CN206110618U - Thick liquid instrument is got rid of in wall plastering special use - Google Patents
Thick liquid instrument is got rid of in wall plastering special use Download PDFInfo
- Publication number
- CN206110618U CN206110618U CN201620995942.2U CN201620995942U CN206110618U CN 206110618 U CN206110618 U CN 206110618U CN 201620995942 U CN201620995942 U CN 201620995942U CN 206110618 U CN206110618 U CN 206110618U
- Authority
- CN
- China
- Prior art keywords
- layer
- slurry
- gets rid
- rid
- thick liquid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model provides a thick liquid instrument is got rid of in wall plastering special use belongs to the architectural engineering technology field, and its structure includes that grab handle, main part skeleton, the main thick liquid that gets rid of clap and attach layer, cotton cloth fabric layer, and the main part skeleton adopts the crossing nodical welding of three horizontal two formulas of indulging to constitute by sharp reinforcing bar, the main thick liquid that gets rid of is clapped and is attached the layer and formed by the crisscross coincide of 7~10 layers of wire net mesh, and cotton cloth fabric layer is attached to the main thick liquid that gets rid of and is clapped and attach a layer upper surface, and cotton cloth fabric layer top is provided with the fabric cover layer, the main thick liquid that gets rid of is clapped through the fixed interlayer structure of iron wire ligature, with cotton cloth fabric layer centre gripping in the centre between the mesh that attaches layer and fabric cover layer, the main part skeleton sets up the upper surface on the fabric cover layer to with the fixed welding in fabric cover layer, the anterior segment of grab handle welds on the main part skeleton. The mastic thick liquid is clapped to this thick liquid instrument is got rid of in wall plastering special use's even, porous characteristics of mesh size attaches on the wall, the building plaster and the building block between form the even interface agent of thick liquid point, avoid appearing the wall plastering hollowing.
Description
Technical field
This utility model is related to construction engineering technical field, and specifically a kind of wall plastering is special to get rid of slurry instrument.
Background technology
General, in conventional building plastering engineering, surface of wall is got rid of slurry and is typically carried out using instruments such as besom, hairbrush
Brush, it is high to the operation level requirement of workman, and there is limitation to opereating specification and height, get rid of slurry quality often unstable.
At this stage urgently demand one kind is got rid of slurry specific purpose tool and can solve the problem that and overcome disadvantages described above and deficiency.
The content of the invention
Technical assignment of the present utility model is to solve the deficiencies in the prior art, there is provided a kind of wall plastering is special to get rid of slurry work
Tool.
The technical solution of the utility model realizes that in the following manner a kind of wall plastering is special to get rid of slurry instrument, its
Structure includes that lever, main body framework, master get rid of slurry and clap attached layer, cotton tissue layer,
Main body framework is formed by welding by rectilinear reinforcement using the intersecting intersection point of three horizontal two vertical type;
The main attached layer of slurry bat that gets rid of staggeredly is formed by stacking by 7~10 layers of steel wire mesh, should be by 7~10 layers of steel screen layer and layer
It is connected interlayer structure by iron wire colligation between mesh;
Cotton tissue layer is attached to master and gets rid of the attached layer upper surface of slurry bat, and cotton tissue layer top is provided with fabric cover layer;
Fabric cover layer is staggeredly formed by stacking by 2 layers of steel wire mesh;Pass through between 2 layers of steel screen layer and the mesh of layer
Iron wire colligation is connected interlayer structure;
Master gets rid of slurry and claps by iron wire colligation fixation interlayer structure between attached layer and the mesh of fabric cover layer, by cotton fabric
Layer is clamped in centre;
Main body framework is arranged on the upper surface of fabric cover layer, and fixes welding with fabric cover layer;
The leading portion of lever is welded in main body framework.
Main body framework constitutes " day " font using three horizontal two vertical type by rectilinear reinforcement and intersecting intersection point is formed by welding.
Described master gets rid of the iron wire colligation connection of the attached layer of slurry bat, the iron wire colligation connection of fabric cover layer and indulges along three horizontal two
The interlayer projection colligation connection of main body framework.
Lever, main body framework, fabric cover layer, cotton tissue layer, master get rid of slurry, and to clap attached layer parallel to each other.
This utility model beneficial effect produced compared with prior art is:
The special mesh size for getting rid of slurry instrument of the wall plastering is uniform, porous the characteristics of adhesive water mud clapped be attached to metope
On, and steel wire carries on the back attached cotton tissue layer and can keep adhesive water mud humidity, is difficult by walling unit suck dry moisture, so as to build
Build to plaster and the slurry uniform interfacial agents of point are formed and building block between, it is to avoid wall plastering hollowing occur.
The special slurry instrument that gets rid of of the wall plastering can be replaced using live existing building material steel wire, reinforcing bar, steel pipe, towel
Slurry instrument is got rid of to prepare, slurry mould is got rid of and is simply easily made, it is easy to operate, get rid of that slurry point position is high, slurry point is uniform, and anti-hollowing performance is good.
A kind of wall plastering is special get rid of slurry tool design rationally, simple structure, it is safe and reliable, easy to use, be easy to dimension
Shield, has good value for applications.
Description of the drawings
Accompanying drawing 1 is interlayer structure schematic diagram of the present utility model;
Accompanying drawing 2 is overlooking the structure diagram of the present utility model.
Labelling in accompanying drawing is represented respectively:
1st, lever, 2, main body framework, 3, fabric cover layer, 4, cotton tissue layer, 5, master get rid of slurry and clap attached layer,
6th, rectilinear reinforcement, 7, steel wire, 8, iron wire.
Specific embodiment
Below in conjunction with the accompanying drawings the slurry instrument that gets rid of special to a kind of wall plastering of the present utility model is described in detail below.
As shown in drawings, a kind of wall plastering of the present utility model is special gets rid of slurry instrument, and its structure includes lever 1, main body
Skeleton 2, master get rid of slurry and clap attached layer 5, cotton tissue layer 4,
Main body framework 2 is formed by welding by rectilinear reinforcement 6 using the intersecting intersection point of three horizontal two vertical type;
Master gets rid of the attached layer 5 of slurry bat and is staggeredly formed by stacking by 7~10 layers of mesh of steel wire 7, should be by 7~10 layers of steel screen layer and layer
Mesh between be connected interlayer structure by iron wire colligation;
Cotton tissue layer 4 is attached to master and gets rid of the attached layer upper surface of slurry bat, and cotton tissue layer top is provided with fabric cover layer;
Fabric cover layer 3 is staggeredly formed by stacking by 2 layers of steel wire mesh;Lead between 2 layers of steel screen layer and the mesh of layer
Cross iron wire colligation to be connected interlayer structure;
Master gets rid of slurry and claps by the colligation of iron wire 8 fixation interlayer structure between attached layer 5 and the mesh of fabric cover layer 3, by cotton
Tissue layer 4 is clamped in centre;
Main body framework 2 is arranged on the upper surface of fabric cover layer 3, and fixes welding with fabric cover layer 3;
The leading portion of lever 1 is welded in main body framework 2.
Main body framework constitutes " day " font using three horizontal two vertical type by rectilinear reinforcement and intersecting intersection point is formed by welding.
Described master gets rid of the iron wire colligation connection of the attached layer of slurry bat, the iron wire colligation connection of fabric cover layer and indulges along three horizontal two
The interlayer projection colligation connection of main body framework.
Lever, main body framework, fabric cover layer, cotton tissue layer, master get rid of slurry, and to clap attached layer parallel to each other.
The mesh number of steel wire carrys out selection with 10 layers of mesh number for still having uniform-light transmission mesh after overlapping.
The special slurry instrument that gets rid of of the wall plastering is welded on Ф using reinforcement fabrication 300 × 400 " day " glyph skeletons of Ф 14
On 25 steel pipe levers, steel pipe lever length 1.5m, as operation handle;The specification of steel wire for length it is generous be 10 × 10 ×
1.2mm, cutting size is 300mm × 400mm, and 7~10 layers of steel wire are overlapped, and at the steel wire back side of overlapping thick layer is covered with
Towel, then be attached to the towel back side with 2 layers of steel wire towel is clamped and fixed, then the steel wire for having overlapped is consolidated with 8# iron wires
It is scheduled on skeleton and is formed that this wall plastering is special to get rid of slurry instrument.
Claims (4)
1. a kind of wall plastering is special gets rid of slurry instrument, it is characterised in that gets rid of slurry including lever, main body framework, master and claps attached layer, cotton
Tissue layer,
Main body framework is formed by welding by rectilinear reinforcement using the intersecting intersection point of three horizontal two vertical type;
Master gets rid of the attached layer of slurry bat and is staggeredly formed by stacking by 7~10 layers of steel wire mesh, should be by 7~10 layers of steel screen layer and the mesh of layer
Between be connected interlayer structure by iron wire colligation;
Cotton tissue layer is attached to master and gets rid of the attached layer upper surface of slurry bat, and cotton tissue layer top is provided with fabric cover layer;
Fabric cover layer is staggeredly formed by stacking by 2 layers of steel wire mesh;Pass through iron wire between 2 layers of steel screen layer and the mesh of layer
Colligation is connected interlayer structure;
Master gets rid of slurry and claps by iron wire colligation fixation interlayer structure between attached layer and the mesh of fabric cover layer, by cotton tissue layer folder
Hold in centre;
Main body framework is arranged on the upper surface of fabric cover layer, and fixes welding with fabric cover layer;
The leading portion of lever is welded in main body framework.
2. a kind of wall plastering according to claim 1 is special gets rid of slurry instrument, it is characterised in that:Main body framework is by straight line steel
Muscle constitutes " day " font using three horizontal two vertical type and intersecting intersection point is formed by welding.
3. a kind of wall plastering according to claim 1 is special gets rid of slurry instrument, it is characterised in that:Described master gets rid of slurry and claps attached
The interlayer projection colligation of the iron wire colligation connection of layer, the iron wire colligation connection of fabric cover layer along three horizontal two vertical main body frameworks connects
Connect.
4. a kind of wall plastering according to claim 1 is special gets rid of slurry instrument, it is characterised in that:Lever, main body framework, knit
Thing coating, cotton tissue layer, master get rid of slurry, and to clap attached layer parallel to each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620995942.2U CN206110618U (en) | 2016-08-31 | 2016-08-31 | Thick liquid instrument is got rid of in wall plastering special use |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620995942.2U CN206110618U (en) | 2016-08-31 | 2016-08-31 | Thick liquid instrument is got rid of in wall plastering special use |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206110618U true CN206110618U (en) | 2017-04-19 |
Family
ID=58516567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620995942.2U Active CN206110618U (en) | 2016-08-31 | 2016-08-31 | Thick liquid instrument is got rid of in wall plastering special use |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206110618U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914757A (en) * | 2019-03-26 | 2019-06-21 | 中国五冶集团有限公司 | Slurry tool is got rid of in a kind of plastering |
-
2016
- 2016-08-31 CN CN201620995942.2U patent/CN206110618U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914757A (en) * | 2019-03-26 | 2019-06-21 | 中国五冶集团有限公司 | Slurry tool is got rid of in a kind of plastering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206110618U (en) | Thick liquid instrument is got rid of in wall plastering special use | |
CN206109997U (en) | Two -sided sliding chute device | |
CN205444825U (en) | Plaster and get rid of thick liquid device | |
CN209066819U (en) | Slurry tool is got rid of in a kind of wall plastering | |
CN206844347U (en) | A kind of anti-bank structure of sealing | |
CN204456790U (en) | The twine that a kind of metope gets rid of slurry plucking is clapped | |
CN207597882U (en) | A kind of vibrator for being suitable for deep narrow concrete structure position construction | |
CN205557857U (en) | Troweling structure for treatment on junction part of concrete wall column and filler wall | |
CN202416888U (en) | Device for processing basic layer of plastering engineering or throwing slurry to wall | |
CN204418452U (en) | A kind of precast floor slab cracking-proof structure | |
CN110821112A (en) | Beating pulp napping tool for base layer treatment before plastering construction | |
CN207847109U (en) | Multifunctional flat deck vibrator | |
CN207363235U (en) | Steel-made moving formula Hanging Basket | |
CN205077825U (en) | Get rid of thick liquid design die set | |
CN207110132U (en) | The novel crossed cast-in-place composite wall of support | |
CN206053150U (en) | A kind of building roof dilatation joint waterproof structure | |
CN104652837B (en) | A kind of method and structure for increasing steel pipe frame newly on former concrete pipe support | |
CN210530275U (en) | Napping tool | |
CN206319555U (en) | A kind of construction claying knife | |
CN206083309U (en) | Pre -buried PVC of wall body pipe clearance instrument | |
CN206053218U (en) | A kind of flexible combination tapestry brick | |
CN206205181U (en) | Cracking resistance cement foaming insulation board | |
CN217840732U (en) | Special tool for throwing pulp | |
CN205955242U (en) | Mortar of building a wall is spread and is put assistant mold | |
CN206189813U (en) | Wall body is plastered basic unit and is got rid of a mao ware with adjustable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |