwards through positive eight prisms reinforcer (5)
Embodiment 4
The places different from embodiment 3 are:Described movable telescopic steel pipe (6) is to cover small two sections and two sections greatly
Isometric steel pipe above.
Embodiment 5
The places different from embodiment 4 are:Described fixed claw (4) is the triangle made by steel plate, is arranged on work
The end of dynamic formula telescopic steel pipe (6) minimum steel pipe.
Embodiment 6
The places different from embodiment 4 are:Described foundation bolt supported hole (1) is the circle that high-strength zinc-coated flat steel sheet is rolled into
Ring, it is arranged on the end of movable telescopic steel pipe (6) minimum steel pipe.
Embodiment 7
The places different from embodiment 5 are:Described triangle is isosceles right triangle, and right-angle side is vertically downward.
Embodiment 8
The places different from embodiment 3 are:Described positive eight prism (3) and positive eight prisms reinforcer (5) are using high
Strong zinc-coated flat steel sheet is made, and the general frame of movably foot bolt locating rack is formed originally with movable telescopic steel pipe (6).
This movably foot bolt locating rack operation principle:
Equipment Foundations size is estimated first, and four on this locating rack positioning movable telescopic steel pipes with fixed claw are stretched
It is placed in after to suitable size in Equipment Foundations, tightens up positioning movable telescopic steel pipe, fixed claw is stuck in base side edge, fixed claw
Tip alignment base center line, then the Telescopic Fixed screw of the steel pipe on screwed in place movable telescopic steel pipe, completes this positioning
The fixed work in place of frame.Unclamp the Telescopic Fixed spiral shell of steel pipe on the movable telescopic steel pipe of other four foundation bolts support
Silk, the foundation bolt supported hole of the movable telescopic steel pipe end is pulled to directly over embedding anchor bolts hole.Foundation bolt is worn
The embedded hole crossed after the foundation bolt supported hole of this locating rack on the basis of being put into, the band upper cap nut on foundation bolt allow nut card
On positioning hole, foundation bolt is set to be suspended in embedded hole, the position that foundation bolt is then measured with steel tape and horizon rule is inclined
Difference, the position deviation of foundation bolt is adjusted by adjusting length and the angle of movable telescopic steel pipe, is tightened after adjustment
The Telescopic Fixed screw of steel pipe on movable telescopic steel pipe, foundation bolt positioning work are completed.
Preferably case study on implementation of the present utility model is the foregoing is only, should not to limit the utility model
, it is noted that all made within spirit of the present utility model and principle all any modification, equivalent and improvement etc., all should be wrapped
It is contained within the scope of protection of the utility model.
Claims (8)
1. movably foot bolt locating rack, it is characterised in that:Including foundation bolt supported hole (1), positive eight prism (3), Gu
Determine pawl (4), movable telescopic steel pipe (6);Described foundation bolt supported hole (1) and fixed claw (4) is arranged on movable telescopic
The end of steel pipe (6), and be arranged on by what movable telescopic steel pipe (6) was spaced on positive eight prism (3) seamed edge face;Lower margin spiral shell
Bolt supported hole (1) and fixed claw (4) point centered on the center of gravity of positive eight prism (3), each orthogonal is in " ten " font.
2. movably foot bolt locating rack according to claim 1, it is characterised in that:Described movable telescopic steel pipe
(6) it is provided with the Telescopic Fixed screw of steel pipe (2).
3. movably foot bolt locating rack according to claim 1 or 2, it is characterised in that:Described positive eight prism
(3) outside is provided with positive eight prisms reinforcer (5), and described movable telescopic steel pipe (6) is passed through after positive eight prisms reinforcer (5)
It is fixed on positive eight prism (3).
4. movably foot bolt locating rack according to claim 3, it is characterised in that:Described movable telescopic steel pipe
(6) it is to cover more than small two sections and two sections isometric steel pipes greatly.
5. movably foot bolt locating rack according to claim 4, it is characterised in that:Described fixed claw (4) is served as reasons
The triangle that steel plate is made, it is arranged on the end of movable telescopic steel pipe (6) minimum steel pipe.
6. movably foot bolt locating rack according to claim 4, it is characterised in that:Described foundation bolt supported hole
(1) annulus being rolled into for high-strength zinc-coated flat steel sheet, it is arranged on the end of movable telescopic steel pipe (6) minimum steel pipe.
7. movably foot bolt locating rack according to claim 5, it is characterised in that:Described triangle is that isosceles are straight
Angle triangle, right-angle side is vertically downward.
8. movably foot bolt locating rack according to claim 3, it is characterised in that:Described positive eight prism (3)
Made with positive eight prisms reinforcer (5) using high-strength zinc-coated flat steel sheet, this movable lower margin spiral shell is formed with movable telescopic steel pipe (6)
The general frame of bolt locating rack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720579165.8U CN206971772U (en) | 2017-05-23 | 2017-05-23 | Movably foot bolt locating rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720579165.8U CN206971772U (en) | 2017-05-23 | 2017-05-23 | Movably foot bolt locating rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206971772U true CN206971772U (en) | 2018-02-06 |
Family
ID=61410377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720579165.8U Active CN206971772U (en) | 2017-05-23 | 2017-05-23 | Movably foot bolt locating rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206971772U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060352A (en) * | 2017-05-23 | 2017-08-18 | 广西建宁输变电工程有限公司 | Movably foot bolt locating rack |
-
2017
- 2017-05-23 CN CN201720579165.8U patent/CN206971772U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060352A (en) * | 2017-05-23 | 2017-08-18 | 广西建宁输变电工程有限公司 | Movably foot bolt locating rack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060352A (en) | Movably foot bolt locating rack | |
CN206971772U (en) | Movably foot bolt locating rack | |
CN206829570U (en) | A kind of modularization scaffold of packaged type | |
CN203866974U (en) | Embedded bolt set positioning device | |
CN206225126U (en) | A kind of device for strengthening transformer stability | |
CN204475814U (en) | A kind of working platform for building | |
CN208328974U (en) | A kind of goaf place high voltage power transmission tower can rectify a deviation basis | |
CN203346897U (en) | Foundation raft embedded steel column positioning support | |
CN205732360U (en) | A kind of oil pressure arbor press | |
CN201972409U (en) | Adjustable leveling bench | |
CN202865867U (en) | Pre-buried screw spatial locator | |
CN206966544U (en) | Silk device on a kind of honeybee equipment frame | |
CN204892618U (en) | Portable municipal steel pipe alignment device | |
CN202804528U (en) | Standard knot guide rail positioning welding tool | |
CN203180383U (en) | Mechanism case installation special device | |
CN203729565U (en) | Simple travelling table | |
CN207260014U (en) | A kind of barrier wall being easily installed | |
CN206554957U (en) | A kind of steady monomer column attachment means | |
CN206829265U (en) | Platform basin lifts fixator | |
CN204286339U (en) | The quick checking tool of a kind of pre-embedded bolt | |
CN207277830U (en) | The jacking structure of formwork erection | |
CN202055550U (en) | Span adjusting device | |
CN209762571U (en) | Bolt leveling mechanism | |
CN206445771U (en) | A kind of adjustable section electric apparatus for examination and repair of transformer fan | |
CN206279855U (en) | Rod-adjurstable formula steel column correcting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |