CN209066819U - Slurry tool is got rid of in a kind of wall plastering - Google Patents
Slurry tool is got rid of in a kind of wall plastering Download PDFInfo
- Publication number
- CN209066819U CN209066819U CN201821032448.1U CN201821032448U CN209066819U CN 209066819 U CN209066819 U CN 209066819U CN 201821032448 U CN201821032448 U CN 201821032448U CN 209066819 U CN209066819 U CN 209066819U
- Authority
- CN
- China
- Prior art keywords
- circular framework
- rid
- slurry
- circular
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a kind of wall plasterings to get rid of slurry tool, including circular framework, two longitudinal bars are provided on the inside of the circular framework, the both ends of longitudinal bar are respectively welded at the inside rear and front end of circular framework, two cross reinforcements are provided on the inside of the circular framework, the both ends of the cross reinforcement are respectively welded at the inside both ends of circular framework, the point of intersection of the cross reinforcement and longitudinal bar is welded and fixed, the second steel wire is provided on front side of the circular framework, attached layer is clapped with slurry is got rid of in the front side of second steel wire, it gets rid of the attached layer of slurry bat and is staggeredly formed by stacking by four layers of alkaline-resisting grid cloth mesh, lever is provided on rear side of the circular framework;Slurry tool is got rid of in the wall plastering has the characteristics that mesh size is uniform, porous, has the characteristics that easy to make, carrying portable, easy to operate, the bat of adhesive water mud is attached on metope, uniform interfacial agents is formed between building wall plastering and masonry, avoids the occurrence of gaul and other issues.
Description
Technical field
The utility model relates to technical field of building construction, slurry tool is got rid of in specially a kind of wall plastering.
Background technique
Traditional architecture engineering wall surface surface gets rid of slurry tool and the tools such as besom, hairbrush is generally used to be brushed, worker operation
Horizontal uneven, construction quality is unstable, preferably forms wall plastering hollowing and other issues;For this purpose, it is proposed that a kind of metope
Slurry tool is got rid of in plastering.
Utility model content
The purpose of this utility model is to provide a kind of wall plasterings to get rid of slurry tool, to solve to propose in above-mentioned background technique
The problem of.
To achieve the above object, the utility model provides the following technical solutions: slurry tool, including circle are got rid of in a kind of wall plastering
Shape skeleton is provided with two longitudinal bars on the inside of the circular framework, and the both ends of the longitudinal bar are respectively welded at round bone
The inside rear and front end of frame is provided with two cross reinforcements on the inside of the circular framework, and the both ends of the cross reinforcement are respectively welded
At the inside both ends of circular framework, the point of intersection of the cross reinforcement and longitudinal bar is welded and fixed, the front side of the circular framework
It is provided with the second steel wire, and the second steel wire is fitted on longitudinal bar and cross reinforcement, the front side of second steel wire has
Get rid of slurry and clap attached layer, it is described get rid of slurry and clap attached layer be staggeredly formed by stacking by four layers of alkaline-resisting grid cloth mesh, it is described to get rid of before slurry claps attached layer
Side pressure has first steel wire, and first steel wire and the second steel wire are fixed on round bone by multiple fixed tied silks
On frame, lever is provided on rear side of the circular framework, a cross reinforcement and circular framework wherein is welded and fixed in the lever
On, the two sides of the lever are welded with oblique fixed link, and the oblique fixed link is welded on circular framework far from one end of lever
Outside.
Preferably, for the circular framework by 12 model bar bending of Ф at circle, the lever is set as 25 steel pipe of Ф.
Preferably, two longitudinal bars and cross reinforcement form " well " glyph skeleton.
Preferably, first steel wire and the second steel wire are disposed as circular steel silk screen, and the net of circular steel silk screen
Hole size is equal, and the outer diameter of circular steel silk screen is respectively less than the internal diameter of circular framework.
Compared with prior art, the utility model has the beneficial effects that the structure design of the utility model is reasonable, which is smeared
Ash, which gets rid of slurry tool, has the characteristics that mesh size is uniform, porous, has the characteristics that easy to make, carrying portable, easy to operate, general
The bat of adhesive water mud is attached on metope, is formed uniform interfacial agents between building wall plastering and masonry, is avoided the occurrence of plastering
Hollowing and other issues;This get rid of slurry tool using live existing building material reinforcing bar, steel wire, alkaline-resisting grid cloth, etc. make
Slurry tool is got rid of, it is simple for production, get rid of slurry uniformly, easily controllable construction quality.
Detailed description of the invention
Fig. 1 is the utility model structure back side schematic diagram;
Fig. 2 is the utility model architecture front-side schematic diagram;
Fig. 3 is that the utility model gets rid of the attached layer schematic diagram of slurry bat.
In figure: circular framework 1, cross reinforcement 3, gets rid of the attached layer 4 of slurry bat, alkaline-resisting grid cloth 401, lever 5, tiltedly fixes longitudinal bar 2
Bar 6, the first steel wire 7, fixed tied silk 8, the second steel wire 9.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, the utility model provides a kind of technical solution: slurry tool, including circle are got rid of in a kind of wall plastering
Skeleton 1, for circular framework 1 by 12 model bar bending of Ф at circle, the inside of circular framework 1 is provided with two longitudinal bars 2, indulges steel
The both ends of muscle 2 are respectively welded at the inside rear and front end of circular framework 1, and the inside of circular framework 1 is provided with two cross reinforcements
3, the both ends of cross reinforcement 3 are respectively welded at the inside both ends of circular framework 1, and the point of intersection of cross reinforcement 3 and longitudinal bar 2 is welded solid
Fixed, two longitudinal bars 2 and cross reinforcement 3 form " well " glyph skeleton, and the front side of circular framework 1 is provided with the second steel wire 9,
And second steel wire 9 be fitted on longitudinal bar 2 and cross reinforcement 3, attached layer 4 is clapped with slurry is got rid of in the front side of the second steel wire 9, gets rid of slurry and claps
Attached layer 4 is staggeredly formed by stacking by four layers of alkaline-resisting 401 mesh of grid cloth, and the front side for getting rid of the attached layer 4 of slurry bat is pressed with first steel wire
7, the first steel wire 7 and the second steel wire 9 are fixed on circular framework 1 by multiple fixed tied silks 8,7 He of the first steel wire
Second steel wire 9 is disposed as circular steel silk screen, and the mesh size of circular steel silk screen is equal, and the outer diameter of circular steel silk screen
The respectively less than internal diameter of circular framework 1, the rear side of circular framework 1 are provided with lever 5, and a horizontal steel wherein is welded and fixed in lever 5
On muscle 3 and circular framework 1, lever 5 is set as 25 steel pipe of Ф, and the two sides of lever 5 are welded with oblique fixed link 6, and oblique fixed link 6 is remote
One end from lever 5 is welded on the outside of circular framework 1;It is uniform, porous with mesh size that slurry tool is got rid of in the wall plastering
The characteristics of, have the characteristics that easy to make, carrying portable, easy to operate, the bat of adhesive water mud is attached on metope, in building wall
Uniform interfacial agents are formed between face plastering and masonry, avoid the occurrence of gaul and other issues;This gets rid of slurry tool using existing
Existing building material reinforcing bar, steel wire, alkaline-resisting grid cloth, etc. make the slurry tool that gets rid of, it is simple for production, get rid of slurry uniformly, be easy to
Control construction quality.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
1. slurry tool, including circular framework (1) are got rid of in a kind of wall plastering, it is characterised in that: set on the inside of the circular framework (1)
Two longitudinal bars (2) are equipped with, the both ends of the longitudinal bar (2) are respectively welded at the inside rear and front end of circular framework (1), institute
It states and is provided with two cross reinforcements (3) on the inside of circular framework (1), the both ends of the cross reinforcement (3) are respectively welded at circular framework
(1) point of intersection of inside both ends, the cross reinforcement (3) and longitudinal bar (2) is welded and fixed, before the circular framework (1)
Side is provided with the second steel wire (9), and the second steel wire (9) is fitted on longitudinal bar (2) and cross reinforcement (3), second steel
Attached layer (4) is clapped with getting rid of slurry in the front side of silk screen (9), it is described get rid of slurry and clap attached layer (4) interlocked by four layers of alkaline-resisting grid cloth (401) mesh
It is formed by stacking, described get rid of is pressed with first steel wire (7), first steel wire (7) and second on front side of the attached layer (4) of slurry bat
Steel wire (9) is fixed on circular framework (1) by multiple fixed tied silks (8), is provided on rear side of the circular framework (1)
Lever (5), the lever (5) are welded and fixed on a cross reinforcement (3) and circular framework (1) wherein, and the two of the lever (5)
Side is welded with oblique fixed link (6), and the oblique fixed link (6) is welded on the outer of circular framework (1) far from the one end of lever (5)
Side.
2. slurry tool is got rid of in a kind of wall plastering according to claim 1, it is characterised in that: the circular framework (1) is by Ф
12 model bar bendings are set as 25 steel pipe of Ф at circle, the lever (5).
3. slurry tool is got rid of in a kind of wall plastering according to claim 1, it is characterised in that: two longitudinal bars (2) and horizontal steel
Muscle (3) forms " well " glyph skeleton.
4. slurry tool is got rid of in a kind of wall plastering according to claim 1, it is characterised in that: first steel wire (7) and
Second steel wire (9) is disposed as circular steel silk screen, and the mesh size of circular steel silk screen is equal, and circular steel silk screen is outer
Diameter is respectively less than the internal diameter of circular framework (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821032448.1U CN209066819U (en) | 2018-07-02 | 2018-07-02 | Slurry tool is got rid of in a kind of wall plastering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821032448.1U CN209066819U (en) | 2018-07-02 | 2018-07-02 | Slurry tool is got rid of in a kind of wall plastering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209066819U true CN209066819U (en) | 2019-07-05 |
Family
ID=67089211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821032448.1U Active CN209066819U (en) | 2018-07-02 | 2018-07-02 | Slurry tool is got rid of in a kind of wall plastering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209066819U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211376A (en) * | 2020-09-30 | 2021-01-12 | 中建七局第一建筑有限公司 | Wall gets rid of thick liquid device fast |
CN114635543A (en) * | 2022-03-24 | 2022-06-17 | 中国五冶集团有限公司 | Plastering slurry throwing net racket |
-
2018
- 2018-07-02 CN CN201821032448.1U patent/CN209066819U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211376A (en) * | 2020-09-30 | 2021-01-12 | 中建七局第一建筑有限公司 | Wall gets rid of thick liquid device fast |
CN112211376B (en) * | 2020-09-30 | 2022-02-25 | 中建七局第一建筑有限公司 | Wall gets rid of thick liquid device fast |
CN114635543A (en) * | 2022-03-24 | 2022-06-17 | 中国五冶集团有限公司 | Plastering slurry throwing net racket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209066819U (en) | Slurry tool is got rid of in a kind of wall plastering | |
CN105113667A (en) | Prefabricated steel bar truss wall mould shell | |
CN105019600A (en) | Disassembly-free precast concrete frame column template | |
CN201296996Y (en) | Welded steel fabric used in concrete prefabricated components | |
CN104775627A (en) | Steel plate net cage reinforced concrete column structure and preparation method | |
CN105537886A (en) | Automatic manufacturing process for butterfly rebars of tunnel grid rebar truss | |
CN204876190U (en) | Brickwork infilled wall adds muscle constructional column of plastering | |
CN104594529A (en) | Outer wall of steel structure plant, model frame of upright post at corner and outer wall construction method | |
CN205444825U (en) | Plaster and get rid of thick liquid device | |
CN206289787U (en) | The prefabricated built-in steel pipe bundle concrete walls of formwork | |
CN200992775Y (en) | Welded steel fabric mesh | |
CN104612302A (en) | Non-dismantling thermal insulation floor formwork | |
CN201512946U (en) | Barrel storeroom sliding form system structure | |
CN205822501U (en) | A kind of body of wall of prestressing force grass stock mould block splicing | |
CN211313089U (en) | Evaporate and press aerated concrete panel net cage | |
CN201428338Y (en) | Improved frame of anti-theft metal lattice window | |
CN205400222U (en) | Novel steel construction tower modelled after an antique | |
CN204571340U (en) | A kind of steel plate cylinder mould reinforced steel concrete rod structure | |
CN204691048U (en) | Building block brick | |
CN203625900U (en) | Prestressed concrete square pile with supporting structure | |
CN204960047U (en) | Prefabricated steel bar truss wall body mould shell | |
CN214942329U (en) | Steel mesh inner die for assembly type building | |
CN204059956U (en) | Steel wood composite keel | |
CN217840732U (en) | Special tool for throwing pulp | |
CN204252289U (en) | A kind of bracket steel plate for connecting-type steel column and beam steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |