CN206345050U - Packing support for seamless steel pipe of packing - Google Patents
Packing support for seamless steel pipe of packing Download PDFInfo
- Publication number
- CN206345050U CN206345050U CN201621390022.4U CN201621390022U CN206345050U CN 206345050 U CN206345050 U CN 206345050U CN 201621390022 U CN201621390022 U CN 201621390022U CN 206345050 U CN206345050 U CN 206345050U
- Authority
- CN
- China
- Prior art keywords
- packing
- steel pipe
- seamless steel
- packing body
- collision piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Basic Packing Technique (AREA)
Abstract
The utility model discloses the packing support for seamless steel pipe of packing, it is intended to solves the problem for setting drive mechanism to improve cost in the packing support for seamless steel pipe of packing;Its drip irrigation device is a kind of packing support for seamless steel pipe of packing, including supporting track, the first packing body positioned at supporting track one end, first packing body is fixedly connected with supporting track, the other end of supporting track is movably set with the second packing body, the regulation drive mechanism for driving the second packing body movement is provided with supporting track, second packing body includes the first collision piece and the second collision piece, first collision piece and the second collision piece are set in obtuse angle, second collision piece fits in supporting track, first packing body lower end offers the through hole passed through for the second collision piece, the top of second collision piece contacts at through-hole wall.The utility model is not provided with drive mechanism for the packing support for seamless steel pipe of packing.
Description
Technical field
The utility model is related to a kind of support, the more particularly to packing support for seamless steel pipe of packing.
Background technology
After seamless steel pipe is machined, generally it is required for being packed in seamless steel pipe, is then transported again, from
And enable seamless steel pipe to keep a relatively steady state, moreover, in order to cause the sky in transportation
Between utilization rate it is bigger, seamless steel pipe generally can be all packaged into hexagonal configuration, seamless steel pipe is so not only further improved
Positional stability, while also cause space availability ratio it is higher.
At present, the U of Publication No. CN 203047772 Chinese patent discloses the special packing frame of steel pipe, and it includes being located at
The first packing support frame of supporting track one end, the first packing support frame is fixedly connected with supporting track, the supporting rail
The other end in road is provided with the second packing support frame, and the second packing support frame can be moved on supporting track, supporting track
The regulation drive mechanism for being used for driving the second packing support frame movement is provided with, this packing support is simple and compact for structure, uses
It is convenient, but in use,
While drive mechanism regulation the second packing body movement, the effect of the packing body of support second is also acted as, is so adjusted
Drive mechanism is indispensable, is arranged such regulation drive mechanism and improves equipment cost.
It is, therefore, desirable to provide a kind of new scheme solves the above problems.
Utility model content
The purpose of this utility model is to provide the packing support for seamless steel pipe of packing, and the first collision piece and second are supported
Contact element is set in 120 degree angles so that the second collision piece by seamless steel pipe whole Action of Gravity Field, such second collision piece and
There is sufficiently large quiet frictional force effect between supporting track, so that the second packing body does not have movement tendency, avoid the need for using
Drive mechanism is supported, and second packing body can by adjusting manually, therefore packing seamless steel pipe packing support not
It is cost-effective with drive mechanism is set.
Above-mentioned technical purpose of the present utility model technical scheme is that:One kind is used to pack seamless
The packing support of steel pipe, including supporting track and positioned at supporting track one end first pack body, it is described first packing body with
Supporting track is fixedly connected, and the other end of the supporting track is movably set with the second packing body, and the second packing body includes
First collision piece and the second collision piece, first collision piece and the second collision piece are set in 120 degree of angles, and described second contradicts
Part fits in supporting track, and the first packing body lower end offers the through hole passed through for the second collision piece, and described second supports
The top of contact element contacts at through-hole wall.
By above-mentioned technical proposal, when packing seamless steel pipe, first pass through regulation second manually and pack body to correct position,
Seamless steel pipe is put between the first packing body and the second packing body again, such first packing body and the second packing body are to seamless steel
Pipe plays position-limiting action, thus allows for normal packaging operation, in packing process, because seamless steel pipe self gravitation is made
With, so seamless steel pipe and second packing body contact position produce pressure, wherein the first collision piece due to by perpendicular to
First collision piece and seamless steel pipe contact surface component are acted on, component direction perpendicular to the first collision piece and seamless steel pipe contact surface,
So that the first collision piece has the trend of motion, by setting the second collision piece on the second packing body so that steel pipe is straight down
Gravity all act in the second collision piece, the frictional force existed between such second collision piece and supporting track is very big, this
The collision piece of sample first can not overcome the quiet frictional force between the second collision piece and supporting track and remains stationary, so that second
Packing body does not have movement tendency, therefore the packing support of packing seamless steel pipe enters without setting drive mechanism to the second packing body
Row regulation and support, have so saved cost, when packing frame is idle, and because the first collision piece is inclined, itself is heavy in addition
Power is acted on, and the second collision piece may be caused to tilt, by opening up through hole in the first packing body lower end, and such second collision piece can be with
By the first packing body lower end through hole, thus by the second packing body can be driven to be moved on supporting track manually, when for
When the packing frame of packing seamless steel pipe is idle, the position of the second collision piece is limited by through hole, will not so be contradicted because of first
The Action of Gravity Field of part and cause the second collision piece tilt, so as to maintain the positional stability of the second packing body.
The utility model is further arranged to, and is provided with the first packing body for supporting the first of seamless steel pipe to delay
The second bolster for supporting seamless steel pipe is provided with stamping, the second packing body.
By above-mentioned technical proposal, by setting the first bolster and second to delay on the first packing body and the second packing body
Stamping, so directly supports seamless steel pipe by the first bolster and the second bolster, when seamless steel pipe is right due to oneself gravity
When first bolster and the second bolster act power so that the first bolster and the first bolster are deformed upon, so increase
The contact area of seamless steel pipe and bolster is added, has reduced the pressure that seamless steel pipe is subject to, such seamless steel pipe is in packing
It will not deform, lift seamless steel pipe quality.
The utility model is further arranged to, and the first groove, first bolster are offered on the first packing body
It is sticked in the first groove, offers the second groove on the second packing body, second bolster is sticked in the second groove
In.
By above-mentioned technical proposal, it can engage the first groove of the first bolster by being opened up on the first packing body, make
The first bolster can by way of engaging with first pack body be connected, so facilitate the disassembly and assembly of the first bolster,
Second bolster is also in this way, same easy to disassemble and assembling.
The utility model is further arranged to, and the supporting track includes track body, and the track body is along its length
The first keeper and the second keeper are provided with, first keeper and the second keeper contact at the two of the second packing body
Side.
By above-mentioned technical proposal, when the second packing body is movable on supporting track, due to the first keeper and the
Two keepers are contradicted in the second packing body both sides, so just can be spacing to the second packing body progress, and prevent second dozen
Inclusion run-off the straight in the horizontal direction, so as to improve the stability of the second packing body position, while the second packing body is the
Positioning piece and second be set to also can be relatively stable under the guide effect of part motion and with the through hole of the first packing body lower end
Alignment, convenient operation.
The utility model is further arranged to, and first keeper and the second keeper are L-shaped to be set.
By above-mentioned technical proposal, because the first keeper and the second keeper are contradicted in the second packing body both sides,
So when adjusting the second packing body position, the first keeper of extruding and the second keeper are known from experience in the second packing, and such first determines
The junction of the junction and the second keeper and track body of position part and track body can all can be by torsional stress, by by first
Keeper and the second keeper are respectively provided with L-shaped structure, and the structural strength of such first keeper and the second keeper increases, and
And it is more firm with the connection of track body, so that the company of the first keeper and track body and the second keeper and track body
The place of connecing will not be broken, extension device service life.
The utility model is further arranged to, and the drive for driving the second packing body movement is provided with the supporting track
Motivation structure, the drive mechanism includes the nut for being fixedly connected on the fixing nut of supporting track and being engaged with fixing nut
Bar, the fixing nut with first packing body be located at second packing body both sides, the Nut pole pass through fixing nut, and with
Second packing body rotates connection.
By above-mentioned technical proposal, the position of the second packing body is more accurately adjusted by drive mechanism, turned
Dynamic Nut pole, because Nut pole is threadedly coupled with fixing nut, while fixing nut is affixed on supporting track, such as
This Nut pole can be moved in fixing nut, and Nut pole and the second packing body are to rotate connection, and such Nut pole is certainly
Body movement can drive the second packing body to move, and so adjust the distance between the second packing body and first packing body, make packing
Frame disclosure satisfy that the bundling job requirements of any specification steel pipe so that the packing frame scope of application is wider.
The utility model is further arranged to, and described Nut pole one end rotates with the second packing body and is connected, and is set on the other end
It is equipped with handle.
By above-mentioned technical proposal, handle is set on Nut pole, increases power arm during rotating nut bar by handle,
So reduce the driving force needed for drive nut bar so that more laborsaving during drive nut bar, reduce labor intensity.
The utility model is further arranged to, and side of the first packing body away from the second packing body is provided with for putting
The rack of seamless steel pipe is put, described rack one end is connected to the first packing body, and the other end is provided with for supporting rack
Support member.
By above-mentioned technical proposal, rack provides the placement location of many seamless steel pipes, and so many seamless steel pipes can
First deposit on rack, when needing packing seamless steel pipe, transfer part seamless steel pipe can be used to beat directly from rack
Bag, so improves packing efficiency.
The utility model is further arranged to, and position-limiting drum is set on the rack, and the top of the position-limiting drum, which is less than, puts
Separated in the top of rack, the position-limiting drum and be provided with gag lever post, described gag lever post one end is located in position-limiting drum, the other end is high
In rack.
By above-mentioned technical proposal, because the top of position-limiting drum is less than the top of rack, such seamless steel pipe is in glove
When moving and packed on frame, it becomes possible to normal to carry out, and when need not be packed, gag lever post is put
It is placed in position-limiting drum, now gag lever post tip height is above rack top, just can be to seamless thus by gag lever post
Steel pipe progress one is spacing, and seamless steel pipe is not able to move on packing frame, so as to prevent seamless steel pipe to fall and send out
It is raw to damage, when normally being packed, gag lever post is taken out from position-limiting drum and can normally be packed, simple side
Just.
The utility model is further arranged to, and the 3rd buffering for supporting seamless steel pipe is provided with the rack
Part.
By above-mentioned technical proposal, the 3rd bolster is set on rack, nothing is so directly supported by the 3rd bolster
Steel pipe is stitched, when seamless steel pipe acts power due to oneself gravity to the 3rd bolster, causes the 3rd bolster to deform upon,
The contact area of seamless steel pipe and bolster is so added, it can be seen from pressure formula, the pressure that seamless steel pipe is subject to reduces,
So seamless steel pipe will not deformation, lifting seamless steel pipe quality when placing.
In summary, the utility model has the advantages that:
One:First collision piece and the second collision piece are arranged to 120 degree of angles, the second collision piece and supporting track is utilized
Between frictional force the second packing body is not had a movement tendency, the second collision piece top is contradicted with the first packing body so that second
Collision piece will not be tilted, without setting drive mechanism to be supported the second packing body;
Secondly:The first bolster, the second bolster and the 3rd are set on the first packing body, the second packing body and rack
Bolster, using the first bolster, the cushioning effect protection seamless steel pipe of the second bolster and the 3rd bolster will not be deformed, and be protected
Protect seamless steel pipe quality;
Thirdly:By setting the first groove and the second groove on the first packing body and the second packing body so that first delays
Stamping and the second bolster can be sticked in the first groove and the second groove, such first bolster and the second bolster dismounting and group
Fill more convenient;
It four:Set on track body be L-shaped structure the first keeper and the second keeper, and the first keeper
The both sides of the second packing body are contacted at the second keeper, so that the second packing body, which is limited in the first keeper and second, to be determined
In the part of position, the second packing body position stability is improved, and the first keeper and the second keeper are not easy to break, and extension first is determined
The service life of position part and the second keeper;
It five:By setting rack, it movable part seamless steel pipe can be used to pack directly from rack, so be lifted
Packing efficiency;
It six:Position-limiting drum is set on rack, is then separated in position-limiting drum and gag lever post is set, limit is taken out during packing
Position bar, inserts gag lever post, so makes packaging operation more simple and convenient when not packing.
Brief description of the drawings
Fig. 1 is the structural representation in embodiment one, state when main performance packing support and rack limit is left unused;
Fig. 2 is the enlarged drawing of part A in Fig. 1;
Fig. 3 is the sectional view of the positive apparent directions of Fig. 1, main performance bolster and the annexation of groove and the second packing body
With the position relationship of through hole;
Fig. 4 is the sectional view of Fig. 1 side-looking directions, and the first keeper of main performance and the second keeper are packed body with second
The position relationship of position relationship and the second packing body and through hole;
Fig. 5 is the structural representation in embodiment two.
In figure, 1, supporting track;2nd, the first packing body;3rd, the second packing body;31st, the first collision piece;32nd, second contradict
Part;4th, drive mechanism;41st, fixing nut;42nd, Nut pole;5th, through hole;6th, the second bolster;7th, the first bolster;8th, first determines
Position part;9th, the second keeper;10th, the first groove;11st, the second groove;12nd, handle;13rd, rack;14th, support member;15th, it is spacing
Cylinder;16th, the 3rd bolster;17th, track body.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment one:For the packing support for seamless steel pipe of packing, such as Fig. 1, shown in Fig. 3 and Fig. 4, including supporting track 1
And the first packing body 2 of the one end of supporting track 1 is welded on, the other end of supporting track 1 is movably set with the second packing body 3,
Second packing body 3 includes the first collision piece 31 and the second collision piece 32, and the second collision piece 32 is to fit in supporting track 1 to set
Put, before seamless steel pipe is packed, first pass through and manually adjust the second packing body 3 to correct position, so that beat
Bag support disclosure satisfy that various sizes of Steel pipe bind job requirements so that the packing support scope of application is wider, and when seamless
When steel pipe is put between the first packing body 2 and the second packing body 3, the first packing packing body 3 of body 2 and second is played to seamless steel pipe
Position-limiting action, thus allows for normal packaging operation, when carrying out seamless steel pipe packing, the first collision piece 31 and seamless steel pipe
Contact surface due to by seamless steel pipe gravity component effect so that the first collision piece 31 has the trend of motion, simultaneously because
The first collision piece 31 and the second collision piece 32 in second packing body 3 are set in 120 degree of angles so that the weight of steel pipe straight down
Power is all acted in the second collision piece 32, and the frictional force existed between such second collision piece 32 and supporting track 1 is very big, is led to
The quiet frictional force crossed between the second collision piece 32 and supporting track 1 keeps the static of the position of the first collision piece 31, so that
The second no movement tendency of packing body 3, so there is no need to set drive mechanism to move or support the second packing body 3, so
It is cost-effective;By opening up the through hole 5 passed through for the second collision piece 32, and the second collision piece in the first packing body 2 lower end
32 top can contact at the inwall of through hole 5,, can if the mass of the first collision piece 31 is big so when packing support is idle
The second collision piece 32 is had the trend of tilting, by the restriction effect of through hole 5, limit the position of the second collision piece 32 so that the
Two collision piece 32 do not have the trend of tilting, so maintain the positional stability of the second packing body 3.
Side of the first packing body 2 away from the second packing body 3 is provided with the rack 13 for placing seamless steel pipe, so
Many seamless steel pipes can be deposited in first on rack 13, when needing packing seamless steel pipe, can be shifted directly from rack 13
Part seamless steel pipe is used to pack, and so improves packing efficiency;Position-limiting drum 15, the top of position-limiting drum 15 are welded with rack 13
End, which is less than to separate in the top of rack 13, position-limiting drum 15, is provided with gag lever post, and gag lever post one end is located in position-limiting drum 15, separately
One end is higher than rack 13, and so before seamless steel pipe is packed, gag lever post is disposed in position-limiting drum 15, so that seamless
Steel pipe does not fall out in packing support and is damaged, when normally being packed, by gag lever post from position-limiting drum 15
Taking-up can normally be packed, simple and convenient.
As shown in Figure 2 and Figure 4, supporting track 1 includes track body 17, and it is in L that track body 17 is provided with along its length
The first keeper 8 and the second keeper 9 of shape structure, the first keeper 8 and the second keeper 9 contact at the second packing body 3
Both sides, when the second packing body 3 is movable on supporting track 1, are contradicted by the first keeper 8 and the second keeper 9
Second packing body 3 both sides, it is spacing so as to be carried out to the second packing body 3, and prevent the second packing body 3 from sending out in the horizontal direction
It is raw to tilt, so that the stability of the position of the second packing body 3 is improved, while the second packing body 3 is fixed in the first keeper 8 and second
Motion that also can be relatively stable under the guide effect of position part 9 is simultaneously alignd with the through hole 5 of the first packing body 2 lower end, convenient operation;
When adjusting the second packing 3 position of body, the second packing body 3 can extrude the first keeper 8 and the second keeper 9 so that first determines
The junction of the junction and the second keeper 9 and track body 17 of the position keeper 9 of part 8 and second and track body 17 can all can be by
To torsional stress, by the way that the first keeper 8 and the second keeper 9 are respectively provided with into L-shaped structure, such first keeper 8 and second
The structural strength increase of keeper 9, and it is more firm with the connection of track body 17, so that the first keeper 8 and track
The junction of the keeper 9 of body 17 and second and track body 17 will not be broken, extension device service life.
As shown in figure 3, offering the first groove 10 on the first packing body 2, the first bolster 7 is sticked in the first groove
In 10, such first bolster 7 can by way of engaging with first packing body 2 be connected, so facilitate disassembly and assembly, pass through
First bolster 7 is directly contacted with seamless steel pipe, and the conflict that seamless steel pipe is subject to is reduced using the cushioning effect of the first bolster 7
Power, makes seamless steel pipe not deform upon, and the second bolster 6 and the second groove 11 are also in this way, possess effect same, in rack
It is provided for supporting the 3rd bolster 16 of seamless steel pipe on 13, wherein the first bolster 7, the second bolster 6, the 3rd bolster
16 be all wood materials, reduces the conflict power that seamless steel pipe is subject to using the cushioning effect of the 3rd bolster 16, makes seamless steel pipe
Will not deformation, so as to lift seamless steel pipe quality.
Embodiment two:For the packing support for seamless steel pipe of packing, it is with the difference of embodiment one, such as Fig. 5 institutes
Show, when being provided with the drive mechanism 4 for driving the second packing body 3 to move on supporting track 1, adjusted by drive mechanism 4
The distance between the second packing packing body 2 of body 3 and first is more accurate, and drive mechanism 4 includes being welded in consolidating on supporting track 1
Determine nut 41 and the Nut pole 42 being engaged with fixing nut 41, and Nut pole 42 passes through fixing nut 41, one end and the
Two packing bodies 3 are rotated is provided with handle 12 on connection, the other end, passes through the rotating nut bar 42 of handle 12, such drive nut bar
42 is more laborsaving, due to the small volume of fixing nut 41, and the position that such Nut pole 42 contacts at the second packing body 3 is exactly to be located at
The bottom of second packing body 3, so that Nut pole 42 be applied to the motive force of the second packing body 3 and the second packing body 3 and
Frictional force between supporting track 1 is on a horizontal line, and the motive force that such second packing body 3 needs when moving is smaller, this
It is more laborsaving during sample drive nut bar 42.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in right of the present utility model by Patent Law.
Claims (10)
1. it is used for the packing support of seamless steel pipe of packing a kind of, including supporting track (1) and positioned at supporting track (1) one end
First packing body (2), the first packing body (2) is fixedly connected with supporting track (1), the other end of the supporting track (1)
It is movably set with the second packing body (3), it is characterised in that:The second packing body(3)Including the first collision piece(31)With second
Collision piece(32), first collision piece(31)With the second collision piece(32)Set in 120 degree of angles, second collision piece
(32) supporting track (1) is fitted in, described first packing body (2) lower end offers the through hole passed through for the second collision piece (32)
(5), the top of second collision piece (32) contacts at through hole (5) inwall.
2. the packing support according to claim 1 for seamless steel pipe of packing, it is characterised in that:The first packing body
(2) it is provided with the first bolster (7) for supporting seamless steel pipe, the second packing body (3) and is provided with for supporting on
The second bolster (6) of seamless steel pipe.
3. the packing support according to claim 2 for seamless steel pipe of packing, it is characterised in that:The first packing body
(2) the first groove (10) is offered on, first bolster (7) is sticked in the first groove (10), the second packing body
(3) the second groove (11) is offered on, second bolster (6) is sticked in the second groove (11).
4. the packing support according to claim 1 for seamless steel pipe of packing, it is characterised in that:The supporting track
(1) track body is included(17), the track body(17)The first keeper (8) and the second keeper are provided with along its length
(9), first keeper (8) and the second keeper (9) contact at the both sides of the second packing body (3).
5. the packing support according to claim 4 for seamless steel pipe of packing, it is characterised in that:First keeper
(8) and the second keeper (9) it is L-shaped set.
6. the packing support according to claim 1 for seamless steel pipe of packing, it is characterised in that:The supporting track
(1) it is provided with for driving the mobile drive mechanism (4) of the second packing body (3), the drive mechanism (4) includes being fixedly connected
In the fixing nut (41) of supporting track (1) and the Nut pole (42) being engaged with fixing nut (41), the fixing nut
(41) it is located at the both sides of the second packing body (3) with the first packing body (2), the Nut pole (42) passes through fixing nut (41), and
And be connected with the second packing body (3) rotation.
7. the packing support according to claim 6 for seamless steel pipe of packing, it is characterised in that:The Nut pole (42)
One end rotates with the second packing body (3) and is connected, and the other end is provided with handle (12).
8. the packing support according to claim 1 for seamless steel pipe of packing, it is characterised in that:The first packing body
(2) side away from the second packing body (3) is provided with the rack (13) for placing seamless steel pipe, the rack (13) one
End is connected to the first packing body (2), and the other end is provided with the support member (14) for supporting rack (13).
9. the packing support according to claim 8 for seamless steel pipe of packing, it is characterised in that:The rack (13)
Upper setting position-limiting drum (15), the top of the position-limiting drum (15), which is less than in the top of rack, the position-limiting drum (15), to be separated
Gag lever post is provided with, described gag lever post one end is located in position-limiting drum (15), and the other end is higher than rack.
10. the packing support according to claim 8 for seamless steel pipe of packing, it is characterised in that:The rack
(13) the 3rd bolster (16) for supporting seamless steel pipe is provided with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621390022.4U CN206345050U (en) | 2016-12-17 | 2016-12-17 | Packing support for seamless steel pipe of packing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621390022.4U CN206345050U (en) | 2016-12-17 | 2016-12-17 | Packing support for seamless steel pipe of packing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206345050U true CN206345050U (en) | 2017-07-21 |
Family
ID=59322119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621390022.4U Expired - Fee Related CN206345050U (en) | 2016-12-17 | 2016-12-17 | Packing support for seamless steel pipe of packing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206345050U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110406728A (en) * | 2019-07-15 | 2019-11-05 | 天津友发钢管集团股份有限公司 | Steel pipe blanking is packaged production line |
CN113320737A (en) * | 2021-06-09 | 2021-08-31 | 克拉玛依市科能防腐技术有限责任公司 | Finished oil pipe packing device and method |
-
2016
- 2016-12-17 CN CN201621390022.4U patent/CN206345050U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110406728A (en) * | 2019-07-15 | 2019-11-05 | 天津友发钢管集团股份有限公司 | Steel pipe blanking is packaged production line |
CN113320737A (en) * | 2021-06-09 | 2021-08-31 | 克拉玛依市科能防腐技术有限责任公司 | Finished oil pipe packing device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114803244B (en) | Front-end loading and unloading mechanism for warehousing and transportation | |
CN206345050U (en) | Packing support for seamless steel pipe of packing | |
CN102862824B (en) | Z-steel stacking equipment | |
CN205998240U (en) | A kind of packaging box conveying device of wall brick packer and wall brick packer | |
CN211109732U (en) | Jacking rotary transfer device for conveying line | |
CN207242223U (en) | Pack A type frame clamping and positioning device and package post | |
CN201144004Y (en) | Pushing device for packing bags | |
CN104310072A (en) | Green brick stacking machine | |
CN115959486B (en) | Container stacking robot and using method | |
CN101596713A (en) | Lift rotary working table for forging | |
CN112173781B (en) | Material suction device for automatic production line and use method thereof | |
CN105923404B (en) | A kind of brickkiln automatic setting machine | |
CN212150814U (en) | A packing plant for brick pillar | |
CN212710262U (en) | Multi-connected-bag boxing device | |
CN204237270U (en) | Setting machine | |
CN209796771U (en) | Mechanism for adjusting sliding angle of iron wire | |
CN208467154U (en) | A kind of tilting trestle of mold billet | |
CN202321633U (en) | Mechanical arm capable of automatically adapting to deflection angles | |
CN209408718U (en) | A kind of feeding device of cutting machine | |
CN202214965U (en) | Complete electric mechanical whitewashing equipment | |
CN215623211U (en) | Mirror plate packaging production line | |
CN212862319U (en) | Built-in lifting structure for chip equipment packaging box | |
CN110902601A (en) | Liftable hydraulic means | |
CN214779325U (en) | Protection type gangue baked brick packing is with high-speed pile up neatly device | |
CN217915270U (en) | Steel material rack for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170721 Termination date: 20181217 |
|
CF01 | Termination of patent right due to non-payment of annual fee |