CN206310238U - A kind of laboratory air supply system - Google Patents

A kind of laboratory air supply system Download PDF

Info

Publication number
CN206310238U
CN206310238U CN201621466585.7U CN201621466585U CN206310238U CN 206310238 U CN206310238 U CN 206310238U CN 201621466585 U CN201621466585 U CN 201621466585U CN 206310238 U CN206310238 U CN 206310238U
Authority
CN
China
Prior art keywords
pressure regulator
steel cylinder
regulator valve
valve
connecting tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621466585.7U
Other languages
Chinese (zh)
Inventor
邱晶晶
李鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Standard Purification Technology Co Ltd
Original Assignee
Guangdong Standard Purification Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Standard Purification Technology Co Ltd filed Critical Guangdong Standard Purification Technology Co Ltd
Priority to CN201621466585.7U priority Critical patent/CN206310238U/en
Application granted granted Critical
Publication of CN206310238U publication Critical patent/CN206310238U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)

Abstract

The utility model discloses a kind of laboratory air supply system,Including the first steel cylinder and the second steel cylinder,The output end of the first steel cylinder and the second steel cylinder is connected by after connecting tube parallel connection with the input of the first flow divider,First magnetic valve and the first pressure regulator valve are installed in the connecting tube being connected with the output end of the first steel cylinder,Second magnetic valve and the second pressure regulator valve are installed in the connecting tube being connected with the output end of the second steel cylinder,This laboratory air supply system is using double steel cylinder plenum systems,One steel cylinder is gas source,Another steel cylinder is used as bailout gas,Ensure that the continuity of supply,Even if changing the continuity that bottle nor affects on supply,This laboratory air supply system is using stainless steel metal high-pressure hose as connecting pipe,Ensure that the fastness of connection,Increased the service life of pipeline,This laboratory air supply system is provided with pressure regulator valve in supply starting point and supplying terminal,Efficiently solve the problems, such as insufficient pressure caused by gas pressure is gradually reduced in use in steel cylinder.

Description

A kind of laboratory air supply system
Technical field
The utility model is related to air supply system technical field, specially a kind of laboratory air supply system.
Background technology
When laboratory carries out various experiments, it is necessary to use various analytical instrument, some of which instrument needs to use high-purity Degree gas, traditional hair that does is that gas cylinder is directly placed in instrument side, and directly gas cylinder is connected with instrument using flexible pipe carried out There is both sides defect in supply, this way, one is that two is to need because gas cylinder is directly placed at the indoor high risk for causing Gas cylinder switch is manually opened, is wasted time and energy, cause the wasting of resources, central gas supply system is also known as central support air system (Central Gas Supply System), it is a kind of a kind of plenum system being more and more generally used.It is mainly by source of the gas, cuts Changing device, regulator, terminal gas point, monitoring and warning device composition.In brief, central gas supply system is by central gas storage Gas in equipment is transported to each scattered terminal gas point after switching device and pressure regulation by pipe-line system.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect, there is provided a kind of laboratory air supply system, this Using double steel cylinder plenum systems, a steel cylinder is gas source to laboratory air supply system, and another steel cylinder is used as bailout gas, it is ensured that The continuity of supply, even if change the continuity that bottle nor affects on supply, this laboratory air supply system is high using stainless steel metal Pressure flexible pipe is used as connecting pipe, it is ensured that the fastness of connection, increased the service life of pipeline, and this laboratory air supply system exists Supply starting point and supplying terminal are provided with pressure regulator valve, and gas pressure is gradually reduced in use in efficiently solving steel cylinder Caused by insufficient pressure problem, in can effectively solving the problems, such as background technology.
To achieve the above object, the utility model provides following technical scheme:A kind of laboratory air supply system, including first The output end of steel cylinder and the second steel cylinder, first steel cylinder and the second steel cylinder is by defeated with the first flow divider after connecting tube parallel connection Enter end connection, the first magnetic valve and the first pressure regulator valve are installed, with second in the connecting tube being connected with the output end of the first steel cylinder The second magnetic valve and the second pressure regulator valve, the output end of first flow divider are installed in the connecting tube of the output end connection of steel cylinder It is connected with set of terminal by connecting tube, non-return valve is installed in the connecting tube between the set of terminal and the first flow divider.
Used as a kind of optimal technical scheme of the present utility model, first flow divider has multiple output ends, each output End is connected by connecting tube with a set of terminal, is mounted in the connecting tube between each set of terminal and the first flow divider inverse Only valve.
Used as a kind of optimal technical scheme of the present utility model, the set of terminal includes experimental bench, the experimental bench it is upper End is provided with the second flow divider, and the input of the second flow divider is connected by connecting tube with the output end of the first flow divider, and second The output end of flow divider is provided with three connecting tubes, and the 3rd pressure regulator valve, the 4th are separately installed with from left to right in three articles of connecting tubes Pressure regulator valve and the 5th pressure regulator valve, are provided with the 5th magnetic valve below the 3rd pressure regulator valve, is provided with below the 4th pressure regulator valve Four magnetic valves, the 3rd magnetic valve is provided with below the 5th pressure regulator valve.
As a kind of optimal technical scheme of the present utility model, controlling switch group, institute are provided with the middle part of the experimental bench Controlling switch group is stated to be electrically connected with external power source, controlling switch group respectively with the first magnetic valve, the second magnetic valve, the 3rd electromagnetism Valve, the 4th magnetic valve, the 5th magnetic valve, the first pressure regulator valve, the second pressure regulator valve, the 3rd pressure regulator valve, the 4th pressure regulator valve and the 5th adjust Pressure valve is electrically connected, and controlling switch group is provided with corresponding control button, and the bottom of experimental bench is provided with gas monitor, gas prison Control device is electrically connected with external power source, and buzzer is provided with gas monitor, and the gas monitor passes through controller and buzzing Device is electrically connected.
Used as a kind of optimal technical scheme of the present utility model, the connecting tube is stainless steel metal high-pressure hose.
Compared with prior art, the beneficial effects of the utility model are:This laboratory air supply system is using double steel cylinder supply Mode, steel cylinder is gas source, and another steel cylinder is used as bailout gas, it is ensured that the continuity of supply, even if not changing bottle also not The continuity of supply is influenceed, this laboratory air supply system is using stainless steel metal high-pressure hose as connecting pipe, it is ensured that even The fastness for connecing, increased the service life of pipeline, and this laboratory air supply system is provided with supply starting point and supplying terminal Pressure regulator valve, efficiently solves the problems, such as insufficient pressure caused by gas pressure is gradually reduced in use in steel cylinder.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
In figure:1 first steel cylinder, 2 second steel cylinders, 3 first magnetic valves, 4 second magnetic valves, 5 first pressure regulator valves, 6 second are adjusted Pressure valve, 7 first flow dividers, 8 second flow dividers, 9 connecting tubes, 10 non-return valves, 11 the 3rd pressure regulator valves, 12 the 4th pressure regulator valves, 13 Five pressure regulator valves, 14 the 3rd magnetic valves, 15 the 4th magnetic valves, 16 the 5th magnetic valves, 17 experimental benches, 18 controlling switch groups, 19 gases Watch-dog, 20 buzzers, 21 set of terminal.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1 is referred to, the utility model provides a kind of technical scheme:A kind of laboratory air supply system, including the first steel cylinder 1 With the second steel cylinder 2, the output end of the first steel cylinder 1 and the second steel cylinder 2 is by the input after the parallel connection of connecting tube 9 with the first flow divider 7 End connection, the first steel cylinder 1 and the second steel cylinder 2 in parallel can be supplied individually, and when the first steel cylinder 1 is taken a breath, the second steel cylinder 2 is to be System provides gas, and when the second steel cylinder 2 is taken a breath, the first steel cylinder 1 provides gas for system, it is ensured that the continuity of supply, connection Pipe 9 is stainless steel metal high-pressure hose, and stainless steel metal high-pressure hose ensure that the fastness of connection, increased the use of pipeline In the life-span, the first magnetic valve 3 and the first pressure regulator valve 5 are installed, with second in the connecting tube 9 being connected with the output end of the first steel cylinder 1 Second magnetic valve 4 and the second pressure regulator valve 6, the first pressure regulator valve 5 and second are installed in the connecting tube 9 of the output end connection of steel cylinder 2 Pressure regulator valve 6 is used for the pressure of the input gas of regulating system, and the output end of the first flow divider 7 is by connecting tube 9 and set of terminal 21 Connection, the first flow divider 7 by gas distribution to multiple set of terminal 21, the connecting tube 9 between the flow divider 7 of set of terminal 21 and first On non-return valve 10 is installed, set of terminal 21 includes experimental bench 17, and the upper end of experimental bench 17 is provided with the second flow divider 8, second point By gas distribution to multiple terminals, the input of the second flow divider 8 passes through the output end of the flow divider 7 of connecting tube 9 and first to stream valve 8 Connection, the output end of the second flow divider 8 is provided with three connecting tubes 9, the 3rd is separately installed with from left to right in three articles of connecting tubes 9 Pressure regulator valve 11, the 4th pressure regulator valve 12 and the 5th pressure regulator valve 13, the 3rd pressure regulator valve 11, the 4th pressure regulator valve 12 and the 5th pressure regulator valve 13 are used In the pressure of the output gas of regulating system, the lower section of the 3rd pressure regulator valve 11 is provided with the 5th magnetic valve 16, the 4th pressure regulator valve 12 Lower section be provided with the 4th magnetic valve 15, the lower section of the 5th pressure regulator valve 13 is provided with the 3rd magnetic valve 14, the middle part of experimental bench 17 Be provided with controlling switch group 18, controlling switch group 18 is electrically connected with external power source, controlling switch group 18 respectively with the first magnetic valve 3rd, the second magnetic valve 4, the 3rd magnetic valve 14, the 4th magnetic valve 15, the 5th magnetic valve 16, the first pressure regulator valve 5, the second pressure regulator valve 6, 3rd pressure regulator valve 11, the 4th pressure regulator valve 12 and the 5th pressure regulator valve 13 are electrically connected, controlling switch group 18 be provided with corresponding control by Button, the bottom of experimental bench 17 is provided with gas monitor 19, and gas monitor 19 is electrically connected with external power source, gas monitor 19 On buzzer 20 is installed, gas monitor 19 is electrically connected by controller with buzzer 20, gas monitor 19 be used for monitor Whether gas there occurs leakage, and after pernicious gas is more than the threshold values set on gas monitor 19 in air, buzzer 20 is opened It is dynamic, experimenter is reminded, the first flow divider 7 has multiple output ends, and each output end passes through connecting tube 9 and a set of terminal 21 Connection, is mounted on non-return valve 10 in the connecting tube 9 between each flow divider 7 of set of terminal 21 and first, non-return valve 10 is used to prevent Only there is adverse current in gas.
When in use:First steel cylinder 1 and the second steel cylinder 2 in parallel can be supplied individually, when the first steel cylinder 1 is taken a breath, the Two steel cylinders 2 provide gas for system, and when the second steel cylinder 2 is taken a breath, the first steel cylinder 1 provides gas for system, it is ensured that supply Continuity, the first flow divider 7 by gas distribution to multiple set of terminal 21, the second flow divider 8 by gas distribution to multiple terminals, First pressure regulator valve 5 and the second pressure regulator valve 6 are used for the pressure of the input gas of regulating system, the 3rd pressure regulator valve 11, the 4th pressure regulator valve 12 and the 5th pressure regulator valve 13 be used for regulating system output gas pressure, non-return valve 10 is used to prevent gas from adverse current, gas occurring Body watch-dog 19 is used to monitor whether gas there occurs leakage, when pernicious gas is more than what is set on gas monitor 19 in air After threshold values, buzzer 20 starts, and reminds experimenter.
Using double steel cylinder plenum systems, a steel cylinder is gas source to this laboratory air supply system, and another steel cylinder is used as standby With source of the gas, it is ensured that the continuity of supply, even if changing the continuity that bottle nor affects on supply, this laboratory air supply system is not using Rust steel metal high-pressure hose is used as connecting pipe, it is ensured that the fastness of connection, increased the service life of pipeline, this laboratory Air supply system is provided with pressure regulator valve in supply starting point and supplying terminal, and gas pressure is using process in efficiently solving steel cylinder In gradually reduce caused by insufficient pressure problem.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out various changes in the case where principle of the present utility model and spirit is not departed from, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of laboratory air supply system, including the first steel cylinder (1) and the second steel cylinder (2), it is characterised in that:First steel cylinder (1) and the second steel cylinder (2) output end by connecting tube (9) parallel connection after be connected with the input of the first flow divider (7), with first The first magnetic valve (3) and the first pressure regulator valve (5) are installed in the connecting tube (9) of the output end connection of steel cylinder (1), with the second steel cylinder (2) the second magnetic valve (4) and the second pressure regulator valve (6), first flow divider are installed in the connecting tube (9) of output end connection (7) output end is connected by connecting tube (9) with set of terminal (21), between the set of terminal (21) and the first flow divider (7) Non-return valve (10) is installed in connecting tube (9).
2. a kind of laboratory air supply system according to claim 1, it is characterised in that:First flow divider (7) has many Individual output end, each output end is connected by connecting tube (9) with a set of terminal (21), each set of terminal (21) with first point Non-return valve (10) is mounted in connecting tube (9) between stream valve (7).
3. a kind of laboratory air supply system according to claim 1, it is characterised in that:The set of terminal (21) includes experiment Platform (17), the upper end of the experimental bench (17) is provided with the second flow divider (8), and the input of the second flow divider (8) is by connection Pipe (9) is connected with the output end of the first flow divider (7), and the output end of the second flow divider (8) is provided with three connecting tubes (9), three The 3rd pressure regulator valve (11), the 4th pressure regulator valve (12) and the 5th pressure regulator valve (13) are separately installed with from left to right in article connecting tube (9), The 5th magnetic valve (16) is provided with below 3rd pressure regulator valve (11), the 4th magnetic valve is provided with below the 4th pressure regulator valve (12) (15), it is provided with the 3rd magnetic valve (14) below the 5th pressure regulator valve (13).
4. a kind of laboratory air supply system according to claim 1 or 3, it is characterised in that:In the experimental bench (17) Portion is provided with controlling switch group (18), and the controlling switch group (18) electrically connects with external power source, and controlling switch group (18) is respectively With the first magnetic valve (3), the second magnetic valve (4), the 3rd magnetic valve (14), the 4th magnetic valve (15), the 5th magnetic valve (16), One pressure regulator valve (5), the second pressure regulator valve (6), the 3rd pressure regulator valve (11), the 4th pressure regulator valve (12) and the 5th pressure regulator valve (13) are electrically connected Connect, controlling switch group (18) is provided with corresponding control button, the bottom of experimental bench (17) is provided with gas monitor (19), gas Body watch-dog (19) is electrically connected with external power source, and buzzer (20), the gas monitor are provided with gas monitor (19) (19) electrically connected with buzzer (20) by controller.
5. a kind of laboratory air supply system according to claim 1, it is characterised in that:The connecting tube (9) is stainless steel Metal high voltage flexible pipe.
CN201621466585.7U 2016-12-29 2016-12-29 A kind of laboratory air supply system Expired - Fee Related CN206310238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621466585.7U CN206310238U (en) 2016-12-29 2016-12-29 A kind of laboratory air supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621466585.7U CN206310238U (en) 2016-12-29 2016-12-29 A kind of laboratory air supply system

Publications (1)

Publication Number Publication Date
CN206310238U true CN206310238U (en) 2017-07-07

Family

ID=59248440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621466585.7U Expired - Fee Related CN206310238U (en) 2016-12-29 2016-12-29 A kind of laboratory air supply system

Country Status (1)

Country Link
CN (1) CN206310238U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408734A (en) * 2018-05-22 2018-08-17 福建久策气体集团有限公司 A kind of high-purity boron chloride preparation method and device
CN108799831A (en) * 2018-08-03 2018-11-13 容县康瑞医疗器械有限公司 Supply monitoring alarm device
CN115597001A (en) * 2022-09-05 2023-01-13 安徽壹月科技有限公司(Cn) Special gas flow distribution box with multi-branch pressure independent adjusting structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408734A (en) * 2018-05-22 2018-08-17 福建久策气体集团有限公司 A kind of high-purity boron chloride preparation method and device
CN108799831A (en) * 2018-08-03 2018-11-13 容县康瑞医疗器械有限公司 Supply monitoring alarm device
CN115597001A (en) * 2022-09-05 2023-01-13 安徽壹月科技有限公司(Cn) Special gas flow distribution box with multi-branch pressure independent adjusting structure

Similar Documents

Publication Publication Date Title
CN206310238U (en) A kind of laboratory air supply system
CN209286412U (en) A kind of multiloop oxygen source automatic switching control equipment
CN205443349U (en) Gas supply system suitable for blast furnace oxygen coal jetting technology
CN205299066U (en) Gaseous switched systems in full -automatic laboratory
CN202533791U (en) Centralized oxygen supply system
CN203533212U (en) Double-way pressure regulating device of central gas supply system
CN207865046U (en) A kind of automatic switchover medical gas cylinder manifold device
CN214580427U (en) Centralized gas supply system for laboratory
CN203880394U (en) Apparatus for replacing gas container without interruption
CN206545780U (en) A kind of urgent switching system in instrument general mood source for chlorine storage tank SIS systems
CN211680517U (en) Gas circuit device for reducing pressure drop of laser cutting
CN207112366U (en) A kind of compressed air supply line
CN204135536U (en) The aerating device of stainless steel pipes welding protection
CN202859828U (en) Oxygen filling and oxygen supply switching device for vehicle
CN218883669U (en) Full-automatic integrated gas supply system cabinet
CN205841163U (en) Multistage supercharging system
CN205322950U (en) Centralized oxygen supply system of hospital
CN212719217U (en) Gas supply device for fuel cell system
CN211098448U (en) Oxygen machine oxygen supply system of nano bubble aqueous solution generating device
CN214864533U (en) Pipeline system of release agent spraying device
CN213272056U (en) Secondary decompression busbar
CN212191649U (en) Welding cutting gas energy-saving control device
CN210215397U (en) Multichannel gas circuit auto-change over device and cell culture device
CN214008841U (en) Main transformer on-line monitoring gas cylinder connecting device
CN213936268U (en) Hydrogen energy automobile fuel cell laboratory hydrogen supply device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20191229