CN206337787U - A kind of indoor moisture proof cracking resistance earth construction - Google Patents
A kind of indoor moisture proof cracking resistance earth construction Download PDFInfo
- Publication number
- CN206337787U CN206337787U CN201621457551.1U CN201621457551U CN206337787U CN 206337787 U CN206337787 U CN 206337787U CN 201621457551 U CN201621457551 U CN 201621457551U CN 206337787 U CN206337787 U CN 206337787U
- Authority
- CN
- China
- Prior art keywords
- layer
- membrane
- cracking resistance
- proof
- damp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Floor Finish (AREA)
- Laminated Bodies (AREA)
Abstract
A kind of indoor moisture proof cracking resistance earth construction, sequentially consists of compacting ground layer, fine sand layer, composite geo-membrane damp-proof layer, concrete hardening layer, fibrous mesh cloth, anticracking grout float coat;In use, on the one hand fine sand layer can improve the flatness of compacting ground layer, while can play certain buffer protection function again, it is to avoid the out-of-flatness due to tamping ground layer causes the moistureproof damage layer of composite geo-membrane;Composite geo-membrane damp-proof layer can effectively prevent that underground moisture from permeating up, and with preferable mechanical property, can preferably be combined with concrete hardening layer when thereon, layer concrete is poured;Fiber mesh layer of cloth can effectively prevent that crack from occurring in flooring structure with receiving face anticracking grout layer;The utility model has the advantages that moistureproof cracking resistance.
Description
Technical field
The utility model is related to architecture indoor earth construction field, more particularly to a kind of indoor moisture proof cracking resistance earth construction.
Background technology
Nowadays, China's new countryside construction just expansion like a raging fire, but still exist in the New Buildings of rural area
Many problems.One layer of flooring of building generally directly carries out concrete hardening on the plain soil matrix layer of compacting and repaves decorative layer,
This flooring, easily causes " getting damp " phenomenon although simple in construction.Particularly in south China, due to summer rainwater compared with
Many, weather is more moist, and indoor one layer of ground is even more often to occur one layer of water dew before rain, after rain, and life is caused greatly
Inconvenience.So " being got damp " phenomenon for China's farm building flooring, existing earth construction need to improve.
The content of the invention
The drawbacks of in order to avoid present in a floor earth construction in above-mentioned existing farm building room, mesh of the present utility model
Be that a kind of simple in construction, easy construction is provided, and can effectively prevent the indoor moisture proof cracking resistance earth construction of " getting damp " phenomenon.
To achieve these goals, the technical solution of the utility model is realized in:
Fine sand layer is laid on a kind of indoor moisture proof cracking resistance earth construction, including compacting ground layer 1, compacting ground layer 1
2, laying concrete hardening layer 4, concrete on laying composite geo-membrane damp-proof layer 3, composite geo-membrane damp-proof layer 3 on fine sand layer 2
Laid on hardened layer 4 and lay anticracking grout layer 6 on fibrous mesh cloth layer 5, fiber mesh layer of cloth 5.
Described composite geo-membrane damp-proof layer 3 includes the fiber mesh of common geomembrane and common geomembrane surface mount
Cloth.
Described fine sand layer 2 is 5-10mm.
Described concrete hardening layer 4 is 40-50mm.
The beneficial effects of the utility model:
1st, the one side of fine sand layer 2 can improve the flatness of compacting ground layer 1, be protected while can play certain buffering again
Shield is acted on, it is to avoid because the out-of-flatness for tamping ground layer 1 causes composite geo-membrane damp-proof layer 3 to destroy;
2nd, composite geo-membrane damp-proof layer 3 can effectively prevent that underground moisture from permeating up, and with preferable mechanical property,
Can preferably it be combined with concrete hardening layer 4 when thereon, layer concrete is poured.
3rd, fiber mesh layer of cloth 5 can effectively prevent that crack from occurring in flooring structure with receiving face anticracking grout layer 6.
Brief description of the drawings
Fig. 1 is the overall structure diagram that the utility model is provided.
Embodiment
Detailed narration is made to structural principle of the present utility model and operation principle below in conjunction with the accompanying drawings.
Shown in reference picture 1, a kind of indoor moisture proof cracking resistance earth construction, including compacting ground layer 1, tamp ground layer 1
Laying concrete is hard on laying composite geo-membrane damp-proof layer 3 on upper laying fine sand layer 2, fine sand layer 2, composite geo-membrane damp-proof layer 3
Change and lay anticracking grout layer 6 on laying fibrous mesh cloth layer 5, fiber mesh layer of cloth 5 on layer 4, concrete hardening layer 4.
Described composite geo-membrane damp-proof layer 3 includes the fiber mesh of common geomembrane and common geomembrane surface mount
Cloth.
Described fine sand layer 2 is 5-10mm.
Described concrete hardening layer 4 is 40-50mm.
Operation principle of the present utility model:
In use, first in the compacting upper berth 5-10mm fine sand layers 2 of ground layer 1, the one side of fine sand layer 2 can improve rammer
The flatness of real ground layer 1, while certain buffer protection function can be played again, it is to avoid due to compacting ground layer 1 not
Smooth to cause composite geo-membrane damp-proof layer 3 to destroy, the paving composite geo-membrane damp-proof layer 3 on fine sand layer 2, composite geo-membrane is prevented
Damp layer 3 is that the composite that one layer of fibrous mesh cloth is constituted is pasted in the upper surface of common geomembrane, and composite geo-membrane is moistureproof
Layer 3 can effectively prevent that underground moisture from permeating up, and with preferable mechanical property, can when thereon, layer concrete is poured
Preferably combined with concrete hardening layer 4, the concrete hardening layer 4 on composite geo-membrane damp-proof layer 3 is 40-50mm, is being poured
Before not hardening after complete concrete hardening layer 4 and also, face is received in its surface paving fibrous mesh cloth 5 and with anticracking grout layer 6, can
Effectively prevent that crack from occurring in flooring structure.
Claims (4)
1. a kind of indoor moisture proof cracking resistance earth construction, including compacting ground layer (1), it is characterised in that compacting ground layer (1)
Laid on laying composite geo-membrane damp-proof layer (3) on upper laying fine sand layer (2), fine sand layer (2), composite geo-membrane damp-proof layer (3)
Laying is anti-on laying fibrous mesh cloth layer (5) on concrete hardening layer (4), concrete hardening layer (4), fiber mesh layer of cloth (5)
Split screed (6).
2. a kind of indoor moisture proof cracking resistance earth construction according to claim 1, it is characterised in that described composite geo-membrane
Damp-proof layer (3) includes the fibrous mesh cloth of common geomembrane and common geomembrane surface mount.
3. a kind of indoor moisture proof cracking resistance earth construction according to claim 1, it is characterised in that described fine sand layer (2)
For 5-10mm.
4. a kind of indoor moisture proof cracking resistance earth construction according to claim 1, it is characterised in that described concrete hardening
Layer (4) is 40-50mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621457551.1U CN206337787U (en) | 2016-12-28 | 2016-12-28 | A kind of indoor moisture proof cracking resistance earth construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621457551.1U CN206337787U (en) | 2016-12-28 | 2016-12-28 | A kind of indoor moisture proof cracking resistance earth construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206337787U true CN206337787U (en) | 2017-07-18 |
Family
ID=59304499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621457551.1U Expired - Fee Related CN206337787U (en) | 2016-12-28 | 2016-12-28 | A kind of indoor moisture proof cracking resistance earth construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206337787U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797931A (en) * | 2018-06-15 | 2018-11-13 | 湖南宝家云建筑工程管理有限公司 | A kind of damp proofing of ground processing method |
CN111691640A (en) * | 2020-06-29 | 2020-09-22 | 海通建设集团有限公司 | Prestressed seamless terrace and construction method thereof |
-
2016
- 2016-12-28 CN CN201621457551.1U patent/CN206337787U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797931A (en) * | 2018-06-15 | 2018-11-13 | 湖南宝家云建筑工程管理有限公司 | A kind of damp proofing of ground processing method |
CN111691640A (en) * | 2020-06-29 | 2020-09-22 | 海通建设集团有限公司 | Prestressed seamless terrace and construction method thereof |
CN111691640B (en) * | 2020-06-29 | 2021-08-03 | 海通建设集团有限公司 | Prestressed seamless terrace and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105040554A (en) | Garden path structure and paving construction technology thereof | |
CN206337787U (en) | A kind of indoor moisture proof cracking resistance earth construction | |
CN103866927B (en) | Breathing roof insulation structure and construction method thereof | |
CN210508199U (en) | Ground with dampproofing heat preservation function | |
CN107989243A (en) | A kind of construction method for caisson of toilet backfill | |
Tavares et al. | Common pathologies in composite adobe and reinforced concrete constructions | |
CN206267495U (en) | A kind of architecture storey tolerant noise-insulating warm-keeping system | |
CN107574952A (en) | A kind of damp-proofing wall and its construction technology | |
CN104404857A (en) | Permeable brick paving ground and construction method | |
CN201567514U (en) | Road surface construction structure | |
CN207017545U (en) | Foam concrete heat-preserving roofing optimizes architectural construction and local structure | |
CN204982595U (en) | Court terrace structure | |
CN206397056U (en) | A kind of anti-aging wear-resisting antiseepage terrace | |
TW201500617A (en) | Man-made athletic field and athletic runway structure featuring eco-green building and construction method thereof | |
CN205776811U (en) | A kind of node preventing assembled Timberwork wall from making moist with basis | |
CN105155387A (en) | Garden road structure | |
CN207003175U (en) | A kind of new underloading permeable pavement structure | |
CN108611948A (en) | A kind of urban road permeable pavement structure | |
CN104074292A (en) | A damp-proof and heat insulating ground system and a construction method thereof | |
CN205025043U (en) | Ground system | |
CN206034227U (en) | Ecological brick who is difficult for rocking | |
CN203145236U (en) | Anti-frost-heaving firm weatherproof heat-preserving plinth | |
CN203188483U (en) | Roof with floor tiles | |
CN207295788U (en) | A kind of antifreeze aproll structure of extensional mode thermal insulation board | |
CN202745087U (en) | Insulation structure capable of reducing frost heaving thaw collapse quantity of soil of side slope in cold region |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170718 Termination date: 20191228 |