CN206329032U - Template suitable for pouring section after assembled beam-column - Google Patents

Template suitable for pouring section after assembled beam-column Download PDF

Info

Publication number
CN206329032U
CN206329032U CN201621304667.1U CN201621304667U CN206329032U CN 206329032 U CN206329032 U CN 206329032U CN 201621304667 U CN201621304667 U CN 201621304667U CN 206329032 U CN206329032 U CN 206329032U
Authority
CN
China
Prior art keywords
template
assembled beam
column
section
pour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621304667.1U
Other languages
Chinese (zh)
Inventor
龙莉波
马跃强
戚建文
曾晓晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201621304667.1U priority Critical patent/CN206329032U/en
Application granted granted Critical
Publication of CN206329032U publication Critical patent/CN206329032U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of template for being applied to pour section after assembled beam-column, it is of the present utility model be applied to assembled beam-column after pour the template of section under assembled beam-column system, by through the bolt hole and the screw rod of described sleeve pipe on the U-shaped steel form, with the nut of the fixed screw rod, realize and utilize screw rod and nut fixed form, reduce the use of batten roll and steel pipe, reduce lower support, material consumption is saved, so as to which the two ends of assembled beam or the template of post be fixedly connected with two assembled beams to be connected or post respectively, the materials such as batten stirrup need not be used to be supported and reinforce template, pars infrasegmentalis support is poured after release, it is flexible during splicing, dismounting is easy, reduce cost.

Description

Template suitable for pouring section after assembled beam-column
Technical field
The utility model is related to a kind of template for being applied to pour section after assembled beam-column.
Background technology
For prefabricated assembled prefabricated bean column node, the method poured after is attached.Traditional pin-connected panel coagulation Although clay model plate has the advantages that flexible, reinforcing support is carried out by batten stirrup in construction, and will be After pour Duan Chu bottoms and set up support system, occupied ground simultaneously reduces efficiency of construction, adds the duration.
Utility model content
The purpose of this utility model is to provide a kind of, can avoid the drawbacks of conventional template is brought, and improves construction effect Rate.
To solve the above problems, the utility model provides a kind of template for being applied to pour section after assembled beam-column, including:
U-shaped steel form, two blocks of side plates being connected by base plate and with the base plate are constituted, and the base plate is surrounded with two blocks of side plates U-shaped groove, the two ends correspondence of every block of side plate offers bolt hole;
The sleeve pipe at the edge of assembled beam to be connected or post is embedded in advance, wherein, the position of the bolt hole position and sleeve pipe Put consistent;
Through the nut of the bolt hole and the screw rod of described sleeve pipe on the U-shaped steel form, and the fixed screw rod.
Further, in above-mentioned template, the size of the U-shaped groove and assembled beam or column dimension one to be connected Cause.
Further, in above-mentioned template, the aperture of the bolt hole and sleeve pipe is consistent with the diameter of the screw rod.
Further, pour section in above-mentioned template, after being formed in the U-shaped groove and use ultra-high performance concrete.
Further, in above-mentioned template, the edge of the assembled beam to be connected or post is additionally provided with recess.
Further, in above-mentioned template, the shape of each recess is consistent.
Further, in above-mentioned template, the base plate is connected with two pieces of plate-side plate weldings.
Compared with prior art, it is of the present utility model suitable for pouring the template of section in assembled beam-column body after assembled beam-column It is real by the nut through the bolt hole and the screw rod of described sleeve pipe on the U-shaped steel form, and the fixed screw rod under system Screw rod and nut fixed form are now utilized, the use of batten roll and steel pipe is reduced, reduces lower support, saved material Consumption, so as to the two ends of assembled beam or the template of post are fixedly connected with two assembled beams to be connected or post respectively, i.e., Template is fixed between assembled beam or post, so as to template is fixed at the node of assembled beam or post, it is not necessary to use The materials such as batten stirrup are supported and reinforced to template, pars infrasegmentalis support are poured after release, flexible during splicing, dismounting is held Easily, cost is reduced, the drawbacks of conventional template is brought can be avoided, construction quality is can guarantee that after installation, efficiency of construction can be improved again, Node is poured after the completion of maintenance, just dismountable screw rod and template, is reused, and the utility model is particularly suitable for use in assembled beam Bean column node construction under cylinder system.
Brief description of the drawings
Fig. 1 is the scheme of installation for being applied to pour the template of section after assembled beam-column of the embodiment of the utility model one;
Fig. 2 is the sectional view at A-A along assembled beam-column axial direction in Fig. 1.
Embodiment
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings and tool Body embodiment is described in further detail to the utility model.
As illustrated in fig. 1 and 2, the utility model provides a kind of template for being applied to pour section after assembled beam-column, including:
U-shaped steel form 1, two blocks of side plates 12 being connected by base plate 11 and with the base plate 11 are constituted, the base plate 11 and two Block side plate 12 surrounds U-shaped groove, and the two ends correspondence of every block of side plate 11,12 offers bolt hole;
The sleeve pipe 4 at the edge of assembled beam 2 to be connected or post 3 is embedded in advance, wherein, the bolt hole position and sleeve pipe 4 Position it is consistent, it is ensured that aperture just can pass through screw rod;
Through the nut of the bolt hole and the screw rod 5 of described sleeve pipe 4 on the U-shaped steel form 1, and the fixed screw rod 5 6.It is of the present utility model to be applied to pour the template of section under assembled beam-column system after assembled beam-column, by through described U-shaped The screw rod of bolt hole and described sleeve pipe on steel form, and the nut of the screw rod is fixed, realization is fixed using screw rod and nut Template, reduces the use of batten roll and steel pipe, reduces lower support, saved material consumption, so that by assembled beam Or the two ends of the template of post are fixedly connected with two assembled beams to be connected or post respectively, i.e., template is fixed on into assembled beam Or between post, so as to template is fixed at the node of assembled beam or post, it is not necessary to using materials such as batten stirrups to template It is supported and reinforces, pars infrasegmentalis support is poured after release, flexible during splicing, dismounting is easy, reduces cost, can avoid tradition The drawbacks of Form board tape comes, can guarantee that construction quality after installation, efficiency of construction can be improved again, node is poured after the completion of maintenance, just Dismountable screw rod and template, are reused, and the bean column node that the utility model is particularly suitable for use under assembled beam-column system is applied Work.
In the embodiment of the application one, as illustrated in fig. 1 and 2, the size of the U-shaped groove 1 and assembled beam 2 to be connected or The size of post 3 is consistent, so as to ensure to pour section after being formed consistent with assembled beam to be connected or column dimension in U-shaped groove.
In the embodiment of the application one, as illustrated in fig. 1 and 2, the aperture of the bolt hole and sleeve pipe 4 is straight with the screw rod 5 Footpath is consistent, is more closely fixedly connected on assembled beam or post with the two ends for realizing template.
In the embodiment of the application one, as shown in figure 1, pouring section after being formed in the U-shaped groove using very-high performance coagulation Native (UHPC), here, section is poured after being done using ultra-high performance concrete pours material, structure connection safety is also greatly improved.
In the embodiment of the application one, as shown in figure 1, the edge of the assembled beam 2 to be connected or post 3 be additionally provided with it is recessed Mouthfuls 8, to pour the bonding strength of section after increasing between assembled beam to be connected or post.
In the embodiment of the application one, as shown in figure 1, the shape of each recess is consistent, it is easy to batch production.
In the embodiment of the application one, the base plate is connected with two pieces of plate-side plate weldings, to ensure bonding strength.
As illustrated in fig. 1 and 2, the above-mentioned Formwork Installation Method for being applied to pour section after assembled beam-column, including:
Step S1, makes assembled beam 2 or post 3, in assembled beam or the edge service sleeve 4 of post in factory;
Step S2, makes U-shaped steel form 1, wherein, what the U-shaped steel form 1 was connected by base plate 11 and with the base plate 11 Two blocks of side plates 12 are constituted, and the base plate 11 and two blocks of side plates 12 surround U-shaped groove, and spiral shell is opened up in the two ends correspondence of every block of side plate 12 Keyhole, the bolt hole position is consistent with the position of described sleeve pipe 4;
Step S3, lifts assembled beam 2 at the scene or post 3 arrives precalculated position;
Step S4, the U-shaped steel form 1 is placed at the node of assembled beam 2 or post 3, and the screw rod 5 is passed through into institute The bolt hole and described sleeve pipe 4 on U-shaped steel form are stated, U-shaped steel form is fixed between assembled beam or post with nut 6;
Step S5, surrounds after casting concrete is formed in U-shaped groove in the base plate 11 and two blocks of side plates 12 and pours section 7;
Step S6, pours section 7 after being conserved according to standard conditions;
Step S7, unclamps nut 6 and takes out screw rod 5, U-shaped steel form 1 under dismounting, to assembled beam or the set at the edge of post Pore is repaired.The template of the present utility model for being applied to pour section after assembled beam-column passes through under assembled beam-column system Through the nut of the bolt hole and the screw rod of described sleeve pipe on the U-shaped steel form, and the fixed screw rod, realization utilizes screw rod With nut fixed form, the use of batten roll and steel pipe is reduced, lower support is reduced, material consumption has been saved, so that The two ends of assembled beam or the template of post are fixedly connected with two assembled beams to be connected or post respectively, i.e., fixed template Between assembled beam or post, so as to template is fixed at the node of assembled beam or post, it is not necessary to use batten stirrup etc. Material is supported and reinforced to template, pars infrasegmentalis support is poured after release, flexible during splicing, dismounting is easy, reduces cost, The drawbacks of conventional template is brought can be avoided, construction quality is can guarantee that after installation, efficiency of construction can be improved again, node pours maintenance After the completion of, just dismountable screw rod and template are reused, and the utility model is particularly suitable for use in the beam under assembled beam-column system Column border node is constructed.
In the embodiment of the application one, as illustrated in fig. 1 and 2, the size of the U-shaped groove and assembled beam 2 to be connected or The size of post 3 is consistent, so as to ensure to pour section after being formed consistent with assembled beam to be connected or column dimension in U-shaped groove.
In the embodiment of the application one, as illustrated in fig. 1 and 2, the aperture of the bolt hole and sleeve pipe 4 is straight with the screw rod 5 Footpath is consistent, is more closely fixedly connected on assembled beam or post with the two ends for realizing template.
In the embodiment of the application one, as shown in figure 1, section 7 is poured after being formed in the U-shaped groove uses very-high performance coagulation Native (UHPC), here, section is poured after being done using ultra-high performance concrete pours material, structure connection safety is also greatly improved.
In the embodiment of the application one, as shown in figure 1, the edge of the assembled beam 2 to be connected or post 5 be additionally provided with it is recessed Mouthfuls 8, to pour the bonding strength of section after increasing between assembled beam to be connected or post.
In the embodiment of the application one, as shown in figure 1, the shape of each recess 8 is consistent, it is easy to batch production.
In the embodiment of the application one, the base plate is connected with two pieces of plate-side plate weldings, to ensure bonding strength.
It is in summary, of the present utility model to be applied to pour the template of section under assembled beam-column system after assembled beam-column, By the nut through the bolt hole and the screw rod of described sleeve pipe on the U-shaped steel form, and the fixed screw rod, realize and utilize Screw rod and nut fixed form, reduce the use of batten roll and steel pipe, reduce lower support, saved material consumption, So as to which the two ends of assembled beam or the template of post be fixedly connected with two assembled beams to be connected or post respectively, i.e., by template It is fixed between assembled beam or post, so as to template is fixed at the node of assembled beam or post, it is not necessary to use batten steel The materials such as hoop are supported and reinforced to template, pars infrasegmentalis support are poured after release, flexible during splicing, dismounting is easy, reduces Cost, can avoid the drawbacks of conventional template is brought, and can guarantee that construction quality after installation, efficiency of construction can be improved again, node is poured Build after the completion of maintenance, just dismountable screw rod and template, are reused, and the utility model is particularly suitable for use in assembled beam-column system Under bean column node construction.
The embodiment of each in this specification is described by the way of progressive, and what each embodiment was stressed is and other Between the difference of embodiment, each embodiment identical similar portion mutually referring to.
Obviously, those skilled in the art can be new without departing from this practicality to the various changes of utility model progress and modification The spirit and scope of type.So, if it is of the present utility model these modification and modification belong to the utility model claim and its Within the scope of equivalent technologies, then the utility model is also intended to including these changes and modification.

Claims (7)

1. a kind of template for being applied to pour section after assembled beam-column, it is characterised in that including:
U-shaped steel form, two blocks of side plates being connected by base plate and with the base plate are constituted, and the base plate surrounds U-shaped with two blocks of side plates Groove, the two ends correspondence of every block of side plate offers bolt hole;
The sleeve pipe at the edge of assembled beam to be connected or post is embedded in advance, wherein, the bolt hole position and the position phase of sleeve pipe Unanimously;
Through the nut of the bolt hole and the screw rod of described sleeve pipe on the U-shaped steel form, and the fixed screw rod.
2. it is applied to pour the template of section as claimed in claim 1 after assembled beam-column, it is characterised in that the U-shaped groove Size is consistent with assembled beam to be connected or column dimension.
3. it is applied to pour the template of section as claimed in claim 1 after assembled beam-column, it is characterised in that the bolt hole and set The aperture of pipe is consistent with the diameter of the screw rod.
4. it is applied to pour the template of section as claimed in claim 1 after assembled beam-column, it is characterised in that in the U-shaped groove Section, which is poured, after being formed uses ultra-high performance concrete.
5. it is applied to pour the template of section as claimed in claim 1 after assembled beam-column, it is characterised in that the dress to be connected Edge with formula beam or post is additionally provided with recess.
6. it is applied to pour the template of section as claimed in claim 5 after assembled beam-column, it is characterised in that the shape of each recess is protected Hold consistent.
7. it is applied to pour the template of section as claimed in claim 1 after assembled beam-column, it is characterised in that the base plate and two pieces Plate-side plate welding is connected.
CN201621304667.1U 2016-11-30 2016-11-30 Template suitable for pouring section after assembled beam-column Active CN206329032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621304667.1U CN206329032U (en) 2016-11-30 2016-11-30 Template suitable for pouring section after assembled beam-column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621304667.1U CN206329032U (en) 2016-11-30 2016-11-30 Template suitable for pouring section after assembled beam-column

Publications (1)

Publication Number Publication Date
CN206329032U true CN206329032U (en) 2017-07-14

Family

ID=59288292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621304667.1U Active CN206329032U (en) 2016-11-30 2016-11-30 Template suitable for pouring section after assembled beam-column

Country Status (1)

Country Link
CN (1) CN206329032U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499176A (en) * 2016-11-30 2017-03-15 上海建工二建集团有限公司 Template and its installation method of section is poured after being applied to assembled beam-column
CN115419258A (en) * 2022-09-29 2022-12-02 重庆赛迪工程咨询有限公司 Standardized template for beam connection
CN115492376A (en) * 2022-08-31 2022-12-20 上海宝冶集团有限公司 Template supporting method for lattice beams and lattice columns of ultra-large slope broken stone slope

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499176A (en) * 2016-11-30 2017-03-15 上海建工二建集团有限公司 Template and its installation method of section is poured after being applied to assembled beam-column
CN115492376A (en) * 2022-08-31 2022-12-20 上海宝冶集团有限公司 Template supporting method for lattice beams and lattice columns of ultra-large slope broken stone slope
CN115419258A (en) * 2022-09-29 2022-12-02 重庆赛迪工程咨询有限公司 Standardized template for beam connection

Similar Documents

Publication Publication Date Title
US10273691B2 (en) Method of constructing a reinforced compound concrete beam containing demolished concrete lumps
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
KR101195516B1 (en) Pier Cap Installation Structure Using Precast Concrete Shell And Construction Method Thereof
CN206329032U (en) Template suitable for pouring section after assembled beam-column
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN206784158U (en) A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node
WO2016041237A1 (en) High-strength regenerative mixed steel pipe concrete anti-shock column with internal local restraint, and construction process
WO2016041236A1 (en) High-strength regenerative mixed steel pipe concrete axial-compression column with internal local restraint, and construction process
CN107687219A (en) For the preparation method of the connection component and superimposed sheet that make superimposed sheet
CN105133487A (en) Combined type bridge temporary support and construction method for rapidly building continuous beams by virtue of same
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN207063267U (en) For making the connection component of superimposed sheet
CN106499176A (en) Template and its installation method of section is poured after being applied to assembled beam-column
CN106285002A (en) Cast-in-place walls difference of height tool-type hoisting die construction method
CN106193455A (en) A kind of ultra-high performance concrete cylinder permanent template and preparation method thereof
CN106639151B (en) Built-in X-type is to drawing steel plate type welding rectangular steel-tube concrete column and construction method
CN105839851B (en) Using the construction method for the prefabricated frame trestle that segmentation connection is formed
CN110195514A (en) A kind of segment-shaped dome concreting method
CN209260922U (en) Band girder rib laminated floor slab pre-tensioning system connecting joint structure
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN206467580U (en) A kind of reinforced bridge pier
CN103397778A (en) Method for constructing high-rise commercial and residential building structure transfer floor
CN106049759A (en) Cylindrical ultra-high performance concrete permanent formwork and preparation method thereof
CN211850892U (en) Pouring device for pouring concrete silo pressure reducing cone
CN207193782U (en) A kind of pole type box culvert supporting embedded part of primary concreting Underground Culvert

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant