- Publication number
- CN206319342U CN206319342U CN201621462894.7U CN201621462894U CN206319342U CN 206319342 U CN206319342 U CN 206319342U CN 201621462894 U CN201621462894 U CN 201621462894U CN 206319342 U CN206319342 U CN 206319342U
- Authority
- CN
- China
- Prior art keywords
- hollow pipe
- steel wire
- cut
- pff wall
- groove section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
A kind of cut-pff wall special groove section joint brushing device, including hollow pipe, hollow pipe top are provided with bale handle, and hollow pipe side is provided with scrub brush body, and hollow pipe opposite side is provided with locating rack, hollow pipe and is provided with balancing weight;Scrub in brush body, fixed plate, which is fixedly installed in hollow pipe side, fixed plate, is from top to bottom provided with multilayer steel wire floor, and each layer steel wire floor is made up of many steel wires be arrangeding in parallel, a is set at an angle for line and the vertical direction of each layer steel wire floor outer end.The cut-pff wall special groove section joint brushing device that the utility model is provided, can solve the problem of seam mudcake scrubs difficult, improve construction efficiency, it is ensured that the quality of cut-pff wall or diaphram wall.
Description
Technical field
The utility model is related to cut-pff wall and construction of diaphragm wall cleaning device, especially a kind of cut-pff wall special groove
Section joint brushing device.
Background technology
The construction of cut-pff wall and diaphram wall, tends to be universal in water conservancy and hydropower, Urban Underground railway and water conservancy ranks
Trend, in trenching construction caused by the factors such as construction technology, workmen, construction equipment, geological conditions cut-pff wall and underground
There is mass defect and quality accident in construction of diaphragm wall, and processing mass defect and quality accident need continuous in cut-pff wall or underground
The upstream face of wall is constructed one section of cut-pff wall or diaphram wall again.The benefit wall of construction and former cut-pff wall or diaphram wall seam
The scrub of mudcake brings very big difficulty and technical barrier to construction.Conventional scrubbing tool is difficult to meet technical requirement on design,
Processed conventionally method:Circular bite wire brush is scrubbed.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of cut-pff wall special groove section joint brushing device, can
To solve the problem of seam mudcake scrubs difficult, construction efficiency is improved, it is ensured that the quality of cut-pff wall or diaphram wall.
In order to solve the above technical problems, the technical scheme that the utility model is used is:A kind of cut-pff wall special groove section connects
Head brushing device, including hollow pipe, hollow pipe top are provided with bale handle, and hollow pipe side is provided with scrub brush body, hollow pipe
Opposite side is provided with locating rack, hollow pipe and is provided with balancing weight;
Scrub in brush body, fixed plate, which is fixedly installed in hollow pipe side, fixed plate, is from top to bottom provided with multilayer steel wire
Layer, each layer steel wire floor is made up of many steel wires be arrangeding in parallel, and line and the vertical direction of each layer steel wire floor outer end are in certain angle
A is spent to set;
Reinforced bar support one end is fixedly connected with hollow pipe, and the reinforced bar support other end is fixedly connected with fixed plate.
The quantity of steel wire floor is ten layers.
The steel wire diameter of the four layers of steel wire floor in top is 8 millimeters, and the steel wire diameter of the 6 layers of steel wire floor in bottom is 1 millimeter.
A is set the line of each layer steel wire floor outer end at an angle with vertical direction, a=15-20 degree.
Balancing weight is the balancing weight using concreting.
The cut-pff wall special groove section joint brushing device that the utility model is provided, processing, it is easy to operate, can be fast rapid
Cut-pff wall or diaphram wall seam are handled, can be by the cut-pff wall of original construction or the benefit wall seam of diaphram wall and construction in later period
Mudcake quickly scrubbed clean with most simple, most shortcut, so as to improve construction efficiency, it is ensured that the matter of cut-pff wall or diaphram wall
Amount;Material requested buying is convenient, reduces construction cost;Improve operating efficiency.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is front view of the present utility model;
Fig. 2 is side view of the present utility model;
Fig. 3 is top view of the present utility model.
Embodiment
As Figure 1-3, a kind of cut-pff wall special groove section joint brushing device, including hollow pipe 2, the top of hollow pipe 2
Bale handle 1 is provided with, the side of hollow pipe 2 is provided with scrub brush body, and the opposite side of hollow pipe 2 is provided with locating rack 6, hollow pipe 2 and set
It is equipped with balancing weight 7;
Scrub in brush body, fixed plate 3 is fixedly installed in the side of hollow pipe 2, fixed plate 3 and is from top to bottom provided with composite steel
Silk layer 4, each layer steel wire floor 4 is made up of many steel wires be arrangeding in parallel, and line and the vertical direction of each outer end of layer steel wire floor 4 are in one
Determine angle a settings;
The one end of reinforced bar support 5 is fixedly connected with hollow pipe 2, and the other end of reinforced bar support 5 is fixedly connected with fixed plate 3.
The quantity of steel wire floor 4 is ten layers.
The steel wire diameter of the four layers of steel wire floor 4 in top is 8 millimeters, and the steel wire diameter of the 6 layers of steel wire floor in bottom is 1 millimeter.
A is set the line of each outer end of layer steel wire floor 4 at an angle with vertical direction, a=15-20 degree, preferably 15 degree.
Balancing weight 7 is the balancing weight using concreting.
Bale handle 1 diameter, 50~80 millimeters of round steel are processed into " U " type, 400 millimeters of " U " type length, 500 millimeters of width.
The preferably steel pipe of hollow pipe 2,800 millimeters of length, a diameter of 500 millimeters, thickness of steel pipe is 20 millimeters.
In use, with the main rope of percussive drill(When Kong Shen≤40 meter, it is contemplated that use mud steel wire rope)By this reality
Seam scrub is carried out in slotted eye with new hang in, you can by the cut-pff wall or diaphram wall and the benefit wall of construction in later period of original construction
The mudcake of seam is quickly scrubbed clean with most simple, most shortcut, so as to improve construction efficiency, it is ensured that cut-pff wall or diaphram wall
Quality;Material requested buying is convenient, reduces construction cost;Improve operating efficiency.
Claims (5)
1. a kind of cut-pff wall special groove section joint brushing device, it is characterised in that:Including hollow pipe(2), hollow pipe(2)Top
It is provided with bale handle(1), hollow pipe(2)Side is provided with scrub brush body, hollow pipe(2)Opposite side is provided with locating rack(6), it is hollow
Pipe(2)Inside it is provided with balancing weight(7);
Scrub in brush body, fixed plate(3)It is fixedly installed on hollow pipe(2)Side, fixed plate(3)On be from top to bottom provided with multilayer
Steel wire floor(4), each layer steel wire floor(4)It is made up of many steel wires be arrangeding in parallel, each layer steel wire floor(4)The line of outer end with it is vertical
A is set at an angle in direction;
Reinforced bar support(5)One end and hollow pipe(2)It is fixedly connected, reinforced bar support(5)The other end and fixed plate(3)It is fixedly connected.
2. cut-pff wall special groove section joint brushing device according to claim 1, it is characterised in that:Steel wire floor(4)'s
Quantity is ten layers.
3. cut-pff wall special groove section joint brushing device according to claim 2, it is characterised in that:Four layers of top steel wire
Layer(4)Steel wire diameter be 8 millimeters, the steel wire diameter of the 6 layers of steel wire floor in bottom is 1 millimeter.
4. cut-pff wall special groove section joint brushing device according to claim 1, it is characterised in that:Each layer steel wire floor
(4)A is set the line of outer end at an angle with vertical direction, a=15-20 degree.
5. cut-pff wall special groove section joint brushing device according to claim 1, it is characterised in that:Balancing weight(7)For
Using the balancing weight of concreting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621462894.7U CN206319342U (en) | 2016-12-29 | 2016-12-29 | Cut-pff wall special groove section joint brushing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621462894.7U CN206319342U (en) | 2016-12-29 | 2016-12-29 | Cut-pff wall special groove section joint brushing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206319342U true CN206319342U (en) | 2017-07-11 |
Family
ID=59261069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621462894.7U Active CN206319342U (en) | 2016-12-29 | 2016-12-29 | Cut-pff wall special groove section joint brushing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206319342U (en) |
-
2016
- 2016-12-29 CN CN201621462894.7U patent/CN206319342U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203034511U (en) | Wall brusher of double-helix grooving machine | |
CN206319342U (en) | Cut-pff wall special groove section joint brushing device | |
CN205823216U (en) | Underwater cast-in-place pile drags for slag drill bit | |
CN203846483U (en) | Underground continuous wall H-shaped steel wall brushing machine | |
CN205387724U (en) | A scarfing cinder brush wall is put for underground continuous wall connects | |
CN102155010A (en) | Seaming method of underground diaphragm wall | |
CN105371946B (en) | A kind of constant water jet source device of pressure | |
CN206223119U (en) | A kind of shield scraper of real-time monitoring wear extent | |
CN206604862U (en) | Driven cleaning chemical devices | |
CN204912946U (en) | Device is cut to compound pipe end portion aluminium strip book of plastic -aluminum | |
CN208998714U (en) | A kind of chassis stone, chuck stone bury detecting structure | |
CN219795273U (en) | Filling device for pipeline gap | |
CN203866972U (en) | Embedded component for filler wall tie bars | |
CN106044357A (en) | Unbonded steel strand steel wire separator | |
CN206110618U (en) | Thick liquid instrument is got rid of in wall plastering special use | |
CN208396660U (en) | A kind of Multifunctional drill | |
CN104652837B (en) | A kind of method and structure for increasing steel pipe frame newly on former concrete pipe support | |
CN206887960U (en) | A kind of obstacle cleaning plant in the peg hole based on impact drill | |
CN208131693U (en) | The thin-wall pipes protective device of extruder | |
CN204269187U (en) | A kind of thing connection pressure resistance type water level measurement system | |
CN207672565U (en) | Novel broken stone pile shoe | |
CN209821130U (en) | Water conservancy construction is with mixing earth quality detection mechanism | |
CN210323497U (en) | Bending-resistant and wear-resistant optical cable | |
CN206671262U (en) | A kind of pipe Steel section member carrying out flaw detection device | |
CN211036942U (en) | Point distribution device is visited to borer for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |