CN206328764U - A kind of half fills the stone facing structure of concrete - Google Patents

A kind of half fills the stone facing structure of concrete Download PDF

Info

Publication number
CN206328764U
CN206328764U CN201621235228.XU CN201621235228U CN206328764U CN 206328764 U CN206328764 U CN 206328764U CN 201621235228 U CN201621235228 U CN 201621235228U CN 206328764 U CN206328764 U CN 206328764U
Authority
CN
China
Prior art keywords
concrete
fills
building stones
stone
facing structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621235228.XU
Other languages
Chinese (zh)
Inventor
陈振华
高健
金海胜
金锦强
臧振涛
刘林松
张鲁刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201621235228.XU priority Critical patent/CN206328764U/en
Application granted granted Critical
Publication of CN206328764U publication Critical patent/CN206328764U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of half fills the stone facing structure of concrete, from level to or diagonally disposed building stones place and form, irrigate cementing material, influx height is less than the building stones design thickness of pavement structure in the Partial seams gap between building stones and adjacent building stones in, form half filling concrete.Compared with conventional " concrete fills building block stone ", the utility model only irrigates the cementing materials such as part concrete or mortar, increases substantially permeability rate, adaptive deformation ability and the unrestrained performance that disappears of masonry, cementing material consumption is greatly decreased, so as to reduce cost;Compared with routine is without cementing material masonry, globality, the wind and wave resistance impact capacity of masonry are greatly improved.

Description

A kind of half fills the stone facing structure of concrete
Technical field
The utility model belongs to flood control (tide) mitigation field, is mainly used in dike in water conservancy, municipal administration, harbour and coastal engineering Dam slope face, the protection of plane, can also be applied to the side slope protection of the engineerings such as highway, railway.
Background technology
Relevant pavement structure is common, the lower-cost domatic safeguard structure with plane with " building stones ", is typically pressed Whether there is cementing material and be divided into two major classes, no cementing material is divided into placed rockfill (cobble, the rectangular slab of stone), reason building block stone, perpendicular building block again Stone, throwing reason block stone, the concrete that is divided into for having cementing material fill building block stone, sand cemented rock (cobble, the rectangular slab of stone), placed rockfill mortar-chalked joint Deng.
The concrete for having cementing material is filled in building block stone, cemented rock (cobble, the rectangular slab of stone) structure, and building stones surrounding fills agglutination material Expect (concrete or mortar), volume accounting of the cementing material in masonry is generally 40%~60%, and structural integrity is preferable, but cementing Material usage is big, high cost, very low permeability rate, adaptive deformation ability, disappear unrestrained poor performance;Placed rockfill mortar-chalked joint is dry Surface mortar-chalked joint is carried out on the basis of building block stone, structural integrity is better than placed rockfill, but jointing mortar adaptive deformation ability Difference, durability is not high, permeability rate is low, the unrestrained poor performance that disappears, wind and wave resistance impact capacity be not high.
Building stones structure without cementing material, adaptive deformation ability is good, permeability rate is high, disappear unrestrained better performances, low cost, but whole Body is poor, and wind and wave resistance impact capacity is not high.
In summary, there are many shortcomings in the existing pavement structure relevant with " building stones ".
The content of the invention
Cost and performance can not be taken into account in order to overcome the shortcomings of existing stone facing structure, and the utility model provides a kind of Take into account the stone facing structure of half filling concrete of cost and performance.
The utility model solves the technical scheme that its technical problem used:
A kind of half fills the stone facing structure of concrete, from level to or diagonally disposed building stones place and form, building stones with it is adjacent Cementing material is irrigated in Partial seams gap between building stones, influx height is less than the building stones design thickness of pavement structure, is formed Half fills concrete.
Further, perfusion cementing material in 3/1/3rd~tetra- thickness ranges of the seam.
It is preferred that, the seam bottom irrigates cementing material.
Either:Perfusion cementing material in the middle part of the seam.
Again either:Perfusion cementing material at the top of the seam.
Downside and/or downside perfusion cementing material in the middle part of the seam.
Further, the pavement structure is including irrigating between building stones and adjacent building stones in unit, the perfusion unit Form half and fill concrete.The seam irrigates the planar range of cementing material, can also irregularly be arranged with regular arrangement.
Seam insertion between adjacent perfusion unit, formed mask inside and outside can supply water, air turnover drainage belt.
The building stones are block stone, rubble, cobble or the rectangular slab of stone.It is of course also possible to be other building stones.
The utility model is after building stones " reason is thrown or reason is built or laid dry ", and in building stones peripheral portion gap, (for example half is left It is right), cementing material Partial Height scope (such as half or so) perfusion concrete or mortar;During using irregular perfusion, position is irrigated Put after generally three angle seams, larger vertical masonry joint, perfusion cementing material, can generally make several piece building stones rather than a sheet of building stones It is bonded into an entirety;During using rule perfusion, perfusion position is the gap between middle whole piece building stones, the portion of surrounding building stones Parting gap is not irrigated, and is formed a relative constructing operation and is easily irrigated unit, the seam irrigated between unit is not irrigated, and is irrigated The gap of the most middle building stones surrounding of unit does not irrigate or buried osculum depending on feelings.
Using the stone facing structure of " half fills concrete ", cementing material building stones structure had both been combined and without cementing material building stones The advantage of structure, turn avoid both shortcomings;Can be separately as pavement structure, also can be first as construction time interim mask knot Structure, second phase add building stones or concrete to be re-used as permanent pavement structure after the settlement difference that makes corrections.
The beneficial effects of the utility model are mainly manifested in:Compared with conventional " concrete fills building block stone ", the utility model is only The cementing material such as part concrete or mortar is irrigated, permeability rate, adaptive deformation ability and the unrestrained performance that disappears of masonry is increased substantially, significantly Cementing material consumption is reduced, so as to reduce cost;Compared with routine is without cementing material masonry, greatly improve masonry globality, Wind and wave resistance impact capacity.
Brief description of the drawings
Fig. 1 is a kind of half structural representation for filling concrete.
Fig. 2 is another half structural representation for filling concrete.
Fig. 3 is the structural representation of another half filling concrete.
Fig. 4 is still another half structural representation for filling concrete.
Fig. 5 is that a kind of concrete partly fills block (hair) stone floor map.
Fig. 6 is that another concrete partly fills block (hair) stone floor map.
Embodiment
The utility model is further described below in conjunction with the accompanying drawings.
Reference picture 1~Fig. 6, a kind of half fills the stone facing structure of concrete, from level to or diagonally disposed building stones 1 place and Into perfusion cementing material 2 in the Partial seams gap between building stones 1 and adjacent building stones, influx height is less than the block of pavement structure Stone design thickness, forms half and fills concrete.
Further, perfusion cementing material in 3/1/3rd~tetra- thickness ranges of the seam.
It is preferred that, the seam bottom irrigates cementing material.
Either:Perfusion cementing material in the middle part of the seam.
Again either:Perfusion cementing material at the top of the seam.
Downside and/or downside perfusion cementing material in the middle part of the seam.
Further, the pavement structure include in perfusion unit 3, the perfusion unit 3 building stones and adjacent building stones it Between form half and fill concrete.The seam irrigates the planar range of cementing material, can also irregularly be arranged, no with regular arrangement Regular arrangement refers to Fig. 5, regular arrangement reference picture 6.During rule perfusion, the seam within dotted line frame needs perfusion;According to difference Situation, perfusion unit 3 can also select middle building stones stay seam do not fill or set osculum, to realize whole stone facing knot The drain function of structure.
It is adjacent perfusion unit 3 between seam insertion, formed mask inside and outside can supply water, air turnover drainage belt 4.
The building stones are block stone, rubble, cobble or the rectangular slab of stone.It is of course also possible to be other building stones.
The cementing material of the present embodiment is usually concrete, it would however also be possible to employ cement mortar, epoxy resin mortar, epoxy concrete or water Lower indiffusion concrete etc..
Described above is not limitation of the utility model, and the utility model is also not limited to the example above, this technology neck The those of ordinary skill in domain, in the range of the utility model, the change made, changes addition or replaces, should belong to this practicality New protection domain.

Claims (9)

1. a kind of half fills the stone facing structure of concrete, from level to or diagonally disposed building stones place and form, it is characterised in that:Stone Cementing material is irrigated in Partial seams gap between material and adjacent building stones, the building stones design that influx height is less than pavement structure is thick Degree, forms half and fills concrete.
2. as claimed in claim 1 half fills the stone facing structure of concrete, it is characterised in that:/ 3rd~the tetra- of the seam Perfusion cementing material in/tri- thickness ranges.
3. as claimed in claim 2 half fills the stone facing structure of concrete, it is characterised in that:The seam bottom irrigates agglutination material Material.
4. as claimed in claim 2 half fills the stone facing structure of concrete, it is characterised in that:Perfusion agglutination material in the middle part of the seam Material.
5. as claimed in claim 2 half fills the stone facing structure of concrete, it is characterised in that:Perfusion agglutination material at the top of the seam Material.
6. as claimed in claim 4 half fills the stone facing structure of concrete, it is characterised in that:In the middle part of the seam downside and/or Downside irrigates cementing material.
7. half as described in one of claim 1~6 fills the stone facing structure of concrete, it is characterised in that:The pavement structure bag Formation half fills concrete between including the building stones and adjacent building stones in perfusion unit, the perfusion unit.
8. as claimed in claim 7 half fills the stone facing structure of concrete, it is characterised in that:Seam between adjacent perfusion unit Insertion, formed mask inside and outside can supply water, air turnover drainage belt.
9. half as described in one of claim 1~6 fills the stone facing structure of concrete, it is characterised in that:The building stones be block stone, Rubble, cobble or the rectangular slab of stone.
CN201621235228.XU 2016-11-17 2016-11-17 A kind of half fills the stone facing structure of concrete Active CN206328764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621235228.XU CN206328764U (en) 2016-11-17 2016-11-17 A kind of half fills the stone facing structure of concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621235228.XU CN206328764U (en) 2016-11-17 2016-11-17 A kind of half fills the stone facing structure of concrete

Publications (1)

Publication Number Publication Date
CN206328764U true CN206328764U (en) 2017-07-14

Family

ID=59289181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621235228.XU Active CN206328764U (en) 2016-11-17 2016-11-17 A kind of half fills the stone facing structure of concrete

Country Status (1)

Country Link
CN (1) CN206328764U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638627A (en) * 2016-11-17 2017-05-10 浙江水利水电学院 Stone laying face protection structure of half pouring concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638627A (en) * 2016-11-17 2017-05-10 浙江水利水电学院 Stone laying face protection structure of half pouring concrete

Similar Documents

Publication Publication Date Title
CN103643656B (en) High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body
CN106638627A (en) Stone laying face protection structure of half pouring concrete
CN103397617B (en) Extruding wall-geomembrane face dam
CN103410175A (en) Water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN106284215B (en) A kind of mixed dam
CN104099903A (en) High-base asphalt concrete core wall dam
CN206784082U (en) A kind of High Speed Railway Subgrade of saline soil area
CN206328764U (en) A kind of half fills the stone facing structure of concrete
CN208981282U (en) A kind of high earthquake territory concrete face rockfill dam dam crest structure
CN106087639A (en) A kind of highway, Irish bridge structure and Irish bridge construction method
CN103205951A (en) Sludge-type soil combined secondary dike-back pressure diking method
CN209873714U (en) River bank protection structure for urban mountain area
CN205604186U (en) Clay core morals and manners material dam
CN217231650U (en) Double combined wave-dissipating seawall with rough stone facing structure
CN206784320U (en) A kind of geomembrane air exit
CN206267098U (en) A kind of Channel slope stabilization feature wall
CN201284475Y (en) Combined concrete cut-off wall
CN212533930U (en) Slope protection for antiseep water conservancy flood control
CN209568531U (en) A kind of water storage system of discarded Rare-earth Mine
CN206599758U (en) A kind of combined type bulwark
CN208009360U (en) A kind of sea wall construction time passes the flood period safeguard structure
CN106149640A (en) Improve method and the double-drainage body rock of rock infiltration security
CN209603196U (en) Sole plate post-poured strip structure
CN208039146U (en) A kind of Eco-hydrological connectivity structure for wetland both sides of the road shallow-layer water body
CN208251021U (en) Dam upstream foundation pit auxiliary seepage proof ply angles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant