CN206308623U - A kind of Cast-in-situ Beam falsework for soft base matter - Google Patents

A kind of Cast-in-situ Beam falsework for soft base matter Download PDF

Info

Publication number
CN206308623U
CN206308623U CN201621358458.5U CN201621358458U CN206308623U CN 206308623 U CN206308623 U CN 206308623U CN 201621358458 U CN201621358458 U CN 201621358458U CN 206308623 U CN206308623 U CN 206308623U
Authority
CN
China
Prior art keywords
bracket
cast
phc pile
pile tubes
bailey beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621358458.5U
Other languages
Chinese (zh)
Inventor
唐峰
苏建萍
夏颂军
张倩
李昊添
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Construction Co General Contracting Management Branch
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
China Communications Construction Co General Contracting Management Branch
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communications Construction Co General Contracting Management Branch, CCCC Fourth Highway Engineering Co Ltd filed Critical China Communications Construction Co General Contracting Management Branch
Priority to CN201621358458.5U priority Critical patent/CN206308623U/en
Application granted granted Critical
Publication of CN206308623U publication Critical patent/CN206308623U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of Cast-in-situ Beam falsework for soft base matter, including Bailey beam, positioned at the Cast-in-situ Beam and total sub-semigroup on Bailey beam top, the bottom vertical runs of the Bailey beam have PHC pile tubes, sandbox is set between Bailey beam and PHC pile tubes, before PHC pile tubes upper end, trailing flank is set up in parallel bracket more than two, the bottom of bracket sets fixed plate, positioned at preceding, running through between bracket on trailing flank has pull bar, tray support is set between bracket arranged side by side on same side, upper end on the inside of PHC pile tubes is laid with damper, hound is respectively provided between adjacent PHC pile tubes, supported rod erecting and support rail, the bottom of hound sets connecting seat, connecting seat and damper are attached.The utility model construction cost is low, good economy performance and do not limited by spanning headroom, can effectively reduce truss quantity and amount of deflection.

Description

A kind of Cast-in-situ Beam falsework for soft base matter
Technical field
The utility model is related to a kind of Cast-in-situ Beam falsework construction field, more particularly to a kind of Cast-in-situ Beam for soft base matter Falsework.
Background technology
The soil property of soft foundation is soft, saturation, in soft modeling to stream modeling shape, sensitivity high, low intensity, thixotropy high, soft Ji Qiao Location area slightly construction disturbance and load apply, under cover soft soil easily unstability, therefore carry out cast-in-situ box girder in soft foundation bridge site Construction, it is necessary to consider its foundation capability, it is existing using support to ensure the safety and box girder construction quality of supporting structure system Method construction prestressed reinforced concrete continuous box girder is poured, support Design is needed from security, adaptability, reliability, economy four Individual aspect is accounted for;Existing raft support method is high to ground processing requirement, because Soft Soil Layer is in soft modeling to stream modeling shape, soil body pole Unstable, deep foundation base treatment is it is difficult to ensure that the homogenieity of soil body treatment effect, therefore raft support method is not suitable for soft soil foundation, And the country mainly carries out the construction of soft base bridge site cast-in-situ box girder using steel-pipe pile falsework method at present, construction technology is more ripe, but Steel-pipe pile steel using amount and early stage occupancy expenses are big, and cost is high, and inserting piling recovery process is more, less economical, and more spanning is due to bridge Not enough, large-scale lifting pile pulling device cannot be in place for lower headroom, is unfavorable for operation, and steel-pipe pile reclaims difficult, meanwhile, it is existing existing Truss quantity is more during pouring box girder construction, truss discontinuity, increases the changes of the flexural member under load action such as truss Shape.
Utility model content
The purpose of this utility model be to provide a kind of low construction cost, good economy performance and do not limited by spanning headroom, can be with Truss quantity and amount of deflection are reduced, makes the Cast-in-situ Beam falsework for soft base matter of truss uniform force.
To achieve these goals, the technical solution of the utility model is:
A kind of Cast-in-situ Beam falsework for soft base matter, including Bailey beam, positioned at the Cast-in-situ Beam and bowl button on Bailey beam top Formula scaffold, the bottom vertical runs of the Bailey beam have PHC pile tubes, and sandbox is set between Bailey beam and PHC pile tubes, described The forward and backward side of PHC pile tubes upper end is set up in parallel bracket more than two, and the bracket of the forward and backward side is in mirror image, bracket It is trapezoidal, flanging is respectively provided with the edge of bracket, the bottom of bracket sets fixed plate, the fixed plate and PHC pile tubes upper end Preformed hole be fixedly connected, it is arranged side by side on same side through there is pull bar between the bracket on forward and backward side Tray support is set between bracket, and the upper end on the inside of PHC pile tubes is laid with damper, is set respectively between adjacent PHC pile tubes Hound, supported rod erecting and support rail are put, the supported rod erecting is disposed longitudinally on the lower end of Bailey beam, adjacent supported rod erecting Bottom be fixed with support rail, one end of hound is fixed in Bailey beam, and the other end is fixed on the side of supported rod erecting bottom On wall, the bottom of hound sets connecting seat, and connecting seat and damper are attached.
Further, transverse distribution beam is fixed between the sandbox and Bailey beam.
Further, the tray support includes four transverse reinforced bars and two middle studdles, four horizontal strokes It is in " mouth " font to bracing piece combination, two middle studdles are in " X " font, and middle studdle is located at the interior of transverse reinforced bar Portion.
Further, the damper is viscous damper.
Further, the hound, supported rod erecting, pull bar and support rail are screw-thread steel.
The utility model is a kind of Cast-in-situ Beam falsework for soft base matter, and its advantage is:
The utility model adds the PHC pile tube falseworks of Bailey beam plus total sub-semigroup, whole falsework body using PHC pile tubes Architecture stabilization, safe and reliable, applicability is good, and PHC pile tubes cooperate with Bailey beam and total sub-semigroup, while increasing Bracket, it is easy construction, simple to operate, the revolving of girder steel is improve, to surrounding environment without in larger interference, and construction in construction Do not limited by spanning headroom, increased hound, supported rod erecting and support rail in the bottom of Bailey beam, under can effectively increasing The intensity of string bear external force, it is possible to reduce truss quantity and amount of deflection, makes Bailey beam uniform force, and damper can effectively increase The durability of bridge.
Brief description of the drawings
Fig. 1 is a kind of structural representation of Cast-in-situ Beam falsework for soft base matter of the utility model.
Fig. 2 is a kind of structural representation of the side of Cast-in-situ Beam falsework for soft base matter of the utility model.
In accompanying drawing marked as:1 is Cast-in-situ Beam, and 2 is Bailey beam, and 3 is PHC pile tubes, and 4 is bracket, and 5 is fixed plate, and 6 is diagonal brace Bar, 7 is supported rod erecting, and 8 is damper, and 9 is tray support, and 10 is total sub-semigroup, and 11 is sandbox, and 12 is transverse distribution Beam, 13 is pull bar, and 14 is connecting seat, and 15 is support rail.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description:
As shown in Fig. 1~Fig. 2, a kind of Cast-in-situ Beam falsework for soft base matter, including Bailey beam 2, pushed up positioned at Bailey beam 2 The Cast-in-situ Beam 1 and total sub-semigroup 10 at end, the bottom vertical runs of the Bailey beam 2 have PHC pile tubes 3, Bailey beam 2 and PHC Sandbox 11 is set between pile tube 3, transverse distribution beam 12 is fixed between sandbox 11 and Bailey beam 2, the upper end of PHC pile tubes 3 Forward and backward side is set up in parallel bracket 4 more than two, and the bracket 4 of the forward and backward side is in mirror image, and bracket 4 is trapezoidal, support Be respectively provided with flanging on the edge of frame 4, the bottom of bracket 4 sets fixed plate 5, the fixed plate 5 and the upper end of PHC pile tubes 3 it is pre- Box out and be fixedly connected, it is arranged side by side on same side through there is pull bar 13 between the bracket 4 on forward and backward side Tray support 9 is set between bracket 4, and tray support 9 includes four transverse reinforced bars and two middle studdles, described four The combination of root transverse reinforced bar is in " mouth " font, and two middle studdles are in " X " font, and middle studdle is located at transverse reinforced bar Inside, the upper end of the inner side of PHC pile tubes 3 is laid with damper 8, and damper 8 is viscous damper, is divided between adjacent PHC pile tubes 3 Not She Zhi hound 6, supported rod erecting 7 and support rail 15, the supported rod erecting 7 is disposed longitudinally on the lower end of Bailey beam 2, adjacent The bottom of supported rod erecting 7 be fixed with support rail 15, one end of hound 6 is fixed in Bailey beam 2, and the other end is fixed on branch On the side wall of support vertical rod 7 bottom, the bottom of hound 6 sets connecting seat 14, and connecting seat 14 and damper 8 are attached, diagonal brace Bar 6, supported rod erecting 7, pull bar 13 and support rail 15 are screw-thread steel.
The embodiment of the above, simply preferred embodiment of the present utility model not limits the utility model reality Apply scope, therefore the equivalent change or modification that all constructions according to described in the utility model the scope of the claims, feature and principle are done, all should It is included in present utility model application the scope of the claims.

Claims (5)

1. a kind of Cast-in-situ Beam falsework for soft base matter, including Bailey beam(2), positioned at Bailey beam(2)The Cast-in-situ Beam on top(1) And total sub-semigroup(10), it is characterised in that the Bailey beam(2)Bottom vertical runs have PHC pile tubes(3), Bailey beam (2)With PHC pile tubes(3)Between sandbox is set(11), the PHC pile tubes(3)The forward and backward side of upper end be set up in parallel two groups with On bracket(4), the bracket of the forward and backward side(4)In mirror image, bracket(4)It is trapezoidal, bracket(4)Edge on set respectively Put flanging, bracket(4)Bottom set fixed plate(5), the fixed plate(5)With PHC pile tubes(3)The preformed hole of upper end is consolidated Fixed connection, the bracket on forward and backward side(4)Between through there is pull bar(13), the bracket arranged side by side on same side(4) Between tray support is set(9), PHC pile tubes(3)The upper end of inner side is laid with damper(8), adjacent PHC pile tubes(3)It Between be respectively provided with hound(6), supported rod erecting(7)And support rail(15), the supported rod erecting(7)It is disposed longitudinally on Bailey beam (2)Lower end, adjacent supported rod erecting(7)Bottom be fixed with support rail(15), hound(6)One end be fixed on Bei Lei Beam(2)On, the other end is fixed on supported rod erecting(7)On the side wall of bottom, hound(6)Bottom set connecting seat(14), even Joint chair(14)And damper(8)It is attached.
2. a kind of Cast-in-situ Beam falsework for soft base matter according to claim 1, it is characterised in that the sandbox(11) And Bailey beam(2)Between be fixed with transverse distribution beam(12).
3. a kind of Cast-in-situ Beam falsework for soft base matter according to claim 1, it is characterised in that the bracket support Part(9)Including four transverse reinforced bars and two middle studdles, four transverse reinforced bars combination is in " mouth " font, two Middle studdle is in " X " font, and middle studdle is located at the inside of transverse reinforced bar.
4. a kind of Cast-in-situ Beam falsework for soft base matter according to claim 1, it is characterised in that the damper (8)It is viscous damper.
5. a kind of Cast-in-situ Beam falsework for soft base matter according to claim 1, it is characterised in that the hound (6), supported rod erecting(7), pull bar(13)And support rail(15)It is screw-thread steel.
CN201621358458.5U 2016-12-12 2016-12-12 A kind of Cast-in-situ Beam falsework for soft base matter Expired - Fee Related CN206308623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621358458.5U CN206308623U (en) 2016-12-12 2016-12-12 A kind of Cast-in-situ Beam falsework for soft base matter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621358458.5U CN206308623U (en) 2016-12-12 2016-12-12 A kind of Cast-in-situ Beam falsework for soft base matter

Publications (1)

Publication Number Publication Date
CN206308623U true CN206308623U (en) 2017-07-07

Family

ID=59251374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621358458.5U Expired - Fee Related CN206308623U (en) 2016-12-12 2016-12-12 A kind of Cast-in-situ Beam falsework for soft base matter

Country Status (1)

Country Link
CN (1) CN206308623U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972621A (en) * 2019-04-22 2019-07-05 中建三局基础设施建设投资有限公司 A kind of pile pulling device and its construction method for small headroom phytal zone steel-pipe pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972621A (en) * 2019-04-22 2019-07-05 中建三局基础设施建设投资有限公司 A kind of pile pulling device and its construction method for small headroom phytal zone steel-pipe pile
CN109972621B (en) * 2019-04-22 2024-03-26 中建三局基础设施建设投资有限公司 Pile pulling device for steel pipe pile in small-clearance shallow water area and construction method of pile pulling device

Similar Documents

Publication Publication Date Title
CN105568866B (en) Across the large-span steel box beam push construction method of existing road
CN101935986B (en) Overwater large-span steel tube pile cast-in-situ trestle and building method thereof
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN108004928A (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN107435335A (en) Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam
CN201762663U (en) Reinforced concrete superposed beam wing board support
CN103321151A (en) Key construction technology for large-span continuous box beam to cross existing railway bracket
CN105113539B (en) Combined multi-functional diaphram wall Core Walls Structure and its construction method in a kind of contrary sequence method
CN211472143U (en) Pier steel form
CN210659228U (en) Movable single-side formwork system for subway construction
CN206308623U (en) A kind of Cast-in-situ Beam falsework for soft base matter
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN102733307A (en) Method for constructing cast-in-place beam falsework
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN107227741B (en) Basement supporting construction
CN103603357A (en) Multi-platform inner-support-free self-waterproof foundation pit retaining structure and construction method thereof
CN205100527U (en) A cantilever construction platform for surmounting retaining wall
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN205296206U (en) Tower cane foundation
CN206359894U (en) Naked rock geology combined type cast-in-place box beam bracket system in a kind of water
CN103981810A (en) Steel tube arch main arch splicing and supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20181212

CF01 Termination of patent right due to non-payment of annual fee